17-105770FILE
CITY OF
Federal Way
rkevival Slavic Baptist Church Email:
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www.cityoffederalway.com
Jim Ferrell, Mayor
Andrey Marcheriko
37515 86'Ave S
Federal Way, WA 98003
RE: File #17-105770-00-AD; LAND USE EXTENSION CONDITIONAL A-PPROVAL
Korean American Calvary Baptist Church, 37515 81h Ave S, Federal Way
0- •
t ,` our December 1, 2017, apj2lication requesting a
IRWIN@ . N
sq. N. cnuren wiln a SPUFLN CUTTL,, I
hereby ganted approval subject to the conditions listed below. !his extension will expire on January 25,
2020, if no further action is taken.
N� 'W 0111
Mr. Marchenko
January 26, 2018
Page 2
and storm drainage design;
end of the expiration period;
(iii) Whether the delayed project is an impediment to other development projects in the
vicinity as a result of traffic concurrency reserved capacity.
Staff Response —Physical conditions in the vicinity of the project have not been
altered; however, the city has adopted new codes and standards that would affect
project layout, storm drainage design, impact fees, and concurrence capacity.
Public Works Department staff has identified specific mitigation to address these
new codes, which are still applicable to this approval letter.
CONDITIONAL APPROVAL
As a condition of approval of the land use extension request, the following Public Works Department
requirement must be met:
The project's original approval was vested to the stormwater design criteria of the 2009 King County
Surface Water Design Manual (KCSWDM). City adoption of the 2016 KCSWDM took effect April
24, 2016. In order to maintain consistency with regulations set forth in the city's National Pollution
Discharge and Elimination System (NPDES) municipal stormwater permit, the applicant will be
required to design all stormwater systems and facilities utilizing the criteria of the 2016 KCSVY'DM.
CLOSING
Should you have any further questions about this letter, please contact Senior Planner Dave Van De
Weghe at david.vandewegyhe� bc-i�tvoffed�eir-al,�va���.coi�n, or 253-835-2638.
Brian Davis
Director of Community Development
c: Spring Vly Montessori Sch, 36605 Pacific Hwy S, Federal Way, WA 98003
Kevin Peterson, Engineering Plans Reviewer
17-105770-00-AD Doc LD 77036
M
For Staff Use
Code Interpretation/Clarifica°on -
No Fee
El
Critical Areas Letter/Analysis/Peer Review -
No Fee (Actual Cost if Applicable)
Request for Extension (Land Use/Plat Approval) -
Check Current Fee Schedule
El
Revisions to Approved Permit -
Check Current Fee Schedule
El
Tree Removal -
No Fee
El
Zoning Compliance Letter
Check Current Fee Schedule
Bulletin #079 — January 4, 2016 Page 1 of 1 k:\Ilandouts\Request for Administrative Decision
. _.34'46'1. 235.00'
SITE PLAN
SCALE: 1 , -40*-0*
Sul:
0 V 40' w
. MW
ARCHITECT:
CML ENGINEERiD
t
ENCINEERS
LANDSCAPE
ARCHITECT:
gAACK
ae
SEPTIC
DESIGNER:
%mce"C'
STRUCTURAL
ENGINEER:
SCOPE OF WORK
iffilrimm���
-Coil
A
. . . . . . . . . . . .
jj�
ACCESSIBUTY CODE MIfT A117.1-2003
uf.v;"* tl;X-,%p
A-3 0490
wam wk powm AS mw OOMPAM IS"
wauwm
WILONG NB= MV *-)SNUCHIS AM ARDS FOR USE A-3)
glee=,
wX 91001011
How PREIVOCO 1 STORIES 3r-T
AULDIVAE MW#4 WA PM FMM 6q 6MO SF
Otaw m wowx go", .2) 1UM SF PER FLOOR (3(M
g4w 24.000 SF PER FLOOR
20,000 SF
wkwaw.
