Loading...
23-100518EPermit 1 �� 11 (�i� Q �jCommuntyDeelopmentDept. #-023-10VJ18-00—ME 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: EREDA/FELEKE Project Address: 32811 7TH AVESW Parcel Number: 683782 0400 Project Description: Replace gas furnace Owner Applicant Contractor EYODAB EREDA JA[MIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 32811 7TH AVE SW 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA 98023 SEATTLE WA 98168 BRENNHA97IR9 (12/29/23) 4601 S 134TH PL TMS CARD IS TO REAIMN ON -SITE Construction Inspection Record F;6deral Way IN-SPECTION REQUESTS: (2-53) 835-30-50 Scheduled inspections nrly be failed if this; card is not on -site. DO NOT LOSE THIS C.IM Inspections are listed as close to sequential or as possible top to bottom). ease schedule inspections as appropriate. Work st not be covered until (read left to right. mu it is approved, Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are log d on the back of this card. ELECTRICAL El LTIFER Ground (4295) El Ditch cover (4030) Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) 5 Temporary Power (4275) Service (4235) Approved Approved Approved By Date By Date Bi Date El Feeders/Sub-partels (4045) Rough Electrical (4225) El Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ED Final - Electrical (4055) A --A [By Date Afechanical Rough -in (4165) Approved By Date Plumbing Groundwork (4190) Approved to cover Date ME(I"HANIC"A L El Gas Piping (4125) Approved to release test By Date Rough Plumbing (423 Approved Bv Date E] Final - Xlechanical (4065) Approved By Date 4afx-4 El Final - Plumbing (4075) Approved By Date