Re: File #17-104851-UP PROCESS 111, PROJECT APPROVAL
NWCC Center Plaza — Fire Damage Rebuild, 2020 South 320th Street, Federal Way
The Community Development Department has completed administrative land use review of the proposed
NWCC Center Plaza project located at 2020 South 320th Street. The applicant proposes reconstruction of a
22,000 square foot multi -tenant commercial building with associated site work. The previous 22,000 square
foot building was destroyed by fire on May 21, 2017.
The Process III Master Land Use (NdLU) application submitted October 10, 2017, with subsequent
resubmittals dated October 30, 2017, January 8, 2018, and March 14, 2018, is hereby conditionally approved
based on the enclosed findings of fact, incorporated into this decision in full, and the following conclusions
based on those facts:
1. The proposal is consistent with the comprehensive plan;
2. The proposal is consistent with all applicable provisions of Federal Way Revised Code (FWRC);
3. The proposal is consistent with the public health, safety, and welfare;
4. The streets and utilities in the area of the subject property are adequate to serve the
anticipated demand from the proposal;
5. The proposed access to the subject property is at the optimal location and configuration; and
6. Traffic safety impacts for all modes of transportation, both on and off site, are adequately
mitigated.
The remainder of this letter outlines the land use review process required for this particular site improvement;
summarizes the State Environmental Policy Act (SEPA) process; lists conditions of the land use decision; and
provides other procedural information. This land use decision does not authorize initiation of construction
activities.
REviEw PROCESS
The site is within the City Center Core (CC-C) zoning district. Retail, restaurant, and office are permitted uses
in this zone subject to the provisions of FWRC 19.225.010, "Office Use"; F\VRC 19.225.020, "Retail Use";
Page 2 of 3
March 26, 20181
and FWRC 19.225.040, "Entertainment." The proposed uses, not exempt from SEPA, are reviewed under
Use Process III, Prqject Approval. The Director of Community Development makes a written decision on the
application based on the criteria listed under FWRC 19.65.100.
SEPA PROCESS -
Pursuant to Wasbin ,gton Administrative Code (WAC) 197-11-172 and FWRC 14.15.130, the project qualified as a
Planned Action on November 13, 2017. The project is not subject to a SEPA threshold determination, an
environmental impact statement (EIS), SEPA appeal, or any other additional review under SEPA.
CONDITIONS OF APPROVAL
The following conditions are reasonably necessary to eliminate or minimize any undesirable effects of granting
application approval.
1. Prior to final inspection, vents and similar appurtenances that extend above the rooffine must be
surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building, to
obscure the view of the appurtenances from adjacent streets and properties.
2. Per FWRC 19.15.090(3), a Site Plan Modification (Administrative Decision) is required for the new trash
enclosure.
BUILDING PERMIT REQUIREMENTS
This Process III land use decision does not constitute a building permit, or authorize clearing/grading
activities. If you have any questions regarding the building permit submittal (city file no. 17-104861-CO),
please contact the Permit Center at 253-835-2607, or I)g
REQUESTS FOR CHANGE OF VALUATION
Per FWRC 19.65.100(4)(i), affected property owners may request a change in valuation for property tax
purposes, nomithstanding any program of revaluation.
APPROVAL DURATION
Per FWRC 19.15.100(2), unless modified or appealed, the Process III decision is valid for five years from the
date of issuance of the decision. Time extensions to the decision may be requested prior to the lapse of
approval, following the provisions listed in FWRC 19.15.110. The improvements must be substantially
completed within the five-year time period, or the land use decision becomes void.
APPEALS
Per FWRC 19.05.360, the effective date of issuance is three calendar days following the date of this letter,
March 29, 2018. Pursuant to FWRC 19.65.120(l), this land use decision may be appealed by the applicant,
any person who submitted written comments or information, or any person who has specifically requested
copy of the decision. In compliance with FWRC 19.65.120(2), any appeal must be in the form of a letter
delivered to the Community Development Department, with the established fee, and within 14 days after 11
effective date of issuance of this decision, or April 12, 2018. The appeal letter must contain a staterner I
17-104851-00-UP D ID, 77489
Mr, Joe Donahou
Page 3 of 3
March 26, 2018
identifying the decision being appealed, along with a copy of the decision; as statement of the alleged errors in
the dixector's decision, including identification of specific factual Findings and ccractusions of the director
disputed by the person filing the appeal; and the appellant's name, address, telephone and fax numbers, and
any other information to facilitate communications widi the appellant. The Federal Way Hearing Examiner
will hear any appeals of the Process Ill decision.
CLOSING
This land use decision does not waive compliance with future City of Federal Way codes, policies, and
standards relating to this development.
If you have any questions regarding this decision, please contact Senior Planner Stacey Welsh, at 253-835-2634, or
sty wel l rt citloffedr al va, -con'.
Sincerely,
rya Davis
Community Development Director
enc: Exhibit A, Findings for Project Approval
Approved Site Plan
Approved Landscape Plan
Approved Elevations
Stacey Welsh, Senior Planner
Peter Lawrence, Plans Examiner
Cole Elliott, Development Services Manager
Sarady Long, Senior Transportation Planning Engineer
Brian Asbury, Lakehaven Water & Sewer
Chris Cahan, South King Fire & Rescue
Mark McDonald, NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122
John Wilson, King County Assessor, #ADM-AS-0708,500 4- Avenue, Seattle, WA 98104
Doc. I.D. 77489
17-104851-00-UP
Findings for Project Approval
Federal Way Revised Code (FWRC) Chapter 19.65, "Process III Project Approval"
NWCC Center Plaza — Fire Damage Rebuild, File #17-104851-UP
The Director of Community Development hereby makes the following fitidings pursuant to content
requirements of the Process III written decision as set forth in Federal Way Revised Code (FWRC)
19.65.100(4). These findings are based on review of existing city documents and items submitted by the
applicant and received on October 10, 2017, October 30, 2017, January 8, 2018, and March 14, 2018.
1. Proposal — Reconstruction of a 22,000 square foot multi -tenant commercial building with associated
site work on a 5.9 acre site. The site contains other commercial buildings and parking areas.
2. Zoning and Comprehensive Plan Designation — Zoning for the subject property is City Center Core
(CC-C). Retail,, restaurant, and office are permitted uses in the CC-C zoning district pursuant to
FWRC 19.225.010, "Office Use"; FWRC 19.225.020, "Retail Use"; and FWRC 19.225.040,
"Entertamm . ent." The Federal Way Comprehensive Plan (FWCP) designation for the subject property
is City Center Core.
Site Plan Review Process — The project requires review under Process 111, -?'roject Approva777T*
Director of Community Development makes a written decision on the application based on the
criteria listed under FWRC 19.65. 100.
4. State Environmental Policy Act (SEPA) — Pursuant to Washington Administrative Code (WAC) 197-
11 - 172 and FWRC 14.15.13 0, the prej ect qualified as a Planned Action on November 13, 2017. The
project is not subject to a SEPA threshold determination, an environmental impact statement (EIS),
SEPA appeal, or any other additional review under SEPA.
Public Notice — Pursuant to Process III regulations, a Notice of Land Use Application (NOA) was
issued on November 17, 2017, and posted on the subject property and displayed on the designated
city notice boards. As it was not published in the newspaper as required, a revised NOA was issued
17
on November 24, 20, and published in the Federal Way Mirror and displayed on the designated
city notice boards. Pursuant to SEPA regulations, for projects that qualify as planned actions, public
notice shall be provided as specified in FWRC 14.15.060(3), "Public notice for projects that qualify
planned actions shall be tied to the underlying permit. If notice is otherwise required for the
underlying permit, the notice shall state that the project has qualified as a planned action." The NO
contained a statement that the project qualified as a planned action.
6. Public Comments — No public comments were received during the comment periods.
Findings for Project Approval Page I of 5
17-104851-00-UP Doe. I.D. 77488
Non-Conforniing Regulations — The existing structure was destroyed by a fire on May 21, 2017. If the
applicant complies with FWRC 19.30.200, then with regard to zoning code provisions, the structure
may be rebuilt.
Per F)ATRC 19.30.200, if a nonconforming use or development is damaged by sudden accidental cause,
that use or development, including associated improvements, may be reconstructed if it meets the
following requirements: (I)The use or development, including associated improvements, as
reconstructed, is not any more nonconforming than it was immediately prior to the damage; (2) The
the dama ed im rovement within
long
61
10. Landscaping — Per FWRC 19.125.060(7), perimeter landscaping is required as follows: Type Ed
"Visual Buffer" landscaping five feet in width along the perimeter of parking areas abutting public
rights -of -way and all other perimeter lot lines, except that landscaping is not required along perimeter
lot lines abutting rights -of -way where no required yards apply pursuant to Chapter 19.225 FWRC.
The only perimeter landscaping affected by the project is located south of the building, where it will
be replaced. For reference, no landscaping is required on the south side as there is a 0-foot yard
(setback) required per FWRC 19.225 and FVTRC 19.125.060(7).
Per FWRC 19.125.070(2)(a)(i)(A), parking lot landscaping is required in the amount of 20 square fe
of landscaping per parking stall. Parking lot landscaping is not proposed to be modified as part of if
project, per the submitted landscaping plan. With regard to landscaping, the replacement building wi
either conform to the code requirements or not be any more non -conforming than it was previously.
Findings for Project Approval Page 2 of
17-104851-00-UP Doe. I.D. 774"
11. Clearing & Grading — Clearing and grading activities will be minor as the same site is being used for
the project. As such, it will be reviewed for consistency with applicable standards set forth in FWRC
Chapter 19.120, as part of the building permit review.
12. Tree RetentionlReplacement — Per FWRC 19.120.030(14), tree removal on sites zoned CC-C is
exempt from the tree code.
14. Community Design Guidelines —FViRC Chapter 19.115 contains the Community Design Guidelines.
The applicant submitted a Crime Prevention Through Environmental Design checklist, which was
-reviewed by city staff. The primary entrances to the building will be visible from the right-of-way, as
they were previously.
toll rill
yard and as such, the new standpipe is not required to be screened.
The previous building used various methods to articulate blank walls on all four building fa9ades,
mainly with the use of alternating sections of windows and brick. Regarding the reconstruction,
according to the architect, "the building articulation has been accomplished by a combination of
design elements that include material, color and textural variation. Banding of materials with differe a
size, color and textural values has been incorporated in the masonry portions of the fagades." The
previous building had fagade modulation on the north and south building fagades. The replacement
building will have similar. fagade modulation on the north and south side, and will also have canopiel,
to further break up the fagade.
With regard to community design guidelines, the replacement building will either conform to the code
requirements or not be any more non -conforming than it was previously.
15. Rooftop Mechanical Equipment — Per FWRC 19.110.070, vents and similar appurtenances that extend
above the roofline must be surrounded by a solid sight -obscuring screen that is integrated into the
architecture of the building and obscures the view of the appurtenances from adjacent streets and
properties. The previous building had no visible rooftop mechanical equipment. The replacement
building's rooftop equipment will be screened by the exterior fagade of the building, as shown on the
plans. The architect indicated that, "the building design uses the height of the parapets and equipment
placement to screen the units on all elevations. Manufactured HVAC equipment screening is
proposed for the east and west elevations where wall articulation reduces the height of the parapet. If
the equipment is relocated or additional equipment added that will be visible above the screening
parapets, the owner will install additional equipment screening." A condition of approval shall requir*
compliance with the standard.
16. GarbagelRecycling — In the original land use application submittal, a trash enclosure was proposed
that would have been an addition to the site and not a replacement of one that existed previously. The
new enclosure required removal of three existing parking spaces. The applicant was requested to
detail on the site plan the number of parking spaces provided compared to the number required, and
factor in the removal of spaces for the new trash enclosure. In the project resubniittal, it stated the
trash enclosure was to be separated from the building reconstruction and permitted separately once
I is
tenant requirements are known. Although it is still shown on the site plan, the new trash enc osure
not approved as part of this Use Process Iff approval. A condition of approval shall note the
Findings for Project Approval Page 3 of 5
17-104851-00-UP Doc, LD, 77488
or -it U I IV.) I I r.) I I a U) drs V-0 I too Mr. NIUMA tell I I a tw-140i I a Valtv; I I I I 411mra I I NNUMN I Va I taxwMI)MANI I WyMMUMV9
la"TJ NMI$
parking.
17. Lighting - The proposal includes outdoor lighting. Per FWRC 19.105.030(3), the applicant shall
select, place, and direct light sources, both directable and nondirectable, so that glare produced by a]
light source, to the maximum extent possible, does not extend to adjacent properties, or to the right-
of-way. The replacement building is setback from the right-of-way and adjacent properties. No
changes are proposed to the existing parking lot lighting.
building permit has been submitted (city file no. 17-104861-CO).
19. Transportation - No concurrency and traffic impact fee are required because the project is a
replacement due to fire. Typically, the applicant/owner would be expected to construct street
improvements consistent with the planned roadway cross -sections as shown in Map HI-4 in Chapter
III of the FWCP and Capital Improvement Program (CIP) shown as Table 111- 10 (FWRC
19.135.040). However, since the fire has been determined to be an accident and the applicant is
proposing to replace the damaged building, street improvements will not be required nor warranted in
meeting nexus and FVvrRC 19.30.200.
20. StIter - The project is required to meet the current version of the stormwater manual. If the
project meets the requirements of FWRC 19.30.200, then additional requirements do not apply.
Engineering review of the submitted building permit application is ongoing.
21. WaterlSewer - Lakehaven Water & Sewer District is the water and sewer service provider. Lakehaven
issued certificates of water and sewer availability on October 27, 2017; certificates are valid for one-
year from the date of issuance. The previous building's sewer service connection was disconnected on
August 1, 2017, under Lakehaven Sewer Service Connection Permit 28218. For the new building, the
applicant will need to submit applications to Lakehaven for any necessary water and/or sewer service
connections. As of March 20, 2018, no service connection application have been submitted to
Lakehaven for sewer re -connection (required), or to upsize the existing domestic service/meter (if
necessary), or for new/additional fire -protection service connection (if necessary). The applicant will
need to address these items as part of the building process.
22. South King Fire & Rescue - This project will require two fire hydrants, and there are two existing fire
hydrants available for this project. Fire apparatus access roads shall be installed and made serviceable
prior to and during the time of construction. A recessed fire department "Knox7 brand key box shall
be installed on the building. An NFPA 13 fire sprinkler system is required. A fire alarm system is
required. The applicant will need to address these items as part of the building process.
23. Conditions ofApproval - The following conditions of approval are attached to the Process Ell decision:
Prior to final inspection, vents and similar appurtenances that extend above the roofline If be
surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building, to
obscure the view of the appurtenances from adjacent streets and properties.
Per FVVrRC 19.15.090(3), a Site Plan Modification (Administrative Decision) is required for the new
trash enclosure.
