Loading...
15-100418CITY Of F�dleral my David Nason A 2215 North 30th Street, Suite 300 Tacoma, WA 98403 Re: File #14-105441-00-PC; EAPPLICATION CONFERENCE SUMMARY Boys & Girls Club Synthetic Field Project CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor Dear Mr. Nason: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held February 19, 2015. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not repkesent all applicable codes. In preparing your formal application, please refer to the complete FWRC and other relevant codes for all additional requirements that may apply to your project. The key contact for your project is Stacey Welsh, 253-835-2634, stacey.welsh@cityoffederalway.com. For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Proposal to construct a synthetic sports field with associated infrastructure. MAJOR ISSUES Outlined below is- a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modificationsand revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project and do not include the majority of the comments provided. The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. Mr. Nason Page 2 March 9, 2015 Planning Division 1. A Lot Line Elimination is required, as the project includes three separate parcels. 2. Maximum building height is 30', which may affect a future lighting component. 0 Public Works Development Services Division The proposal is subject to the requirements of the 2009 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to that manual. Conservation Flow Control ani, Enhanced Basic Water Quality requirements apply. Public or Traffic Division Construct street frontage improvements along the property frontage on 8"' Avenue S (FWRC 19.135.040). Building Division L' Demolition permit required for the existing home to be removed. 2. If field lighting is used, electrical and building permits are required. 3. Pedestrian paths from the existing parking lot to the new field and from the right-of-way to the new field must be accessible. 4. Construction of the field requires an EN permit rather than a building permit. Lakehaven Utility District A water service connection application (form enclosed) submitted separately to Lakehaven is requir for each new service connection to the water distribution system, or any modification to an existing water service connection (e.g., larger service, irrigation, abandonment of existing service(s), re- activation, etc.), in accordance with standards defined in Lakehaven's current 'Fees and Charges Resolution'. A "domestic" service/meter cannot be used to supply field watering &/or irrigate non- residential property, due to incompatibility with non-residential sewer service billing. I DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the conference, Each section should be read thor ALe--9p the representative listed for that section. Zoning Designation and Use — The *subject property is designated Single Family Residential (RS 7.2); the proposed use is a synthetic sports field, which is considered accessory to community recreation area/clubhouse, a permitted use in the RS, 7.2 zone as listed within and subject to the regulations set forth in the Use Zone Chart of FWRC 19.200.120. a. Meeting follow up: This is the use category originally discussed between staff and the applicam in December 2014. Since the preapplication. meeting, related notes have been updated to reflect 5is. 15-100418 Doc, ID, 68060 2. Land Use Application —Per the Zone Chart, the project requires a Process III Land Use application. Process III is an administrative review conducted by city staff with a final decision issued by the Director of Community Development. 3. State Environmental Policy Act (SEPA) Environmental Review — The project is subject to environmental review under the State Environmental Policy Act (SEPA) as the proposal exceeds flexible thresholds (grade/fill of more than 500 cubic yards of material) pursuant to FVTRC 14.15.03 0.1 (e). The city does utilize the optional DNS method of combined land use and SEPA notifications when environmental checklists are thoroughly completed. The optional DNS process allows a combined project and anticipated environmental determination public notice period that expedites the overall land use application process. An environmental threshold determination made by the Director of Community Development must be issued prior to land use or building permit approval. 4. Lot Line Elimination — A Lot Line Elimination is required for the project, as it includes three separate parcels (082104-9058, 082104-9119, and 082104-9268). 