Loading...
17-100355low 10, A D.0 I h A h7q g i A R � D Aq RECEIVED MAR 13 2017 To: Cole Elliott, City of Federal Way Re: Permit #17-100355-00-AD; Change of Use Analysis We appreciate the work that was done to complete the referenced Change of Use for the property at 35100 Pacific Highway South. Ed McManamna, the Architect for South King Fire& Rescue (SKF&R) contacted you on or about March 1, 2017, by phone regarding the intended use of this property. We want to add more information for you to consider in the analysis of this Change of Use Permit. SKF&R intends to utilize portions of both buildings for maintenance operation and that no exterior maintenance activities are anticipated. The Maintenance bay floor drains would discharge to oil/water separators and then out to sanitary sewer. The only exterior activities anticipated would be vehicle parking as is currently allowed on the site. In the future, should SKF&R make permit required exterior to include additional storm water improvements. a ffil, I Deputy Chief South King Fire & Rescue 3 16 17 1st AVENUE SOUTH - FEDERAL WAY, WASHINGTON 98003-520) Seattle. 253/839-6234 Tacoma. 253/927-3118 Lax. 253/529- 7204 An Equal Opporlunity Employer FILE Cl" OF F6dera I VV�y Deputy Dave Mataftin IQ& •"I• Iff-71INKIKIM, AE - Permit #17-100355-00-AD; CHANGE OF USE ANALYSIS South Mug Fire & Rescue, 35100 Pacific Hwy South, Federal Way CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway. com Jim Ferrell, Mayor I ceipt oT yoll TTJ-t1T'M- iul 1117 SIS U1 ­1 .11 Ly. I subject property consists of two tax parcels, 202104-9148 and 202104-9059. The request is to locate a fire district maintenance shop and admin office within the existing development. As proposed, the administrative office, vehicle maintenance, fueling station, and storage facilities will serve the Fire District's current operational needs and a future fire station is anticipated at a later date. ZONING COMPLIANCE REVIEW Federal Way Revised Code (FWRQ 19.15.025 addresses a change of use at a developed site as follows: 19.15.025 Zoning and use review processfor new tenants — Change of use at a developed site. The purpose of this section is to review and determine compliance with applicable zoning and development code requirements when a new use is proposed to occuy an existing building or site. When a land use changesftom one use catego�y in the zoning charts to another use category, a zoning compliance review shall be pe7formed as part of the use process review, when re, e_d or in coniunction with the re4uired ation andlor buildinffijerinit review. Each paragraph in a zoning chart is a use category. If the new use is in the same use category as anyprevious legal use of the site, no zoning compliance review is required. TY10 an equipment rental facility and contractor's yard/equipment storage facility pursuant to FWRC 19.240.050 and 19.240.020, respectively. A new use is proposed to occupy the site and is permitted determine compliance with the use zone chart standards that directly relate to the new use. Use -Specific Regulations and Notes — The subject property must be designed so that truck parking, lo areas; areas where noise i eneratin i out oor uses and activities in occur;and verns anci similar teatures are 1QUULUU US 1aF US PUS6111r, I 1 (1111 allY LeSIGOuLla"I"10 use, natural system, and public rights -of -way. No changes to the existing building or outdoor storage area are proposed. The location of the outdoor I., 2 -q f2 r 2.­s; *-u, A!e -iidtt-sf-way. There are no residential zones or uses nearby. klAun_ �a= E Parking — Parking requirements for government facilities is determined on a case -by -case basis. No more than ten employees will work at this site. The general public will not visit the site except on occasion where a small group would need to meet for fire department business. The existing 30 parking stalls on site are sufficient. Therefore, the Change of Use does not trigger any additional parking requirements. Deputy Mataftin March I . 2017 Page 2 Setbacks — Required minimurn setbacks for the proposed use in the CE zone are 20 ft. front, 10 ft. side, and 10 ft. rear. The existing building on the site meets the setback requirements. Parking areas and driveways inay be located within required setback; however, all outdoor storage area iteirts must comply with required setbacks noted above. LAND USE REVIEW PROCESS The proposed new fire station will require additional land use review if a new building, addition, or site modifications are proposed. Per FWRC 19.15.030, Review process for improvements and additions to developed site, improvements and/or additions to existing developed sites are subject to land use review processes as follows: I . Minor improvements, modifications and additions. Minor improvements, modifications and additions to a site such as parking lot and landscape area modifications and improvements, and/or ID additions to an existing developed site that are exempt from SEPA shall be processed using Process 1, provided the improvements and/or additions do not exceed either of the following thresholds: a. Twenty-five percent of the gross floor area of the existing use; or b. Two thousand square feet of new gross floor area. Z. Substantial improvements. Improvements and/or additions to an existing developed site that are exempt from SEA and exceed the thresholds in subsection (1) of this section, but do not exceed 100 percent of the