Loading...
23-102178Plumbing City of Federal way Permit #-.23-102178-00-PL Community Development Dept, 33325 8th Ave S FILF7 Federal Way, WA 98003 Inspection Request Line: (253)835-3.050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCLAREN Project Address: 34426 30TH AVESW Parcel Number: 797200 0220 Project Description: REPLACE GAS WATER Owner Appilcant Contractor CHARLES MCLAREN KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 34426 30TH AVE SW ENERGY SERVICES CO (PLUMBING) FEDERAL WAY WA 3909 196TH ST SW WAS IES796NU (10/25/23) 98023-3019 LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 TMS -r IS TO REALAIN ON Constructioncily of Federal Way1 t0 Scheduled inspections be failed if this card is not -site. DO NOT LOSE �, (:.ARD, Inspectionsare listed as close to sequential or as possible (read left to ri lat. top to bolt i). Please schedule inspections as appropnate, Work inust not be covered until it is approved. Check with your inspector if you are unsure about anv of the inspections or the inspection sequence, On -going inspections are logged on the back of this card. UFER Ground (4295) ' Ditch cover (4030) Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date B}• Date Bv Date 'EJ Pool Bonding (4195) El Temporary- Posner (4275) } Service (4235) Approved Approved Approved By Date Bv DateBY Date ED Feeders/Sub-panels (4045) Rough Electrical (4225) 10 Ceiling Cover (4020) Approved Approved Approved Bi• Date Bi- Date BS• o Date Final - Electrical (4055) Approved By Date Afec anical Rough -in (4165) Gas Piping (125) El Final - Mechanical (4065) Approved Approved to release test Approved }• Date ByDate s'A.J Date PLUMBING Plumbing Groundwork (4190) El Rough Plumbing (4230) Final - Plumbing (075) Approved to cover Approved Approved y Date By Date BY Date