23-103093Plumbing
City of Federal Way Permit •
Community Development Dept,
33325 Sth Ave S FILE
Federal way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PAVILION APARTMENT ES; BLDG 22
Project Address: 1900 SW CAMPUS DR Parcel Number: 132103 9103
Project Description: Replace existing polybutylene piping with PEX in (14) units. start point is at the main at T;
end point is at, but does not include each fixture
Owner Applicant Contractor
PRIME CATALINA CAMPUS DRIVE769999 LEWIS ROSSSagewater SAGEWATER (PLUMBING)
PO BOX 360859 1319 N POWHATAN ST SAGEWL*777JK (8/31/23)
LOS ANGELES CA 90036 ALEXANDRIA VA 22314
1314 POWHATAN ST
ALEXANDRIA VA 22314
Plu bing F' tures
Dishwashers 14 Laundry Washer Outlets 14 Lavatories 28
Showers 28 -Sinks 14 Urinals 28
Water Heaters 14
PERMIT EXPIRES Monday, 11 December, 223
Permit Issued on Wednesday, June 1, 223
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
N
OEW
a d he ; ° Federal Way.
Owne o g
r r a ent: Date:
r� �
THIS CARD IS TO REALAIN ON -SITE
CMly or Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections =-.1, be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close ro sequential or as possible
(read left to right, top to bottom). Please schedule inspections as appropnate. NVork must not be covered unffl it is approved. Check with vour inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspection -are logged on the back of this card.
I -I A
ELECTRWAIL
LTFER Ground (4295)
El
Ditch cover (4030)
E]
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place.concrete
By
Date
By
Date
B-%
Date
Pool Bonding (4195)
U
Temporary Power (4275)
U
Service (4235)
Approved
Approved
Approved -
Bs'
Date
By
Date
B-s
Date
E]
Feeders/Sub-panels (4045)
Rough Electrical (4225)
El
Ceiling Cover (4020)
Approved
AWroxed
Approved
BY
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Date
MECIHANICAL
El
-Mechanical Rough -in (4165)
Gas Piping (4125)
El
Final -'Alechanical (4065)
Approved
Approved to release test
Approved
Bv
Date
Bv
Date
By
Date
PLUMBING
El
Plumbing Groundwork (4190)
Rough Plumbing (4230)
E]
Final - Plumbing (407-;)
Approved to cover
Approved
Approved
BY
Date
By
Date
BY
Date