square footage of the gross floor area of the existing use, shall be reviewed using Process II. At the time a new fire station is proposed, feel free to contact me to discuss the exact review process that will be required. IT U*11S L4. any cr=11, . _ , , Ily — 111K�� '71/111 fCtUlre a . OLTIUary Line Adjustment to be completed before a building permit can be issued. InIFTNUTY M2 s4Ekg� Ml!kc ougAt�PIMEgM6 Change in Use will require an update of the stormwater system to meet the most recent King County Surface Water Design Manual (KCSWDM) standards in accordance with FWRC 19.3 0.120. I.f. The improvements must be designed to meet Conservation Flow Control and Enhanced Basic Water Quality treatment standards. Not enough information is provided for staff to determine if the site meets the most recent KCSWDM. If the site does not meet the 2016 KCSWDM and improvements are required, the applicant will be required to submit an Engineering (EN) pen -nit application to the City for review and approval. For more infon-nation please contact Development Services Manager Cole Elliott at 253-835-2730 or cole.elliott@cityoffederalway.com. Lraffic The proposed change of use is expected to generate additional p.m. trips. As such, a concurrency pen -nit application and $4,650 application fee is required for this change of use. 17-100355-00-AD Doc, LD 7596 Deputy 'Mataffin March 1, 2017 Page 3 Also, it appears that the applicant will be required to pay a traffic impact fee as well. Prior to occupying the site the above -mentioned fees must be paid to the Permit Center. Please contact Senior Transportation Planning Engineer Sarady Long at 253-835-2743 or sarady.long@cityoffederalway.com if you have any questions. Bt Building has no comments on the Change of Use. Any tenant improvement/addition related to this building will require submittal of a building permit application to the Pen -nit Center. For infortnation regarding building permit application process please contact the Permit Center at 253-835-2607 or permitcenter@cityoffederalway.coi-n. Lakehaven trUIRL,* District Lakehaven has no comment on the proposed Change of Use action, as based on the submittal it appears no existing /or future Lakehaven water or sewer system facilities will be adversely impacted if approved. General All Lakehaven Development Engineering related application forms, and associated standards information, can be accessed at Lakehaven's Development Engineering web pages All comments herein are valid for one (1) year arid are based on the proposal(s) submitted and v zo Iicies. Akuy change to either the develogment pro�_! �al( ) or Lakehaven's regulations and policies may affect the above comments accordingly. Water - Technical (future fire station/development) A Certificate of Water Availability issued separately by Lakehaven may be required to be submitted with any land use arid/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical. Hydraulic model results (FF #206) indicate that Lakehaven's standard maximum allowable system liquid velocity of 10 ft/s is exceeded at a fire flow rate above 3,000 GPM in this area. This flow figure depicts the calculated perfon-nance of the water distribution system under high demand conditions. Fire flow rates greater than available in the existing distribution systern may be accommodated through water distribution system improvements. Please contact Lakehaven for further detail. The site has two (2) existing dornestic water service connections (SvcNo 3552 [1.5" meter] & 3553 [2" 1� meter]), and one (1) existing fire -protection service connection (SvcNo 23121, 6"). C� If additional hydraDt/s is/are required or indicated, or if any existing water distribution facilities are required to be relocated, a Lakehaven Developer Extension (DE) Agreement will be required. Additional detail and/or design requirements can be obtained from Lakehaven by completing & cornpleting & submitting a separate application to Lakehaven for either a Developer Pre-Desigir Meeting or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakebaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. RJURNINEMM Deputy Mataftin March 1, 2017 Page 4 To satisfy prernise isolation requirements, the installation & satisfactory testing of an approved backflow prevention assembly (BPA) adjacent to each domestic & irrigation service meter is required pursuant to WAC 246-290-490 & Lakehaven standards regarding premise isolation. As low health cross -connection • . . . . . . . . . . . . . . . . . . . e check valve assembl. IDCVA.), or a reduced yressure backflow assemblv—(RPBA) etector assemblkufl)CDA�, or a reduced pressure detector assembly (RPDA) is required for 3 " & larger fire protection service connections. Contact Lakehaven's Cross -Connection Control Program Manager (Chris Zoepfl, C 253-946-5427) for additional information on premise isolation/BPA installation & testing coordination. Sewer- Technical (future fire station/development) A Certificate of Sewer Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building pen -nit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1-2 work days to issue for typical. A separate Lakehaven Sewer Service Connection Permit is required for each new connection to the sanitary sewer systern or any modification (re -align, abandon, etc.) to an existing sewer service connection, in accordance with standards defined in Lakehaven's current 'Fees and Charges Resolution'. Minimum