Loading...
RES 23-843 - Adopting Extended TIP for 2024-29RESOLUTION NO. 23-843 A RESOLUTION of the City of Federal Way, Washington, adopting an extended and revised Transportation Improvement Program for 2024- 29, and directing the same to be filed with the Washington State Secretary of Transportation and the Transportation Improvement Board. (Amending Resolution Nos. 91-67, 92-117, 93-155, 94-186, 95- 210, 96-236, 97-258, 98-273, 99-299, 00-316, 01-343, 02-365, 03-391, 04- 433, 05-451, 06-481, 07-503, 08-732, 09-550, 10-558, 11-609, 12-622, 13- 640, 14-666, 15-692, 16-706,17-721, 18-733, 18-738, 19-761, 20-792, 20- 802, 21-811, and 22-830). WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the Federal Way City Council adopted an original Transportation Improvement Program ("TIP") on July 23, 1991 (Resolution No. 91-67); and WHEREAS, the Federal Way City Council updated a TIP annually thereafter; and WHEREAS, the Federal Way City Council held a public hearing on the TIP on June 20, 2023, in compliance with the requirements of State laws; and WHEREAS, the City Council has determined current and future City street and arterial needs, and based upon these findings has prepared a revised and extended TIP for the ensuing six calendar years; and WHEREAS, pursuant to Chapters 35.77 and 47.26 RCW, the City Council is required annually to revise and adopt an extended TIP; and WHEREAS, the City's SEPA Responsible Official has adopted the Determination of Non - Significance ("DNS"), Federal Way File 23-101915-00-SE, issued for the City's 2024-29 TIP, which includes the extended and revised projects contained in the TIP adopted herein; and Resolution No. 23-843 Page I of 5 WHEREAS, adoption of the City's 2024-29 TIP DNS reflects the fact that there will be no significant adverse environmental impacts as a result of adoption or implementation of the extended and revised TIP adopted herein. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, RESOLVES AS FOLLOWS: Section 1. Program Adopted. The extended and revised Transportation Improvement Program for the City of Federal Way, copies of which are attached hereto as Exhibits A and B and incorporated herein by this reference, which sets forth the City's transportation project locations, types of improvements, and the estimated costs thereof, is hereby approved and adopted for the ensuing six (6) calendar years (2024-29 inclusive). Section 2. Filing ogram. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this Resolution, together with Exhibits A and B, with the Washington State Secretary of Transportation and the Washington State Transportation Improvement Board. Section 3. Severability. If any section, sentence, clause or phrase of this resolution should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause, or phrase of this resolution. Section 4. Corrections. The City Clerk and the codifiers of this resolution are authorized to make necessary corrections to this resolution including, but not limited to, the correction of scrivener/clerical errors, references, resolution numbering, section/subsection numbers and any Resolution No. 23-843 Page 2 of 5 references thereto. Section 5. Ratification. Any act consistent with the authority and prior to the effective date of this resolution is hereby ratified and affirmed. Section 6. Effective Date. This resolution shall be effective immediately upon passage by the Federal Way City Council. RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON this 20th day of June, 2023. CITY OF FEDERAL WAY: J�,► FERRELL, MAYOR ATTEST: � W-Mwj- &S�A SW-PI4ANIE COURTNEY, CMC C Y CLERK APPROVED AS TO FORM: A-Ia'r'A� - J. YAN CALL, CITY ATTORNEY FILED WITH THE CITY CLERK: 06/14/2023 PASSED BY THE CITY COUNCIL: 06/20/2023 RESOLUTION NO.: 23-843 Resolution No. 23-843 Page 3 of'S Exhibit A CITY OF FEDERAL WAY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) - 2024 TO 2029 Map ROADWAY CAPITAL PROJECTS Year 2023 Costs in $ thousands ID** Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total 1a City Center Access Phase 1 - Environmental Update environmental documentation for modified access at S 320th St & S 324th St 4,422 300 4,722 1 b City Center Access Phase 2 - SB Ramps Construct all SB 1-5 ramps, extend S 324th Street from 23rd Ave S to 1-5 6,000 24,000 10,490 20,000 22,560 22,560 105,610 2 SR 99 @ S 373rd St Install roundabout, median control 20 400 525 2,100 2,100 5,145 3 SW 320th St @ 47th Ave SW Install traffic signal 637 637 4 S 312th St @ 28th Ave S Add SB right -turn lane or construct roundabout 809 809 5 SW 340th St: 37th Ave SW - City Limits Widen to 5 lanes 310 420 525 2,308 3,563 6 21 st Ave S @ S 320th St Install traffic signal 112 1,047 1,159 7 S 320th St & 1st Ave S Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316th St or