23-101041Ri/
City of Federal Wayermit
Community Development Dept.
?7
- -
33325 8th Ave S
ra
-
Inspection Request Line` (253) 835-3050
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MILHOLLAND
Project Address: 35654 9THAVESW
Parcel Number: 440560 0201
Project Description:Remove/replace
gas water heater
Owner
Applicant
Contractor
MICHAEL MILHOLLAND
JASON HANLEYBROWNFAST WATER
FAST WATER HEATER CO (PLUMBING)
35654 9TH AVE SW
HEATER COMPANY
FASTWWH79901 (10/1/23)
FEDERAL WAY WA
11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-10e
98023-7226
BOTHELL WA 98011
BOTHELL WA-9801.1
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: n I I I K I mate:`
c
6�
RD
T S C_A IS T}Oy 1L�n�+N O -SITES
CITY or a. ram'"
FederalINSPEC'TIONREQUESTS:
o
Construction n c ` on Record
(253) 835-3050
Scliedziled impections rrta.- be iarled if this c.`t d is not on -site, DC►;NOT LOSE TW.S CARD. Inspections are listed as close to sequential order as Possible
(read left to right, top to bottom) Please schedule inspections as appropriate- Work rtrtrst not be ccvered until it is iMtroved, Cbeck %vith your irispec€or i '
.Erica are tttrstsre about atty of the inspections or
tite ins tiger se t ence. -going inspections are logged on the back of tiers card.
UFER Ground (4295)
Ditch cover (4030) Stab/Concrete Floor (4255)
Approved
Approved Approved to pLace concrete
By Date
By Date By Date
t PoolApprovedTemporaryPower
p ( �)
Approved Approved
®' Date
By, Date Bt°` Date
Feeders/Sub-panels (4045)
El Rough Electrical (4225) EJ Ceihng Cover (20)
Approved
Approved Approved
® Date
By Date B`• Date
°3 Final - Electrical (4055)
Approved
By Date
MECHANICAL
El Alechanical Rough -in (4165)
EGas Piping (4125) El Final - -Mechanical (4065)
Approved
Approved to release test Approved
y Date
By Date By2L Date Z
Plumbing Groundwork (4190)
Rough Plumbing (4230)
Approved -Approved
Date BvDate
Final - Plumbing (75)
Approved
Date