RES 23-843 - Adopting Extended TIP for 2024-29RESOLUTION NO. 23-843
A RESOLUTION of the City of Federal Way, Washington, adopting an
extended and revised Transportation Improvement Program for 2024-
29, and directing the same to be filed with the Washington State
Secretary of Transportation and the Transportation Improvement
Board. (Amending Resolution Nos. 91-67, 92-117, 93-155, 94-186, 95-
210, 96-236, 97-258, 98-273, 99-299, 00-316, 01-343, 02-365, 03-391, 04-
433, 05-451, 06-481, 07-503, 08-732, 09-550, 10-558, 11-609, 12-622, 13-
640, 14-666, 15-692, 16-706,17-721, 18-733, 18-738, 19-761, 20-792, 20-
802, 21-811, and 22-830).
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the Federal
Way City Council adopted an original Transportation Improvement Program ("TIP") on July 23,
1991 (Resolution No. 91-67); and
WHEREAS, the Federal Way City Council updated a TIP annually thereafter; and
WHEREAS, the Federal Way City Council held a public hearing on the TIP on June 20,
2023, in compliance with the requirements of State laws; and
WHEREAS, the City Council has determined current and future City street and arterial
needs, and based upon these findings has prepared a revised and extended TIP for the ensuing six
calendar years; and
WHEREAS, pursuant to Chapters 35.77 and 47.26 RCW, the City Council is required
annually to revise and adopt an extended TIP; and
WHEREAS, the City's SEPA Responsible Official has adopted the Determination of Non -
Significance ("DNS"), Federal Way File 23-101915-00-SE, issued for the City's 2024-29 TIP, which
includes the extended and revised projects contained in the TIP adopted herein; and
Resolution No. 23-843 Page I of 5
WHEREAS, adoption of the City's 2024-29 TIP DNS reflects the fact that there will be no
significant adverse environmental impacts as a result of adoption or implementation of the extended
and revised TIP adopted herein.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
RESOLVES AS FOLLOWS:
Section 1. Program Adopted. The extended and revised Transportation Improvement
Program for the City of Federal Way, copies of which are attached hereto as Exhibits A and B and
incorporated herein by this reference, which sets forth the City's transportation project locations,
types of improvements, and the estimated costs thereof, is hereby approved and adopted for the
ensuing six (6) calendar years (2024-29 inclusive).
Section 2. Filing ogram. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby
authorized and directed to file a copy of this Resolution, together with Exhibits A and B, with the
Washington State Secretary of Transportation and the Washington State Transportation Improvement
Board.
Section 3. Severability. If any section, sentence, clause or phrase of this resolution should be
held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or
unconstitutionality shall not affect the validity or constitutionality of any other section, sentence,
clause, or phrase of this resolution.
Section 4. Corrections. The City Clerk and the codifiers of this resolution are authorized to
make necessary corrections to this resolution including, but not limited to, the correction of
scrivener/clerical errors, references, resolution numbering, section/subsection numbers and any
Resolution No. 23-843 Page 2 of 5
references thereto.
Section 5. Ratification. Any act consistent with the authority and prior to the effective date of
this resolution is hereby ratified and affirmed.
Section 6. Effective Date. This resolution shall be effective immediately upon passage by the
Federal Way City Council.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON this 20th day of June, 2023.
CITY OF FEDERAL WAY:
J�,► FERRELL, MAYOR
ATTEST:
� W-Mwj- &S�A
SW-PI4ANIE COURTNEY, CMC C
Y CLERK
APPROVED AS TO FORM:
A-Ia'r'A� -
J. YAN CALL, CITY ATTORNEY
FILED WITH THE CITY CLERK: 06/14/2023
PASSED BY THE CITY COUNCIL: 06/20/2023
RESOLUTION NO.: 23-843
Resolution No. 23-843 Page 3 of'S
Exhibit A
CITY OF FEDERAL WAY
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) - 2024 TO 2029
Map
ROADWAY CAPITAL PROJECTS
Year 2023 Costs in $ thousands
ID**
Location
Description
Previous Years
2023
2024
2025
2026
2027
2028
2029
Total
1a
City Center Access Phase 1 - Environmental
Update environmental documentation for modified access at S 320th St & S 324th St
4,422
300
4,722
1 b
City Center Access Phase 2 - SB Ramps
Construct all SB 1-5 ramps, extend S 324th Street from 23rd Ave S to 1-5
6,000
24,000
10,490
20,000
22,560
22,560
105,610
2
SR 99 @ S 373rd St
Install roundabout, median control
20
400
525
2,100
2,100
5,145
3
SW 320th St @ 47th Ave SW
Install traffic signal
637
637
4
S 312th St @ 28th Ave S
Add SB right -turn lane or construct roundabout
809
809
5
SW 340th St: 37th Ave SW - City Limits
Widen to 5 lanes
310
420
525
2,308
3,563
6
21 st Ave S @ S 320th St
Install traffic signal
112
1,047
1,159
7
S 320th St & 1st Ave S
Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316th St or Alternatlive Measure
569
10,376
10,945
8
S 348th St: 9th Ave S - SR 99
Overlay
15
95
1,076
1,186
9
16th Ave S: S 344th St - S 348th St
Add SB auxiliary lane
4201
1,678
4,306
6,404
10
Citywide
Implement Adaptive Traffic Control System Phases I & 11
2,693
300
2,993
11
Citywide
Install variable lane use control signs
466
516
100
1,082
12
Military Rd S @ S Star Lake Rd
Add EB right -turn lane, sidewalk
220
1,049
1,269
13
SR 509 @ SW 301st St
Install compact roundabout
157
734
891
14
Citywide
Implement Adaptive Traffic Control System Phase 111
700
105
805
15
SR 509 @ 47th Ave SW
Install compact roundabout
1,110
130
1,240
16
SW 340th St: 31st Ave SW - 37th Ave SW
Widen to 5 lanes
525
1,570
4,200
6,295
17
Citywide
Annual overlays
3,150
3,150
3,150
3,150
3,150
3,150
3,150
22,050
18
SR 509 @ 4th Ave S
Install compact roundabout
210
840
1,050
19
City Center
Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades
875
875
20
Citywide
Adaptive Traffic Control System Phase IV; 1 st Ave S
787
787
21
Citywide
Adaptive Traffic Control System Phase V; 21st Ave SW & SW Campus Dr
1259
1,259
22
Military Rd S: S 320th St - SR 18
Overlay
50
1260
1,310
23
S 356th St: 1st Ave S - SR 99
Widen to 5 lanes, bike lanes, sidewalks
315
315
3150
3150
14050
20,980
24
Citywide
Street Vegetation Management
200
200
200
200
200
200
200
1,400
25
SW 344th St @ 27th Ave SW
Construct compact roundabout
50
110
585
745
26
Citywide
High Friction Surface Treatments
383
3640
4,023
27
S 320th St: 1 st Ave S - SR 99
Overlay
50
3100
3,150
28
S 324th St: 11th PI S - SR 99
Overlay
50
840
890
Subtotal Roadway Capital Projects
10,3051
6,598
14,203
36,153
23,917
39,760
32,740
41,535
205,211
Map
NON -MOTORIZED
CAPITAL PROJECTS
Year 2023 Costs in $ thousands
ID
Location
Description
Previous Years
2023
2024
2025
2026
2027
2028
2029
Total
29
SW King County Regional Trail Plan
Plan to connect trails to adjacent cities
100
200
300
30
1 st Ave S: S 292nd St - S 312th St
Shoulder improvements
3,950
3,950
31
Citywide
ADA Retrofits
420
420
420
420
420
420
420
2,940
32
Citywide Pedestrian Safety
Install mid -block crossing treatments or other pedestrian improvements
1,231
168
168
168
168
335
335
335
2,908
33
Citywide Pedestrian Safety System Improvements
Install mid -block crossing treatments
160
1,080
1,240
34
Citywide RRFB Upgrades
Replace median -mounted RRFB's with mast arm mountings
140
690
830
35
SR 509: SW 312th St - 21 st Ave SW
Install sidewalk and streetlights on south side
200
1,300
1,500
36
Federal Way Transit Center
Pedestrian Access Improvements
100
900
1,000
37
S 312th St: Steel Lake Park - 28th Ave S
Install sidewalk and streetlights on south side
100
650
750
38
City Center Access - BPA Trail Extension
Construct multi -use path between Celebration Park and Federal Way Transit Center
630
1,049
1,049
4,300
7,028
39a
Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St)
Construct multi -use path
200
262
944
2188
7,350
10,944
39b
Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St)
Construct multi -use path
300
1,993
2,293
40
S 314th St: PVR Wy S - 23rd Ave S
Add sidewalks and street lights
175
131
131
1,678
1,365
3,480
41a
S 288th St: Military Rd S - 34th Ave S
Restripe to 3 lanes with bike lanes, improve pedestrian facilities
105
944
1,049
41 b
S 288th St: 16th Ave S - 34th Ave S
Restripe to 3 lanes with bike lanes, improve pedestrian facilities
100
104
104
2,308
2,616
42
FWHS - City Center Greenway: S 308th St / 20th Ave S
Greenway improvements
104
420
524
43
Citywide
Local Improvement District Non -Motorized Improvement Program
315
315
315
315
3151
315
315
2,205
44
S 320th St Grade Separation
Conceptual design and feasibility analysis to lower S 320 St in City Center
200
100
300
45
28th Ave S: S 312th St - S 308th Ln
Install sidewalk and streetlights on east side of 28th Ave S and south side of S 308th Ln
20
300
500
200
1,020
Subtotal Non -Motorized Capital Projects
2,306
5,478
4,706
7,953
9,083
3,797
7,534
6,020
46,877
TOTAL CAPITAL PROJECT COSTS
1 12,6111
12,0761
18,9091
44,1061
33,0001
43,5571
40,2741
47,5551
252,088
Resolution No. 23-843 Page 4 of 5
Puget Sound
Dumas
Bay
SwDasr
0
Q-
co
Norths re -
hO Pk J •�
co \
< •`
rn '�
d-
Commencement
Bay
p�O'\
I N�A odd
J:\complan\Transportation\tip_24_ 9.mxd
Is
Poverty
Bay
J �
X
aN
e
Lore
39 bVR
7F'
42 145
t7a14 �
E
Exhibit B
i
City of Federal Way
2024 - 2029
Transportation
Improvement
Program
Legend
• Intersection Improvements
City Center Access - Phase 1
City Center Access - Phase 2
Corridor Improvement
Non -Motorized Improvement
Overlay Improvement
Federal Way Transit Center
Project #'s 10, 11, 14, 17, 19, 20, 21, 24, 26,
29, 31, 32, 33, 34, & 43 are City Wide projects
and are not called out on the map
Original Map Date: March 2023
0 0.5 1
v Miles
CITY OF
Federal Way
Centered on Opportunity
This map is accompanied by no warranties,
and is simply a graphic representation.
No. 23-843
Page 5 of