23-102847City of Federal Way
Community Development Dept,
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FERGUSON
Project Address: 29618 2ND AVE SW
Project Description: Panel Upgrade and 2 new circuits
Electrical
Permit #:23-102847-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 513730 0110
Owner
Applicant
Contractor
TARA FERGUSON
AMANDA MOOREFULLER ELECTRIC INC
FULLER ELECTRIC (EL 01)
29618 2ND AVE SW
1220 S 356TH ST SUITE A-5
FULLEEI027BK (1/12/24)
FEDERAL WAY WA 98023
FEDERAL WAY WA 98003
37107 12TH AVE S SUITE A-5
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 1 Hot Tub 1
PERMIT EXPIRES Tuesday, 28 November, 2023
Permit Issued on Thursday, June 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0Date:
n � )4YT'1
_N�
CR.Y or
Federal Way
THIS CARD IS TO REALUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections nix; be failed if this card is not on -site. DO NOT LOSE THUS C-A-RD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_
ELECTRICAL
❑
LIFER Ground (4295)
0
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
PooI Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
pproved
By
Date
-By
Date
By
Date
❑
FeederslSub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
Bv-
Date
Bv
Date
0 Final - Electrical (4055)
Approved
By
Date 4
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
Bv-
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date