Loading...
23-101981Plumbing City of Federal Way � Community Development Dept. 33325 8th Ave S { FILInspection Permit • Federal way, WA 98003 Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE VILLAGE AT REDONDO CONDOS, BLDG U Project Address: 187 S 286TH LN Parcel Number: 894444 0000 Project Description: Remove/replace electric water heater, Unit U203 Owner Applicant Contractor VILLAGE AT REDONDO LLC JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO (PLUMBING) 6440 HALEY LOOP RD NE HEATER COMPANY FASTWWH79901 (10/1/23) BAINBRIDGE ISLAND WA 98110 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-101 BOTHELL WA 98011 BOTHELL WA 98011 Water Heaters I PERMIT EXPI14ES Tuesday, 10 October, 2023 Permit Issued on Thursday, April 13, 2023 1 hereby'certify that the above information is correct and that the construction on the above described property and the occupancy and the usna in accordance with the laws, rules and regulations of the State of 1 t rid INFederalWay. Owner or agent: Date. I S C-ARD IS TO REAL -UN ON -SITE cav of Construction Inspection Record Federal Way INSPECTION QUESTS: (253) 53-5,10 0 Scheduled inspections v failed i card e is t -site. SE -f S C _ Inspectionsare listed as close to sequential or as possible •covered (read left to right. top to ttont). ease schedule inspections as appropriate. Workt not be it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El LIFER Ground (4295) Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete y Date By Date Bv Date El Pool Bonding (4195) Temporary Power (4275) El Service (4235) Approved Approved Approved y Date By Date By Date Feeders/Sub-panels (4045) El Rough Electrical (225) El Ceiling Cover (4020) Approved Approved Approved By Date B y Date By Date Final - Electrical (55) Approved y Date Mechanical Rough -in (4165) 2 Gas Piping (4125) tj Final - Mechanical (065) Approved Approved to release tat Approved By Date BV Date By Date PLUMBING Plumbing Groundwork (190) El Rough Plumbing (230) El Final - Plumbing (75) Approved to cover Approved Approved y Date B® Date By Date 2