18-103180CITY OF
Fedciftmi Vft
Centered on Opportunity
�_, i'; iZll
Robert Kim
34911 57h Avenue
Auburn, WA 98001
RE: Permit #18-103180-00-A11;
My Life - Units D and F, 30315 Pacific Hwy S, Federal Way
xr p! s
h -7 xq q,-
M,i
LL j
33325 8th Avenue South,
Federal Way, WA 98003-6325
(253) 835-7000
wwwcityoffederalway.com
Jim Ferrell, Mayor
I've receivecitne cnange or Tse I — ?_1V1yV__erVV
store and smoke shop to limited manufacturing and retail store. A review of the submitted materials
identifies the following items were to be reviewed in order to issue a department response to the change
of use zoning compliance.
ALLOWED USES
Federal Way Revised Code (FVTRC) 19.15.025 addresses a change of use at a developed site as follows:
Any new use shall comply with only those standards of the use zoning charts that are directly
related to the new use as determined by the director. Examples include parking, use -specific
setbacks, use -specific special regulations and notes, and nonconforming surface water quality
Jrnjw; %nYow-ztoed in FWRC 19.30.120. Other noncon(jorming Lhe site which are
not made nonconforming as a result of the change of use are not required to be brought into
conformance as a result of this subsection.
The property at the address above is zoned Community Business (BC). As outlined in the business mod
provided, the proposed uses are light manufacturing and retail sales. Pursuant to (FWRC) 19.220.010
both uses are allowed in this zone. I
PARKING
As shown in the site plan, the entire shopping center is allotted 131 parking spaces. FVvRC 19.220.010
states that for light manufacturing spaces, there shall be one parking space for every 1,000 square feet of
gross floor area and for retail sales spaces, there shall be one parking space for every 300 square feet of
gross floor area. With this change of use, the parking requirement for the two units in question is reduced.
Since the proposed change of use will lead to a lesser minimum parking requirement from the prior uses
and no parking spots will be taken away, the provided parking is adequate for the change of use.
CONCLUSION
The proposed zoning change of use for this developed site is hereby approved. This letter is not intend
to identify all issues, as modifications to the building require additional review processes, including, bui
not limited to, building permit review. Also, you will need to obtain a city business license through the
contact me at 253-835-2622 or riley.bushnell@cityoffederalway.comr, pleas
Mr. Kim
August 20, 2018
Page 2
IMIM,
RBushnell
Planning Intern
enc: Approved Resubmitted Site Plan
IS- 103 1 80-00-AD Doc ID, 78108
CITY OF
-1 Fbaeml Afty
JUL 19 2018 33325 84h Avenue South
Federal Way, WA 98003-6325
CITY OF' FEDERAL OVA Y 253-835-2607; Fax 253-835-2609
COMMUNrrY DEVELOPMENT wwwxftvoffedeEgAay�
FILE g____ AD DATE
For zoning questions please contact Planning at 253-835-2655, or For questions
about submittal requirements please contact the Permit Center at 253-835-2607, or
Use this checklist to help gather all of the required information and documents in order to submit a complete change
of use application for a project involving a new commercial tenant in an existing building pursuant to Federal Way
Revised Code (FWRC) 19.15.025. Please note, incomplete applications will not be accepted.
Site Address (incl. Suite/Unit #):
< f I
Proposed Use(s):_14�!AgW ^'wl _& feii
7
New Gross Floor Area:
Current/Previous Use(s): 'ok <-,40 V
_. / 771---
Existing Gross or -a:
Proposed Modifications to Site or Building Exterior:
For Staff Use
Zoning Setbacks
Use -Specific Notes/Regulations
Surface Water
Building permit required? Yes[] No 0 V J
Change of occupancy? Yes[] No 0
Traffic impact fee required? Yes[] No 0
C>
3 4 91'1 -Al W,1 IP-
Bulletin #068- May 31, 2018
Page 1 of 2 o ando ing ComplHance Review - Chat
u67D
mil
~
Business Model:
L Retail stone: Sell products towalk in customers
2. OnUne': Sell products on|ir�evia Amazon,.Bbay, and other online retailer
' l 'Site Plan attached
Manufacturing Process:
. .
` i Purchase qƒRaw Motericl�
' 1. To start our process, the company will find and purchase raw materials (American
Ginseng, Blueberry, Acai Berry, exc) from external vendors. The raw material comes in
the form ofpowder.
�
ii Filling Raw Materials /nCapsules
1. Once we obtain the raw material, it will be filled into empty capsules.
a. |tisa¢this step inthe process weplan touse amachine called the ProfUer
3700 (Attached in the link is the details of the machine and a video that walks
through how the machine opecytea): .
°
~
iii Bottling Capsules
a. When enough capsules are created/filled, an employee will fiU the apwophate
amount of capsules into ea� empty bottle.
h. VVhenthe botdeshave theappropriate amount ufcapsules, it isclosed and sealed. _
VVeplan toseal the bottles manually using heating guns. ^
iv. Labeling the Bottles -
1. We will then label the bottles. This is also a manual process.
u Once the bottles are labeled, the process bcomplete and ready todisplay ntour retail store o/
ship to online customers.
The Machines: �
The machine to be used in the manufacturing process is for the filling of the capsules.
l.The machine lsnot large insize.
2.|1ioasemi-automatic machine that does not utilize electricity oroil.
3. The machine is not loud and will not disrupt the residential area when it is used.
I 'ours of Operation:
If you have any other questions around the business or manufacturing process, please email us
back or call us a'. 253-332-1666 (Robert Kim, Company President).
RECEENED