Findings for Project Approval Page 4 of 5
17-104851-00-UP Doc. ID. 77488
24. CbriviWion —;As Qonddfionw� the propospd site plan, application has been determined to be consi8tent
with th& FWCP; with a apolkabl& provi kos of the M� and with the public health, safety and
welfare. The streets and utilities in the area of the subject property are adequate to serve the
anticipated demand from the proposal, and the proposed access to the subject property is at the
optimal location and configuration for access. The proposed development is consistent with Process
III, Project Approval, decisional criteria required under FWRC Chapter 19.65.
wdtLthe
pertinent zoning regulations, and all other applicable city regulations. Final construction drawings will be
reviewed for compliance with specific regulations, conditions of approval, and other applicable city
requirements. This decision shall not waive compliance with future City of Federal Way codes, policies,
and standards relating to this development.
Prepared by: Stacey Welsh, Senior Planner Date: March 23, 2018
Findih Ys for Project Approval Page 5 of 5Doc. I.D. 77488
17-104851-00-UP
RESUBMITTED
CrTY OF FEDERAL WAY
COMMUNrTY DEVELOPMENT
WARIMM-11MM
Stacey Welsh, AICP
Senior Planner
City of Federal Way
33325 81h Avenue South
Federal Way, WA 98003-6325
RE: Permit Application ff 17-104851-UP; TECHNICAL REVIEW COMMENT LETTER
Center Plaza Building A; 2020 South 320tb Street, Federal Way, WA
Below you will find a summary ofthe changes to the fermit Application c[ocumenis as-77 res��on,#-Y* OF y*;X
review /comment letter dated December 11, 2017. Changes to the documents have been clouded in addition
to the summary of the changes contained in this letter. Please feel free to contact me if you have any
additional questions or comments.
W� �--I=
a. The Parking Summary has been updated. Please reverence the revised table.
b. The trash enclosure should be separated from the Building Reconstruction and a separate permit
application will be submitted along with a revised parking count. Many times Leases designat"
specific trash storage volume dedicated to a single Tenant. We wish to confirm the required size
and best location of the enclosure based on the Tenant requirements before we proceed ftuther
with the permitting.
c. No new transformer will be installed. The screening of the existing transformer will be a
component of the landscape upgrades, reference the revised landscape drawings. A new FDC will
be installed adjacent to the existing fire hydrant east of the building. Screening landscaping will
be added as Fire Department clearances allow. Reference the revised Landscape design.
4. a. The trash enclosure is to be submitted for a separate permit review when the required size can
more accurately be determined.
5. a The Building articulation has been accomplished by a combination of design elements that
include material, color and textural variation. Banding of materials with different size, color and
textural values has been incorporated in the masonry portions of the facades. Sections of projecting
metal canopies have been used to divide the facades into smaller visual components using color and
shading. The largest blank portions of the wall use a panelized finish with a defined reveal pattern to
visually reduce the size of the wall using many smaller components. No additional landscape
screening has been added in the glazed recesses due to a basic conflict with the retail nature of the
use.
b. The north and south facades of the new building have similar modulation to the previous
building. The east and west comers of the north and south facades are angled in similar fashion to tho
original building to minimize the mass of the building. Both buildings also contain modulation in the
mid -portion of the north and south facades. The size of the proposed mid -building modulation is
greater than that provided by the original building. In addition, the parapets return onto the roof to
extend a modulation element onto the roof, which the original building did not do. The new building
also uses compliant canopy elements on the south elevation to provide an additional modulation
element. The original building used an uninterrupted canopy which did not enhance the modulation
of the fagade.
c. The mechanical design for the building is not yet complete, but it is anticipated that HVAC
equipment will consist of multiple units having the relatively small capacity of 5 tons. No large
HVAC equipment is intended to individually serve large portions of the building will be used. The
building design uses the height of the parapets and equipment placement to screen the units on all
elevations. Manufactured HVAC equipment screening is proposed for the east and west elevations
where wall articulation reduces the height of the parapet. If the equipment is relocated or additional
equipment added that will be visible above the screening parapets, the Owner will install additional
equipment screening.
d. The height of the proposed building is the same as the height of the original building.
1101110 �-1
mm= i L
6. Comments from the Building Department were received and responded to separately from the
remaining Technical Review Comments.
7. The SEPA Checklist has not been revised, but the Civil Engineering has been updated. See the
attached Site Development drawings and response letter.
LARIMOM=8
W
I IV
9. Since the time of the Comment Letter from Brian, the Water and Sewer availability have been
confirmed and applications made for new service to the reconstructed building.
10. The Water Availability Certificate and Hydraulic Flow Model were submitted with the Building
Permit application. A copy is attached.
Fire Hydrants
11. The existing Fire Hydrant locations will be reused. Reference the Revised Site DevelopmeM
Drawings for the Fire Hydrant locations serving Building A. I
i • �,-- a I
mmz•=- �
14. Acknowledged. Reference the Site Development Drawings for additional information.
15. Compliant Fire Lane markings will be provided prior to the Final Inspections. Reference the revised
Site Development documents for the proposed Fire Lane markings and Emergency Vehicle Access
route.
17. The general location of the lockbox is noted on the drawings. During construction the Fire Marshal
will be consulted on the exact preference for the final location. Reference Drawing A- I I I and A-201
for the location.
Fire Sprinkler System
18. Acknowledged. The sprinkler system design is identified as a Deferred Submittal and will be
submitted separately.
19. The Building is being designed with fire sprinkler coverage throughout the entire structure.
20. Acknowledged. Reference the Fire Sprinkler Design documentation of the Deferred Submittal when
provided.
Fire Alarm System
0
22. Reference the Fire Alarm Design documentation of the Deferred Submittal when provided. The
system will be designed with sufficient capacity to adequately meet the needs of the anticipated mix
of tenants.
Fire Suppression System
23. Acknowledged. An approved fire suppression system will be installed when required by the tenant
NSWIMMI
FMWITJI�I �
Let me know if you have questions regarding the resubmittal materials or if any additional information is
required to complete your review.
Sincerel)
Jim Wieben, Architect
DDG Architects
8383 15 8th Ave NE, Suite 250
Redmond, WA 98052
(425) 285-9992 x106
I
Aakehaven
WATER A, SEWER DISTRIC 1'
Hydraulic Model Fire Flow Estimat�i
Request/Reporting Form
Requested By: Date:
Shawna Upton 12/21/17
Location to be Modeled: Existing Hydrant for 2020 S 320" St
Lakehaven V4 Section Grid: 1{/8
Intersection: S 320"' St & 2 1"Ave S — Approx.330ft North & 80 ft West
Add. Description: I See attached map 578
Results By: Date: Model Run No.:
John Bowman 1/3/18 Master Water System Model 2007.net
FF #339
ondition Pressure (psi) Flow (gpm)
Static 63 0
Fire Flow 20 12,500
NOTES:
Lakehaven's adopted level of service goals for fire flow rates are 1000 gpin within single
family residential areas (including duplexes) and 2500 gpin for multi -family, commercial,
industrial areas.
Model results depict the theoretical performance of the water system under high demand
conditions and are not guaranteed to represent actual system performance. A design
professional should be consulted for site specific design purposes.
. — I "FITITT"NTM7 11 717ra-z' ITf nffi,
system pressure of 20 psi at the location modeled. The model indicates that Lakehaven's
standard maximum allowable velocity of 10 ft/s is exceeded at a fire flow rate above 6900
gpm. Fire flow capacities greater than 6900 gpm may be accommodated through water
system improvements.
RESUBMITTED
010318FF339- 2020 S 32 Oth(Form Update 1/6/17) JAN 0 8 2018
CUY OF FEDEPX AAY
MMMUNrrYDEN LOPMEN9'
0921049297 wtr.docx (Form Update 1/3/17) 2
018
� L WAY
,,MN(U I 4
41�-
�Pil
ii 'iii, ai
`
December 11, 2017
kl`;,,#doe I)onahou
Donahoe Design Group Architects LLC
8383 1581h Avenue _NE, Suite 250
Redmond, WA 98052
COMMENTSCenterNWCC a,. Darnage Rebuild, 2020 South 3201h Street, Federal
CITY HALL
33325 8th ..Avenue Soul
Federal Way, WA 98003-6325
(253) 835-7000
www, cityoffederalway. com
Jim Ferrell, Mayor
Dear Mr. Donahou:
City- departments/divisions have the following comments in response to your October 1011, and October 30,
2017, project submittals, which will need to be addressed prior to land use application approval, or as
od- er,�vise noted. Questions regarding the technical review comments should be addressed to the staff
representative. The Ferlerral JVq)., Revised. Code (f7WRC) is available online at
Stacev Welsh — Planning Division, (253) 835-2634, t to 1 1Slct of ruff ds 1 a . ,o :
1. Technical comments made about an item on one sheet may necessitate changes to other related sheets
and it is 'the applicant's responsibility- to determine any such necessary adjustments. Please ensure
consistent information is comniunicared throughout the plan set and associated application materials.
2. A building permit has been submitted (17-104861-CO) and technical comment letters have been sent
from the Building and Public Vxorks Development Services Divisions. if any resultant changes to the
building permit plan set affect land use application documents that have been submstted, those will need
to be revised accordingly.
3. On Sheet A-101 (site plan), address the following:
a. T'he ou" 3g rice in the prrk,iri table only adds up to 15,500 square to t; not the project's proposed
22,000 square feet. T lze parking requirement for "food" use is inco m ?;,, shown at 30 square feet per
L9.225.040, required parking rtor restaus; nits iu;.:oric :Pace
r0r e c�i 100 sVjU arc -'ecr 0 ro ss floo-` area �egCa and east food restaurants csne spa cc f6 each So
sgzlare Lett or l'' l lau sir ark tnrc>:s:'�aui-;tt i�rovided on the sett: plan must also be reconciled cattle
the information provided in the building permit plan set table of previous tenants and proposed uses.
-Mr. joe Dor-ahou
Page 2 of 5
December 11, 201'
b. it appears that a trash enclosure is proposed that would be an addition to the site and not a
replacement of one that existed previously please confirm. The new enclosure requires removal of
r
existing palLinor spaces. Detail on the site plan the number of parking spaces provided compared to
- - 0
the number required, and factor in the removal of spaces for the new trash -enclosure.
c, Indicate -whether anv new transformers and fire standpipes are planned and if so, how they will
comply with FVTRC 19.115.050(6)(b)(ii),,
4. On Sheet L-1, (landscape plan), address the following:
the - A and 19,125.1-0.
a. Shovv proposed screening around L new trash enclosure per F X/RC 19,125.040(�, ai I D
b. 0-cus luvkcn laurels are proposed for the south side of the building. These tsTlcally grow cluickly and
provide excellent screening. Screening at that location would inhibit visibility into the Pedestrian
z I
pathway along the south side of the corm-nercial building and into the building itself from the psrknig
area and nearby streets.
Z:11
On Shea- _I-1-201 (elevation d,'rawings), address the FollowingZ-1
.
c, The previous building used various mediods to articulate blank walls on all four building facades, mainh,
with the use of alternating sections of windows and brick. Code requires use of methods to articulate
blank walls, and absent that, requires screening of blank walls that are 240 square feet or greater in area
per F-Wg-C 19,1115.060(3)(b) and 19,125.040(22). All four elevations of the replacement building contain
blank wall areas greater than 240 square feet, which would create a nonconforming situation. Please
:incorporate additional methods of articulation or screening per the listed code requirements.
b. The previous building had facade modulation on the north and south building facades. Code requires
building facade modulation and screening options in, F-NNRC 19M5.060(2), W-if-h the previous
building, both the north and south building facades only met one of the four modulation options
(see facade modulation -code item [2] [a]). Demonstrate how the replacement building is not more
nonconto-nming'VI-Ith regard to this requirement, it appears that canopies will be used, lvhich could be
a substitute for st-jaight facade modulation if they are six feet in width and meet the folllmtiino-ZD on tine
north and south facades- "(2)(c) Camopyararnaoc As a modulation option, canopies or arcades may be
used only aloe; facades drat are visible from a righil-of-wadT, NEnicaum length: 50 percent of die
length of the facade using th
is option.
0
c. Shmv the mechanical equipment screening on the -north and FW19�110'07
south facades per RC I
d. Please provide a detail that compares the previous building's height -with the proposed building,
I which is shown to be 24'aches L -all L
a. Review -he recently updated F-W'RC19.1215.150 code section and the enclosed checklist for solid
waste and recycling design requ: Ltements.
j -
-� r I , -
Iseter La-,,x.Trence — Building Div-11'sion, `253) 835-2621,
6. No buildingcommentson the Use Process application; building plans have been submitted.
� k-' I 10-185§'M-L P il" LD -,"WU
1Ir. Joe D o nahou
Page 3 of 5
December 11, 2017
Cole Elliott — PW Development Services Division, (253) 835-2730,
7. Regarding ffie SEPA checklist, under answer B.3.c.3: "Exisdrig drainage will remain unchanged." should
be modified to state-, "Existing drainage wiIII remain unchanged EXCEPTAS RErUTRED TOwE-,ET/.'DAI
ST,4N? A IRLDS OR Al DDRESS.-H �ELLTH 0 R LRt SAFF TY ISS UES. -' (Comment from Stace-y Welsh
lanning]: you do no not need to submit a revised SEPA checklist, as the project has cluali.6hed as a
planned action per F-VVRC 14.15.130. Comment #7 is provided as information regarding drainage on the
site and the language should be updated any there else that it is Hated in the subimttal documents,)
Sated j Long — PW Tzaffic Division, (253) 835-2743,
8. No comment on the proposed reconstruction of a 22,000 square foot building. -NL-o concurrency and
traffic impact fee because it a replacer-rient due to fire.
Brian Asbury — LaKlehaven -Water & Sewer District, (253) 946-5407,
9. The applicant has not completed and submitted to Lakehaven an application for Certificate(s) of
Availability. Additionally, the applicant has not completed and submitted to I'Lakehaven other applications
that are necessary to be able to more specifically determine the applicant's requirernents for connection to
Lakehaven's water and/or sewer systems to serve the subject property except die previous budding's
ZD
sewer service connection was appropriately disconnected on August 1, 2017, under Lakehaven Sewer
Service Connection Pe it 28218. For the new building, the applicant will need to submit appLications to
Lakehaven for any necessary -water and/or sewer service connections,
Chris Cahan — South -4L'--qg Fire & Rescue, � (253) 946-7243, ghjj��� r�.ot
10, 'he required fire flow for this project is 2,000 gallons per minute. A Cenr#oale including a
o'-Yock-il, shall be requested from the water district and provided at The dMe of building permit
application.
Fire Hydrants
11, This project willre(4uire two fire hydrants 1eapproved* locations, There are -,,,,o existing fire hydrants
available for d-iis project.