5. Land Use Review Timeframes — The Planning Division will notify the applicant of application status within 28 days of submittal. If the application is determined complete, staff will issue a Letter of Complete Application. FWRC limits the administrative review to 120 days from the date of a complete application. The 120-clay review period will stop any time the applicant has been requested by the city to correct plans, perform required studies, or provide additional information Deeded to issue a decision. The review period will begin within 14 days following submittal of requested items. Please be advised that any request for corrections and/or additional information must be provided within 180 days of written notification, or the land use application will expire. 6. Public Notice — Process III applications and SEPA determinations require a public notice and 15-day comment period. Within 14 days of issuing the Letter of Complete Application, a Notice of Application and Optional DNS will be published in the Federal Way Mirror, mailed to persons within 300 feet of the subject property, posted on the subject property, and placed at the City's three designated notice boards. 7. Critical Areas —Portions of the subject property are within a 1 -year Wellhead Protection Zone. The proposed improvements do not trigger any added code requirements. i'. General Zoning Regulations — The Use Zone Chart of FWRC 19.200.120 provides regulations for the proposed use, a synthetic sports field, which is considered accessory to community recreation area/clubhouse,- a permitted use in the RS 7.2 zone. The following is only a portion of the zoning regulations governing the proposed use in the RS 7.2 zone. The applicant should consult the referenced Use Zone Chart prior to submitting a Master Land Use Application: a. Required Yards, Lot Coverage, Building Height — Required yards, lot coverage and building height for community recreation area/clubhouse are: i. Front/side/rear — 20'. 1. Per FV*TRC 19.125.160, no improvement or structure may be in a required yard except as follows: 15-100418 Doe I D. 68060 a. Any improvement or structure, other than a driveway and/or parking area, that is not more than four inches above finished grade may be anywhere in a required setback yard. b. An improvement or structure that is not more than 18 inches above finished grade may extend not more than five feet into a required yard. c. Fences and railings not over six feet in height may be located in required yards subject to the fenceregulations contained within this chapter, ii. Maximum lot coverage— 75%. iii. Maximum building height— 30' above average building elevation. 1. This could affect a future lighting component. b. Parking— Required parking is I parking space per 300 sq. ft. of gross floor area (gfa). The proposal does not include new gfa. The site plan depicts a new small parking area with accessible spaces. c. Special Regulations & 11,6tes: a. • • operation may be limited to • impacts • nearby residential uses. b. Site design and specific uses and activities within the facility may be limited by the city to reduce impacts • nearby residential uses. c. (We may exercise these provisions in response to public comment.) 9. Community Design Guidelines — Review of the proposal under the city's design guidelines, FWRC Chapter 19.115, is required for the project and will occur in conjunction with the Use Process. The principal applicable guidelines for the project are noted below. However, this does not necessarily include all applicable guidelines, and project designers must consult the guidelines in their entirety in preparing an application. The application must include a written narrative identifying how the proposal complies with the applicable •.. guidelines, as detailed. a. FVVRC 19.115.010(2) CPTED — Implement Crime Prevention through Environmental Design (CPTED) principles to reduce opportunities for criminal activities to occur. The city's Police Department and Planning Division will evaluate the formal application and review for compliance with CPTED principles. A completed CPTED checklist must be submitted with your application. i. Natural Surveillance — Promote visibility of public spaces and areas. ii. Access Control — Identify techniques that deter unauthorized access and/or inappropriate access. iii. " Ownership —Reduce perception of areas as ownerless. b. FWRC 19.115.050 Site Design —Refer to all sections of this chapter for site design standards. Key sections include: i. (1) General Criteria (a), (b), (c), (d), (e) and (g) ii. (4) Pedestrian circulation and public spaces (a) and (b) 1. (a) Primary entrances to buildings, except for zero lot line townhouse development and attached dwelling units oriented around an internal courtyard, should be clearly visible or recognizable from the right-of-way. Pedestrian pathways from rights -of -way and bus stops to primary entrances, from parking lots to primary entrances, and pedestrian areas, shall be accessible and should be 15-100418 Doe, LD. 68060 clearly delineated. [Pedestrian paths are needed from the existing parking lot to the,)' eld andfroin e Ave S. to the field.] iii. (5) Landscaping iv. (7) Miscellaneous (a) c. FWRC 19.115.090(4) District Guidelines for all residential zones — Requirements of this section apply to the project (FVvRC 19.115.090(1)(i) and 0). 