Loading...
11-102110iL a CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway, com RE: FILE #11-102110-00-AD; VILLAGE GREEN INUMORY CARE DisCUSSION FROm2011 Dear Mr. Powell: The following is a recollection of my participation in the Village Green memory care discussion. ere e a an a modification to the approved site plan that had been approved by the Hearing Examiner under Process TV. I was asked to review the original SEPA documents and see if they were adequate to address the proposed changes, and I was to contact Monte at home once the files were transferred from storage. Following file retrieval and review, I met with Monte Powell and his architect Joji Minatogawa on July 1, 2011, regarding the addition of memory care (congregate care) units to that portion of the Village Green Retirement Campus known as Cottages West. The proposal was clared as a two story with partial basement building, approximately 29,000 SF in size, containing single and double occupancy units of memory care with support services. A total of 51 beds were listed on the "Village Green Memory Care squarefeet analysis " dated March 23, 2011. This number may increase up to 60 beds depending on final design. The memory care building would replace four to five of the duplex units approved under the Cottages West site plan on the south side of the property in the vicinity of duplex units #28/ 29/30/31/31/33/34/35 and 36. It was again noted that due to financing needs, the memory care building needs to be on its own parcel without adding any new parcels to the Village Green Campus. ISM, 111111 opollpill 1 1 i Green Campus, and that the approved Cottages West site plan could be modified via an administrative process to eliminate duplex units and replace them with memory care units/beds, consistent with the codes in effect at the time of application. I I also noted that in reviewing the Village Green files, I found that 24 memory care beds had been proposed and approved as a part of the 1998 Phase 1. However, a subsequent modcation to the approved Phase I site vlan changed these units from memonj care units to duplex units. I suUested that it would be appropriate to ask about "credit" for these units in subsequent preapplication conference process. Monte Powell March 28, 2012 Page 2 I said that the zoning land use chart for senior housing in the RS zoning district had not undergone any Chan es since the ori --itt IFA t" -------------- I encouraged contact with the Public Works Traffic division to ascertain if there would be additional traffic mitigation for memory care.111 7g.T=- LIM �,N&TpnVfAp -fok- 00 rg U si I gy! I Rio) I mud uggywalej I IR r*190-SIVAOT21NAVIT i , .' . Sincerely, Deb Barker Senior Planner enc: Preapplication Handout Master Land Use Application c: Heidi P. Swartz, 5724 30'h Avenue NE, Seattle, WA 98105 Isaac Conlen, Planning Manager Ell Following the meeting, in a letter dated July 26, 2011, Senior Transportation Engineer Sarady Long confirmed that traffic impact fees would be required for any memory care units, and those fees paid to the city prior to building permit issuance - file I I - 10211 0-00-AD. 11-102110 Doc. I D, 60715 Village Green KUennmpy Care Square Feet Analysis March 23, 2011 Gross Bldg s.f.