12. *Hvdrant location in relationship ce buildings and sprinkler IFDC shall be approved by Fire -?Vlarshal's Office
13. Fire hydrants shall be 'in service prior to and da-Mi-Ig the nine of construction.
Emergency Access
141. Fire apparatus access roads shall comply v�iitli all resin ifi,-ervcsn- of Fire <kccess Polic), 10.006 (enclosed).
Mr. Joe Donahou
Page 4 of 5
December 11, 2017
15. Desig-nated and marked fire lanes may be required for ernergenc urin tb
�, access. This may be done d g e plats
check or prior to building &n,,al. Requirements and marking options can be found in Title 8 of the FyVRC:
htrrx "'FcderP1V`;ay/'
16. Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction.
Fire Department Lock Box
IT A recessedifire department "Knox" brand key box shall be installed on the building. Location of box will be
approved by the plan revrower or Deputy Fire Nfarshal onsite,
Firm Spr—Mider Systerr.
18, -4,a17\T'_P4
19. An automatic fire sprinkler system shall beinstalledin all occupancies where the tot-,d floor area included within
the surrounding exterior omits on all floor levels, including basements, exceeds 5,000 square feet. Fire walls shall
not be considered to separate a building to enable deletion of die required automatic fi-
fire-ectinguishiner sy
stem.
�D
20. The system demand pressure (to me source) required in a hydraulically designed automatic fire sprinkler system
shall be at least 10 percent less than the correlative water supply curve pressure.
am
21, -.,1 LF'or - -1 Zamn Sys em is requime'
22. An automatic fire detection system shall be installed in all buildings exceeding 3,000 square feet gross floor
area. The fire alarm system is required to monitor the sprinkler system including water flo-,T,7. Provide filli
nonEcztioa as required by NF11A 72- G,7,ok,& teevtu a, k, _,s '0' "i. 'u
i letci -1 nor be I cr
p , wiwioaxpeig Ae',- i� knon,& This fire detection syei-n m
stshall be orutored by, An qpproved
central and/or remote station.
Fire Suppression System:
21 Jyj-lerd is reqmoecl for all _*Pe I korbea hass&.
CLOSING
Please submit rcV-1-sedappLicatilor, materials is appropriate, accompanied by the completed "Restibrnfttal
Inforrna tion Form," (enclosed1h. Pursuant toF\X,'-RC M 15.050, if an Ap plicant fails te, provide additional
Rsrrnation to the cit:.YaEhin, 180 days of being notified that such Irfor-madon is requested, the application
shall be deemed null and voidand the city shall have no duty to process, review, or issue any decisions N'Vith
respect to such an application.
Mr. Joe Donahou
Page 5 of 5
December 11, 2017
If you have any questions regaraag this letter, please contact me at or
(253) 835-2634
Sincerely,
Stacey -1,Velsh, AICP
Senior Planner
enc: Solid Waste Desii;n Checklisr
Fire ACCCSS 11olicy
Resubmittal Information Form
C: Peter Lawmicc, Rims F=niricr
C01c I "HiOtt Develop-nicnt Serviccs Managcx
Saridy LongScnior'.1'ranspottation Manning Flm,111(11cr
Brian Asbury, Lakehaven Water & Sewc-,
Chris Cahan, South King Fire & Rescue
NW(.:(, Center 17i a, Mark. McDonald, 14-02 Fla,t Pike Strcct, Seattic, WA 98122
Fill- 9,17-104851-110-LT
Review Finding
ndosmmeSize:
1inimumstorage area/trash enclosure sizes
ndusuresmust have adequate width and depth
components and Access:
Gates should span the enclosure front. Poles or hardware cannot obstruct the enclosure
opening.
Enclosure access for occupants, service, and maintenance. Pedestrian access five feet wide.
Allow adequate access to solid waste and recycling containers.
Enclosure design consistent withstmcture.
Enclosures located within zSofeet ofbuilding entrances.
Site Plans should include basic SWR service plan showing intended container sizes for
occupant
Signs required identifying receptacle bywaste type.
Multi -Family Requirements:
Multifamily must have equal service container volume for recycling and trash. Stacked
Multifamily sites must have storage areas on each level.
openings for solid. waste compactors must be at least 12 feet wide.
Surface Water Management:
Basic Spill Prevention Plan required for managing liquids coming from the enclosure.
Smaller. uncovered enclosures (less than or egual to175 square feet in size) drain to an P
aL
water separator.
Larger enclosures (greater than 175 square feet in size) require roof and floor drainage
ticeNehicle Access:
-Is trash enclosures,
Dumpsters or compactors serviced "in place" (4 cubic yards+) require clearance for lifting and
tmptying over the top of the truck (21' of vertical clearance)
z.Trash enclosure "sp|ivrevenuunplan^nsuurce are inthe Development Standards "Design
Requirements for Solid Waste Enclosures" appendix
z�This appendix also includes aturning radius diagram useful for determining ifwaste collection
trucks can access trash enclosures
Fire Prevention Division
Guideline No.10.006
June 20, 2017
FIRE DEPARTMENT ACCESS ROADS
A. Scope and Purpose -
To provide a policy for Fire Apparatus Access Roads within the City of Federal Way and the City of Des
Moines.
B. Code Authority
Washington Administrative Code 51-24-10201 and International Fire Code section 102.
C. Special Provisions
1. Approved fire apparatus access roads shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road
shall extend to within one -hundred -fifty (150') feet of all portions of the facility and all portions of the
exterior walls of the first story of the building as measured by an approved route around the exterior of
the building or facility.
Exception: The Fire Marshal is authorized to increase the dimension of one -hundred -fifty (150') feet
where:
a. The building is equipped throughout with an approved automatic sprinkler system. A twenty (20)
percent increase in the dimension is permitted.
b. Fire apparatus access roads cannot be installed because of location on property, topography,
waterways, non-negotiable grades or other similar conditions, and an approved alternative means
of fire protection is provided.
c. This policy may be modified for Group R-3 occupancies with an approved sprinkler system and
Group U occupancies as approved by the Fire Marshal.
2. The Fire Marshal is authorized to require more than one fire apparatus access road based on the
potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions
or other factors that could limit access.
3. Fire apparatus access roads shall have an unobstructed width of not less than twenty (20') feet
exclusive of shoulders, and an unobstructed vertical clearance of not less than thirteen feet six (13'6")
inches. Security gates when installed shall be in accordance with Administrative policies 10.001 and
10.003.
4. The Fire Marshal shall have the authority to require an increase in the minimum access widths where
they are inadequate for fire or rescue operations.
5. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire
apparatus and shall be surfaced so as to provide all-weather driving capabilities. A paved surface is not
required by the fire department. The roadway must support 75,000 lbs. gross vehicle weight. Current
apparatus weighs 69,500 pounds. That is 22,640 lbs. on the front axle and 46,860 lbs. on the rear
tandem axles. Outrigger point load of45,000 lbs. applied on an 18"x18" inch area.
Note: Grass Crete —The only product currently approved is Presto Geosystems. When Grass Crete is
used, the driving surface must be clearly discernible as a drivable surface.
6. The required turning radius of a fire apparatus access road shall be thirty-two (32) feet inside and for
(40') feet outside radius.
7. Dead-end fire apparatus access roads in excess of one -hundred -fifty (150') feet in length shall I
provided with shall be provided with a cul-de-sac at the dead-end. All such cul-de-sacs shall not be le
than eighty (80') feet in diameter. When buildings are completely protected with an approvE
automatic fire sprinkler system, the provisions of this policy may be modified by the Fire Marshal.
8.' Where a bridge or an elevated surface is part of a fire apparatus access, road, the bridge shall t
constructed and maintained in accordance with AASHTO HB-17. Bridges and elevated surfaces shall t
designed for a live load sufficient to carry the imposed loads of fire apparatus. Vehicle load limits shi
be posted at both entrances to bridges when required by the fire code official. Where elevated surfac(
designed for emergency vehicle use are adjacent to surfaces which are not designed for such us
approved barriers, approved signs or both shall be installed and maintained when required by the Fii
Marshal.
9. The grade of the fire apparatus access road shall be within the limits established by the Fire Marsh
based on the fire department's apparatus:
a. 12% commercial property
b. 15% residential property
10. Where required, approved fire lanes shall be established and marked in accordance with applicable Cil
Codes.
11. The maximum angles of approach, departure and ground clearance for fire apparatus access roads ai
as follows:
a. Angle of departure (A): 5.5 degrees
b. Angle of approach (B): 6.5 degrees
c. Ground Clearance* (D): 8 inches
*Tire -to -tire floor contact (C) ranges from 152" — 220"
"I44
t *#
Aftow,
CITY OF
Federal Way
DEPARTMENT OF COMMUNITY DEVELOPMENT
33325 81h Avenue South
Federal Way WA 98003
253-835-7000; Fax 253-835-2609
�Ww'c ilygf f e (j_ygy � —COM
erolwo
1, te.-'A"�16AAOq -0C&*ereby declare, under penalty of perjury of the laws of the State of
Washington, thard:IJ
0 Notice of Land Use Application/Action
❑ Notice of Determination of Significance
(DS) and Scoping Notice
Notice of Environmental Determination
of Nonsignificance (SEPA, DNS)
Notice of Mitigated Environmental
Determination of Nonsignificance (SEPA,
MDNS)
Notice of Land Use Application &
Optional DNS/MDNS
El FWRC Interpretation
0 Other
El Land Use Decision Letter
13 Notice of Public Hearing before the
Hearing Examiner
El Notice of Planning Commission Public
Hearing
El Notice of LUTC/CC Public Hearing
13 Notice of Application for Shoreline
Management Permit
El Shoreline Management Permit
Adoption of Existing Environmental
Document
was 0 mailed 0 foxed 0 e-mailed and/or 11--posted to or at each of the attached addresses on
Project Name
File Number(s
Signature
:\Dedarafion of Distdbufion.doc/Last printed 8/11/2017 11:45:00 AM
Posted Sites:
Federal Way City Hall: 33325 8th Ave South
Federal Way Library: 34200 1 st Way South
Federal Way 320th Library: 848 S. 320th St
1:\Declaration of Disfdbution.doc/Last printed 8/11/2017 11:45:00 AM
a 931M
Project Name: NWCC Center Plaza -Fire Damage Rebuild
Project Description: Reconstruction of a 22,000 square -foot multi -tenant
commercial building with associated site work.
Applicant. NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122
Agent: Donahou Design Group, 8383 158ffi Avenue NE, Suite 250,
Redmond, WA 98052
Project Location: 2020 South 320th Street, Federal Way, WA, King County
Parcel #092104-9297
Date of Application: October 10, 2017
Date Determined Complete: November 7, 2017
Date of Notice of Application: November 24, 2017
Public Comments Due: December 11, 2017
Requested Decision and Other Permits Included with this Application: The applicant requests a Use
Process III decision (file #17-104851-UP) issued by the Director of Community Development pursuant to
Federal Wlay Revised Code J7WRC) Chapter 19.65. Additional perthhsod/qr approvals in conjunction with the
Use Process III decision include a City Center Planned Actiion&t6iiiiination pursuant to S�*Ekviivnmental
PoligAct (SEPA) Rules WAC 197-11 (file #17-104855-SE) and a building permit (file #17-104861-CO). The
project has qualified as a planned action per FWRC 14.15,130.
Environmental Documents: City Center Planned Action Determination Review Checklist, Environmental
Checklist, and Drainage Memorandum.
IfflOW91k WM 5011M
Consistency with Applicable City Plans and Regulations: The project will be reviewed for consistency
with all applicable codes and regulations, including but not limited to: the Federal lVa Com
Y -prehensive Plan,
al Way,
-d—e 2016 Ykan CounTIS-M �ce Water Desi Zn Manual as amended by the City of Feder
and the Public Works Department Development Standards.
a Was
Comments sent by email should be dire te to*
Availability of File and Environmental Documents: The official project file and referenced
environmental documents are available for public review during normal business hours at the Communi
Development Department (address above). I
B
10
CITY OF
Federal Way
DEPARTMENT OF COMMUNITY DEVELOPMENT
33325 8th Avenue South
Federal Way WA 98003
253-835-7000; Fax 253-835-2609
mw—w- dim
( Nteq Va-fl- hereby declare, under penalty of perjury of the laws of the State of
Was Ington0hat a:
otice of Land Use Application/Action
El Notice of Determination of Significance
(DS) and Scoping Notice
Notice of Environmental Determination
of Nonsignificance (SEPA, DNS)
F-1 Notice of Mitigated Environmental
Determination of Nonsignificance (SEPA,
MDNS)
Notice of Land Use Application &
Optional DNS/MDNS
El FWRC Interpretation
11 Other
0 Land Use Decision Letter
Notice of Public Hearing before the
Hearing Examiner
Notice of Planning Commission Public
Hearing
11 Notice of LUTC/CC Public Hearing
Notice of Application for Shoreline
Management Permit
13 Shoreline Management Permit
Adoption of Existing Environmental
Document
was 0 mailed 0 faxed Xi -mailed and/or 0 posted to or at each of the attached addresses on
A 2017
Project Name --2LVVC —(C
1,q'7-ez , 61�
File Number(s)---j 0 U P L----j
Signature.
Date / / -/ 7-/ -7 -
1:\Declaration of Distidbution.doc/Lost printed 8/11 /2017 11:45:00 AM
i . I -
alm Pli
Wili tillitmolumm•mil•
i: •; 1 1101 i
1:\Declaration of Distdbution.doc/Lost printed 8/11/2017 11:45:00 AM
I
Stac Welsh
From: Linda Mills <Imills@kentreporter.com>
Sent: Friday, November 17, 2017 11:41 AM
To: Stacey Welsh
Subject: Re: FW: public notice
Attachments: 2007972.PDF
HI Stacey,
I have received your notice (re: Notice of Application, 17-104851-UP) to be published in the Federal Way
Mirror on Friday, November 24, 2017.
Thanks!
Linda Mills
Legal/Public Notice Advertising - Obituary Representative
Auburn, Bellevue, Bothell/Kenmore, Covington/Maple Valley/Black Diamond, Issaquah/Sammamish, Kent, Kirkland, Mercer Island, Redmond
and Renton Reporters,
Federal Way Mirror, Snoqualmie Valley Record, and Okanogan Valley Gazette -Tribune
Direct: 253-234-3506 Internal: 36027 Fax: 253-437-6016
19426 68th Ave. S., Ste A, Kent, WA 98032
-6 - , 0 a $1111111re,
8 1 momm I -
Thank you for checking and getting back to me so quickly. Aaagghh so sorry for this last minute scramble)
Please publish the attached legal notice (Notice of Application, 17-104851-UP) in Friday's (11/24/17) issue. Please
furnish an affidavit of publication.
