23-102861Electrical
City of Federal Way
Community Development Dept. Permit -
#.23-102861-00-EL
33325 Sth Ave S FILE
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RUGGLES
Project Address: 5209 SW 324TH PL Parcel Number: 189831 1 0400
Project Description: Install Outdoor Heat Pump and T-stat
Owner Applicant'Contractor
CAROL A RUGGLES DAVID BRADSHAWALL SEASONS INC ALL SEASONS INC (ELECTRICAL)
5209 S 324TH ST 4851 S WASHINGTON ST ALLSEI*035N5 (8/26/23)
FEDERAL WAY WA 98023-3605 TACOMA WA 98409
4851 S WASHINGTON ST
TACOMA WA 98409
Additional Permit Information
Is this an Online or O.T.C. application?.-.-...--,.... Yes
Circuits - Residential 2 Thermostat
PERMIT EXPIRES Tuesday, 28 November, 2023
Permit Issued on Thursday, June 1, 2023
1 hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: nKil INF Date.,
TMS C-ARD IS TO FEIIAIN ON-SITE
CoMy of 401A',
Construction Inspection Record
Federal Way
INSPECTION REQUESTS: 835-30-50
(2-53)
Scheduled inspections be failed if this card
is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to rigght. top to bottom) Please schedule inspections as appropriate. Work nuist not be covered until it is approved. Check with vote inspector if
you are um-ure about ar, of the inspections or
the mspection sequence- On-goiz Wispections are loaged on the back of this card_
Ir
ELECTRWAU
El LTFER Ground (42957
El Ditch cover (4030) Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By Date
By Date
By Date
El Pool Bonding (4195)
E] Temporary Power (4275) Seri -ice (4235)
Approved
Approved Approved
By Date
By Date By Date
Li Feeders/Sub-panels (4045)
Rough Electrical (4225) Ceiling Cover (4020)
El
Approved
Approved Approved
By Date
By Date Bv Date
10 Final - Electrical (405
Approved
By Zlel� Date
El 'Mechanical Rough -in (4165)
Approved
Bi Date
MECHANIC -AL
El Gas Piping (4125)
Approved to rek-ase test
By Date
Final -.%Iechani,al (4065)
Approved
By Date
PLUMBING
El, Plumbing Groundwork (4190) El Rough Plumbing (4230) El Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date BY Date