Loading...
23-102693l Mechanical, City of Federal Way FILE ll, • Community Development Dept.. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-350 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ELLISIFI.SH Project Address: 30102 3RDPLSW Parcel Number: 259970 0320 Project Description: HEAT PUMP REPLACEMENT Owner Applicant Contractor RONALD ELLIS BRIAN GRIFFISGRIFFIS HEATING INC GRIFFIS HEATING INC (GENERAL) 30102 3RD PL SW 402 E MAIN ST SUITE 130 GRIFFHI088DZ (1/5/25) FEDERAL WAY WA AUBURN WA 98002 402 E MAIN ST SUITE 130 98023-3907 AUBURN WA 98002 Additional Permit Information Mechanical Work Valuation?--... .........a.. 14529 Is this an Online or O.T.C. application?...... ...... Yes Compressors / Heat Pumps l Sunday,PERMIT EXPIRES ' November,1 IssuedPermit on Tuesday,1 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way, Owner or agent: ni\u Date: 10-1 _1 THIS 1 IS TO R ON CITY OF an _Construction/ eRecord i • •UESTS: (253) S35-30550 Scheduled inspections ma,r be failed if this card is not -site. DO -NOT LOSE TEM C-ARD, Inspectionsare listed as close to sequential order as possible (read Felt to right. top to bottom). Please schedule inspections as appropriate, Work aarrist not be cohered until it is approved. Check with Your inspector if you are unsure about any ofthe inspections or the inspection sequence. -going inspections are logged on the back of this cud. El LIFER Ground (4295) Ditch cover (4030) . Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) ElTemporary Power (4275) El Seri -ice (4235) Approved Approved Approved By Date i- Date Bv Date Feeders/Sub-panels (4045) 'k Rough Electrical (4225),El Ceiling Cover (20) Approved Approved Approved By Date Bv Date By Date -------------- Final - Electrical (4055) Approved y Date Alechanical Rough -in (4165) El Gas Piping ( lay) Final-1lechanical (4065) Approved Approved to release test Approved y Date Bv Date By Date PLUMBING El Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (4075) Approved to cover Approved Approved y Date By Date By Date