10. Parking Lot Design - Design criteria is based on the enclosed department handout. Typical 90- degree design standards are 9'xl 8' stalls with 25' drive aisles. Wheel stops shall be provided on all stalls adjacent to pedestrian pathways. 11. Lighting — In addition to Crime Prevention through Environmental Design (CPTED) lighting standards, the following shall apply: a. Lighting regulations include FWRC, 19.105.030: i. Efficient light sources. The applicant shall utilize energy efficient light sources. ii. State code. The applicant shall comply with the state energy code with respect to the selection and regulation of light sources. iii. Glare from subject property prohibited. The applicant shall select, place and direct light sources both directable and nondirectable so that glare produced by any light source, to the maximum extent possible, does not extend to adjacent properties or to the right-of-way. (See also FVVRC 7.05.030.) b. Lighting standards shall not reduce the amount of landscaping required for the project (FVVaC 19.115.050). c. If new lighting is proposed, a photometric lighting plan that meets the standards of the Illuminating Engineering Society (IES) minimum outdoor light levels will be required with the Process III application. d. Meeting follow up: At the preapplication meeting, you asked if there was information about lights used for previous field projects. A records check showed there have been no recent private field lighting projects. You may want to check with the Parks Department to see if they have a standard for field lighting. 12. Fencing — Per FVY'RC 19.125.160(5) fences not over six feet in height may be located in required yards. Fences located outside of required yards are subject to the height restrictions that apply for the underlying use in the zone and are subject to building permits if over a certain height. a. Meeting follow up: There are no additional design guidelines that apply to chain link fences in a resi4.ential zone. 13. Landscaping — Landscape requirements are contained in F)ATRC Chapter 19.125 "Outdoors, Yards, and Landscaping." Following are the key 'landscape requirements for the project. (a) A landscape plan prepared by a Washington State licensed landscape architect shall be ' submitted with the formal application. Please follow general guidelines outlined in FWRC 19.125.040(l) through (28) when preparing the site plan and planting schedule. % (b) Per FWRC 19.125.060(2), for properties within the Single Family Residential, RS 7.2 zone: a) Type III landscaping ten feet in width shall be provided along all property lines of ' nonresidential uses in the RS zoning district. Note: this is applicable to the south and east property lines adjacent to the new field (as long as a Lot Line Elimination is completed). 15-100418 Doc, ID, 68060 14. Tree Density Requirements — A tree and vegetation retention plan as required under FWRC 19.120.040(2) must also be submitted with the Process III application. The tree and vegetation retention/replacement plan must be prepared by a certified arborist or certified landscape architect. The standards require each development to maintain a minimuin tree unit density. As required under FWRC 19.120.13 0(2), the minimum tree density in the RS 7.2 zone, is 25 tree units per acre. The subject property's density would be 109 tree units (25 tree units x 4.36 acres). A tree unit is a value assigned to existing trees retained on the property or replacement trees. The larger the tree, the greater value it is assigned. Required tree density can be composed of retained trees and replacement plantings per FWRC 19.120.130. The tree and vegetation plan must clearly show where the 109 tree units are to be located. The formal landscape plan must detail information about tree unit credits and replacement. A tion or fe - in -lieu payment to the city's urban forestry account may be approved by the director. See FWRC 19.120.140 for off -site mitigation and fee -in -lieu payment requirements. 