Thank you,
Stacey Welsh, AICP
11
333258 th Avenue South
Sent: Friday, November 17, 2017 10:53 AM
To: Stacey Welsh
Subject: Re: FW: public notice
The last item lreceived from Tina was Nov Q1h concerning Wild Waves.
LegmVPuNioNoUceAdvertieing-ObituaryReprementative
Auburn, Bellevue, Bothell/Kenmore, Covington/Maple Valley/Black Diamond, Issaquah/Sammamish, Kent, Kirkland, Mercer Island, Redmond
and Renton Reporters,
Federal Way Mirror, Snoqualmie Valley Record, and Okanogan Valley Gazette -Tribune
Direct: Internal: 36027 Fax: 253-437-6016
12
• Fri, Nov 17, 2017 at 10:49 AM, Stacey Welsh wrote:
I'm checking to see it I ina f lety tro, I y o e era T-Sy— st `CC U I IPP F I
the Federal Way Mirror. It is a Notice of Application for the NWCC project. She is out of the office and I'm
trying to determine what occurred.
F17 W&W
037AM33m9i
01 V 04
Pq 1 deral My
333258 th Avenue South
Phone: 253/835-2634 Fax: 253/835-2609
www.cityoffederalway.com
.. ......... ___111_1____111 .. .. . ..... ..........
From: Tina Piety
Sent: Tuesday, November 14, 2017 2:55 PM
To: Stacey Welsh
Subject: RE: public notice
ME=
I've reviewed the NOA and it is ready for you to use. I'll send it to the paper and place it on the website soon.
3
mm
From: Stacey Welsh
Sent: Tuesday, November 14, 2017 10:37 AM
To: Tina Piety
Subject: RE: public notice
Sorry, forgot to ask you to let me know when the notice is ready to use so that I can use it on the boards for
posting.
From: Stacey Welsh
Sent: Monday, November 13, 2017 2:31 Plv.
To: Tina Piety
Subject: public notice
I have a Notice of Application for the NWCC Center Plaza -Fire Damage Rebuild project ready for Friday,
11/17.
Please send the notice to the paper for publication on Friday and put on the city website. No mailing is required.
I will • • the r•
M��
Stacey Welsh, AICP
www.!�it �offc�deralw�acom�
CLASSIFIED ADVERTISING
PROOF/RECEIPT
Client:
93145
FWM Legals
Phone:
(253) 946-2890
Address:
—
Federal Way, WA
Ad#
786217
Requested By:
Fax:
Sales Rep.,-
Mills, Linda
Phone:
(253) 234-3506
ImillsE entreporter.com
Fax:
Class,:
9930
FW Legals
Start Date:
11/24/2017
End Date:
11/24/2017
Nb. of Inserts:
PO #:
Publications:
Federal Way Mirror
Paid Amount:
$0.00
Balance: $0.00
Total Price: S0.00 I
Federal Way
T
•
•
•
•
•
•
•
It 00 p
CD D CD
>
CD
CL
Cr) CD CD
D C
0
-GOS
CD C-D CD
p CD CD 0 0
uj
FJ. 0 0
0
kPI k4�� C'). CD
CD CD *i
0
CD
CD 0 0
CD
0
:� - . CD
CD �n
CD
-�i
CD
CD
p 0 0 p
Qn P;,
Oil
Oml
� p
CD
CD
C"D Cn
CD
CD
0 CD
CD
0
C) P p CAD C
, =
CD
t��
•
C)
�. = CD
0 CD
CD
CD CD
'P
CD 4
Woo
1=
CD
= z S)
CD
CD CD
*We
0
CD 0
CD
CD �5 �4 =
CD
CD CDrf
91
OQ ob m �a
= =. CD
cn- 0 "
Cr �=
CD
GQ
p
0
0
CD C) o-h
7
0 GQ
CD CD CD r-
X co� " -3 DD rD
CD
CD 0 0 OQ K
" 11 ff CD CD
ca,= =4mn-a- 1-0ar:� ID — w -Vm -0
c 0,, E? E?
0.
C-3 =m co ID ID ID ,, - =1 P� �� 0
o ID 11 2, 0 C, Ca.
> cp ro) z > -cn U E.r
1:13 IDD. m
�M-azF-,M53� - D 3 R --, E-- --
� S-
of ID. ID M
S. - - r,., rD
=0 L D 0 (D 2 0, 0 C-3
C-) C-?
oo FF =3' 0- c:=
0 0 r-
(D ON :3 C:,
=1
R I'D:
— f:� :7 — < C, 12
.�
M 5� - E5'0 - CDcID m a r- cn 00
Uj -:— 0. �, 0 2 0 m
c-, 0-
a� 0o , o< rw.aw m On
ur 2�
-=,� :C"o 1-0 110 co m
m --m m rD :1 <� �
0'- co
,P-B w -W I
D' = �C;3 ig -t S�• 5� C, �i, cn CO CD -0
= = !"'F i g —3 -::� — , � ,
vi —s,pf��CLM6,0 < Do 3 ro ar r1a N-1
-V - - -4 to m m r)
_2 2. J Rm c�
M -,j ro m , w >
= EF ccrr� 2� �w
< -4
=DD M c NDZ�
sl CL CL CD
oT�m
m m - C=,
CL CLM a- . m C:) m
* 3 - 8 0 co CO ED -0 w a 3
Ca D cowm<D �Fc 3 ID (<
ro g • C6 m E"
0 w r. co cn 0 eD 0
g K wRg 3
m o m E g3 nw a0 M, co, r; Op 3 0 r-
rD (D
W w, fD
ID 0-
co m M m
0 F < 3 (D
cp m
m Er -5 F 5:',
Z5"m
no Cn =-a (D 0 L�.
�d� a c -0 < = =
CL m M C, cr SLID
Sm rn 9.
-1 ID
o -0 0 l< 0 (D f<D 0
a= =2�=; - — .- a —.nc3
�= M (D -0 2-=o � 0
So� 3 R-L t< kom rD 0. m
w 'e., (D W CL LIL Ca- rD CL
CL
C, r)
2mmy 3 FU' 0
oa — 6-
0 =r
a- n. 0 Er C:) r cn M) -u'
< (D -- . = - 0 C-), 2. -0 - ro m C,
O.
o C) 0 rD
*E52 n o m .
m 7- r-'
RECEIVED
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOV 17 2017 33325 8th Avenue South
Federal Way WA 98003
253-835-7000; Fax 253-835-2609
CITY OF FEDERAL �V,�Y
COMMUNIFTY DEVELOPMEova �cfl �offede�rafwa .co
1, bl�� - -1 hereby declare, under penalty of perjury of the laws of the State of
shington, that a:
Notice of Land Use Application
was posted at the address listed below on 2017
Project Name NWCC Center Plaza -Fire Domade Rebuild
File Number(s) 17-104851 -UP & 17-104855-SE
r, f
Signature Date
Posted Sites:
Project site: 2020 S. 320th Street
C:\Users\swelsh\Desktop\Declaration of Dist6bution.doc/Lost pdnted 11/13/21317 3:08:00 PM
Page I of I
http://gismaps.kingcounty.gov/arcgis/rest/directories/arcgisoutput/Printing/PrintingServic... 11/14/2017
CITY OF z 4
Federal Way
DEPARTMENT OF COMMUNITY DEVELOPMENT
33325 8th Avenue South
Federal Way WA 98003
253-835-7000; Fax 253-835-2609
r.Jtvcrffcer ieva orb
l h f/ herebydeclare, under penalty of perjury of the laws of the State of
P Y P I rY
Washington, that a:
Notice of Land Use Application/Action
El Notice of Determination of Significance
(DS) and Scoping Notice
Notice of Environmental Determination
of Nonsignificance (SEPA, DNS)
Notice of Mitigated Environmental
Determination of Nonsignificance (SEPA,
MDNS)
El Notice of Land Use Application &
Optional DNS/MDNS
FWRC Interpretation
11 Other
was ❑ mailed ❑ faxed
-W—CyL-. 2017
Project Name t'
File Number(s)__
Signa
11 Land Use Decision Letter
Notice of Public Hearing before the
Hearing Examiner
Notice of Planning Commission Public
Hearing
Notice of LUTC/CC Public Hearing
Notice of Application for Shoreline
Management Permit
El Shoreline Management Permit
Adoption of Existing Environmental
Document
❑ e-mailed and/or <Posted to or at each of the attached addresses on
Date l ` f r
Posted Sites:
Federal Way City Hall: 33325 8th Ave South
Federal Way Library: 34200 1 It Way South
Federal Way 320th Library: 848 S. 320th St
1:\Declarafion of D1stdbufion.doc/LcM p6nted 8/11/2017 11:45:00 AM
Land Use Notices I City of Federal Way
Home(/) / Land Use Notices
Translate
Some land use (planning) applications require a public notice. These notices include a Notice of Application (NOA),
Notice of Determination of Nonsignficance (DNS, also referred to as a SEPA notice), Notice of Mitigated Determination
ofNoneignificance(MQWS).Notice ofPublic Hearing, and afew others. The notices are published inthe Federal Way
Mirror. Some are posted at the project site and at the Federal Way libraries and City Hall; and in some cases, mailed to
surrounding property owners.
Disclaimer: Only the notice published in the Federal Way Mirror is considered the official legal notice. The notices below
are intended for informational purpoueaon|y.TheyoovermughUythe|estoixmontho.P|oameconta±thePermi1Cenh*r
at253.835.2GO7.oremail (meiIto: parmitcent*r@oityofedena|way.com).with any questions.
Federal Way Land UNotices
Type
Project Name
Address
�s/default/files/Documents/Department/CD/Planning/LandOA
Plaza - Fire
St
Wild
36201
Public Hearing (/sites/default/files/20171102080321.pdf)
Waves/Enchanted,
Enchanted
Lakota Park
1415 SW
Facility Repair
http://www.cityoffederalway.com/node/ 1962 11/16/2017
Project Name: NWCC Center Plaza -Fire Damage Rebuild
Project Description: Reconstruction of a 22,000 square -foot multi -tenant
commercial building with associated site work.
Applicant: NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122
Agent: Donahou Design Group, 8383 15811, Avenue NE, Suite 250,
Redmond, WA 98052
Project Location: 2020 South 320th Street, Federal Way, WA, King County
Parcel #092104-9297
Date of Application: October 10, 2017
Date Determined Complete: November 7, 2017
Date of Notice of •r November 17, 2017
Public Comments Due: December 4, 2017
Requested Decision and Other Permits Included with this Application: The applicant requests a Use
Process III decision (file #17-104851-UP) issued by the Director of • Development pursuant to
Federal Wlay Revised Code (FWRC) Chapter 19.65. Additional permits and/or approvals in conjunction with the
Use Process III decision include a City Center Planned Action determination pursuant to State Environmental
4J. 544Y4�_ project has qualified as a planned action per FWRC 14.15.130.
Environmental Documents: City Center Planned Action Determination Review Checklist, Environmental
Checklist, and Drainage Memorandum.
Otevelopment Regulations to Be Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14,
"Environmental Policy"; Title 16, "Surface Water Management"; Title 19, "Zoning and Development Code."
Consistency with Appficable City Plans and Regulations: The project will be reviewed for consistency
with all applicable codes and regulations, including but not limited to: the Federal Vay Comprehensive Plan,
Federal Way Revised Code, 2016 King Couqy Surface Water Desi ,gn Manual as amended by the City of Federal Way,
and the Public Works Department Development Standards.
Public Comment & Appeals: The official project file is available for public review at the Community
Development Department (City Hall, 2nd Floor, 33325 81b Avenue South, Federal Way, WA 98003). Any
person may subnait written comments on the Use Process III application to the Director • Community
Development by December 4, 2017. Only the applicant, persons who submit written comments to the
-0 m. I iiiiii ii ii iii ii-4j"Ll ecision imeal the director's decision.
Availability • File and Environmental Documents: The official project file and referenced
environmental documents are available for pubhc review during normal business hours at the Community
Development Department (address above).
► Contact: Senior Planner Stacey Welsh, 253-835-2634, stacey�wehhfitfivofkderalwavxoffl
j&L CITY OF
Aft
Fbdlural WOY
vlbi�
November 7, 2017
Mr. Joe Donahou
Donahou Design Group Architects LLC
8383 158,h Avenue NE, Suite 250
Redmond, WA 98052
CITY HALL
33325 8th Avenue South
(253) 835-7000
www,cityoffederalway.com
Jim Ferrell, Mayor
ILE,
The Co unity Development Department is in receipt of your October 10, 2017, and October 30, 2017, project
submittals. Your proposed project includes reconstruction of a 22,000 square foot multi -tenant building with
associated site work.
NOTICE OF COMPLETE APPLICATION
Please consider this correspondence a formal Letter of Complete Application. Pursuant to Federal Wlay Revised Code
(RXIRC) 19.15.045 and 14.10.020, the application is deemed complete as of the date of this letter. The complete
K•f • io •)gise-i �Iave to �those �reauirements as set forth in FWRI
19.15.040 and 14.10.020. The submittal requirements are not intended to determine if an application conforms to t
City of Federal Way codes; they are used only to determine if all required materials have been submitte i
CLOSING
Formal processing and review of your application will now begin. Technical review comments will follow at a later
date. A Notice of Application must be posted on site, published in the Federal Way Mirror, and placed at the city's
official notice boards within 14 days of this letter. You will be contacted soon regarding placing the public notice
board on your property. Any questions concerning your applications may be directed to me at 253-835-2634, or
stacey.welsh@cityoffederalway.com.
amme
Stacey'Welsh, AICP
Senior Planner
c: Peter Lawrence, Plans Examiner
Cole f"lliott Development Services Manager
Sarady Long, Senior Transportation Planning Flaginecr
Brian iksbury, Lakehaven Water & Sewer
Chris Cahan, South King I �ire & Rescue
Owner
17- 1 W5 I -00-UP D- T,D. 76823
Stacey Welsh
No I'm III 1 11 milli 11 1
From:
Cahan, Chris < Chris.Caha n @south kingf i re.org
Sent:
Wednesday, November 01, 2017 11:31 AM
To:
Stacey Welsh
Subject:
Welcome Back
Attachments:
17-104851 - Center Plaza Fire Rebuild H,docx
Stacey,
I only made one small change. I cleared up some of our language.
Chris
I I � I-, ennai i w, �,is sc�.,'.n ned by R Rd o i'endcr
Agenda Date: 11/01/2017
Subject: 17-104851 - Center Plaza Fire Rebuild
Address: 2004 S 320 St
Planner: Stacey Welsh
From: Chris Cahan, Deputy Fire Marshal
South King Fire and Rescue
253-946-7243
hris.cahan .southkinre.crg
Fire Flow:
The required fire flow for this project is 2,000 gallons per minute. A Certificate of Water Availability
including a hydraulic fire flow model shall be requested from the water district and provided at the
time of building permit application.
