Loading...
17-104851CITY OF Now 0-h CITY HA 33325 8th Avenue Sou Fetleral Wqy, �NA !­i8f13-653 (253) 835-70 www. cityoffederalway. cl Jim Ferrell, Mayor Mr. Joe Donahou Donahou Design Group Architects LLC 8383 158th Avenue NE, Suite 250 Redmond, WA 98052 FILE. Re: File #17-104851-UP PROCESS 111, PROJECT APPROVAL NWCC Center Plaza — Fire Damage Rebuild, 2020 South 320th Street, Federal Way The Community Development Department has completed administrative land use review of the proposed NWCC Center Plaza project located at 2020 South 320th Street. The applicant proposes reconstruction of a 22,000 square foot multi -tenant commercial building with associated site work. The previous 22,000 square foot building was destroyed by fire on May 21, 2017. The Process III Master Land Use (NdLU) application submitted October 10, 2017, with subsequent resubmittals dated October 30, 2017, January 8, 2018, and March 14, 2018, is hereby conditionally approved based on the enclosed findings of fact, incorporated into this decision in full, and the following conclusions based on those facts: 1. The proposal is consistent with the comprehensive plan; 2. The proposal is consistent with all applicable provisions of Federal Way Revised Code (FWRC); 3. The proposal is consistent with the public health, safety, and welfare; 4. The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal; 5. The proposed access to the subject property is at the optimal location and configuration; and 6. Traffic safety impacts for all modes of transportation, both on and off site, are adequately mitigated. The remainder of this letter outlines the land use review process required for this particular site improvement; summarizes the State Environmental Policy Act (SEPA) process; lists conditions of the land use decision; and provides other procedural information. This land use decision does not authorize initiation of construction activities. REviEw PROCESS The site is within the City Center Core (CC-C) zoning district. Retail, restaurant, and office are permitted uses in this zone subject to the provisions of FWRC 19.225.010, "Office Use"; F\VRC 19.225.020, "Retail Use"; Page 2 of 3 March 26, 20181 and FWRC 19.225.040, "Entertainment." The proposed uses, not exempt from SEPA, are reviewed under Use Process III, Prqject Approval. The Director of Community Development makes a written decision on the application based on the criteria listed under FWRC 19.65.100. SEPA PROCESS - Pursuant to Wasbin ,gton Administrative Code (WAC) 197-11-172 and FWRC 14.15.130, the project qualified as a Planned Action on November 13, 2017. The project is not subject to a SEPA threshold determination, an environmental impact statement (EIS), SEPA appeal, or any other additional review under SEPA. CONDITIONS OF APPROVAL The following conditions are reasonably necessary to eliminate or minimize any undesirable effects of granting application approval. 1. Prior to final inspection, vents and similar appurtenances that extend above the rooffine must be surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building, to obscure the view of the appurtenances from adjacent streets and properties. 2. Per FWRC 19.15.090(3), a Site Plan Modification (Administrative Decision) is required for the new trash enclosure. BUILDING PERMIT REQUIREMENTS This Process III land use decision does not constitute a building permit, or authorize clearing/grading activities. If you have any questions regarding the building permit submittal (city file no. 17-104861-CO), please contact the Permit Center at 253-835-2607, or I)g REQUESTS FOR CHANGE OF VALUATION Per FWRC 19.65.100(4)(i), affected property owners may request a change in valuation for property tax purposes, nomithstanding any program of revaluation. APPROVAL DURATION Per FWRC 19.15.100(2), unless modified or appealed, the Process III decision is valid for five years from the date of issuance of the decision. Time extensions to the decision may be requested prior to the lapse of approval, following the provisions listed in FWRC 19.15.110. The improvements must be substantially completed within the five-year time period, or the land use decision becomes void. APPEALS Per FWRC 19.05.360, the effective date of issuance is three calendar days following the date of this letter, March 29, 2018. Pursuant to FWRC 19.65.120(l), this land use decision may be appealed by the applicant, any person who submitted written comments or information, or any person who has specifically requested copy of the decision. In compliance with FWRC 19.65.120(2), any appeal must be in the form of a letter delivered to the Community Development Department, with the established fee, and within 14 days after 11 effective date of issuance of this decision, or April 12, 2018. The appeal letter must contain a staterner I 17-104851-00-UP D­ ID, 77489 Mr, Joe Donahou Page 3 of 3 March 26, 2018 identifying the decision being appealed, along with a copy of the decision; as statement of the alleged errors in the dixector's decision, including identification of specific factual Findings and ccractusions of the director disputed by the person filing the appeal; and the appellant's name, address, telephone and fax numbers, and any other information to facilitate communications widi the appellant. The Federal Way Hearing Examiner will hear any appeals of the Process Ill decision. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. If you have any questions regarding this decision, please contact Senior Planner Stacey Welsh, at 253-835-2634, or sty wel l rt citloffedr al va, -con'. Sincerely, rya Davis Community Development Director enc: Exhibit A, Findings for Project Approval Approved Site Plan Approved Landscape Plan Approved Elevations Stacey Welsh, Senior Planner Peter Lawrence, Plans Examiner Cole Elliott, Development Services Manager Sarady Long, Senior Transportation Planning Engineer Brian Asbury, Lakehaven Water & Sewer Chris Cahan, South King Fire & Rescue Mark McDonald, NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122 John Wilson, King County Assessor, #ADM-AS-0708,500 4- Avenue, Seattle, WA 98104 Doc. I.D. 77489 17-104851-00-UP Findings for Project Approval Federal Way Revised Code (FWRC) Chapter 19.65, "Process III Project Approval" NWCC Center Plaza — Fire Damage Rebuild, File #17-104851-UP The Director of Community Development hereby makes the following fitidings pursuant to content requirements of the Process III written decision as set forth in Federal Way Revised Code (FWRC) 19.65.100(4). These findings are based on review of existing city documents and items submitted by the applicant and received on October 10, 2017, October 30, 2017, January 8, 2018, and March 14, 2018. 