15. Clearing & Grading — The applicant is required firbtain clearing and grading plan approval as a component . of Process III approval. Consult FVY'RC 19.120.040(l) for items that are required to be included on the plan including the anticipated amounts of cut and fill. 16.Time Limitations — Per FVY'RC 19.15.100.2, the applicant must substantially complete construction for the development activity and complete the applicable conditions listed in the decision within five -years after the final decisions. Requests for time extensions may be granted by the Director of Community Development if criteria set forth in FV*TRC 19.15.110 can be met. 18. Application Fees & Submittal — Please contact the Permit Center at 253-835-2607 for updated fee schedules for applications and permits. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Ann Dower, 253-835-2732, Land Use Issues — Stormwater 1. Surface water runoff control and water quality treatment will be required per the 2009 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the 2009 -KCSWDM. This project meets the requirements for a Full Drainage Review. At the time of land use site plan submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the eight core and five special requirements of the KCSWDM Will be required. A Level I downstream analysis shall also be provided in the preliminary TIR. 2. The project lies within a Conservation flow control area. The projectalso lies within an Enhanced Basic Water Quality Area. Flow control and water quality treatment shall be designed to meet the criteria outlined for these areas. 15-100418 Doe, I D. 69060 &SIN OU VA 024 Of N241 k-ifflOd 917,101 VIP LON I I Ld. Redevelopment which involves the collection and/or concentration of surface and/or stormwater runoff from a drainage area of 5,000 square feet or more; Lf. Redevelopment which involves a change in use, and the changed use has a potential to release a new pollutant(s) to surface water systems within the City. For the purposes of this subsection, "new- pollutant(s)" means a pollutant that was not discharged at that location immediately prior to the change in use, as well as a pollutant that was discharged in less quantities immediately prior to the change in use; As currently designed, water quality treatment will be required for the entire site, including new and existing pollution -generating impervious surfaces. For pollution -generating impervious surfaces (i.e., parking lot), treatment options must be selected from the Enhanced Basic Water Quality Menu provided in the KCSVTDM. Basic Water Quality requirements would apply to pollution -generating pervious surfaces (i.e., soccer field). If stormwater runoff from the soccer field can be fully dispersed or fully infiltrated, it will not be considered "concentrated," will not release pollutants to the City system, and thus would not trigger water quality requirements. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 5. Detention and water quality facilities must be above ground (i.e. open pond). Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. 6. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 7. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination System (NPDES) permit may be required. Information regarding this permit can be obtained from the Washington State Department of Ecology at h1tRLHwy --------- or by calling 360-407-6437. Kight-of-Way Improvements See the Traffic Division comments from Erik Preston, Senior Traffic Engineer, for traffic related items. I►I I - 6_ I I , is 1 . Engineered plans -are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the City. Engineering review fees are $824.50 for the first 12 hours of review, an d $68.00 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a professional engineer registered/licensed in the State of Washington. 2. The Federal Way Development StandW* Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the City's website * assist the applicant's engineer in preparing the plans and TIR. 15-100419 Doc, LD, 68060 Bonding is required for temporary erosion and sediment control measures associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to. 30 percent of the original amount and held for a two-year maintenance period. 4. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street. systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two- year maintenance period, the remainder of the bond will be released; Maintenance for private roads and drainage facilities remains the responsihility of the individual property owners. 5. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations ,?Te calleii out. 6. Drawings submitted for plan review shall be printed on 24" x 36" or22" x 34" paper. All final approved drawings shall be drafted/plotted on 24" x 36" or 22" x 34" mylar sheet with permanent black ink. Site plans shall be drawn at a scale of 1 20', or larger. Architectural scales are not permitted on engineering plans. 7. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures, per Appendix D, 2009 KCSVY`DM, must be shown on the engineering plans. 8. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. F`UBLIC WORKS TRAFFIi2 DIVISION (Erik Preston. 253-835-2744iei7*�iM�-,Oog�WQMd�rW)��4Y�com Transportation Concurreney Analysis (FWRC 19.90) Based on the submitted materials for a private non-commercial synthetic sports field, the proposed project is estimated to generate no new weekday PM peak hour vehicle trips. However, it is reasonable to assume that pedestrian activity will increase with the construction of the sports field. A concurrency permit is not required for this development project. ...... . . . . . . . . percent threshold criteria. for requiring street frontage improvements as identified in the FWRC 19.135.03 0. The applicant/owner may submit an appraisal for the subject property, or King County Assessor's records may be used. The Public Works Development Services Division will evaluate t sm'tirriMet a-1WKM7iF?M 0 1 JA requiring street frontage improvements to the extent they are commensurate with the impacts of theE development. I 15-100418 Doc. I.D. 68060 1 Since the proposed project is estimated to generate no addition vehicle trips during the PM peak hour and the subject property does not have continuous frontage on 8h Avenue ' S, requiring full frontage improvements would not be commensurate with the impacts of the development. As such, the project is expected to increase pedestrian activity to and from the site which does not have existing pedestrian facilities. The applicant/owner would be expected to construct the following street improvements consistent with providing safe pedestrian access to the site: a. Construct the missing section of pedestrian curb on the shoulder walkway in front of the existing residence driveway. b. Traffic Division staff recommends constructing an ADA accessible pedestrian connection to the shoulder walkway separate from the vehicle access. BUILDING DIVISION (Scott Sproul, 253-835-2633, scott.sprou!@cit .clan 1 International Building Code (113C), 2012 Washington State Amendments WAC 51-50 International Mechanical Code (IMC), 2012 Washington State Amendments WAC 51-52 Uniform Plumbing Code (UPC), 2012 Washington State Amendments WAC 51-56 & WAC 51-57 International Fire Code (IFC), 2012 Washington State Amendments WAC 51 -54 National Electric Code (NEC), 2012 Accessibility Code, ICC/ANSI Al 17.1 - 2009 International Residential Code, 2012 Washington State Amendments WAC 51-51 Washington State Energy Code, 2012 WAC 5 1 -11 Site -Specific Requirements • Demolition permit required for the existing home to be removed. • If field lighting is used, electrical and building permits are required. • Pedestrian paths from the existing parking lot to the new field and from the right-of-way to the new field must be accessible. • Construction of the field requires an EN permit rather than a building pen -nit. 15-100418 Doc. ID. 68060 LAKEHAVEN UTILITY DISTRICT (Brian Asbury, 253-946-5407, AAAyaQLa�� 11Ir 1 r11�112?�111111; I� III I I I 10ITTIT-IMMMIN CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City's review of the formal aDDlication. The comDletion of the j2reav�Jication Drocess in the content of this letter i 5-100418 Doc. I D. 68060 does not vest any ftiture project application. Comments in this letter are only valid for one year as per FV,rRC 19.40.070(4). As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. information regarding development requirements outlined abo�e. In' addition to this preapplication letter, please examine the complete F)YRC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department LIe - neral vuestions can be directed towards the k ect contact, Stacey Welsh, 253-835-2634. We look forward to working with you. MTATMPJ Stacey Welsh, AICP Senior Planner enc: Bulletin 001 'Process 111 Submittal Requirements' Bulletin 003 'Master Land Use Application' Bulletin 022 'CPTED Checklist' Bulletin 042 'Parking Lot Design Criteria' Bulletin 050 'SEPA Environmental Checklist' Lakehaven Utility Map FYvTRC 7. 