Fire Hydrants:
This project will require 2 fire hydrant(s) in approved* locations. There are 2 existing fire hydrants
available for this project.
*Hydrant location in relationship to buildings and sprinkler FDC shall be approved by Fire Marshal's
Office
Fire hydrants shall be in service prior to and during the time of construction.
Emergency Access:
Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006
(attached).
Designated and marked fire lanes may be required for emergency access. This may be done during
the plans check or prior to building final. Requirements and marking options can be found in title 8 of
the Federal Way Revised Code: htto,/I .codeoublishin .comiWA/FederalWav/
Fire apparatus access roads shall be installed and made serviceable prior to and during the time of
construction.
Fire Department Lock Box:
A recessed fire department "Knox" brand key box shall be installed on the building. Location of box
will be approved by the plan reviewer or Deputy Fire Marshal onsite.
Fire Sprinkler System:
An automatic fire sprinkler system shall be installed in all occupancies where the total floor area
included within the surrounding exterior walls on all floor levels, including basements, exceeds 5,000
square feet. Fire walls shall not be considered to separate a building to enable deletion of the
required automatic fire -extinguishing system.
The system demand pressure (to the source) required in a hydraulically designed automatic fire
sprinkler system shall be at least 10 per cent less than the correlative water supply curve pressure.
Fire Alarm:
An automatic fine detection system shall be installed in all buildings exceeding 3.000 square feet
gross floor area. The fire alarm system is required to monitor the h klincluding water
be required for this pro'ect — check with Fire Marshal's Office when Occu�ancy use is known. This
fire detection system shall be monitored by an approved central and/or remote station.
Fire Suppression System:
DATE: 10/26/2017
TO: Stacey Welsh,
Planning
FROM: Cole Elliott, PE
Development Services Manager
SU11133ECT: NWCC CENTER PLAZA - FIRE DAMAGE REBUILD - (17-104855-00-SE)
2004 S 320TH ST
Development Services has reviewed the SEPA checklist and make the following comment:
• Under B.3.c 3) answer, "Existing drainage will remain unchanged." Should be modified to state:
"Existing drainage will remain unchanged EXCEPTAS REQUIRED TO MEETADA STANDARDS OR
ADDRESS HEAL TH OR LIFE SAFETY ISSUES. "
From: Brian Asbury <BAsbun/@|akehaveno»g>
Sent: Thursday, October 26,20I72:0UPKA
To: Stacey Welsh
Subject: NVV[[Center Plaza -Fire DamageRebui|d(l7-lO484I UP&17 I04855'SE)
Following are Lakehaven comments regarding the City's completeness review for the submittal received by
the City on 10/10/17 for the subject application/project. Let me know if there's any questions or if
additional information is needed.
Applicant has not completed and submitted to Lakehaven an application for Certlficate�s) Of
Availability. Additidnally, applicant has not completed and submitted to L614haVen other applications that are
necessary to be able to more specifically determine the apoicaWs requirements for connection to
Lakehaven's water and/or sewer systems to serve the subject property; except the previous building's sewer
service connection was appropriately disconnected on 8/1/17 under Lakehaven Sewer Service Connection
Permit 28218. As previously noted, applicant will need to submit to Lakehaven an application for
Certificate(s) of Availability. For the new building applicant will need to submit applications to Lakehaven for
any necessary water and/or sewer service connections.
Brian Asbury
Development Engineering Supervisor
Lakehaven
PS - Email from NWCC indicates we should be receiving application for Certificates today or tomorrow,
and if so then Id have those issued tomorrow or Monday.
The contents of this email may be determined to be a public record and subject to disclosure pursuant to RCW
42.56 regardless of any expectations or claims of confidentiality or privilege asserted.
Stacey Welsh
From: Stacey Welsh
Sent: Thursday, October 26,ZOl7IO:JSAM
To: loed@ddganchitectzzonn'
Subject: Center Plaza Rebuild (l7 10485I-UP)
Attachments: 129Resubmit1a|lnformation.doc
current letters of water and sewer availability. The submittal checklist that you turned in had those items checked, so
I'm checking with you to see if they were just accidentally omitted. They are required in order to have a complete
application. Please provide the items to the Permit Center using the attached Resubmittal Form.
3332SumAvenue South
Federal Way, VVA9QQO3'63ZS
Phone: 253/835-2634 Fax: 253/835-2609
�
'���� �
M�� �8�0[
�wo �
�
`
Lakehaven
DTY OF F
4
00��,!MU N TY"DEV ELOPME NT
WATER& SEWER DISTRICT
This certificate is intended to provide the applicant, land use agencies &/or public health departments with
information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole
discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations
in Lakehaven's or Other Purveyor's system facilities.
Proposed Land Use: El Building Permit-SFR El Building Permit-MFR 0 Building Permit -Other
El Subdivision El Short Subdivision El Binding Site Plan
[] Rezone El Boundary Line Adjustment
El Other (specify/describe) -
Tax Parcel Numbor(s):U9l1049297 Site Address: 2020 S 320th St LakahevenGISGrid: K-08
Ex. Bldg. Area to Remain: 46,500±l- s New Bldg. Area Proposed: 22J000±/- s�
�. water service can be provided by service connection to an exist 12" diameter waterman that is on the site
2. El Water service for the site will require an improvement mu,xenupm/^water distribution system of:
a. feet cf"diameter water main toreach the site; and/or
[] b. The construction of water distribution system on the site; and/or
[] c. A major portion of Lakehaven's comprehensive water system plan would need to be implemented and/or
constructed; and/or
d. Other (describe):
3. a. The existing water system is in conformance with Lakehaven's Comprehensive Water System Plan.
[] b. The existing water system is not in conformance with Lokehavmn's Comprehensive Water System Plan and an
Amendment tothis Plan will be required. This may cause o delay in issuance of land use approvals or permits.
4. a. The subject property is within the corporate limits ofLakeheven VVoter& Sewer District, or has been granted
Boundary Review Board approval for extension of water service outside of Lakehaven's water service area.
[] b. Annexation or Boundary Review Board approval will be necessary to provide service.
5. Water service is subject to:
10 a. Payment of connection charges (for any new/modified sen/|oa connection, to be determined by Lokehaven)}
[] b. Proof or reservationof easement(s) as required by Lakeheven'
0 c. Other: VpterComments/special conditions: Jbg,p. a !cd am building I e has an existina water qervice anection (Svc AQ327,
y&n �tandam!sto determine,, iLit!s_ sufficient for new,
The nearest fire hydrants are on the Property (as marked on map on the back of this page).
Fire Flow etnoless than 20psi available within the water distribution ie2,500GPM (appmximate)for two (z) hours ormore.
This flow figure depicts the theoretical performance ofthe water distribution system under high demand conditions. Fire flow rates
greater than this may be accommodated through water distribution system improvements, contact Lakehoven for additional
information. .
57e Pressure Zone Est. MeterBevobun'SI5: 420+/' Est. Pressure Range etMeter(s) (psi): Min. 85, Max. 74
l hereby certify that the above water system information is true. This certification shall be valid for one (z) year from the gate or
signature.
Signature.
ogz10*sz97w,r.docx(Form Update 1/3/17)
Date: ZI
Page zofz
0921049297 wtr.docx (Form Update 1/3/17) Page 2 of 2
Q, Lakehaven
WATER & SEWER DISTRICT
Lakehaven !eMtMTnn!5Mering Section
This certificate is intended to provide the applicant, land use agencies &/or public health departments with
information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole
discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations
in Lakehaven's or Other Purveyor's system facilities.
Proposed Land Use: [] Building Permit-SFm [] Building Permit'MRm 0 Building Permit -Other
[] Subdivision [] Short Subdivision [] Binding Site Plan
[] Rezone LJ Boundary Line Adjustment
LJ Other (specifyYdeaor|be)_
Tax Parcel Number(a): D9219-4-92-92 Site Address: u:kehovanszsGrid: K-08
Ex. Bldg. Area to Remain:
Applicant's Name:
1. Sewer service can be provided by service connection to on existing J0'diameter sewer main that is on the site and the
sewer system has the capacity to serve the proposed land use.
2. Sewer service for the site will require an improvement to Lakehaven's sanitary sewer system of:
o. feet of " diameter sewer main ortrunk to reach the site; and/or -
[] b. The construction ofnsanitary sewer collection system onthe site; and/or
[] c. A major portion ofLokekovent comprehensive wastewater system plan would need to be implemented and/or
constructed; and/or
El d. Other (describe):
3. 0 a. The existing sewer system is in conformance with Lakeheven's Comprehensive Wastewater System Plan.
[] b. The existing sewer system is not in conformance with Lakehaven's Comprehensive Wastewater System Plan and an
Amendment to this p|on will be required. This may cause a delay in issuance of land use approvals orpermits.
4. 0 o. The proposed site land use is within the corporate limits ofLakehaven Water mSewer District, or has been granted
Boundary Review Board approval for extension of sewer service outside of Lakehaven's sewer service area.
[l b. Annexation or Boundary Review Board approval will be necessary to provide service.
S. Seweroomicn is subject to:
o. Payment of connection charges (for any new/modified service connection, to be determined by Lakehaven);
0! b.Proof or reservationof easement(s) as required by Lah h
Comments/special conditions: _
l hereby oarbry that the above sewer system information is true. This certification shall be valid for one (q year from the date of
signature.
o9z1n49zg7awcdocx(Form Update 1/3/17) Page znfz
0921049297 swr.docx (Form Update 1/3/17) Page 2 of 2
CITY OF FEDERAL VVAf
COM,4UNITY DEVELOPNENT DEPARTMENJ
!I vm flea I
DATE: 10-16-17
TO: Cole Elliott, Development Services Manager
Peter Lawrence, Plans Examiner
Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer District
Chris Cahan, South King Fire & Rescue
Lindsey Sperry, Public Safety Officer
Rob Van Orsow, Solid Waste/Recycling Coordinator
FROM: Stacey Welsh, Planning
FOR DRC MTG. ON: 10-26-17 - Internal completeness
FILE NUMBER(s): 17-104851-UP & 17-104855-Se
RELATED FILE NOS.: 17-1102705-PC & 17-104861-CO
PROJECT NAME: NWCC CENTER PLAZA - FIRE DAMAGE REBUILD
PROJECT ADDRESS: 2004 S 320TH ST
PARCEL NUIMER: 0921049297
ZONING DISTRICT: CC-C
PROJECT DESCRIPTION: Reconstruction of a 22,000 square foot multi -tenant
building with associated site work.
LAND USE PERM11TS: Up III & City Center Planned Action SEPA
PROJECT CONTACT: Joe Donahou
Donahou Design Group Architects LLC
8383 15 8th Ave NE, Suite 250
Redmond, WA 98052
MTERIALS SUBZ41TTED: Master Land Use Application
Title Report
Drainage Memorandum
Site Photos
CPTED Checklist
City Center Planned Action Determination Checklist
SEPA Checklist
Vicinity Map
Plan Set: site plan, elevations, topo, grading,
drainage, utility, landscape, materials board
RECEIVED'11 � Sj�,,R , LAND USE APPLICATION
,4 ENT OF COMMUNITY DEVELONMENT SERVICES
33325 8'1, Avenue South
OCT 10 2017 Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
CITY OF FEDERAI. WAY W \V \v. c i t y_t�ff Ld qr
GOMMUNfTY DEVELOPMENT
APPLICATION No(s) 17-10ye
Date MI&I r7
Project Name
Property Address/Location e2e)e5> 4-
Parcel Nuniber(s)
Project Description =%Z=! ;
F999APL4 �11 v �
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
Preapplication Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
—Zoning Designation
Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
A!117 0! Occupancy Type
Construction Type
Applicant &) W C C, a-
N arrie., A4AP-41— /-1600,#�JAL4>
Address: 1*4s jqge.5q��
Ci Ly/S rate: es
Zip: 22.
Phone:
Fax:
Email:
2
Signature`~`
Agent (if different than Applicant)
Name: JOC-5 PVJAtfC0
, Address: ''.( � & 4`
01 11
'V - 1�, T' � �3F�e
77-S4- 7373
City/State: pt-,VOI 6-?l P 1,4
Zip: 17 S'O 5Z
Phone:
Fax:
Email:
Signature:
Owner
Name: rL,6eA,
Address:
Cily/State. /1JA_ Iq 12> Paz,
Zile:
Phone:
Fax:
Email:
Signature_;;01_;��
E
3L[Iletirl #003 — January 1, 2011
Page I of I
k:\H and 0 UtSMA aster Land Use Application
A"
I
O
�.
7�
a)
0
0
Pate Vol?
�j
�3
'10"�6aUer Way South
qlnoS AuM
L IC C
CP
0
V.
fD
PQ
>
ca
a
to Sa
=3
nue Smith
23rd
Lr
0
0
o 0 -n
:3
ro
cn
;P
0
ED
0
m
CL
r-
.<
0
cl,
C,
§0
C=
n
m
arn
m
C= <
FTI
u
-4
M,
RECEIVED
mean=
CITY OF FEDERAL WAY
OOMMUNMY DEVELOPMENT
TO: City of Federal Way
FROM: Tim Gabelein, PE
DATE: October 3, 2017
RE: Drainage Memorandum for 2020 S 320"' St Rebuild
Project Description
The project involves the reconstruction of a 22,000 SF single story commercial building located at 2020 S 320'h St in
Federal Way, A. The existing structure was destroyed by fire on May 21, 2017. The rebuilt building (Building A)
is the southernmost commercial building on the 260,258 SF lot (Parcel #0921049297). Site Access to the site will
remain from driveways located off of 21" Ave S, S 318' PI and 20"' Ave S. Improvements include utility
connections to the existing utility stubs, site grading as necessary for the construction of the replacement stiucture,
and adjacent concrete walkways and asphalt restoration to original conditions. A new fire service will be provided to
the building as well.
for water Mitigation
Because the previous building at 2020 S 32011 St was destroyed by a fire, the project complies with The Federal Way
Revised Code (FWRC) 19.30.200 which states that "The use of development, including associated improvements, as
reconstructed, is not any more nonconforming than it was immediately prior to the damage". As a result, the design
of the rebuilt building has been designed to be just that - no more non -conforming than the previous building prior to
its destruction by fire. Complying with FWRC 19.30.200, the rebuilt building will not add any additional impervious
area than existed beforehand. Additionally, the rebuilt building will mimic the previous building's drainage system.
Roof downspouts will be curb discharged to the parking lot as existing with the prior building. The building's
footing drain will connect to an area drain southeast of the building which will then drain to a catch basin with sump
in the parking lot.
