Loading...
23-102981Electrical City of Federal Way FILE Permit •Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) - Ph: (253) 835-2607 Fax: (253) 835-2 009 Project Name: MARBALLI Project Address: 846 S MARINE HILLS WAY Parcel Number: 515293 0070 Project Description: ADD CIRCUIT C Owner Applicant Contractor ABHISHEK MARBALLI KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 846 S MARINE HILLS WAY ENERGY SERVICES CO (ELECTRICAL 01) FEDERAL WAY WA 98003 3909 196TH ST SW WASHIES854NG (9(7(23) LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 980365 Additional Permit Information Is this an Online or O.T.C. application?,......--.— Yes Circuits - Residential 1 PERMIT EXPIRES Monday, 4 December, 2023 Permit Issued on Wednesday, June 7, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ow s'g anIt C Federal Way. Owner or agent. t Date: W4 0' --SITE THIS C-ARD IS TO R-EALAIN _N Construction Inspection Record Federal Way INSPECTION REQUESTS: (2-53) 83-5-3050 Scheduled inspections nixy be failed if this card is not ou-site, DO NOT LOSE THIS C-A.RD. Inspectionsare listed as close to sequential order as possible (read left to right. top to botioni), Please schedule inspections is appropriate, 'Work- must not be covered until it is approved, Check with your inspector if you are tract re about any of the inspections or the inspection sequence. On-gow-2 M-spectiom are logged on the back of this card. ELEC TRICAL El LTIR Ground (4295) Ditch cover (4030) E] Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bending (4195) Temporary Power (4275) El Service (4235) Approved Approved Approved Bs- Date Bv Date Bv Date Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date Bi Date Final - Electrical (4055) Approved B Date 1/0 ME(­�'HANUCAL 'echanical Rough -in (4165) Gas Piping (4125) El Final -'-%Ich,,ic,l (4065) Approved Approved to release tea Approved By Date By Date By Date El Plumbing Groundwork (4190) Approved to cover By Date Rough Plumbing (4230) Approved By Date Final - Plumbing (4075) Approved By Date