Alternatlive Measure 569 10,376 10,945 8 S 348th St: 9th Ave S - SR 99 Overlay 15 95 1,076 1,186 9 16th Ave S: S 344th St - S 348th St Add SB auxiliary lane 4201 1,678 4,306 6,404 10 Citywide Implement Adaptive Traffic Control System Phases I & 11 2,693 300 2,993 11 Citywide Install variable lane use control signs 466 516 100 1,082 12 Military Rd S @ S Star Lake Rd Add EB right -turn lane, sidewalk 220 1,049 1,269 13 SR 509 @ SW 301st St Install compact roundabout 157 734 891 14 Citywide Implement Adaptive Traffic Control System Phase 111 700 105 805 15 SR 509 @ 47th Ave SW Install compact roundabout 1,110 130 1,240 16 SW 340th St: 31st Ave SW - 37th Ave SW Widen to 5 lanes 525 1,570 4,200 6,295 17 Citywide Annual overlays 3,150 3,150 3,150 3,150 3,150 3,150 3,150 22,050 18 SR 509 @ 4th Ave S Install compact roundabout 210 840 1,050 19 City Center Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades 875 875 20 Citywide Adaptive Traffic Control System Phase IV; 1 st Ave S 787 787 21 Citywide Adaptive Traffic Control System Phase V; 21st Ave SW & SW Campus Dr 1259 1,259 22 Military Rd S: S 320th St - SR 18 Overlay 50 1260 1,310 23 S 356th St: 1st Ave S - SR 99 Widen to 5 lanes, bike lanes, sidewalks 315 315 3150 3150 14050 20,980 24 Citywide Street Vegetation Management 200 200 200 200 200 200 200 1,400 25 SW 344th St @ 27th Ave SW Construct compact roundabout 50 110 585 745 26 Citywide High Friction Surface Treatments 383 3640 4,023 27 S 320th St: 1 st Ave S - SR 99 Overlay 50 3100 3,150 28 S 324th St: 11th PI S - SR 99 Overlay 50 840 890 Subtotal Roadway Capital Projects 10,3051 6,598 14,203 36,153 23,917 39,760 32,740 41,535 205,211 Map NON -MOTORIZED CAPITAL PROJECTS Year 2023 Costs in $ thousands ID Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total 29 SW King County Regional Trail Plan Plan to connect trails to adjacent cities 100 200 300 30 1 st Ave S: S 292nd St - S 312th St Shoulder improvements 3,950 3,950 31 Citywide ADA Retrofits 420 420 420 420 420 420 420 2,940 32 Citywide Pedestrian Safety Install mid -block crossing treatments or other pedestrian improvements 1,231 168 168 168 168 335 335 335 2,908 33 Citywide Pedestrian Safety System Improvements Install mid -block crossing treatments 160 1,080 1,240 34 Citywide RRFB Upgrades Replace median -mounted RRFB's with mast arm mountings 140 690 830 35 SR 509: SW 312th St - 21 st Ave SW Install sidewalk and streetlights on south side 200 1,300 1,500 36 Federal Way Transit Center Pedestrian Access Improvements 100 900 1,000 37 S 312th St: Steel Lake Park - 28th Ave S Install sidewalk and streetlights on south side 100 650 750 38 City Center Access - BPA Trail Extension Construct multi -use path between Celebration Park and Federal Way Transit Center 630 1,049 1,049 4,300 7,028 39a Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St) Construct multi -use path 200 262 944 2188 7,350 10,944 39b Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St) Construct multi -use path 300 1,993 2,293 40 S 314th St: PVR Wy S - 23rd Ave S Add sidewalks and street lights 175 131 131 1,678 1,365 3,480 41a S 288th St: Military Rd S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 105 944 1,049 41 b S 288th St: 16th Ave S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 100 104 104 2,308 2,616 42 FWHS - City Center Greenway: S 308th St / 20th Ave S Greenway improvements 104 420 524 43 Citywide Local Improvement District Non -Motorized Improvement Program 315 315 315 315 3151 315 315 2,205 44 S 320th St Grade Separation Conceptual design and feasibility analysis to lower S 320 St in City Center 200 100 300 45 28th Ave S: S 312th St - S 308th Ln Install sidewalk and streetlights on east side of 28th Ave S and south side of S 308th Ln 20 300 500 200 1,020 Subtotal Non -Motorized Capital Projects 2,306 5,478 4,706 7,953 9,083 3,797 7,534 6,020 46,877 TOTAL CAPITAL PROJECT COSTS 1 12,6111 12,0761 18,9091 44,1061 33,0001 43,5571 40,2741 47,5551 252,088 Resolution No. 23-843 Page 4 of 5 Puget Sound Dumas Bay SwDasr 0 Q- co Norths re - hO Pk J •� co \ < •` rn '� d- Commencement Bay p�O'\ I N�A odd J:\complan\Transportation\tip_24_ 9.mxd Is Poverty Bay J � X aN e Lore 39 bVR 7F' 42 145 t7a14 � E Exhibit B i City of Federal Way 2024 - 2029 Transportation Improvement Program Legend • Intersection Improvements City Center Access - Phase 1 City Center Access - Phase 2 Corridor Improvement Non -Motorized Improvement Overlay Improvement Federal Way Transit Center Project #'s 10, 11, 14, 17, 19, 20, 21, 24, 26, 29, 31, 32, 33, 34, & 43 are City Wide projects and are not called out on the map Original Map Date: March 2023 0 0.5 1 v Miles CITY OF Federal Way Centered on Opportunity This map is accompanied by no warranties, and is simply a graphic representation. No. 23-843 Page 5 of