` Basement 5,560.0 Main Floor , 11,660.0 Second Floor 11,660.0 Total Gross 8|dgm.f. 28,880.0 28,080.0 s.f, Net Areas ' Congregate Residence Floor Area Main Floor _ Congregate Unit l 3,602{] Congregate Unit I/458.0 Second Floor ' Congregate Unit 3 3,682.0 _ Congregate Unit 4 . 2,687.0 Circulation area: Uving/Stair/Bev. Basement 297.0 Main Roo, 3,534.0 Second Floor ],534J) Total Circulation area 7,365.0 7,365.0 Comnmunk«/Suppurt/Res.Kk/Dinin8 Basement 5,352J0 Main Floor 1,078.0 Second Floor 1,776.0 Total Community , 9,00.0 9,00.0 Total Net Areas 28,880.0 y� Number ofDouble Occupancy Rooms 21 x 2 43 Number of Single Occupancy Rooms 9 9 51 Beds Total Beds 0TY OF Federal Mr. Monte Powell 29607 8Avenue South Federal Way, WA 98003 CITY HALL 33325 8th Avenue South Mailing Address: PO Box 97 Federal Way, WA 98063-971 Z (253) 835-7000 www.cityoffederalway.com FILE Following our meeting on July 19, 2011, 1 spoke with the City's Public Works Traffic Division about the potential of adding a memory care wing to the Village Green site. Senior Transportation Planning Engineer Sarady Long looked into the matter, and has provided the following comments: "Village Green Phase III (Cottages West) was approved in 2000 under the old pro-rata share mitigation system, which required traffic mitigation only if trips generated by the proposed development impacts transportation improvement project by 10 or more trips. Since the project's trips did not impact any TIP [�rojects by 10 or more PM peak hour trips, there was no traffic mitigation for this project. Furthermore, a 5-year extension was approved in 2008 for the remaining Phase II and III of the Village Green project without any traffic mitigation paid. with a 28,880 SF Congregate building (Assisted Living/Nursing Home) consisted of approximately 51 beds. This proposal will generate approximately 11 PM peak hour trips. As such, a concurrency review application with an application fee of $1,584.50 will be required. Additionally, the applicant will be required to pay traffic impact fee currently estimated at $27,656 prior to building permit issuance. IN iiiiiiiiiliiii� 111111111111111 Estimated Trip Generation: 51 beds Nursing Home (Assisted Living) @ 0.22 trips per bed = 0.22 x 51 beds = 11 PM Peak Hour Trips Traffic Impact Fee (2011 Fee Schedule) =51 beds x $542.28 per bed = $27,656 Also, I have considered traffic impact fee credit for an existing use or previously paid impact fee. HowevM this does not apply as Phase III (Cottages West) did not pay any traffic mitigation and the five Cottages West units have not been built Hopeftilly this information is useful to you and your design team. Please do not hesitate to contact Mr. Long at 253- 835-2743, or �araclv . I can be reached at 253-835-2642. We look for -ward to working with you on the memory care project. Sincerely, /Ovtlg�f6L�,�- Deb Barker Senior Planner Doc LD 58414 Deb Barker From: Sarady Long Sent: Tuesday, July 26, 2011 9:50 AM To: Deb Barker Cc: Rick Perez; Ken Miller; Kevin Peterson Subject: Village Green Phase III Question Hi Deb, Thank you for providing the back up information on the proposed project. It helps me a lot in explaining this project to Rick, Ken and Cary. Phase III (Cottages West) was approved in 2000 under the old pro-rata share mitigation system, which required traffic mitigation only if trips generated by the proposed development impacts transportation improvement project by 10 or more trips. Since the project's trips did not impact any