1. Proposal — Reconstruction of a 22,000 square foot multi -tenant commercial building with associated site work on a 5.9 acre site. The site contains other commercial buildings and parking areas. 2. Zoning and Comprehensive Plan Designation — Zoning for the subject property is City Center Core (CC-C). Retail,, restaurant, and office are permitted uses in the CC-C zoning district pursuant to FWRC 19.225.010, "Office Use"; FWRC 19.225.020, "Retail Use"; and FWRC 19.225.040, "Entertamm . ent." The Federal Way Comprehensive Plan (FWCP) designation for the subject property is City Center Core. Site Plan Review Process — The project requires review under Process 111, -?'roject Approva777T* Director of Community Development makes a written decision on the application based on the criteria listed under FWRC 19.65. 100. 4. State Environmental Policy Act (SEPA) — Pursuant to Washington Administrative Code (WAC) 197- 11 - 172 and FWRC 14.15.13 0, the prej ect qualified as a Planned Action on November 13, 2017. The project is not subject to a SEPA threshold determination, an environmental impact statement (EIS), SEPA appeal, or any other additional review under SEPA. Public Notice — Pursuant to Process III regulations, a Notice of Land Use Application (NOA) was issued on November 17, 2017, and posted on the subject property and displayed on the designated city notice boards. As it was not published in the newspaper as required, a revised NOA was issued 17 on November 24, 20, and published in the Federal Way Mirror and displayed on the designated city notice boards. Pursuant to SEPA regulations, for projects that qualify as planned actions, public notice shall be provided as specified in FWRC 14.15.060(3), "Public notice for projects that qualify planned actions shall be tied to the underlying permit. If notice is otherwise required for the underlying permit, the notice shall state that the project has qualified as a planned action." The NO contained a statement that the project qualified as a planned action. 6. Public Comments — No public comments were received during the comment periods. Findings for Project Approval Page I of 5 17-104851-00-UP Doe. I.D. 77488 Non-Conforniing Regulations — The existing structure was destroyed by a fire on May 21, 2017. If the applicant complies with FWRC 19.30.200, then with regard to zoning code provisions, the structure may be rebuilt. Per F)ATRC 19.30.200, if a nonconforming use or development is damaged by sudden accidental cause, that use or development, including associated improvements, may be reconstructed if it meets the following requirements: (I)The use or development, including associated improvements, as reconstructed, is not any more nonconforming than it was immediately prior to the damage; (2) The the dama ed im rovement within long 61 10. Landscaping — Per FWRC 19.125.060(7), perimeter landscaping is required as follows: Type Ed "Visual Buffer" landscaping five feet in width along the perimeter of parking areas abutting public rights -of -way and all other perimeter lot lines, except that landscaping is not required along perimeter lot lines abutting rights -of -way where no required yards apply pursuant to Chapter 19.225 FWRC. The only perimeter landscaping affected by the project is located south of the building, where it will be replaced. For reference, no landscaping is required on the south side as there is a 0-foot yard (setback) required per FWRC 19.225 and FVTRC 19.125.060(7). Per FWRC 19.125.070(2)(a)(i)(A), parking lot landscaping is required in the amount of 20 square fe of landscaping per parking stall. Parking lot landscaping is not proposed to be modified as part of if project, per the submitted landscaping plan. With regard to landscaping, the replacement building wi either conform to the code requirements or not be any more non -conforming than it was previously. Findings for Project Approval Page 2 of 17-104851-00-UP Doe. I.D. 774" 11. Clearing & Grading — Clearing and grading activities will be minor as the same site is being used for the project. As such, it will be reviewed for consistency with applicable standards set forth in FWRC Chapter 19.120, as part of the building permit review. 12. Tree RetentionlReplacement — Per FWRC 19.120.030(14), tree removal on sites zoned CC-C is exempt from the tree code. 14. Community Design Guidelines —FViRC Chapter 19.115 contains the Community Design Guidelines. The applicant submitted a Crime Prevention Through Environmental Design checklist, which was -reviewed by city staff. The primary entrances to the building will be visible from the right-of-way, as they were previously. toll rill yard and as such, the new standpipe is not required to be screened. The previous building used various methods to articulate blank walls on all four building fa9ades, mainly with the use of alternating sections of windows and brick. Regarding the reconstruction, according to the architect, "the building articulation has been accomplished by a combination of design elements that include material, color and textural variation. Banding of materials with differe a size, color and textural values has been incorporated in the masonry portions of the fagades." The previous building had fagade modulation on the north and south building fagades. The replacement building will have similar. fagade modulation on the north and south side, and will also have canopiel, to further break up the fagade. With regard to community design guidelines, the replacement building will either conform to the code requirements or not be any more non -conforming than it was previously. 