Mount Vernon Office Lake Forest Park Office Whidbey Island Office
2210 Riverside Drive, Suite 110 15029 Bothell Way NE, Suite 600 PO Box 1132
Mount Vernon, WA 98273 Lake Forest Park, WA 98155 Freeland, WA 98249
Tel 360.899.1110 Tel 206.523.0024 Tel 360.331,4131
CITY OF
Fbderal Mu
J
DEPARTMENT OF CO UNITY DEVELOPMENT SERVICES
33325 81h Avenue South
PO Box 9718
Federal Way WA 98063-9718
253-835-2607; Fax 253-835-2609
RECEIVED A, NV —XV .
1111111111IM11111i
I
Crime Preven Environmental
Design (CPTED) Checklist
Directions
Please fill out the checklist to indicate which strategies have been used to implement CPTED principles in
your proposed project. Please check all strategies that are applicable to your project for each of the
numbered guidelines. You may check more than one strategy for each guideline.
Your responses will be evaluated by City Staff, and will be integrated into the Site Plan and/or Building
Permit review process.
Section and
v"
----------
Functional Area
Evaluation for
Performance
Performance Standard
Agency Use'Only
Standard
Strategy
a Appficable during Site Plan Review
E) Applicable during Building Permit Review
Section 1.0
Natural Surveillance
1.Blind
Corners
Avoid blind corners in pathways and parking lots.
—Revise
NA
Comments:
Pathways should be direct. All barriers along pathways should
be permeable (see through) including landscaping, fencing etc.
Consider the installation of mirrors to allow users to see ahead
of them and around corners. e
Other strategy used-----
El
------------- --
1.2
Site and Building Layout
—Conforms
Allow natural observation from the street to the use, from the
_Revise
use to the street, and between uses
_NA
Comments:
Bulletin #022 - August 18, 2004 __Fag_e_i —.f9 k:\Handouts\CPTED Checklist
Section and Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
a Applicable duffing Site Plan Review
eApplicable durin.- Building Permit Review
— ------------ ------ _L
13 Orient the main entrance towards the street or both streets on
For Non -Single corners. M
Family
Development El Position habitable rooms with windows at the front of the
dwelling. M
■
Offset windows, doorways and balconies to allow for natural
observation while protecthig privacy. 0
Locate main entrances/exits all d in view
of the street. X PIA'e.' *X'_
For Commercial/
Retail/ Industrial
If employee entrances must be separated from the main
and Community El
entrance, they should maximize opportunities for natural
Facilities
surveillance from the street. 0
In industrial developments, administration/offices should be
located at the front of the building. a
Avoid large expanses of parking. Where large expanses of
For Surface
parking are proposed, provide surveillance such as security
Parking and
cameras. 0
Parking
Structures
Access to elevators, stairwells and pedestrian pathways should
be clearly visible from an adjacent parking area. A
El Locate parking areas in locations that can be observed by
adjoining uses. a
Open spaces shall be clearly designated and situated at
For Common/ locations that are easily observed by people. Parks, plazas,
Open Space common areas, and playgrounds should be placed in the front
Areas of buildings. Shopping centers and other similar uses should
face streets. M
Other strategy used:
Bulletin #022 — August 18, 2004 Page 2 of 9 k:\Handouts\CPTED Checklist
Section and V Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
it Applicable during Site Plan Review
0 Applicable during Building Permit Review
1.3 Common/Open Space Areas and Public On -Site Open ---Conforms
Space —Revise
Provide natural surveillance for commonlopen space areas. _NA
Comments:
Position active uses or habitable rooms with windows adjacent
El to main common/open space areas, e.g. playgrounds,
swinurung pools, etc., and public on -site open space. Iff
Design and locate dumpster enclosures in a manner which
Xscreens refuse containers but avoids providing opportunities to
hide. 0
Locate waiting areas and external entries to elevators/stairwells
El close to areas of active uses to make them visible from the
building entry. E)
Locate seating in areas of active uses. E)
Other strategy used:
0
1.4
Entrances
—Conforms
Provide entries that are clearly visible.
—Revise
_NA
Comments:
Design entrances to allow users to see into them before
Aentering.
Iff
Entrances should be clearly identified (Signs must conform to
XFWCC
Section 22-1569(D). Permit Exceptions. (Applicable
during
Other strategy used:
1.5
Fencing
—Conforms
Fence design should maximize natural surveillance from the
—Revise
street to the building and from the building to the street, and
_NA
minimize opportunities for intruders to hide.
Comments:
Bulletin #022 — August 18, 2004 Page 3 of 9
k:\Handouts\CPTED Checklist
Section and ✓ Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
it Applicable during Site Plan Review
e Applicable during Building Permit Review
Front fences should be predominantly open in design, e.g.
pickets or wrought iron, or low in height. e
Design high solid front fences in a manner that incorporates
open elements to allow visibility above the height of five feet.
e
If noise insulation is required, install double -glazing at the
El front of the building rather than solid fences higher than five
feet. e
Other strategy used:
El
1.6 Landscaping Conforms
Avoid landscaping which obstructs natural surveillance and - -Revise
allows intruders to hide. NA
Comments:
Trees with dense low growth foliage should be spaced or their
JK crown should be. raised to avoid a continuous barrier.
Use low groundcover, shrubs a minimum of 24 inches in
height, or high -canopied trees (clean trimmed to a height of
eight feet) around children's play areas, parking areas, and
along pedestrian pathways. 11
Avoid vegetation that conceals the building entrance from the
street.
Other strategy used:
❑
1.7 Exterior Lighting —Confo s
Provide exterior lighting that enhances natural surveillance. Revise
(Refer to FWCC Section 22-1635(g)(1) for specific lighting _NA
requirements.) Comments:
Prepare a lighting plan in accordance with Illuminating
Engineering Society of America (IESA) Standards, which
El addresses project lighting in a comprehensive manner. Select a
lighting approach that is consistent with local conditions and
crime problems. 4
Bulletin #022 — August 18, 2004 Page 4 of 9 kiHandoutslCP'T'ED Checklist
Section and Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
0 Applicable during Site Plan Review
Applicable during Building Permit Review
Locate elevated light fixtures (poles, light standards, etc.) in a
[3 coordinated manner that provides the desired coverage. The
useful ground coverage of an elevated light fixture is roughly
twice its height. a
For areas intended to be used at night, ensure that lighting
supports visibility. Where lighting is placed at a lower height to
support visibility for pedestrians, ensure that it is vandal -
resistant. E) I
XEnsure inset or modulated spaces on a building facade,
access/egress routes, and signage is well lit. (3
XIn areas used by pedestrians, ensure that lighting shines on
pedestrian pathways and possible entrapment spaces. E)
Place lighting to lake, into account vegetation, in it, current and
mature form, as well as any other element that may have the
potential for blocking light. e
Avoid lighting of areas not intended for nighttime use to avoid
giving a false impression of use or safety. If danger spots are
usually vacant at night, avoid lighting them and close them off
to pedestrians. E)
■
Select and light "safe routes" so that these become the focus of
legitimate pedestrian activity after dark. 0
v-,e Avoid climbing opportunities by locating light standards and
A electrical equipment away from walls or low buildings. E)
Use photoelectric rather than time switches for exterior
lighting. e
In projects that will be used primarily by older people
El (retirement homes, congregate care facilities, senior and/ or
community centers, etc.) provide higher levels of brightness in
public/common areas. e
Other strategy used:
1.8 Mix of Uses —Conforms
In mixed use buildings increase opportunities for natural —Revise
surveillance, while protecting privacy. _NA
Comments:
Bulletin #022 — August 18, 2004 Page 5 of 9 k:kHandouts\CPTED Checklist
Section and Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
a Applicable during Site Plan Review
during Building Permit Review
Where allowed by city code, locateshops and businesses on
lower floors and residences on upper floors. In this way,
El residents can observe the businesses after hours while the
residences can be observed by the businesses during business
hours, K
Include food kiosks, restaurants, etc, within parks and parking
El structures. 0
Other strategy: used
El
1.9 Security Bars, Shutters, and Doors —Conforms
When used and permitted by building andfire codes, security _Revise
bars, shutters, and doors should allow observation of the street --NA
and be consistent with the architectural style of the building. Comments:
El Security bars and security doors should be visually permeable
Other strategy used:
_
2.1 Building Identification —Conforms
Ensure buildings are clearly identified by street number to _Revise
prevent unintended access and to assistpersons trying tofind —NA
the building. Identification signs must conform to FWCC, Comments:
Section 22-1569(D). Permit Exceptions.
Street numbers should be plainly visible and legible from the
street or road fronting the property. e
Section and Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
a Applicable during Site Plan Review
eApplicable during Building Permit Review
In residential uses, each individual unit should be clearly
numbered. In multiple building complexes, each building entry
El should clearly state the unit numbers accessed from than entry.
In addition, unit numbers should be provided on each level or
floor. e
XStreet numbers should be made of durable materials, preferably
reflective or luminous, and unobstructed (e.g. by foliage). e
For larger projects, provide location maps (fixed plaque
E1_ format) and directional signage at public entry points and along
internal public routes of travel. E)
Other strategy used:
El
2.2 Entrances —Conforms
Avoid confusion in locating building entrances. —Revise
_NA
Comments:
Entrances should be easily recognizable through desiga
El features and directional signage. (Signs must conform
FWCC Section 22-1569(D). Permit Exceptions. 10
Minimize the number of entry points. 10
Other strategy used:-
13
2.3 Landscaping —Conforms
Use vegetation as barriers to deter unauthorized access. —Revise
_NA
Comments:
0 Consider using thorny plants as an effective barrier. e
Other strategy used:
2.4 Landscaping Location —Conforms
Avoid placement of vegetation that would enable access to a —Revise
building or to neighboring buildings. _NA
Comments:
Bulletin #022 - August 18, 2004 Page 7 of 9 k:\Handouts\CPTED Checklist
Section and ✓Functional Area Evaluation for
Performance Performance Standard Agency Use Only
Standard
Strategy
a Applicable during Site Plan Review
eApplicable during Building Permit Review
Avoid placement of large trees, garages, utility structures,
fences, and gutters next to second story windows or balconies
that could provide a means of access. H
Other strategy use&—,
2.5
Security
—Conforms
Reduce opportunities for Unauthorized access
—Revise
_NA
Corrunents:
Consider the use of security hardware and/or human measures
to reduce opportunities for unauthorized access. (Applicable
during fe
.rti �icate 0
Other strategy used,
2.6
Sig age
—Conforms
Insure that signage is clearly visible, easy to read and simple to
—Revise
understand [Signs must conform to FWCC Section 22-1569(D).
_NA
Permit Exceptions].
Comments:
Use strong colors, standard symbols, and simple graphics for
informational signs. C)
Upon entering the parking area, provide both pedestrians and
For Surface
drivers with a clear understanding of the direction to stairs,
Parking and
elevators, and exits. e
Parking
Structures
In multi -level parking areas, use creative signage to distinguish
between floors to enable users to easily locate their cars. e
D
Advise users of security measures that are in place and where
to find them, i.e. security phone or intercom system, E)
Provide signage in the parking area advising users to lock their
cars. e
Bulletin #022 — August 18, 2004 Page 8 of 9
k:\Handouts\CPTED Checklist
Section and ✓
Functional Area
Evaluation for
Performance
Performance Standard
Agency Use Only
Standard
Strategy
a Applicable during Site Plan Review
eApplicable during Building Permit Review
Where exits are closed after hours, ensure this information is
indicated at the parking area entrance. E)
Other strategy used
Section 3.0
Ownership
3.1
Maintenance
—Conforms
Create a "cared for" image
—Revise
NA
.
2244e JJ T
jAM
Comments:
Ensure that landscaping is well maintained, as per FWCC
Section 22-1569, in order to give an impression of ownership,
care, and security. (Ongoing).
Where possible, design multi -unit residential uses such that no
El
more than six to eight units share a common building entrance.
a
Other strategy used:—,,
3.2
Materials
—Conforms
Use materials, which reduce the opportunity for vandalism.
I
—Revise
_NA
Comments:
Consider using strong, wear resistant laminate, impervious
glazed ceramics, treated masonry products, stainless steel
materials, anti -graffiti paints, and clear over sprays to reduce
opportunities for vandalism. Avoid flat or porous finishes in
areas where graffiti is likely to be a problem, e
0
Where large walls are unavoidable, refer to FWCC Section 22-
1564(u) regarding the use of vegetative screens. e
Common area and/or street furniture shall be made of long
wearing vandal resistant materials and secured by sturdy
anchor points, or removed after hours. e
Other strategy used: —
El
Bulletin #022 — August 18,
2004 Page 9 of 9 k:\Handouts\CPTED Checklist
Fidelityt
s rance Co y � � F C
October 10, 2017
CC Center Plaza LLC, a Delaware linifted liability company
YOUR F:
OUR NO.: 20375966
Attached is your Subdivision Guarantee policy of title insurance.
Thank you for allowing us to serve you. We look forward to assisting you in the future.
Marc Wise
Order No. 20375966-416-416- W Guarantee No.WA-FBC-IMP-27WAG14-1-17-20375966
EXHIBIT
LEGAL DESCRIPTION
LOTS 1, 2 AND 3, TOGETHER WITH AN UNDIVIDED INTEREST IN TRACT "X", OF KING COUNTY SHORT
PLAT NO. 1077139, AS RECORDED UNDER RECORDING NO. 7806301002, RECORDS OF KING COUNTY
AUDITOR;
EXCEPT THAT PORTION OF SAID LOT 3 CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED
MARCH 2, 2006 UNDER RECORDING NO. 20060302001898;
ALSO EXCEPT THAT PORTION OF TRACT "X" CONVEYED TO THE CITY OF FEDERAL WAY BY DEEDS
RECORDED MARCH 2, 2006 AND APRIL 10, 2006 UNDER RECORDING NOS. 20060302001899 AND
200604100023 4;
ALSO EXCEPT THAT PORTION OF LOT 3 AND TRACT "X" CONVEYED TO THE CITY OF FEDERAL WAY BY
DEED RECORDED AUGUST 30, 2017 UNDER RECORDING NO. 20170830000746
10AwI-,-sI" ►� z
27AG14 Subdivision Guarantee Page 11
Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG]4-1-17-20375966
SUBDIVISION GUARANTEE
SCHEDULE A
Order No.: 20375966-416-416-MAW Liability: $1,000.00
Guarantee No.: WA-FBCM-IMP-27WAG14-1-17-20375966 Premium: $550.00
Customer No.: Tax: $55.55
Total: $605.55
1. Name of Assured:
NW Capital Corp
2. Date of Guarantee:
October 3, 2017 at 8:00 A.M.
The assurances referred to on the face page hereof are:
That according to those public records which, under the recording laws, impart constructive notice of matters affecting title to
the following described land:
See Exhibit A attached hereto and made a part hereof.
