23-102298Mechanical
City of Federal Way
Community Development Dept
FIL Eo
• w
Permit •
33325 8th Ave S
Federal Way, WA 98003
Inspection Request Line: (253)835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: YAPLEE
Project Address: 34332 27TH AVESW
Parcel Number: 294450 0020
Project Description: Water heater replacement
Owner
Applicant
Contractor
REGINALD & CANDACE YAPLEE
PERMIT DEPARTMENTDRF WATER
SMART WATER EXPERTS (PLUMBING)
34332 27TH AVE SW
HEATING SOLUTIONS
SMARTWE782KP(8/2l24)
FEDERAL WAY WA 98023
10242 S BODE ST
10242 BODE ST
PLAINFIELD IL 60585
PLAINFIELD IL 60585
AdditionalPermit"Information
Mechanical Work Valuation?,—.. . ..a
5159.59 Is this an Online or O.T.C. application? .. ............ Yes
Hot Water Tanks 1
PERMIT EXPIRES Saturday, 28 October, 2023
Permit Issued on Monday, May 1, 2023
1 hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W i oI� d the N0i of Federal Way:.
OOwner or agent: date:
T S CALRD IS TO REALAi's O\-SITE
"'" of
`Construction II e do Record
Federal Way
INSPECTIO`1REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom), Please schedule inspections as appropriate. Work- must not be covered until it is approved. Check with your inspector if
you are unssnire about an,. of the inspections or
the inspection sequence. On -going inspections are Iogaed on the back of this card.
ELECTRICAL
'_ L Ground (295)
Ditch cover (030) E Slab/Concrete Floor (4255)
Approved
Approved Approved to palace concrete
By Date
By Date By Date
Pool Bonding (41455)
Temporary Power ( 275)0
Seri -ice (235)
Approved
Approved
Approved
By Date
ate
By Date
El Feeders/Sub-panels (4 5)
El Rough Electrical (4225) Ceiling Corer (4020)
Approved
Approved Approved
v Date
By Date Bv Date
t G Final - Electrical (4055)
Approved
Bs'" Date
El -Mechanical Rough -in (4165) El Gas Piping (4125) El Final - Alec apical (4065)
Approved Approved to release test Approved
s Date FDate By Ai Date 112,11,13
PLIUMBING
t _ Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (475)
Approved to cover Approved Approved
y Date By Date By Date