15. Rooftop Mechanical Equipment — Per FWRC 19.110.070, vents and similar appurtenances that extend above the roofline must be surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building and obscures the view of the appurtenances from adjacent streets and properties. The previous building had no visible rooftop mechanical equipment. The replacement building's rooftop equipment will be screened by the exterior fagade of the building, as shown on the plans. The architect indicated that, "the building design uses the height of the parapets and equipment placement to screen the units on all elevations. Manufactured HVAC equipment screening is proposed for the east and west elevations where wall articulation reduces the height of the parapet. If the equipment is relocated or additional equipment added that will be visible above the screening parapets, the owner will install additional equipment screening." A condition of approval shall requir* compliance with the standard. 16. GarbagelRecycling — In the original land use application submittal, a trash enclosure was proposed that would have been an addition to the site and not a replacement of one that existed previously. The new enclosure required removal of three existing parking spaces. The applicant was requested to detail on the site plan the number of parking spaces provided compared to the number required, and factor in the removal of spaces for the new trash enclosure. In the project resubniittal, it stated the trash enclosure was to be separated from the building reconstruction and permitted separately once I is tenant requirements are known. Although it is still shown on the site plan, the new trash enc osure not approved as part of this Use Process Iff approval. A condition of approval shall note the Findings for Project Approval Page 3 of 5 17-104851-00-UP Doc, LD, 77488 or -it U I IV.) I I r.) I I a U) drs V-0 I too Mr. NIUMA tell I I a tw-140i I a Valtv; I I I I 411mra I I NNUMN I Va I taxwMI)MANI I WyMMUMV9 la"TJ NMI$ parking. 17. Lighting - The proposal includes outdoor lighting. Per FWRC 19.105.030(3), the applicant shall select, place, and direct light sources, both directable and nondirectable, so that glare produced by a] light source, to the maximum extent possible, does not extend to adjacent properties, or to the right- of-way. The replacement building is setback from the right-of-way and adjacent properties. No changes are proposed to the existing parking lot lighting. building permit has been submitted (city file no. 17-104861-CO). 19. Transportation - No concurrency and traffic impact fee are required because the project is a replacement due to fire. Typically, the applicant/owner would be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map HI-4 in Chapter III of the FWCP and Capital Improvement Program (CIP) shown as Table 111- 10 (FWRC 19.135.040). However, since the fire has been determined to be an accident and the applicant is proposing to replace the damaged building, street improvements will not be required nor warranted in meeting nexus and FVvrRC 19.30.200. 20. StIter - The project is required to meet the current version of the stormwater manual. If the project meets the requirements of FWRC 19.30.200, then additional requirements do not apply. Engineering review of the submitted building permit application is ongoing. 21. WaterlSewer - Lakehaven Water & Sewer District is the water and sewer service provider. Lakehaven issued certificates of water and sewer availability on October 27, 2017; certificates are valid for one- year from the date of issuance. The previous building's sewer service connection was disconnected on August 1, 2017, under Lakehaven Sewer Service Connection Permit 28218. For the new building, the applicant will need to submit applications to Lakehaven for any necessary water and/or sewer service connections. As of March 20, 2018, no service connection application have been submitted to Lakehaven for sewer re -connection (required), or to upsize the existing domestic service/meter (if necessary), or for new/additional fire -protection service connection (if necessary). The applicant will need to address these items as part of the building process. 22. South King Fire & Rescue - This project will require two fire hydrants, and there are two existing fire hydrants available for this project. Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. A recessed fire department "Knox7 brand key box shall be installed on the building. An NFPA 13 fire sprinkler system is required. A fire alarm system is required. The applicant will need to address these items as part of the building process. 23. Conditions ofApproval - The following conditions of approval are attached to the Process Ell decision: Prior to final inspection, vents and similar appurtenances that extend above the roofline If be surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building, to obscure the view of the appurtenances from adjacent streets and properties. Per FVVrRC 19.15.090(3), a Site Plan Modification (Administrative Decision) is required for the new trash enclosure. Findings for Project Approval Page 4 of 5 17-104851-00-UP Doc. ID. 77488 24. CbriviWion —;As Qonddfionw� the propospd site plan, application has been determined to be consi8tent with th& FWCP; with a apolkabl& provi kos of the M� and with the public health, safety and welfare. The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal, and the proposed access to the subject property is at the optimal location and configuration for access. The proposed development is consistent with Process III, Project Approval, decisional criteria required under FWRC Chapter 19.65. wdtLthe pertinent zoning regulations, and all other applicable city regulations. Final construction drawings will be reviewed for compliance with specific regulations, conditions of approval, and other applicable city requirements. This decision shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. Prepared by: Stacey Welsh, Senior Planner Date: March 23, 2018 Findih Ys for Project Approval Page 5 of 5Doc. I.D. 77488 17-104851-00-UP RESUBMITTED CrTY OF FEDERAL WAY COMMUNrTY DEVELOPMENT WARIMM-11MM Stacey Welsh, AICP Senior Planner City of Federal Way 33325 81h Avenue South Federal Way, WA 98003-6325 RE: Permit Application ff 17-104851-UP; TECHNICAL REVIEW COMMENT LETTER Center Plaza Building A; 2020 South 320tb Street, Federal Way, WA Below you will find a summary ofthe changes to the fermit Application c[ocumenis as-77 res��on,#-Y* OF y*;X review /comment letter dated December 11, 2017. Changes to the documents have been clouded in addition to the summary of the changes contained in this letter. Please feel free to contact me if you have any additional questions or comments. W� �--I= a. The Parking Summary has been updated. Please reverence the revised table. b. The trash enclosure should be separated from the Building Reconstruction and a separate permit application will be submitted along with a revised parking count. Many times Leases designat" specific trash storage volume dedicated to a single Tenant. We wish to confirm the required size and best location of the enclosure based on the Tenant requirements before we proceed ftuther with the permitting. c. No new transformer will be installed. The screening of the existing transformer will be a component of the landscape upgrades, reference the revised landscape drawings. A new FDC will be installed adjacent to the existing fire hydrant east of the building. Screening landscaping will be added as Fire Department clearances allow. Reference the revised Landscape design. 