23-102633T S C_ IS TO -L-.I\ ON' -SITE
"'"°` l
ConstructionInspection Record
Federal Way
L`SPECTIOti 3) S35-3050
QUESTS: (2
Scheduled inspections nmy be failed if this card is not -site. DO NOT LOSE TMS CXRD,ctil are listed as close to sequential order as possible
(read left to right, top to bottom) Please schedLile inspections as appropriate, Work niust not be covered until it is approved. Check with your inspector if
you are unsure about :> of the inspections or
the inspection sNuence. -going inspections are Iogaed on tl back of dr:s card.
1 UFER Ground (295)
' Ditch cover (4030) Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
B` Date
By Date
Bv- Date
El Pool Bonding (4195)
Ej Temporary Power (4275) � Service (4235)
Approved
Approved Approved
By Date
By Date By Date
Feeders/Sub-panels (4045)
w` Rough Electrical (4225) Ce" "ngCover (4020)
Approved
Approved Approved
y Date
By Date B} Date
Fin - Electrical (4055)
t -Mechanical Rough -in (4165) El Gas Piping (4125) El Final --lecanicaI (4065)
Approved Approved to release test Approved
y Date By Date By Date
Plumbing Groundwork (4190) ID
Approved to cover
By Date 11 By
ll
i .
Rough Plumbing (4230)
Apprmvd
I
Date
El Final - Plumbing (4075)
Approved
By Date