pipe slope for gravity sewer service connections is 2%. In addition to all other sewer service installation standards, installation of a Type 1, 48 monitoring manhole is typically required on the private building sewer line, for all new or modified non-resideritial connections. Also, installation of an extemally-located oil/water interceptor is required for all new vehicle maintenance/wash facilities, size t* be determined by applicant's engineer. CONCLUSION In summary, the proposed zoning Change of Use for this developed site is acceptable. This letter is not intended to identify all issues, as modifications to the site and its buildings require additional review ivrocesses. includin., but not limited to. land use a-widication and buildina-wiermit review on will __.Also 1i need to obtain a city business license through the City Clerk's Office before occupying the building. If g/ou have any questions regarding this letter, please contact me at 253-835-2641 or becky.chapin@cityoffederalway.coi-n. Sincerely, B e&?y C�Ji ' i i Associate Planner eDC: Concurrency Application Lakehaven Map C Gordy Goodsell, South King Fire & Rescue, Gordon.GoodselI@southkingfire.org Peter Lawrence, Plans Examiner Cole Elliott, Development Services Manager Sarady Long, Senior Transportation Planning Engineer Brian Asbury, Lakehaven Utility District 17-100355-00-AD Doc ID 75396 Becky Chapin From: Goodsell, Gordon Sent: Wednesday, February 08,2O178:I]AK6 To: Becky Chapin Cc: P|um|ee' Ed Subject: FV: Change of useappUcadon35IUOPHS Here is the data that I requested from our fleet and facilities division. Please let me know if additional information is needed. Thank you Gordy From: PlumleeEd Sent: Wednesday, FebruaryD8, 30178:54AM To: Goodsell, Gordon; Boe,Lence Cc: Mataftin, Dave Subject: RE: Change of use application 35100 PHS Hello D[Gordy. Can you relay the following to Becky making sure this meets her needs for the Change of Use planning to move forward? South King Fire & Rescue will have staff at the 35100 PHS Property of no more than six toten employees. There are 30 +- parking stalls onthe parcels Most ofthe work atthe property isfor repairing fire apparatus and storage for the facilities division along with storage space for other fire department items. The general public will not as a rule visit this t i h U group There vxiUbe property except onoccasmnsvv where �rmu . delivery trucks on site from time to time to provide parts for the shop and other equipment deliveries. VVewould like to keep the parking spaces ayisfor now. With regards, Fro Ed P|um|ee Assistant Chief South King Fire &Rescue CeU2S3-347-1SS7 From: Goodsell, Gordon Sent: Wednesday, February O1,2O171:4OPM To: 8oe,Lance Cc: Metaftin, Dave; P|unmlee, Ed Subject: Change of use application 35100 PHS FI Lance, Becky, our assigned planner onthis application asked mefor additional detail related tnparking. The number ofon-site parking and the anticipated need for our proposed use is needed for her review. Some of the parking appears to be striped and designated and other areas appear to be open. I told Becky that the site would not be frequented by visitors beyond parts vendors and fire department employees. A parking study isn't needed —just count up the spots and calculate what you expect the demand to be. Please reply here with the numbers and I will get it to Becky. Gordon Goodsell Fire Marshal / Deputy Chief South King Fire &Rescue 253.946.7241 This email was scanned by Bitdefender CITY OF FEDERAL WAY 919112 11116AINM 10 11 DATE: January 26, 2017 TO: Cole Elliott, Development Services Manager Peter Lawrence, Plans Examiner Brian Asbury, Lakehaven Utility District Rick Perez, City Traffic Engineer FROM. Becky Chapin, Associate Planner FOR DRC MTG. ON.• Please email any comments/concerns with proposed change of use. .......... FILE NUMBER(s): 17-100355-00-AD RELATED FILE NOS.: None PROJECTNAME: South King Fire & Rescue Office/Maintenance Bldg. PROJECTADDRESS: 35100 Pacific Hwy South PROJECT DESCRIPTION, Change of Use Analysis to allow for offices, storage and maintenance facilities. LAND USE PERMITS: Administrative Decision, Change of Use Analysis 5T'7nT77MW0j5 �10 SKF&R 31617 l't Avenue South Federal Way, WA 98003 MA TERLILS SUBMITTED: • Request for Change of Use Analysis • Aerial Photos • Proposed Plans s viDREQUEST FOR CHANGE OF UsF, ANALYsis MY OF DEPARTNIEtff OF CoNtImuNiTY DEVELOPMEW 33325 8'5 Avenue South Federal Way j,4 federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 i"A" t .cityoffederalway.com FILE NUMBER Date 1 /23/16 Applicant K"Is PRTUARY PHONE Deputy Chief Dave Mataftin 253-347-1557 B1J8 ALTERNATE PRONE South King Fire and Rescue IIAHMG ADDPY-IM E49AM 31617 1st Avenue South d ave. matafti n @south ki ngfi re.org cm BTATE zrn PAX Federal Way WA 98003 Site Address: 35100 Pacific Highway S. and 1351 S 351 st St., Federal Way, WA 98003 Parcel 4: 2021049148 and 2021049059 Pronosed Use: Admi�.gi�strative-offiqeayehicle maintenancefueling station, and storage facilities to serve the fire district's operational needs. A future fire station is also anticipated on the site. Curren t/Previons Uses: Office, sjorage,, and maintenance facilities related to previous equipment rental tenant and drilling contractor, ProT,osed Modifications to Site or Buildino Exterior: None anticigated at this time other than maintenance or cosmetic work. Bulletin #168 - October 5,2015 Page 1 of I k:\Handouts\Change of Use Analysis Form