4. a. The trash enclosure is to be submitted for a separate permit review when the required size can more accurately be determined. 5. a The Building articulation has been accomplished by a combination of design elements that include material, color and textural variation. Banding of materials with different size, color and textural values has been incorporated in the masonry portions of the facades. Sections of projecting metal canopies have been used to divide the facades into smaller visual components using color and shading. The largest blank portions of the wall use a panelized finish with a defined reveal pattern to visually reduce the size of the wall using many smaller components. No additional landscape screening has been added in the glazed recesses due to a basic conflict with the retail nature of the use. b. The north and south facades of the new building have similar modulation to the previous building. The east and west comers of the north and south facades are angled in similar fashion to tho original building to minimize the mass of the building. Both buildings also contain modulation in the mid -portion of the north and south facades. The size of the proposed mid -building modulation is greater than that provided by the original building. In addition, the parapets return onto the roof to extend a modulation element onto the roof, which the original building did not do. The new building also uses compliant canopy elements on the south elevation to provide an additional modulation element. The original building used an uninterrupted canopy which did not enhance the modulation of the fagade. c. The mechanical design for the building is not yet complete, but it is anticipated that HVAC equipment will consist of multiple units having the relatively small capacity of 5 tons. No large HVAC equipment is intended to individually serve large portions of the building will be used. The building design uses the height of the parapets and equipment placement to screen the units on all elevations. Manufactured HVAC equipment screening is proposed for the east and west elevations where wall articulation reduces the height of the parapet. If the equipment is relocated or additional equipment added that will be visible above the screening parapets, the Owner will install additional equipment screening. d. The height of the proposed building is the same as the height of the original building. 1101110 �-1 mm= i L 6. Comments from the Building Department were received and responded to separately from the remaining Technical Review Comments. 7. The SEPA Checklist has not been revised, but the Civil Engineering has been updated. See the attached Site Development drawings and response letter. LARIMOM=8 W I IV 9. Since the time of the Comment Letter from Brian, the Water and Sewer availability have been confirmed and applications made for new service to the reconstructed building. 10. The Water Availability Certificate and Hydraulic Flow Model were submitted with the Building Permit application. A copy is attached. Fire Hydrants 11. The existing Fire Hydrant locations will be reused. Reference the Revised Site DevelopmeM Drawings for the Fire Hydrant locations serving Building A. I i • �,-- a I mmz•=- � 14. Acknowledged. Reference the Site Development Drawings for additional information. 15. Compliant Fire Lane markings will be provided prior to the Final Inspections. Reference the revised Site Development documents for the proposed Fire Lane markings and Emergency Vehicle Access route. 17. The general location of the lockbox is noted on the drawings. During construction the Fire Marshal will be consulted on the exact preference for the final location. Reference Drawing A- I I I and A-201 for the location. Fire Sprinkler System 18. Acknowledged. The sprinkler system design is identified as a Deferred Submittal and will be submitted separately. 19. The Building is being designed with fire sprinkler coverage throughout the entire structure. 20. Acknowledged. Reference the Fire Sprinkler Design documentation of the Deferred Submittal when provided. Fire Alarm System 0 22. Reference the Fire Alarm Design documentation of the Deferred Submittal when provided. The system will be designed with sufficient capacity to adequately meet the needs of the anticipated mix of tenants. Fire Suppression System 23. Acknowledged. An approved fire suppression system will be installed when required by the tenant NSWIMMI FMWITJI�I � Let me know if you have questions regarding the resubmittal materials or if any additional information is required to complete your review. Sincerel) Jim Wieben, Architect DDG Architects 8383 15 8th Ave NE, Suite 250 Redmond, WA 98052 (425) 285-9992 x106 I Aakehaven WATER A, SEWER DISTRIC 1' Hydraulic Model Fire Flow Estimat�i Request/Reporting Form Requested By: Date: Shawna Upton 12/21/17 Location to be Modeled: Existing Hydrant for 2020 S 320" St Lakehaven V4 Section Grid: 1{/8 Intersection: S 320"' St & 2 1"Ave S — Approx.330ft North & 80 ft West Add. Description: I See attached map 578 Results By: Date: Model Run No.: John Bowman 1/3/18 Master Water System Model 2007.net FF #339 ondition Pressure (psi) Flow (gpm) Static 63 0 Fire Flow 20 12,500 NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gpin within single family residential areas (including duplexes) and 2500 gpin for multi -family, commercial, industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and are not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. . — I "FITITT"NTM7 11 717ra-z' ITf nffi, system pressure of 20 psi at the location modeled. The model