23-102378F-D"MMI
City of Federal Way
Permit #:23-102378-00-EL
Community Development Dept.
33325 8th Ave S
Inspection Request Line: (253) 835-3050
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
"M 11TAM M=
Owner Applicant
JAMES & VIRGINIA PISTER LYNNETTE HARLEYBRIMMA SOLAR
902 S 295TH ST 13521 E 174TH STREET CT E
FEDERAL WAY WA ' 98023-8213 PUYALLUP WA 98374
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Alt. Serv./Feeder: 0 to 200 aml I
Contractor
BRIMMSL824KJ (5/11/24)
117 E LOUISA ST SUITE 272
SEATTLE WA 98102
FIRE APPROVAL CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreviewgsouthkingfire.org and alarmsgsouthkingfire.org
- Finished installation showing 36" access from the ground and 18 clearance at roof peak.
- Location of shutoff switch with signage.
- Photo of the front of the house showing the address or street side view.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
�f no response from SKFR within 2 bus�. call 253-946-7348 to check status.
I hereby certify that the above information is correct and that the construction on the above described propert
and the occupancy and the use will be in accordance -with the laws, rules and regulations of the State of
�Cq of Federal Way.
Owner or agent: — I =— E Date:
M
THIS CARD IS TAI -SITE
CITY OF �� ,,..x.,. -
Construction Record
Federal Way
INSPECTION REQUESTS: (253) $35-3050
PERMIT : 23 12378
Address: 92 SW 295TH ST
Project: JAMES & VIRGINIA PISTER FEDERAL WAYA 923-213
Scheduled inspections may be failed if this card is not on -site.
DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections
as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
El UFER Ground (4295) El I
Ditch cover (4030)
Slab/Concrete Floor (255)
Approved
Approved
Approved to place concrete
y Date By
Date
Date
Pool Bonding (4195) 6
yy
Temporary Power (4275) l I Service (4235)
Approved
Approved Approved
By Datq By
Date By Date
El Feeders/Sub-panels (4045)
ID
Rough Electrical (4225)
d Final - S K F & R (4060)
Approved
Approved
Approved
y Date
By,
Date
B Date
91
Ceiling Cover (4020)
Final - Electrical (4055)
Approved
proved
By Date By
Date*
Rough Electrical
Final Electricat
Right of Way
Approved
Approved
Approved
y
Date
By
Date
By
Date