TIP projects by 10 or more PM peak hour trips, there was no traffic mitigation for this project. Furthermore, a 5-year extension w approved in 2008 for the remaining Phase 11 and III of the Village Green project without any traffic mitigation paid. I I - 'it, AAart!mt #",ges West with a 28,880 SF Congregate building (Assisted Living/Nursing Home) consisted of approximately 51 beds. This proposal will generate approximately 11 PM peak hour trips. As such, a concurrency review application with an application fee of $1,584.50 will be required. Additionally, the applicant will be required to pay traffic impact fee currently estimated at $27,656 prior to building permit issuance. . . . . . . . ...... r f Estimated Trip Generation: 51 beds Nursing Home (Assisted Living) @ it trips per bed = 0.22 x 51 beds WFULTA r • M Traffic Impact Fee (2011 Fee Schedule) = 51 beds X $542.28 per Bed = $27,656 Also, I have considered traffic impact fee credit for an existing use or previously paid impact fee. However, this does not apply as Phase III (Cottages West) did not pay any traffic mitigation and the five Cottages West units have not been built yet. Senior Trans. Planning Engineer 253-835-2743 (p) 253-835-2709 (f) sarady-long@cityoffederalway,gorn CITY OF Fiaderal A10y FROM: Deb Barker 1�0 MEMORANDUM inquily: What is the "tippingpoint"for theproposed memory carefacility to have to pay additional tra ic determination — Cottages West: Approved for 40 senior housing units, and 86,660 square feet. At this point, 14 of the units are constructed and occupied. Village Green Phase lapproved for memory care. The first phase of Village Green included 16 duplex units at 4,400 square feet each. A modification to the 9,9& rooms in a 4,900 square foot building, for a total of 24 beds within 9,800 square foot of building area. These special needs units were not constructed and insteadtwo duplex units at 4,400 SF were built. This creates a modesi 9csurplus" • • floor area and special needs beds. Current memory care proposal: Proposed is one 28,880 SF building with congregate care (special needs, memory care • Altzheimer'� patients� circulation and support areas in a two story with basement building. This creates 21 double occupancy rooms and • single occupancy rooms for a :• • 51 beds. The memory care building would 10 units). Traffic Mitigation Tire 14 collected • the following: * 1995 Phase I MDNS: Pro-rata share contribution of $19,100 for the South356h Street project * 1997 Phase 11 MDNS: Pro-rata share per dwelling unit $82,500/228 units- $361.84 per unit. * 2000 Phase III (Cottages West) DNS No traffic mitigation I - I • I I , • 1 1 -•• 3 1 =. (1) If any building permits for the Village Green Phase 11 and Phase III (Cottages West) project have not been issued within the City code -based five-year timeline granted under Process IV Approval, the applicant shall fund preparation •. a new • analysis. This analysis must demonstrate that adequate capacity for the un-built portions of the project still exists for the remainder ofthe project. In the event that there is not adequate capacity, the applicant shall be required to construct whatever mitigation measures are necessary to meet the adopted Level of Service (LOS) at any failing intersection. (2) If any building permits for the Village Green Phase 11 and Phase III (Cottages West) project have not been issued within the City codebased five-year timeline granted under Process IV Approval, the applicant shall make payment of applicable transportation • fees that are in effect at the subsequent building permit issuance associated with any extension. Urom: SAEID DANIA% To: stephenc,rong,fays,skipt Date: Tuesday, May 16,1995 848 am Subject: village green of federal way S.356th st. project. the pro-rata share for mitigation of this project is $ 19,100.