indicates that Lakehaven's standard maximum allowable velocity of 10 ft/s is exceeded at a fire flow rate above 6900 gpm. Fire flow capacities greater than 6900 gpm may be accommodated through water system improvements. RESUBMITTED 010318FF339- 2020 S 32 Oth(Form Update 1/6/17) JAN 0 8 2018 CUY OF FEDEPX AAY MMMUNrrYDEN LOPMEN9' 0921049297 wtr.docx (Form Update 1/3/17) 2 018 � L WAY ,,MN(U I 4 41�- �Pil ii 'iii, ai ` December 11, 2017 kl`;,,#doe I)onahou Donahoe Design Group Architects LLC 8383 1581h Avenue _NE, Suite 250 Redmond, WA 98052 COMMENTSCenterNWCC a,. Darnage Rebuild, 2020 South 3201h Street, Federal CITY HALL 33325 8th ..Avenue Soul Federal Way, WA 98003-6325 (253) 835-7000 www, cityoffederalway. com Jim Ferrell, Mayor Dear Mr. Donahou: City- departments/divisions have the following comments in response to your October 1011, and October 30, 2017, project submittals, which will need to be addressed prior to land use application approval, or as od- er,�vise noted. Questions regarding the technical review comments should be addressed to the staff representative. The Ferlerral JVq)., Revised. Code (f7WRC) is available online at Stacev Welsh — Planning Division, (253) 835-2634, t to 1 1Slct of ruff ds 1 a . ,o : 1. Technical comments made about an item on one sheet may necessitate changes to other related sheets and it is 'the applicant's responsibility- to determine any such necessary adjustments. Please ensure consistent information is comniunicared throughout the plan set and associated application materials. 2. A building permit has been submitted (17-104861-CO) and technical comment letters have been sent from the Building and Public Vxorks Development Services Divisions. if any resultant changes to the building permit plan set affect land use application documents that have been submstted, those will need to be revised accordingly. 3. On Sheet A-101 (site plan), address the following: a. T'he ou" 3g rice in the prrk,iri table only adds up to 15,500 square to t; not the project's proposed 22,000 square feet. T lze parking requirement for "food" use is inco m ?;,, shown at 30 square feet per L9.225.040, required parking rtor restaus; nits iu;.:oric :Pace r0r e c�i 100 sVjU arc -'ecr 0 ro ss floo-` area �egCa and east food restaurants csne spa cc f6 each So sgzlare Lett or l'' l lau sir ark tnrc>:s:'�aui-;tt i�rovided on the sett: plan must also be reconciled cattle the information provided in the building permit plan set table of previous tenants and proposed uses. -Mr. joe Dor-ahou Page 2 of 5 December 11, 201' b. it appears that a trash enclosure is proposed that would be an addition to the site and not a replacement of one that existed previously please confirm. The new enclosure requires removal of r existing palLinor spaces. Detail on the site plan the number of parking spaces provided compared to - - 0 the number required, and factor in the removal of spaces for the new trash -enclosure. c, Indicate -whether anv new transformers and fire standpipes are planned and if so, how they will comply with FVTRC 19.115.050(6)(b)(ii),, 4. On Sheet L-1, (landscape plan), address the following: the - A and 19,125.1-0. a. Shovv proposed screening around L new trash enclosure per F X/RC 19,125.040(�, ai I D b. 0-cus luvkcn laurels are proposed for the south side of the building. These tsTlcally grow cluickly and provide excellent screening. Screening at that location would inhibit visibility into the Pedestrian z I pathway along the south side of the corm-nercial building and into the building itself from the psrknig area and nearby streets. Z:11 On Shea- _I-1-201 (elevation d,'rawings), address the FollowingZ-1 . c, The previous building used various mediods to articulate blank walls on all four building facades, mainh, with the use of alternating sections of windows and brick. Code requires use of methods to articulate blank walls, and absent that, requires screening of blank walls that are 240 square feet or greater in area per F-Wg-C 19,1115.060(3)(b) and 19,125.040(22). All four elevations of the replacement building contain blank wall areas greater than 240 square feet, which would create a nonconforming situation. Please :incorporate additional methods of articulation or screening per the listed code requirements. b. The previous building had facade modulation on the north and south building facades. Code requires building facade modulation and screening options in, F-NNRC 19M5.060(2), W-if-h the previous building, both the north and south building facades only met one of the four modulation options (see facade modulation -code item [2] [a]). Demonstrate how the replacement building is not more nonconto-nming'VI-Ith regard to this requirement, it appears that canopies will be used, lvhich could be a substitute for st-jaight facade modulation if they are six feet in width and meet the folllmtiino-ZD on tine north and south facades- "(2)(c) Camopyararnaoc As a modulation option, canopies or arcades may be used only aloe; facades drat are visible from a righil-of-wadT, NEnicaum length: 50 percent of die length of the facade using th is option. 0 c. Shmv the mechanical equipment screening on the -north and FW19�110'07 south facades per RC I d. Please provide a detail that compares the previous building's height -with the proposed building, I which is shown to be 24'aches L -all L a. Review -he recently updated F-W'RC19.1215.150 code section and the enclosed checklist for solid waste and recycling design requ: Ltements. j - -� r I , - Iseter La-,,x.Trence — Building Div-11'sion, `253) 835-2621, 6. No buildingcommentson the Use Process application; building plans have been submitted. � k-' I 10-185§'M-L P il" LD -,"WU 1Ir. Joe D o nahou Page 3 of 5 December 11, 2017 Cole Elliott — PW Development Services Division, (253) 835-2730, 7. Regarding ffie SEPA checklist, under answer B.3.c.3: "Exisdrig drainage will remain unchanged." should be modified to state-, "Existing drainage wiIII remain unchanged EXCEPTAS RErUTRED TOwE-,ET/.'DAI ST,4N? A IRLDS OR Al DDRESS.