23-102628City of Federal Way
Community Development Dept.
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name
Project Address
Project Description
MEYER
1030 S 295TH PL
FILE
Mechanical
Permit #:23-102628-00-ME
Inspection Request Line: (253) 835-3050
Remove and replace existing furnace and air conditioner.
Parcel Number: 515180 0075
Owner
Applicant
Contractor
LYNN MEYER
DAVID KALLANDERRANGER HEATING
RANGER HEATING & COOLING LLC
1030 S 295TH PL
& COOLING
(GENERAL 01)
FEDERAL WAY WA 98003
5013 PACIFIC HWY E SUITE 11
RANGEHC9050M (9/20/24)
TACOMA WA 98424
2010 48TH AVE E
FIFE WA 98424
Mechanical Work Valuation?
Additional Permit Information
., 15000 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures
Air Conditioners - Stand Alonf 1 Furnaces
1
PERMIT EXPIRES Tuesday, 14 November, 2023
Permit Issued on Thursday, May 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wa4hin ton and the City of Federal Way.
Owner or agent: Date:
A:
c7rr of f --.'k
Federal Way
THIS CARD IS TO REALAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2�3) S35-3050
Scheduled inspections ma.; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be co%: Bred until it is approved. Check with your inspector if
you are unsure about anv of the inspections or the inspection sequence- On -going inspections are loosed on the back of this, card.
ELECTRICAL
®
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Pool Bonding (4195)
❑
Temporary- Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
Final - Electrical (4055)
Approved
B}
Date
MECHANICAL
❑ Mechanical Rough -in (4165)
Q Gas Piping (4125)
0 Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By / - Date6 ` 66 w/ ';
PLUMBING
El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date BY Date