The estate or interest in the land which is covered by this guarantee is:
A FEE
Title to the estate or interest in the land is yested i p:
NWCC Center Plaza LLC, a Delaware limited liability company
subject to the Exceptions shown below, which are not necessarily shown in order of their priority.
Exceptions:
I Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes
or assessments on land or by the public records.
2. (a) Unpatented mining claims; (b) reservations or exceptions in Patents or in Acts authorizing the issuance thereof;
(c) Indian treaty or aboriginal rights, including, but not limited to, easements or equitable servitudes; or, (d) water
rights, claims or title to water, whether or not the matters excepted under (a), (b), (c) or (d) are shown by the public
records. 1
1 Title to any property beyond the lines of the land expressly described herein, or title to streets, roads, avenues, lanes,
ways or waterways on which said land abuts, or the right to maintain vaults, tunnels, ramps or any other structure or
improvement; or any rights or easements therein unless such property rights or easements are expressly and
specifically set forth in the land described herein.
27WAG14 Subdivision Guarantee Page 2
Order No. 20375966-416-416-MAW
Company shall have the following additional
options:
(a) To Pay or Tender Payment of the
Amount of Liability or to Purchase the
Indebtedness.
The Company shall have the option to pay or
settle or compromise for or in the name of the
pay the full amount of this Guarantee or, if this
Guarantee is issued for the benefit of a holder of a
mortgage or a lienholder, the Company shall have
the option to Purchase the indebtedness secured by
said mortgage or said lien for the amount owing
thereon, together with any costs, reasonable
to the time of purchase.,
Such purchase, payment or tender of payment
all liability of the company hereund.r, In the event
indebtedness, the owner of such indebtedness shall
transfer and assign said indebtednes5.-ID_Qetner Win
any collateral security, to the Company upon
MIN111 W11 W. .1; 1 W., I I
UAN-TIUMMUM
than ti akei6q nt re '.rejo,that ra h HIR .6 .uIN
the Company has exercised its options under
Paragraph 5, and the Guarantee shall be surrendered
to the Company for cancellation,
(b) To Pay Otherwise Settle With Parties
Other Than the Assured or With the Assured
Claimant.
To pay or otherwise settle with other parties for
or in the name of the Assured claimant any claim
any costs, attorneys' fees and expenses incurred by
Company is obligation to pay,
Upon the exercise by the Company of the
option provided for in Paragraph (b) the Company's
obligation to the Assured under this Guarantee for
the claimed loss or damage, other than to make the
payment required in that paragraph, shall terminate,
including any obligation to continue the defense or
prosecution of any litigation for which the Company
has exercised its options under Paragraph 5.
7. Determination and Extent of Liability.
This Guarantee is a contract of Indemnity
against actual monetary loss or damage sustained or
incurred by the Assured claimant who has suffered
loss or damage by reason of reliance upon the
assurances set forth in this Guarantee and only to the
extent herein described, and subject to the
Exclusions From Coverage of This Guarantee.
The LiabiI4 of the Company under this
these onditions and tipulations or as reduced
under Section 10 of these Conditions and
Stipulations, at the time the loss or damage Assured
against by this Guarantee occurs, together with
interest thereon; or
(c) The difference between the value of the
the value of the estate or interest subject to any
defecL lien or encumbrance Assured
Guarantee.
8. Limitation of Liability.
(a) If the Company establishes the title, or
removes the allegei fefectHeA or excuenbrzirce, sr
cures any other matter Assured against by this
-uaran- — a reasonably diligent manner by any
method includinp litigatiin jij.
its obligation with respect to that matter and shall
not be liable for any loss or damage caused there,
(b) In the event of any litigation by the
company or with the Company's consent, the
of competent jurisdiction, and disposition of all
appeals therefrom, adverse to the title, as stated
herein,
(c) The Company shall not be liable for loss
1".0w"Wk
without the prior written consent OfthC Company-
9. Reduction of Liability or Termination of
Liability.
All payments under this Guarantee, except
payments made for costs, attorneys' fees and
expenses pursuant to Paragraph 4 shall reduce the
amount offiability pro tanto,
10. PaymentofLoss.
(a) No payment shall be made without
producing this Guarantee for endorsement of the
payment unless the Guarantee has bee lost or
il-Raweew-
shall be furnished to the satisfaction of the
Company,
(b) When liability and the extent of loss or
these Conditions and Stipulations, the loss or
damage shall be payable within thirty (30) days
thereafter,
11. Sub rogation Upon Payment or Settlement
Whenever the Company shall have settled and
paid a claim under this Guarantee, all right of
any act of the Assured claimant,
The Company shall be subrogated to and be
respect to the claim had this Guarantee not been
issued, If requested by the Company, the Assured
shall transfer to the Company all rights and remedies
against any person or property necessary in order to
perfect this right of subrogation- The Assured shall
permit the Company to sue, compromise or settle in
the name of the Assured and to use the name of the
Assured in any transaction or litigation involving
these rights or remedies, If a payment on account of
a claim does not fully cover the loss of the Assured
the Company shall be subrogated to all rights and
remedies of the Assured after the Assured shall have
recovered its principal, interest and costs of
collection.
12. Arbitration.
Unless prohibited by applicable law, either the
Company or the Assured may demand arbitration
pursuant to the Title Insurance Arbitration Rules of
the American Arbitration Association. Arbitrable
matters may include, but are not limited to, any
controversy or claim between the Company and the
Assured arising out of or relating to this Guarantee,
any service of the Company in connection with its
issuance or the breach of a Guarantee provision or
other obligation. All arbitrable matters when the
Mount of liability is $1,000,000 or less shall be
arbitrated only when agreed to by both the Company
and the Assured, The Rules in effect at Date of
Guarantee shall be binding upon the parties. The
award may include attorneys' fees only if the
Arbitrator(s) may be entered in any court having
jurisdiction thereof.
The law of the shus of the land shall apply to
an arbitration under the Title Insurance Arbitration
Rules,
A copy of the Rules may be obtained from the
Company upon request.
13 ' Liability Limited to This Guarantee;
Guarantee Entire Contract.
(a) This Guarantee together with all
endorsements, if any, attached hereto by the
Company is the entire Guarantee and contract
between the Assured and the Company. In
interpreting any provision of this Guarantee, this
Guarantee shall be construed as a whole,
(b) Any claim of loss or damage, whether or
not based on negligence, or any action asserting such
claim, shall be restricted to this Guarantee,
(c) No amendment of or endorsement to this
Guarantee can be made except by a writing endorsed
hereon or attached hereto signed by either the
President, a Vice President, the Secretary, and
Assistant Secretary, or validating officer or
authorized signatory of the Company.
14. Notices, Where Sent.
Allnotices required to be given the Company
and any statement in writing required to be furnished
the Company shall include the number of this
Guarantee and shall be addressed to the Company at
Fidelity National Title Insurance Company
Attn: Claims Department
P,O, Box 45023
Jacksonville, FL 32232-5023
27WAG14 Subdivision Guarantee Page
OrderNo. 20375966-416-416-NIAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966
w I I
a mll n -(U-T•-T-#
4. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST,
PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY:
(I ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1)
TAX ACCOUNT NO.: 0921049297
YEAR BILLED PAID BALANCE
2017 $157,276.59 $78,638.30 $78,638.29
TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $78,638.29.
LEVY CODE: 1202
ASSESSED VALUE LAND: $4,684,600.00
ASSESSED VALUE IMPROVEMENTS: $5,981,300.00
ffm..=
5. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST,
PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY:
(1ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1)
TAX ACCOUNT NO.: 0921049270
YEAR BILLED PAID BALANCE
2017 $24,356.60 $12,178.30 $12,178.30
TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $12,178.30.
LEVY CODE: 1202
ASSESSED VALUE LAND: $991,400.00
ASSESSED VALUE IMPROVEMENTS: $661,700.00
(AFFECTS LOT I OF PARCEL B)
6. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTER -EST,
PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY:
(I ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1)
TAX ACCOUNT NO.: 0921049296
YEAR BILLED PAID BALANCE
2017 $6,359.83 $3,179.92 $3,179.92
TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $3,179.91.
LEVY CODE: 1202
ASSESSED VALUE LAND: $415,600.00
ASSESSED VALUE IMPROVEMENTS: $1,000.00
27WAG14 Subdivision Guarantee Page 3
Order No. 20375966-416-416-MAW Guarantee No.WA-FBC-IMP-27WAG14-1-17-20375966
SCHEDULE
(Continued)
T GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST,
PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY:
(1ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1)
TAX ACCOUNT NO.: 092104 9271
YEAR BILLED PAID BALANCE
2017 $9,933.11 $4,966.56 $4,966.55
TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $4,966.55.
LEVY CODE:
ASSESSED VALUE LAND:
ASSESSED VALUE IMPROVEMENTS:1 i
1 FOR SEWER TREATMENT CAPACITY CHARGES,
KING, PIERCE r SNOHOMISH COUNTIES.SAID CHARGES * r APPLY TO PROPERTY
CONNECTING TO THE METROPOLITAN SEWERAGE# RECONNECTING OR CHANGING
ITS USE ir` STRUCTURE AFTER FEBRUARY 1990.
#CONTACT WASTEWATER TREATMENT DIVISION,
PROGRAM, # FURTHER INFORMATION 206-296-1450 ORFAX NO.206-263-6823 `.: EMAIL AT
MAP SHOWING SEWER SERVICEAREA BOUNDARIESAND INCORPORATED AREAS CAN BE
r
FOUND AT:
ji!TRWA�QUAAINKiCMNW.GOV/GIS/WEB/WEB/VMC/UTILITIES/SERVAREA CITIES.PDF
9. NOTICE OF TAP OR CONNECTION CHARGES WHICH HAVE BEEN OR WILL BE DUE IN CONNECTION
WITH DEVELOPMENT O -DEVELOPMENT OF THE LAND AS DISCLOSED BY RECORDED
INSTRUMENT. INQUIRIES REGARDING THE SPECIFIC AMOUNT OF THE CHARGES SHOULD BE
MADE TO THE CITY/COUNTY/AGENCY.
CITY/COUNTY/AGENCY: DING COUNTY WATER DISTRICT NO. 124
RECORDED: JUNE 01, 1981
RECORDING NO.: 8106010916
10. RESERVATIONS AND CONDITIONS CONTAINED IN DEED RECORDED UNDER CO ING NO.
4998538.
27AG14 Subdivision Guarantee Page 4
Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966
SCHEDULE A
(Continued)
11. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: KING COUNTY WATER DISTRICT NO. 124
PURPOSE: WATER PIPELINE
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: JUNE 03, 1976
RECORDING NO.: 7606030445
11 EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
PURPOSE: RECIPROCAL NON-EXCLUSIVE EASEMENT AGREEMENT FOR ACCESS,
INGRESS AND EGRESS
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDING NO. 77092 L_Z(}#I8 I
13. ALL COVENANTS, CONDITIONS, RESTRICTIONS, BUT OMITTING ANY COVENANTS OR
RESTRICTIONS, IF ANY, BASED UPON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION,
FAMILIAL STATUS, MARITAL STATUS, DISABILITY, HANDICAP, NATIONAL ORIGIN, ANCESTRY, OR
SOURCE OF INCOME, AS SET FORTH IN APPLICABLE STATE OR FEDERAL LAWS, EXCEPT TO THE
EXTENT THAT SAID COVENANT OR RESTRICTION IS PERMITTED BY APPLICABLE LAW,
RESERVATIONS, EASEMENTS OR OTHER SERVITUDES, IF ANY, DISCLOSED BY THE SHORT PLAT
RECORDED UNDER RECORDING NO. 7806301002,
THIS POLICY DOES NOT INSURE THAT THE LAND DESCRIBED IN SCHEDULE A IS BENEFITED BY
EASEMENTS, COVENANTS OR OTHER APPURTENANCES SHOWN ON THE PLAT OR SURVEY TO
BENEFIT OR BURDEN REAL PROPERTY OUTSIDE THE BOUNDARIES OF SAID LAND.
14. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: PUGET SOUND POWER & LIGHT COMPANY
PURPOSE: ELECT LINE
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: JANUARY 16,1979
RECORDING NO.: 7901160705
15. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: KING COUNTY WATER DISTRICT O. 124
PURPOSE: WATER PIPELINE
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: JANUARY 18,1979
RECORDING NO.: 7901180951
16. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF:
RECORDED: FEBRUARY 14,1979
RECORDING NO.: 7902141358
REGARDING: WATER SUPPLY AGREEMENT
27WAG14 Subdivision Guarantee Page 5
Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966
SCHEDULE A
(Continued)
17. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: PUGET SOUND POWER & LIGHT COMPANY
PURPOSE: ELECTRIC LINE
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: FEBRUARY 25,1980
RECORDING NO.: 8002250572
GRANTEE: PACIFIC NORTHWEST BELL TELEPHONE COMPANY
PURPOSE: UNDERGROUND COMMUNICATION LINES
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: NOVEMBER 09,1982
RECORDING NO.: 8211090631
GRANTEE: PACIFIC NORTHWEST BELL TELEPHONE COMPANY
PURPOSE: UNDERGROUND COMMUNICATION LINES
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: NOVEMBER 09,1982
RECORDING NO.: 8211090632
20ALL COVENANTS, CONDITIONS, RESTRICTIONS, RESERVATIONS, EASEMENTS OR OTHER
SERVITUDES, IF ANY, DISCLOSED BY THE SHORT PLAT RECORDED UNDER RECORDING NO.
8403140752.
NUNN'" 0-m-T -11 -011=1 i 1911114=1 11111151h N a
GRANTEE: PUGET SOUND POWER & LIGHT COMPANY
PURPOSE: ELECTRIC LINE
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: JUNE 26, 1989
RECORDING NO.: 8906260463
22. TERMS AND CONDITIONS OF REAL PROPERTY LICENSE IMPOSED BY INSTRUMENT RECORDED ON
FEBRUARY 24,1995, UNDER RECORDING NO. 9502240765.
27WAG14 Subdivision Guarantee Page 6
Order No. 20375966-416-416-NMW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966
SCHEDULE A
(Continued)
23. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: LAKEHAVEN UTILITY DISTRICT
PURPOSE: WATER FACILITIES
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: MAY 15,1995
RECORDING NO.: 950515116I
24. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: THE CITY OF FEDERAL WAY
PURPOSE: PERMANENT BEAUTIFICATION EASEMENT
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: MAY 25, 2000
RECORDING NO.: 20000525001732
25. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: THE CITY OF FEDERAL WAY
PURPOSE: BEAUTIFICATION EASEMENT FOR DECORATIVE SIDEWALKS,
LANDSCAPING, STREET TREES AND LIGHTING
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: SEPTEMBER 18, 2000 AND OCTOBER 06, 2000
RECORDING NOS.: 20000918000032 & 20001006000672
26. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: PUGET SOUND ENERGY, INC.