10 (Noise) c'. Mark Hendricks, Federal Way B & G, 30815 8'h Ave S., Federal Way, WA 98063 Calvin Gasaway, Greene Gasaway, PO Box 4158, Federal Way, WA 98063 Ann Dower, Senior Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Vince Faranda, South King Fire & Rescue 15-100418 r l-TGTAXC7 t•1I1'01 7 The Federal Way Boys and Girls Club is located at 30815 8T" Avenue in a Single Family Residential (RS 7.2) zone. It was constructed in 1978, prior to incorporation of Federal Way O, • The applicant is proposing to add a new soccer field, approximately 30,000 square feet in size. The soccer field would be located on a small portion in the south of Parcel 082104-9058, on which the club is located and also on Parcels 082104-9268 and 082104-9119. The soccer field would be an accessory use to the club. Lei The Federal way Boys and Girls Club is considered a recreation area/club house, which is an allowable use in the RS 7.2 zone. Per FWRC 19.200.120, the following standards would apply: Potential Approval Process Setbacks Parking Standards Landscape Categories Screening Community Per FWRC Front 20 feet 1 for each 300 Per FWRC recreation area 19.15.030, Review Side 20 feet square feet of 19.125.060(2), or clubhouse processes for Rear 20 feet gross floor area Type III improvements and landscaping 10 feet additions to However, the in width shall be developed sites, this addition of a soccer provided along all would require field should not property lines Process III review increase the need because SEPA would for parking be required based on the quantity of grading 0 • • Since the soccer field would be constructed over property lines, they would need to do lot line elimination. 1 r • C117-11014 �. The applicant says that they don't know the exact amount of cubic yards, but it will exceed 500 cubic yards. Therefore, SEPA review will be required. I:\2014 Counter Calls\120514 Boys and Girls Club.docx CITY OF FEDERAL WAY Preapplication Conference Sign -In Sheet Ll-I /ILU ID DIM AL CITY OF 41� maelral My David Nason ABBL Inc. 2215 North 30th Street, Suite 300 Tacoma, WA 98403 V'! I—S003-6325 e n (253) 835-7000 www cityoffederalway com Va: FILE #15-1II. 18-00-PC PREAPPLICATION CONFERENCE SCHEDULED Boys and Girls Club Field Project, 30815 8'h Avenue South, Federal Way The Community Development Department is in receipt of your preapplication conference request. The [�rqject applicant has been scheduled as follows: M19MMIM, Hylebos Conference Room 4;*rA 33325 8th Avenue South Federal Way, WA 98003 attend the meeting as this will be the only notice sent by the department. If you have any questions 'tr-253-803-5-2634—. IMM Doc. LD 67830 CITY OF FEDERAL WAY DEPZ.-RrVN1ENT OF COMMUNITY DEVELOPMENT DATE: 1-28-15 TO: Ann Dower, Development Services Rick Perez, Traffic Scott Sproul, Assistant Building official Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue FROM: Stacey Welsh, Planninq FOR DRC` G. ON: 2-12-15 - Internal 2-19-15, 9:00 - with applicant ................ .......... -- ............. ...... FILE NETMER (s) 15-100418-00-PC RELATED FILE NOS.: None PROJECT NAME: BOYS AND GIRLS CLUB - SYNTHETIC FIELD PROJECT PROJECT ADDRESS: 30815 8TH AVE S ZONING DISTRICT: RS 7.2 PROJECT DESCRIPTION: Proposal to construct a synthetic sports field with associated infrastructure. I PROJECT CONTACT.* AHBL INC. DAVID NASON 2215 N. 3 OTH St. Suite 300 Tacoma, WA 98403 MATERIALS SUB14ITTED: Master Land Use Application Civil Site Plan RECEIVED J A N 7 20", 5) CM OF FEDERAL WAY CDS DEPARTumT oF CommuNm DEVELopmFNT SFMVICM 33325 8h Avenue Soul Federal Way, WA 98003-63 3 253-835-2607; Fax 253-835-26 5 *ww�dbmffWmbv-A �goj AppucAmN No(s) (-)u PC', Date -,YAtIWA� -?-S,-7-0kS Project Name -F-6 DORF` L- WP--1 R!E�J -=, At-)O CA-02, Pi KU -TOCrr Property Address/Location A�,i Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Camp Plan/Rezone Land Surface Modification Lot Line Elimination X Preapplication Conference Process I (Di ctor's Approval) Process IT (Site Plan Revi* ProcesEa 0*0a4pro*aO Process IV (H earing Exammer's Decision) Process V Quasi -Judicial Rezone) Process VI SEPA w/Proiect SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Conunercial/Residential Required Information I HuRoMsiiF - Value of Proposed Ernproveme International Building Code (IBC): wduopmq T Applicant Name.- DAQkQ Address-. 9-7-15 30:�/ q;TAC-S ki= 300 City/State: -NC,0,1Ar, W/* q640-3 71p: "IM03 Phone- 2S3- SZ-3 2-14-Z.-2- Fax: 29�;,-s 38-M-1 Email: dno-'."On Cd, m4 6l. car,, Signature: Agent (if different than Applicant) Name: A<3dm,s- P0 ac�-A '44,56 Ay/State: Zip: q, Phone, Fax: Email- r Signature: 5# =1 Name: }LAP CY- Address: SMS 014'PNe St city/state: I Wwy WA Zip. 0 0 to -L Phone: ZSS &81 fa Fax: Email- 1-r1h rft�4S S 'S� \Je 0 Signature:1/1 7- ., I Bulletin #003 — January 1, 2011 Page 1 of 1 kMandoutsWaster Land Use Application