Loading...
23-103034Electrical City of Federal Way Permit•• - - Community Development Dept, 33325 8th Ave S FILE .Federal Way, WA 98003 Inspection Request Line: (253) -0 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PET SUPPLIES PLUS Project Address: 171 S COMMONS Parcel Number: 762240 0015 Project Description: LOW VOLTAGE SOUND SYSTEM AND INSTALL 1 TV AND SIAE PLAYER Owner Applicant Contractor MGP XI COMMONS FW LLC MICHAEL WITTEMUZAK DBA MOOD MUZAK LLC (ELECTRICAL) 425 CALIFORNIA ST MEDIA MUZAKL*016LT (7/23/23) SAN FRANCISCO CA 94104 5524 123RD AVE SE 5718 129TH ST NE SNOHOMISH WA 98290 MARYSVILLE WA 98271 Additional Permit Information Is this an Online or O.T.C. applications ................. Yes Low Voltage - Other (Coei 16 PERMIT EXPIRES Wednesday, 6 December, 2023 Permit Issued on Friday, June 9, 2023 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Dater THIS C-ARD IS TO REALAIN O\-SITE c'T. ®. Federal Way Construction InS ect1 Record � I\SPECTIO` 253 QUESTS: (_ ) 83;-3050 Scheduled inspections failed if this card is not -site. DO NOT LOSE'THIS CARD. Inspectimsare listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate, Work raust not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this curd_ El LTFER Ground (4295)El Ditch cover (4030) 3 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete B®®' Date By Date Bv Date 9 Pool Bonding (4195) Temporary Power (4275) Service (4235) Approved Approved Approved By Date By Date By Date Li Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover ( 20) Approved Approved Approved By Date By Date By Date 10 Finial - Electrical (4055) Z<A oved B® Fate ' • ..El , Mechanical Rough -in (4165) El Gas Piping (4125) Final - ilechanical (4065) Approved approved to release test Approved y Date By Date By Date PLUMBING Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (075) Approved to cover Approved Approved By Date i- Date B}" Date