23-102976Electrical
City of Federal Way Permit •
Community Development Dept.
33325 8th Ave S FILE
Federal Way, WA 98003 Inspection Request Line: (253) 835-305
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MCBEE
Project Address: 32112 40THAVESW Parcel Number: 873190 2380
Project Description: Replace existing 100 amp panel with 20 amp panel, meter base and generator integration
system.
-Owner
Applicant
Contractor
STEPHANIE MCBEE
TAYLOR HEATING
TAYLOR HEATING COOLING
32112 40TH AVE SW
5518 163RD ST E SUITE A
PLUMBING LLC (ELECTRICAL)
FEDERAL WAY WA 98023
PUYALLUP WA 98375
TAYLOHC787N3(6/8/24)
5518 163RD ST E SUITE A
PUYALLUP WA 98375
Additional Permit Information
Is this an Online or O.T.C. applications ...............- Yes
Alt. Serv./Feeder: 0 to 200 a l 1 Circuits - Residential 1 Mast or Meter Repair (Resider I
PERMIT EXPIRES Monday, 4 December, 2023
Permit Issued on Wednesday, June 7, 2023
1 hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
1+'ah`arl t h a f d he it of :Federal Way,...
Owner or agent: �' 1= Date:
r-1
THIS C.ARD IS TO ALA -IN ON -SITE
CRY Of Construction InS ec1Record
Federal Way INSPECTIO` REQL-ESTS: (253) 335-30;0
Scheduled inspections y be failed if this card is not on -site. DONOT LOSE Tffl,$ CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom), Please schedule inspections as appropriate, Work mustnot be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence- -going inspections are logged on the back of this card.
ELEC"At"RIC AL
El
LTFER Ground (4295)
Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
y
Date
By
Date
By
Date
El
Pool Bonding (4195)
El
Temporary Power (4275)
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
Bs-
Date
El
Feeders/Sub-panels (4045)
El
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
By
oted
Date '
El
ilechanical Rough -in (4165)
El
Gas Piping (4125)
Final - -Mechanical (4065)
Approved
Approved to release test
Approved
y
Date
By
Date
By
Date
PLUMBING
Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date B} Date