-H �ELLTH 0 R LRt SAFF TY ISS UES. -' (Comment from Stace-y Welsh lanning]: you do no not need to submit a revised SEPA checklist, as the project has cluali.6hed as a planned action per F-VVRC 14.15.130. Comment #7 is provided as information regarding drainage on the site and the language should be updated any there else that it is Hated in the subimttal documents,) Sated j Long — PW Tzaffic Division, (253) 835-2743, 8. No comment on the proposed reconstruction of a 22,000 square foot building. -NL-o concurrency and traffic impact fee because it a replacer-rient due to fire. Brian Asbury — LaKlehaven -Water & Sewer District, (253) 946-5407, 9. The applicant has not completed and submitted to Lakehaven an application for Certificate(s) of Availability. Additionally, the applicant has not completed and submitted to I'Lakehaven other applications that are necessary to be able to more specifically determine the applicant's requirernents for connection to Lakehaven's water and/or sewer systems to serve the subject property except die previous budding's ZD sewer service connection was appropriately disconnected on August 1, 2017, under Lakehaven Sewer Service Connection Pe it 28218. For the new building, the applicant will need to submit appLications to Lakehaven for any necessary -water and/or sewer service connections, Chris Cahan — South -4L'--qg Fire & Rescue, � (253) 946-7243, ghjj��� r�.ot 10, 'he required fire flow for this project is 2,000 gallons per minute. A Cenr#oale including a o'-Yock-il, shall be requested from the water district and provided at The dMe of building permit application. Fire Hydrants 11, This project willre(4uire two fire hydrants 1eapproved* locations, There are -,,,,o existing fire hydrants available for d-iis project. 12. *Hvdrant location in relationship ce buildings and sprinkler IFDC shall be approved by Fire -?Vlarshal's Office 13. Fire hydrants shall be 'in service prior to and da-Mi-Ig the nine of construction. Emergency Access 141. Fire apparatus access roads shall comply v�iitli all resin ifi,-ervcsn- of Fire <kccess Polic), 10.006 (enclosed). Mr. Joe Donahou Page 4 of 5 December 11, 2017 15. Desig-nated and marked fire lanes may be required for ernergenc urin tb �, access. This may be done d g e plats check or prior to building &n,,al. Requirements and marking options can be found in Title 8 of the FyVRC: htrrx "'FcderP1V`;ay/' 16. Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. Fire Department Lock Box IT A recessedifire department "Knox" brand key box shall be installed on the building. Location of box will be approved by the plan revrower or Deputy Fire Nfarshal onsite, Firm Spr—Mider Systerr. 18, -4,a17\T'_P4 19. An automatic fire sprinkler system shall beinstalledin all occupancies where the tot-,d floor area included within the surrounding exterior omits on all floor levels, including basements, exceeds 5,000 square feet. Fire walls shall not be considered to separate a building to enable deletion of die required automatic fi- fire-ectinguishiner sy stem. �D 20. The system demand pressure (to me source) required in a hydraulically designed automatic fire sprinkler system shall be at least 10 percent less than the correlative water supply curve pressure. am 21, -.,1 LF'or - -1 Zamn Sys em is requime' 22. An automatic fire detection system shall be installed in all buildings exceeding 3,000 square feet gross floor area. The fire alarm system is required to monitor the sprinkler system including water flo-,T,7. Provide filli nonEcztioa as required by NF11A 72- G,7,ok,& teevtu a, k, _,s '0' "i. 'u i letci -1 nor be I cr p , wiwioaxpeig Ae',- i� knon,& This fire detection syei-n m stshall be orutored by, An qpproved central and/or remote station. Fire Suppression System: 21 Jyj-lerd is reqmoecl for all _*Pe I korbea hass&. CLOSING Please submit rcV-1-sedappLicatilor, materials is appropriate, accompanied by the completed "Restibrnfttal Inforrna tion Form," (enclosed1h. Pursuant toF\X,'-RC M 15.050, if an Ap plicant fails te, provide additional Rsrrnation to the cit:.YaEhin, 180 days of being notified that such Irfor-madon is requested, the application shall be deemed null and voidand the city shall have no duty to process, review, or issue any decisions N'Vith respect to such an application. Mr. Joe Donahou Page 5 of 5 December 11, 2017 If you have any questions regaraag this letter, please contact me at or (253) 835-2634 Sincerely, Stacey -1,Velsh, AICP Senior Planner enc: Solid Waste Desii;n Checklisr Fire ACCCSS 11olicy Resubmittal Information Form C: Peter Lawmicc, Rims F=niricr C01c I "HiOtt Develop-nicnt Serviccs Managcx Saridy LongScnior'.1'ranspottation Manning Flm,111(11cr Brian Asbury, Lakehaven Water & Sewc-, Chris Cahan, South King Fire & Rescue NW(.:(, Center 17i a, Mark. McDonald, 14-02 Fla,t Pike Strcct, Seattic, WA 98122 Fill- 9,17-104851-110-LT Review Finding ndosmmeSize: 1inimumstorage area/trash enclosure sizes ndusuresmust have adequate width and depth components and Access: Gates should span the enclosure front. Poles or hardware cannot obstruct the enclosure opening. Enclosure access for occupants, service, and maintenance. Pedestrian access five feet wide. Allow adequate access to solid waste and recycling containers. Enclosure design consistent withstmcture. Enclosures located within zSofeet ofbuilding entrances. Site Plans should include basic SWR service plan showing intended container sizes for occupant Signs required identifying receptacle bywaste type. Multi -Family Requirements: Multifamily must have equal service container volume for recycling and trash. Stacked Multifamily sites must have storage areas on each level. openings for solid. waste compactors must be at least 12 feet wide. Surface Water Management: Basic Spill Prevention Plan required for managing liquids coming from the enclosure. Smaller. uncovered enclosures (less than or egual to175 square feet in size) drain to an P aL water separator. Larger enclosures (greater than 175 square feet in size) require roof and floor drainage ticeNehicle Access: -Is trash enclosures, Dumpsters or compactors serviced "in place" (4 cubic yards+) require clearance for lifting and tmptying over the top of the truck (21' of vertical clearance) z.Trash enclosure "sp|ivrevenuunplan^nsuurce are inthe Development Standards "Design Requirements for Solid Waste Enclosures" appendix z�This appendix also includes aturning radius diagram useful for determining ifwaste collection trucks can access trash enclosures Fire Prevention Division Guideline No.10.006 June 20, 2017 FIRE DEPARTMENT ACCESS ROADS A. Scope and Purpose - To provide a policy for Fire Apparatus Access Roads within the City of Federal Way and the City of Des Moines. B. Code Authority Washington Administrative Code 51-24-10201 and International Fire Code section 102. C. Special Provisions 1. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall extend to within one -hundred -fifty (150') feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The Fire Marshal is authorized to increase the dimension of one -hundred -fifty (150') feet where: a. The building is equipped throughout with an approved automatic sprinkler system. A twenty (20) percent increase in the dimension is permitted. b. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, non-negotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. c. This policy may be modified for Group R-3 occupancies with an approved sprinkler system and Group U occupancies as approved by the Fire Marshal. 2. The Fire Marshal is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. 3. Fire apparatus access roads shall have an unobstructed width of not less than twenty (20') feet exclusive of shoulders, and an unobstructed vertical clearance of not less than thirteen feet six (13'6") inches. Security gates when installed shall be in accordance with Administrative policies 10.001 and 10.003. 4. The Fire Marshal shall have the authority to require an increase in the minimum access widths where they are inadequate for fire or rescue operations. 5. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. A paved surface is not required by the fire department. The roadway must support 75,000 lbs. gross vehicle weight. Current apparatus weighs 69,500 pounds. That is 22,640 lbs. on the front axle and 46,860 lbs. on the rear tandem axles. Outrigger point load of45,000 lbs. applied on an 18"x18" inch area. Note: Grass Crete —The only product currently approved is Presto Geosystems. When Grass Crete is used, the driving surface must be clearly discernible as a drivable surface. 6. The required turning radius of a fire apparatus access road shall be thirty-two (32) feet inside and for (40') feet outside radius. 7. Dead-end fire apparatus access roads in excess of one -hundred -fifty (150') feet in length shall I provided with shall be provided with a cul-de-sac at the dead-end. All such cul-de-sacs shall not be le than eighty (80') feet in diameter. When buildings are completely protected with an approvE automatic fire sprinkler system, the provisions of this policy may be modified by the Fire Marshal. 8.' Where a bridge or an elevated surface is part of a fire apparatus access, road, the bridge shall t constructed and maintained in accordance with AASHTO HB-17. Bridges and elevated surfaces shall t designed for a live load sufficient to carry the imposed loads of fire apparatus. Vehicle load limits shi be posted at both entrances to bridges when required by the fire code official. Where elevated surfac( designed for emergency vehicle use are adjacent to surfaces which are not designed for such us approved barriers, approved signs or both shall be installed and maintained when required by the Fii Marshal. 9. The grade of the fire apparatus access road shall be within the limits established by the Fire Marsh based on the fire department's apparatus: a. 12% commercial property b. 15% residential property 10. Where required, approved fire lanes shall be established and marked in accordance with applicable Cil Codes. 11. The maximum angles of approach, departure and ground clearance for fire apparatus access roads ai as follows: a. Angle of departure (A): 5.5 degrees b. Angle of approach (B): 6.5 degrees c. Ground Clearance* (D): 8 inches *Tire -to -tire floor contact (C) ranges from 152" — 220" "I44 t *# Aftow, CITY OF Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT 33325 81h Avenue South Federal Way WA 98003 253-835-7000; Fax 253-835-2609 �Ww'c ilygf f e (j_ygy � —COM erolwo 1, te.-'A"�16AAOq -0C&*ereby declare, under penalty of perjury of the laws of the State of Washington, thard:IJ 0 Notice of Land Use Application/Action ❑ Notice of Determination of Significance (DS) and Scoping Notice Notice of Environmental Determination of Nonsignificance (SEPA, DNS) Notice of Mitigated Environmental Determination of Nonsignificance (SEPA, MDNS) Notice of Land Use Application & Optional DNS/MDNS El FWRC Interpretation 0 Other El Land Use Decision Letter 13 Notice of Public Hearing before the Hearing Examiner El Notice of Planning Commission Public Hearing El Notice of LUTC/CC Public Hearing 13 Notice of Application for Shoreline Management Permit El Shoreline Management Permit Adoption of Existing Environmental Document was 0 mailed 0 foxed 0 e-mailed and/or 11--posted to or at each of the attached addresses on Project Name File Number(s Signature :\Dedarafion of Distdbufion.doc/Last printed 8/11/2017 11:45:00 AM Posted Sites: Federal Way City Hall: 33325 8th Ave South Federal Way Library: 34200 1 st Way South Federal Way 320th Library: 848 S. 320th St 1:\Declaration of Disfdbution.doc/Last printed 8/11/2017 11:45:00 AM a 931M Project Name: NWCC Center Plaza -Fire Damage Rebuild Project Description: Reconstruction of a 22,000 square -foot multi -tenant commercial building with associated site work. Applicant. NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122 Agent: Donahou Design Group, 8383 158ffi Avenue NE, Suite 250, Redmond, WA 98052 Project Location: 2020 South 320th Street, Federal Way, WA, King County Parcel #092104-9297 Date of Application: October 10, 2017 Date Determined Complete: November 7, 2017 Date of Notice of Application: November 24, 2017 Public Comments Due: December 11, 2017 Requested Decision and Other Permits Included with this Application: The applicant requests a Use Process III decision (file #17-104851-UP) issued by the Director of Community Development pursuant to Federal Wlay Revised Code J7WRC) Chapter 19.65. Additional perthhsod/qr approvals in conjunction with the Use Process III decision include a City Center Planned Actiion&t6iiiiination pursuant to S�*Ekviivnmental PoligAct (SEPA) Rules WAC 197-11 (file #17-104855-SE) and a building permit (file #17-104861-CO). The project has qualified as a planned action per FWRC 14.15,130. Environmental Documents: City Center Planned Action Determination Review Checklist, Environmental Checklist, and Drainage Memorandum. IfflOW91k WM 5011M Consistency with Applicable City Plans and Regulations: The project will be reviewed for consistency with all applicable codes and