Loading...
23-102923Electrical City of Federal Way Permit • Community Development Dept,.: 23 33325 8th Ave S Federal Way, WA 98003 FILEInspection Request Line: (253) 835-3050 Ph: (253) 835-2807 Fax: (253) 835-2809 Project Name: T Project Address: 35833 ISTPLSW Parcel Number: 724290 0490 Project Description: Run electrical for 3 1/2 ton a/c Owner Applicant Contractor JAMES & PHUONG TO JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 35833 1ST PL SW 4601 S 134TH PL (ELECTRICAL) FEDERAL WAY WA 98023 SEATTLE WA 98168 BRENNHA962DU (3/31/24) 4601 S 134TH PL SEATTLE WA 98168 Additional Permit Information, Is this an Online or O.T.C. applications ...............$ Yes Circuits - Residential 1 Thermostat 1 EXPIRESPERMIT Sunday, 3 December, 2023 Permit Issued on Tuesday, June 6, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of in tin a Nee 7.0 federalWay. Owner or agent: — Date: ✓ 4m J � A, TMS C-ARD IS TO REALAIN ON -SITE CITY of '�­` Construction Inspection Record Federal Way INSPECTION REQLTSTS: (2-53) 835-3050 Scl�eduled inspections my be failed if this card is not on -site. DO NOT LOSE TBIS C-kRD. Inspectionsare listedas close a, order as possible (read left to rigjit. top to bottorn) Please schedule mispections as appropriate, Work niust not be covered until it is approved. Check -,vith your inspector if you are unsure about any, of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. UFER Ground (4295) Ditch cover (4030) ED Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bending (4195) Temporary Power (4275) El Ser%ice (4235) Apprmed Approved Approved BV Date By Date By Date El Feeders[Sub-panels (4045) E) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date Bv L Date By Date ]Final - Electrical (4055) Approved By Date ME("HANUC-AL EJ Mechanical Rough -in (4165) Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190 Rough Plumbing (4230) Final - Plumbing (4075) Approved to cover Approved Approved By Date Bv Date Date