Loading...
23-101818City of Federal Way Permit #:23-101818-00-EL Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WOOD Project Description: BLUEBEAM - Rooftop PV solar system. Owner BRIAN & ANITA WOOD 506 SW 298TH ST FEDERAL WAY WA 98023 Applicant WENDY WENRICKA&R SOLAR 3211 MLK JR WAY S SUITE B SEATTLE WA 98144 Additional Permit Information Is this an Online or O.T.C. application? .................. No 1FiCthir Alt. Serv./Feeder: 0 to 200 aml I Contractor A & R SOLAR (ELECTRICAL) RSOLAS*903JM (5/20/24) 1 MARTIN LUTHER KING JR WAY S SUIT SEATTLE WA 98144 FIRE APPROVAL CONDITIONS: Upon completion pletion of installation, the following photographs shall bee ailed to planreview*southkingfire.org and alarmsgsouthkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. um1amm call 253-946-7348 to check status. Building Division CITY OF 33325 Eighth Avenue South Federal Way, WA 98003-6325 4k F Phone 253-835-2607 Fax 253-835-2609 ,;:o, ederal Way 01wICE CORRECTION N ADDRESS: ..■ ■. ■ QUESTIONSIF YOU HAVE i + MADE,WHEN CORRECTIONS HAVE BEEN r •R RE -INSPECTION. SEE BACK OF CARD FOR DETAILS.•TE: ELECTRICAL CORRECTIONSREQUIRED TO BE MADEDAYS. R DO NOT REMOVE THIS NOTICE Page - of THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Ins ection Record Federal Way INSPECTION REQUEVTS: (253) 835-3050 PERMIT #: 2310181800 Address: 506 SW 298TH ST Project: BRIA N & ANITA WOOD FEDERAL WAY WA 98023-3554 Scheduled inspections may be failed if this card is on-site. idled DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read right, top to bottom). Please schedule not inspections as appropriate. Work must not �e covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ID UFER Ground (4295) El Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 'Pool 11 Bon ding (4195) Temporary Power (4275) El Service (4235) Approved Approved Approved By Date By Date By Date E] Feeders/Sub-panels (4045) I'M Rough Electrical (4225) 'El Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date E3 Ceiling Cover (4020) El Final - Electrical (4055) Approved Approved Date By Date By Rough Electrical El Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date