PURPOSE: TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: OCTOBER 12,2000
RECORDING NO.: LOOO 10 12001360
9
GRANTEE:
PUGET SOUND ENERGY, INC.
PURPOSE:
TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY
AREA AFFECTED:
A PORTION OF SAID PREMISES
RECORDED:
DECEMBER 19,2000
RECORDING NO.:
20001219000454
28. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
PURPOSE:
SHOPPING CENTER SIGN AND LANDSCAPE EASEMENT
AREA AFFECTED:
A PORTION OF SAID PREMISES
RECORDING NO.
2002L)530002228
27WAG14 Subdivision Guarantee Page 7
OrderNo. 20375966-416-416- Guarantee No.WA-FC-IMP-27WAG14-1-17-20375966
SCHEDULE A
(Continued)
29. EASEMENT AND THE TERMS AND CONDITIONS THE OF
GRANTEE: THE CITY OF FEDERAL WAY
PURPOSE: PERMANENT EASEMENT FOR SUBTERRANEAN WALL ANCHOR
AREA AFFECTED::, A PORTION OF SAID PREMISES
RECORDED: APRIL 10, 2006
RECORDING O.: 20060410002356
30. DECLARATION OF RESTRICTIONS IMPOSED BY INSTRUMENT RECORDED ON NOVEMBER 03, 20 10,
31. ALL COVENANTS, CONDITIONS, RESTRICTIONS, RESERVATIONS, EASEMENTS OR OTHER
SERVITUDES, IF ANY, DISCLOSED BY THE BOUNDARY LINE ADJUSTMENT RECORDED UNDER
THIS POLICY DOES NOT INSURE THAT THE LAND DESCRIBED IN SCHEDULE A IS BENEFITED BY
EASEMENTS, COVENANTS OR OTHER APPURTENANCES SHOWN ON THE PLAT OR SURVEY TO
BENEFIT OR BURDEN REAL PROPERTY OUTSIDE THE BOUNDARIES OF SAID LAND.
32. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF:
RECORDED: DECEER 23, 2015
RECORDING O.: 20151223000147
CARDING: GRADE RELEASE AGREEMENT — SEWER SERVICE CONNECTION
33. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
PURPOSE: PRIVATE UTILITY EASEMENT
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDING NO. 20170329000904
34. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: PUGET SOUND ENERGY, INC.
PURPOSE: TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY
AREA AFFECTED: A PORTION OF SAID PREMISES
RECORDED: APIL 24, 2017
RECORDING NO.: 20170424000170
FILING AND THE TERMS AND CONDITIONS THEREOF:
GRANTOR:
NCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY
COMPANY
TRUSTEE:
FIDELITY NATIONAL TITLE
BENEFICIARY:
STARWOOD MORTGAGE CAPITAL LLC
ORIGINAL AMOUNT:
$10,725,000.00
DATED:
JULY 17, 2015
RECORDED:
JULY 17, 2015
RECORDING O.:
20150717001350
27AG14 Subdivision Guarantee Page 8
OrderNo. 20375966-416-416-NIAW Guarantee No. WA-FBCM-IMP-27WAG]4-1-17-20375966
I I
�16 mil fff=plTl
SUCCESSIVE ASSIGNMENTS OF THE DEED OF TRUST:
LAST ASSIGNEE: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS TRUSTEE FOR THE
BENEFIT OF THE REGISTERED HOLDERS OF JPMBB COMMERCIAL
MORTGAGE SECURITIES TRUST 2015-C31, COMMERCIAL MORTGAGE
PASS -THROUGH CERTIFICATES, SERIES 2015-C31
RECORDED: OCTOBER 19,2015
RECORDING NO.: 20151019000741
36. ASSIGNMENT OF RENTS AND THE TERMS AND CONDITIONS THEREOF:
ASSIGNOR: NWCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY
COMPANY
ASSIGNEE: STARWOOD MORTGAGE CAPITAL LLC
DATED: JULY 17,2015
RECORDED: JULY 17,2015
RECORDING NO.: 201 5Q717()Ql 3LI
SUCCESSIVE ASSIGNMENTS OF THE ASSIGNMENT OF LEASES AND RENTS:
LAST ASSIGNEE: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS TRUSTEE FOR THE
BENEFIT OF THE REGISTERED HOLDERS OF JPMBB COMMERCIAL
MORTGAGE SECURITIES TRUST 2015-C31, COMMERCIAL MORTGAGE
PASS -THROUGH CERTIFICATES, SERIES 2015-C31
RECORDED: OCTOBER 19,2015
RECORDING NO.: 2015 LO 19000742
37. FINANCING STATEMENT AND THE TERMS AND CONDITIONS THEREOF:
SECURED PARTY: STARWOOD MORTGAGE CAPITAL LLC
DEBTOR: NWCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY
COMPANY
COVERS: PERSONAL PROPERTY LOCATED ON SAID PREMISES
RECORDED: JULY 17,2015
RECORDING NO.: 20150717001352
LAST ASSIGNEE:: STARWOOD MORTGAGE FUNDING 11 LLC
RECORDED: OCTOBER 19,2015
RECORDING NO.: 2b 15 lb 10000141
38. TERMS AND CONDITIONS OF "STIPULATED JUDGMENT AND DECREE OF APPROPRIATION
ENTERED JANUARY 5, 2017 UNDER KING COUNTY SUPERIOR COURT CAUSE NO. 61-2-08897-0
RECORDED ON JANUARY 18,2017, UNDER RECORDING NO. 20170118000215.
39. UNRECORDED LEASEHOLDS, IF ANY; RIGHTS OF VENDORS AND HOLDERS OF SECURITY
INTERESTS ON PERSONAL PROPERTY INSTALLED UPON THE LAND; AND RIGHTS OF TENANTS TO
REMOVE TRADE FIXTURES AT THE EXPIRATION OF THE TERM.
27WA 314 Subdivision Guarantee Page 9
SCHEDULE A
(Continued)
40. ANY RIGHT, INTEREST OR CLAIM THAT MAY EXIST, ARISE OR BE ASSERTED AGAINST THE TITLE
UNDER OR PURSUANT TO THE PERISHABLE AGRICULTURAL COMMODITIES ACT OF 1930, AS
AMENDED, 7 USC 499A ET SE., THE PACKERS AND STOCKYARD ACT OF 1921, AS AMENDED, 7 USC
11 ET SE., OR ANY SIMILAR STATE LAWS.
RIGHTS,4L ANY INTERESTS OR
CLAIMS WHICH MAY EXIST OR
ARISE
ii REASON
FOLLOWINGDISCLOSED BY A SURVEY PREPARED BY r
DATED JULY 6,2015, DESIGNATED JOB NO.t w
A) CONCRETE STAIRS AND WALKWAY ALONG NORTH PROPERTY LINE ENCROACH INTO
NORTHERLY ADJOIER.
B) GRAVEL AA ENCROACHES ACROSS NORTHEAST CORNER OF PROPERTY INTO NORTHERLY
PROPERTY AJOIE.
CONCRETE CURB FOR PARKING AREA ENCROACHESMUCH AS l • FEET INTO PUBLIC
RIGHT-OF-WAY FOR 21 ST AVENUE S ALONG EAST PROPERTY LINE OF PROPERTY.
r ROCKERY ENCROACHES AS PROPERTY
LOCATIONS ALONG WEST LINE OF SOUTHWESTERLY PORTION OF THE PROPERTY INTO
WESTERLY r•
E) WEST FACE OF CONCRETE WALL IN SOUTHEAST CORNER OF PROPERTY ENCROACHES 0.3
FEET EAST OF EAST PROPERTY LINE INTO PUBLIC RIGHT-OF-WAY 21 ST AVENUE S.
i Y i a x.. r i} • 41111 i I
27AG14 Subdivision Guarantee Page 10
1. Definition of Terms.
The following terms when used in the
Guarantee mean:
(a) The "Assured": the party or parties
named as the Assured in this Guarantee, or on a
supplemental writing executed by the Company.
(b) "land": the land described or referred to
in Schedule or in Part 2, and improvements
affixed thereto which by law constitute real property.
The term "land" does not include any property
beyond the lines of the area described or referred to
in Schedule A or in Part 2, nor any right title,
interest estate Or easement in abutting streets, roads,
avenues, alleys, lanes, ways or waterways.
(c) "mortgage": mortgage, deed of trust, trust
deed, or other security instrument.
(d) "public records": records established
under state statutes at Date of Guarantee for the
purpose of imparting constructive notice of matter
relating to real property to purchasers for value and
without knowledge.
(e) "date": the effective date,
2. Notice of Claim to be Given by Assured
Claimant.
An Assured shall notify the Company
P&IM.00-ow-MMA AM Wo
as stated herein, and which might cause loss or
oil
of the prejudice.
3. No Duty to Defend or Prosecute.
The Company shall have no duty to defend or
prosecute any action or proceeding to which the
A�,xrei is 2 pMy, n6t,,vjt%stznfhi& tXe Aztur@ bf?,ny
allegation in such action or proceeding
4. Company's Option to Defend or Prosecute
Even though the Company has no duty to
defend or prosecute as set forth in Paragraph4
above:
Except to the extent that specific assurances are provided In Schedule A of this Guarantee, the Company assumes no liability for loss or damage by reason of the
following' (a) Detects, liens, encumbrances, adverse claims or other matters against the title, whether or not Shown by the public records,
(b) (1) Taxes or assessments of any taxing authority that It -vies taxes or assessments on real property- or, 12) Proceedings by
I , ! a public agency which may result in
taxes Or assessniLrM, or notices of such Proceedings, whether or not the matters excluded under (1) or (2) are shoNvn by the records of the taxing authority or
by the public records,
(c) (1) Unpatented mining claims; (2) reservations or exceptions in parents or in Acts authorizing the issuance thereof, (3) water rights, claims Or title to water,
whether or not the matters excluded under (1), (2) or (3) are, shomm by the public records -
Notwithstanding any specific assurances which are provided in Schedule A of this Guarantee, the Company assurnes no liability for loss or damage by reason of
the following:
(a) Beets, liens, encumbrances, adverse claims or other matters affecting the title to any property beyond die lines ofthe land expressly described in the
description set forth in Schedule (A), (C) or in Part 2 oftbi% Guarantee, or title to streets, roads. avenues, lanes. ways or waterways to which such land abuts,
or the right to maintain therein vaults, tunnels, ramps or any structure or improvements, or any rights or easements therein, unless such property, rights or
easements are expressly and specifically set forth in said description.
(b) Defects, liens, encumbrances, adverse claims or Other matters, whether or not shown by the public records; (1) v%,hich are created, suffered., assumed or
agreed to by one or more of the Assureds; (2) which result in no loss to the Assured; or (3) which do not result in the invalidity or potential invalidity ofany
Judicial or non -judicial proceeding which is within die scope and purpose of the assurances provided,
(c) The identity ofany part), shown or referred to in Schedule A.
(d) The validity, legal effect or priority oraoy matter sho-wrt or referred to in this Guarantee,
GUARANTEE CONDITIONS AND STIPULATIONS
the required cooperation, the Company's obligations
to the Assured under the Guarantee shall terminate,
5. Proof of Loss Damage.
In addition to and after the notices required
under Section 3 of these Conditions and Stipulations
have been provided to the company, a Proof Of loss
or damage signed and swam to by the Assured shall
be furnished to the Company within ninety (90) days
after the Assured shall ascertain the facts giving rise
to the loss or damage, The proof of loss or damage
shall describe the matters covered by this Guarantee
which constitute the basis of loss or damage and
shall state, to the extent possible, the basis of
calculating the amount of the loss or damage. If the
company is prejudiced by the firdure of the Assured
to provide the required proof of loss or dam age, the
company's obligation to such Assured under the
Guarantee shall terminate. hi addition, the Assured
may reasonably be required to submit to examination
let oath by any authorized representative of the
(a) The Company shall have the right, at its
0C I L I -L
provision of this Guarantee, If the Company shall
diligently,
(b) If the Company elects to exercise its
options as stated in Paragraph 5(a) the Company
shall have the right to select counsel of its choice
MR �- �M
e naOIC 10I duir V;Ijl OUL Pdy LOC ICCb A
counsel, norAill the Company pay any fees, costs or
expenses incurred by an Assured in the defense of
&�- wwes—of
covered by this Guarantee,
(c) Whenever the Company shall have
brought an action or interposed a defense as
Company may pursue any litigation to final
determination by a court of competent jurisdiction
and expressly reserves the rjght� in its so e
discretion, to appeal from and adverse judgment or
order,
(d) In all cases where the Guarantee permits
aw"if n ExT r, n
-i0
wlw-NW$,N.Ilil 1
its option, the name of such Assured for this
purpose, Whenever requested by the Company, an
Assured, at the Company's expense, shall give the
Company all reasonable aid in any action or
proceeding, securing evidence, obtaining witnesses,
prosecuting or defending the action or lawful act
which in the opinion of the Company may b4
necessary or desirable to establish the title to th;
estate or interest as stated herein, or to establish &-
lien rights of the Assured, If the Company's
,whether bearing a date before or after Date of
Guarantee, which reasonably pertain to the loss or
damage- Further, if requested by any authorized
representative of Ole Company, the Assured ,;hall
grant its permissirm, in writing, for any authorized
representative of the Company to examine, inspect
and cop), all rccords& books, ledgers, checks,
correspondence and memoranda in the custody or
control of a third party, which reasonably pertain to
the loss damage, All information designated as
confidential by the Assured provided to the
Company, pursuant to this Section shall not be
disclosed to other unless, in the reasonable judgment
of the Company, it is necessary in the administration
of the claim. Failure of the Assured to submit for
examination under oath, produce other reasonably
requested infirrmaboo of grant permission to secure
reasonably necessary information from third parties
as required in the above paragraph, unless prohibited
by law or governmental regulation, shall terminate
any liability of the Company under this Guarantee to
the Assured for that claim,
6. Options to Pay or Otherwise Settle Claims:
Termination of Liability.
In case of a claim under this Guarantee, the
27WAG 14 Subdivision Guarantee Page 2
SUBJECT TO THE EXCLUSIONS FROM COVERAGE, THE LIMITS OF LIABILITY AND THE CONDITIONS AND
STIPULATIONS OF THIS GUARANTEE.
Policy No.: WA-FBCM-IMP-27WAG14-1-17-20375966
end
Fidelity National Title Insurance Company
a Florida Corporation, herein called the Company
GUARANTEES
The Assured named in Schedule A against actual monetary loss or damage not exceeding the liability stated in Schedule A,
which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
Fidelity National Title Insurance Company
Countersigned by: By
( -SEAL Meat Randy Qwrk President
Authorized Signature
27WAG14 Subdivision Guarantee Page I