- this is calculated based on the percent pro-rata share of .91 % as identified in the revised TIA. thanks saeid GREEN LLC 2DOKS POWELL : 98.309 DIES, WA 931" ."522® BON COMPANY, INC. M. DUNG ANSON , P.E. T, MOGG PLS MSAUM BLVIO SW, 301 WA 95166 4-4141 GREEN U-C 95309 NES, WA 96196 24-5274 Y LINE ADJUSTMENT INC COUNTY !ND AVE 74 C (393,809,47t S.F) OP BLA (FILE #00-104014-000-00-SU) I HOUSING COMMUNITY ION OF VILLAGE GREENS) NITS/GROSS ACRES MEN UTILITY D15TRICT VEN UTILITY DISTRICT L 'NAY L WAY SOUND ENERGY T SOUND ENERGY TIONS - 1 HOUR R IAS APPROXIMATED FROM 49 WILL BE PREPARED PLAN SET. FIELD SURVEY By I I OR 2 UNITS 25 CAR GAP, gry 13 EE: =14, SECT 30, TWP VILLAGE GREEN COTTAGES WEST UNIT MATRIX BUILL'INIG TYPE UNIT PLAN 1ST FLOOR 2ND FLOOR GARAGE TOTAL GROSS AREA A 2 B PLAN 3 1542 S,F. 470 S.F. 312 S.F. 2012 S.F. 4648 S.F. CLAN 3 1542 &F. 470 S,F, 312 S,F, 2012 S.F, X 3 PLAN 1542 SY 470 S.F. 31: S.F 2012 S15. 4!545 S.F. 4 PLAN 3 1542 S, F: -70 S.F. 312 S.F, 2012 S.F. 2 5 PLAN 1542 S.F. 470 S.F. 312 S.F. 2012 S.F. 4E48 S.F. 5 PLAN 3 1542 S.F. 47D 5,F,.. 312 BY, 701.1 S,F, 2 7 =LAN 3 1542 S.F, 470 S.F. 312 S,F. 2012 5, F, 46413 S,F. 0 PLAN 3 1542 S.F, +110 3.r 312 5. K 2012 SIF. S PLAN 3 1542 S.F. 470 S.F. 312 S.F. 2012 S.F. 2324 S.F. r 1 10 PLAN 2 1532 S.F. 312 S.F. 1532 S.F, 6396 S.F. 11 PLAN 1 1272 5.r- 375 $F, 1552 S.F, 12 PLAN 2 1552 S.F. 312 S.F. 1552 SR 13 PLAN 1 1272 a F 175 S.F. 1552 S.F. 0 1 14 PLAN 2 1552 S,F. 312 S.F. 1552 S.F. 8396 S.F. 15 PLAN 1272 S.F. 375 S.F 1552 SY. 16 PLAN 2 1552 S.F. 312 S.F. 1552 S.F. 17 PLAN 1 1272 S.F° 575 S,F, 1552 S.F. H 6 18 PLAN 2 1552 5.F. 312 S.F. 1552 S.F. 8395 S.F.. 19 PLAN 1 1272 SY 375 S.F. 1552 S.F. 20 PLAN 2 1552 S.F. ms 12 S.F. 1552 SF. 21 PLAN 1 1272 S°F. 375 S.F 1552 S.F. 1 1 22 PLAN 2 1552 5,F, 312 BY. 1552,S.F. 6396 S.P. 23 PLAN 1 1272 S.F. 375 5, F. 1552 S.F 24 PLAN 2 1552 S.F. 312 S.F. 1552 S.F. 25 PLAN 1 1272 S.F 375 S.F. 1552 S.F. A 2 22 -LAN 3 1542 S.F. 470 S.F. 312 S.F. 1552 S.F. 2324 S.F. K 2 27 PLAN 3 1542 S.F. 470 S.F. 312 S.F. 2012 S.F. 4548 S.F, 28 PLAN 3 1542 S.F, 470 S.Fq 3i2 SZ 7.012 S.F. L 1 29 PLAN 2 1552 S.F. 312 S.F, 1864 S.F. 4.195 S.F. 30 PLAN 1 1272 S.?. 375 S.F, 1547 S,F. 31 PLAN 2 1552 S. FL 312 S.F. 1804 S,F 095 S.F. 32 PLAN 1 1272 S,F., 375 SF, 1647 S.F. 1 .33 PLAN 2 1552 S.F. JIZ SF, 1552 S.F. 8396 SF: 34. PLAN I 1272 S.F. 375 S°F. 1552 S.F. 35 PLAN 2 1552 S.F. 312 S.F. 1552 S.F. 36 PLAN 1 1272 S.F. 375 S. F. 1552 S.F. 1 37 PLAN 2 1552 SX. 312 S.F. 1552 S.F. 8395 S.F. 319 PLAN 1 1272 S.F. 375 S.F. 1552 S,F. 32 PLAN 2 1552 S.F. 312 S.F. 1552 S.F. 40 PLAN 1 1272 5,F. 375 S.F. 1552 S.F. TOTAL NUMBER OF UNITS: 40 ^^ ALL EUILDING TO BE LESS THAN 30' HEIGHT. -F I OR 2 UNITS Cl--I3 \_prdRCN/B&CX TYPE 1 BUILDING 2 OR 4 UNITS SCALE: 1" = 20' 16, PORCH FORC -------- --- L T 49 5' 7T I OR 2 UNITS 26' CAR CAR 26, 1 OR z UNITS 12' 12� RCK/'.)m )L TYPE 2 BUILDING 2 OR 4 UNITS SCALE: 1" = 20' 55.5- IV Cnco