23-102178Plumbing
City of Federal way Permit #-.23-102178-00-PL
Community Development Dept,
33325 8th Ave S FILF7
Federal Way, WA 98003 Inspection Request Line: (253)835-3.050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MCLAREN
Project Address: 34426 30TH AVESW Parcel Number: 797200 0220
Project Description: REPLACE GAS WATER
Owner Appilcant Contractor
CHARLES MCLAREN KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO
34426 30TH AVE SW ENERGY SERVICES CO (PLUMBING)
FEDERAL WAY WA 3909 196TH ST SW WAS IES796NU (10/25/23)
98023-3019 LYNNWOOD WA 98036 3909 196TH ST SW
LYNNWOOD WA 98036
TMS -r IS TO REALAIN ON
Constructioncily of Federal Way1
t0
Scheduled inspections be failed if this card is not -site. DO NOT LOSE �, (:.ARD, Inspectionsare listed as close to sequential or as possible
(read left to ri lat. top to bolt i). Please schedule inspections as appropnate, Work inust not be covered until it is approved. Check with your inspector if
you are unsure about anv of the inspections or the inspection sequence, On -going inspections are logged on the back of this card.
UFER Ground (4295)
'
Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
B}•
Date
Bv
Date
'EJ
Pool Bonding (4195)
El
Temporary- Posner (4275)
}
Service (4235)
Approved
Approved
Approved
By
Date
Bv
DateBY
Date
ED
Feeders/Sub-panels (4045)
Rough Electrical (4225)
10
Ceiling Cover (4020)
Approved
Approved
Approved
Bi•
Date
Bi-
Date
BS•
o
Date
Final - Electrical (4055)
Approved
By
Date
Afec anical Rough -in (4165)
Gas Piping (125)
El
Final - Mechanical (4065)
Approved
Approved to release test
Approved
}•
Date
ByDate
s'A.J
Date
PLUMBING
Plumbing Groundwork (4190)
El
Rough Plumbing (4230)
Final - Plumbing (075)
Approved to cover
Approved
Approved
y
Date
By
Date
BY
Date