TOTAL AM WW2j &AR
awg F&
3D FT, HOT TO DMEED 55 Ff
18; 8F MUMOMM&
ttk
mi. z m 3 WMA& 3 UN. FEMAM 5 M 4 UIV
NEW BUILDING INSUATION - U AND R VALUES (PRESCRIFTW)
GNSLE ROOF. R-30 (U-0036)
OR" mus:- R-19 (U-MM)
OPAQUE DOM U-0.60
SLAB ON ONE- R-10 (U80.54)
VM QAMQ 1/2INCH ARMK LOW-46 FDO WITH U-055. 9HM-0-45
MWA QLAM 9/2'WITH U-0.7% M=4145
PER WSEC 2006 TABLE 13-1 MR CLAIM ZM I
322104 91 9" So Cor Of S 1/2 Of S@ 114 0 No 1/4 Th W AN S
Of Sub 555.5 Ft Th N* Xg A Fe= 1A To Pt 04 N to Of 50 M W Of � Car
Sd Sub Th E To Sd No Golf Ill S To Bq LM B" A �
Cm Of So 1/4 Of Ni 1/4 Th w on s LA Go skw 265 n To Tpab i
cwtq w 15o Ft Th m pill c La A A ih E iso rt iw s 27o n To
Tpob Lm Co R& — ftUm Tmable EM9 So Ca Of S 1/2 Of So 1,
of N. 1/4 th W Xg S L. Of Sub 55" Ft Th N* Mg A F.. L.
Pt on N in Of SA 520 Ft W Of No C" Sd Sub Th Eto Sd No Car
S To ft; Lm B" At $a Car Of So 1/4 Of No 1/4 Th W 0- S LA
S.bd 265 Pt To TMb Th * 150 R N Pl. E Ln 270 R Th
150 Ft Th S 270 R To tgftTh m Co Rds — Parlivri EwMt
mramiummi
RM
P-114IF-1
NEW 20.276 SF CHURCH, 7.930 SF COVERED SPORTS
COURT AND NEW 120 PARKING STMAS
M "I
Department of Community Development
33325 8th Avenue South
Federal Way, WA 98003-6325
T. 253-835-2607 F: 253-835-2609
RE 37515 8th Ave S, Federal Way, WA 98003
Parcel#: 322104-9091
Applicant: Revival SBC
Dear Reviewer,
Enclosed is Extension Request Letter to extend Master Land Use Permit issues for above
referenced project/property.
We are asking you to extend an existing Master Land Use Permit.
Revival Slavic Baptist Church purchased above referenced property at the end of last October.
We worked hard to move in, at the same time researching on how to proceed with granted
Master Land Use Permit.
Unfortunately, time is flying out and we are really close to the time when Permit may expires.
We are planning to begin use of the the permit in year 2018. Currently we are working with Civil
Engineer regarding the land development plans. Due to existing market condition, all Civil
Engineers are very busy and were unable to complete any plans this year.
Please consider our circumstances and extend Master Land Use Permit for above referenced
project/property.
Kind regards,
Andrey Marchenko
Administrator of RSBC
T. 253-905-9547 E: andmarl@yahoo.com
CITY OF FEDERAL WAY
COMNXJNITY DEVELOPMENT DEPARTMENJ
.19)AU 222OW1W � mil-T's 2 a3w i 1i
DATE: 12/11/2017
TO: Cole Elliott, Development Services Manager
Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer District
Chris Cahan, South King Fire & Rescue
FROM: Dave Van De Weghe, Planning
FOR DRC MTG. ON: No meeting
Email comments/conditions of approval to Dave by
12/29/17
. ................................ ..........
FILE NUMBER(s): 17-105770-00-AD
RELATED FILE NOS.: None
PROJECT NAME: KOREAN AMERICAN CALVARY BAPTIST CHURCH
PROJECT ADDRESS: 37515 8TH AVE S
ZONING DISTRICT: RS 35.9
PROJECT DESCRIPTION: Request to extend land approval 11-105147-00-UP.
LIkITY USE PERMXTS: Administrative Decision
PROJECT CONTACT: ANDREY MARCHENKO, andm�,�a�hoo.coa
MATERIALS SE7BMITTED: Application
Site Plan
UP IV Approval: Staff Report & Hearing Examiner's
Decision