regulations, including but not limited to: the Federal lVa Com Y -prehensive Plan, al Way, -d—e 2016 Ykan CounTIS-M �ce Water Desi Zn Manual as amended by the City of Feder and the Public Works Department Development Standards. a Was Comments sent by email should be dire te to* Availability of File and Environmental Documents: The official project file and referenced environmental documents are available for public review during normal business hours at the Communi Development Department (address above). I B 10 CITY OF Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT 33325 8th Avenue South Federal Way WA 98003 253-835-7000; Fax 253-835-2609 mw—w- dim ( Nteq Va-fl- hereby declare, under penalty of perjury of the laws of the State of Was Ington0hat a: otice of Land Use Application/Action El Notice of Determination of Significance (DS) and Scoping Notice Notice of Environmental Determination of Nonsignificance (SEPA, DNS) F-1 Notice of Mitigated Environmental Determination of Nonsignificance (SEPA, MDNS) Notice of Land Use Application & Optional DNS/MDNS El FWRC Interpretation 11 Other 0 Land Use Decision Letter Notice of Public Hearing before the Hearing Examiner Notice of Planning Commission Public Hearing 11 Notice of LUTC/CC Public Hearing Notice of Application for Shoreline Management Permit 13 Shoreline Management Permit Adoption of Existing Environmental Document was 0 mailed 0 faxed Xi -mailed and/or 0 posted to or at each of the attached addresses on A 2017 Project Name --2LVVC —(C 1,q'7-ez , 61� File Number(s)---j 0 U P L----j Signature. Date / / -/ 7-/ -7 - 1:\Declaration of Distidbution.doc/Lost printed 8/11 /2017 11:45:00 AM i . I - alm Pli Wili tillitmolumm•mil• i: •; 1 1101 i 1:\Declaration of Distdbution.doc/Lost printed 8/11/2017 11:45:00 AM I Stac Welsh From: Linda Mills <Imills@kentreporter.com> Sent: Friday, November 17, 2017 11:41 AM To: Stacey Welsh Subject: Re: FW: public notice Attachments: 2007972.PDF HI Stacey, I have received your notice (re: Notice of Application, 17-104851-UP) to be published in the Federal Way Mirror on Friday, November 24, 2017. Thanks! Linda Mills Legal/Public Notice Advertising - Obituary Representative Auburn, Bellevue, Bothell/Kenmore, Covington/Maple Valley/Black Diamond, Issaquah/Sammamish, Kent, Kirkland, Mercer Island, Redmond and Renton Reporters, Federal Way Mirror, Snoqualmie Valley Record, and Okanogan Valley Gazette -Tribune Direct: 253-234-3506 Internal: 36027 Fax: 253-437-6016 19426 68th Ave. S., Ste A, Kent, WA 98032 -6 - , 0 a $1111111re, 8 1 momm I - Thank you for checking and getting back to me so quickly. Aaagghh so sorry for this last minute scramble) Please publish the attached legal notice (Notice of Application, 17-104851-UP) in Friday's (11/24/17) issue. Please furnish an affidavit of publication. Thank you, Stacey Welsh, AICP 11 333258 th Avenue South Sent: Friday, November 17, 2017 10:53 AM To: Stacey Welsh Subject: Re: FW: public notice The last item lreceived from Tina was Nov Q1h concerning Wild Waves. LegmVPuNioNoUceAdvertieing-ObituaryReprementative Auburn, Bellevue, Bothell/Kenmore, Covington/Maple Valley/Black Diamond, Issaquah/Sammamish, Kent, Kirkland, Mercer Island, Redmond and Renton Reporters, Federal Way Mirror, Snoqualmie Valley Record, and Okanogan Valley Gazette -Tribune Direct: Internal: 36027 Fax: 253-437-6016 12 • Fri, Nov 17, 2017 at 10:49 AM, Stacey Welsh wrote: I'm checking to see it I ina f lety tro, I y o e era T-Sy— st `CC U I IPP F I the Federal Way Mirror. It is a Notice of Application for the NWCC project. She is out of the office and I'm trying to determine what occurred. F17 W&W 037AM33m9i 01 V 04 Pq 1 deral My 333258 th Avenue South Phone: 253/835-2634 Fax: 253/835-2609 www.cityoffederalway.com .. ......... ___111_1____­111 .. .. . ..... .......... From: Tina Piety Sent: Tuesday, November 14, 2017 2:55 PM To: Stacey Welsh Subject: RE: public notice ME= I've reviewed the NOA and it is ready for you to use. I'll send it to the paper and place it on the website soon. 3 mm From: Stacey Welsh Sent: Tuesday, November 14, 2017 10:37 AM To: Tina Piety Subject: RE: public notice Sorry, forgot to ask you to let me know when the notice is ready to use so that I can use it on the boards for posting. From: Stacey Welsh Sent: Monday, November 13, 2017 2:31 Plv. To: Tina Piety Subject: public notice I have a Notice of Application for the NWCC Center Plaza -Fire Damage Rebuild project ready for Friday, 11/17. Please send the notice to the paper for publication on Friday and put on the city website. No mailing is required. I will • • the r• M�� Stacey Welsh, AICP www.!�it �offc�deralw�acom� CLASSIFIED ADVERTISING PROOF/RECEIPT Client: 93145 FWM Legals Phone: (253) 946-2890 Address: — Federal Way, WA Ad# 786217 Requested By: Fax: Sales Rep.,- Mills, Linda Phone: (253) 234-3506 ImillsE entreporter.com Fax: Class,: 9930 FW Legals Start Date: 11/24/2017 End Date: 11/24/2017 Nb. of Inserts: PO #: Publications: Federal Way Mirror Paid Amount: $0.00 Balance: $0.00 Total Price: S0.00 I Federal Way T • • • • • • • It 00 p CD D CD > CD CL Cr) CD CD D C 0 -GOS CD C-D CD p CD CD 0 0 uj FJ. 0 0 0 kPI k4�� C'). CD CD CD *i 0 CD CD 0 0 CD 0 :� - . CD CD �n CD -�i CD CD p 0 0 p Qn P;, Oil Oml � p CD CD C"D Cn CD CD 0 CD CD 0 C) P p CAD C , = CD t�� • C) �. = CD 0 CD CD CD CD 'P CD 4 Woo 1= CD = z S) CD CD CD *We 0 CD 0 CD CD �5 �4 = CD CD CDrf 91 OQ ob m �a = =. CD cn- 0 " Cr �= CD GQ p 0 0 CD C) o-h 7 0 GQ CD CD CD r- X co� " -3 DD rD CD CD 0 0 OQ K " 11 ff CD CD ca,= =4mn-a- 1-0ar:� ID — w -Vm -0 c 0,, E? E? 0. C-3 =m co ID ID ID ,, - =1 P� �� 0 o ID 11 2, 0 C, Ca. > cp ro) z > -cn U E.r 1:13 IDD. m �M-azF-,M53� - D 3 R --, E-- -- � S- of ID. ID M S. - - r,., rD =0 L D 0 (D 2 0, 0 C-3 C-) C-? oo FF =3' 0- c:= 0 0 r- (D ON :3 C:, =1 R I'D: — f:� :7 — < C, 12 .� M 5� - E5'0 - CDcID m a r- cn 00 Uj -:— 0. �, 0 2 0 m c-, 0- a� 0o , o< rw.aw m On ur 2� -=,� :C"o 1-0 110 co m m --m m rD :1 <� � 0'- co ,P-B w -W I D' = �C;3 ig -t S�• 5� C, �i, cn CO CD -0 = = !"'F i g —3 -::� — , � , vi —s,pf��CLM6,0 < Do 3 ro ar r1a N-1 -V - - -4 to m m r) _2 2. J Rm c� M -,j ro m , w > = EF ccrr� 2� �w < -4 =DD M c NDZ� sl CL CL CD oT�m m m - C=, CL CLM a- . m C:) m * 3 - 8 0 co CO ED -0 w a 3 Ca D cowm<D �Fc 3 ID (< ro g • C6 m E" 0 w r. co cn 0 eD 0 g K wRg 3 m o m E g3 nw a0 M, co, r; Op 3 0 r- rD (D W w, fD ID 0- co m M m 0 F < 3 (D cp m m Er -5 F 5:', Z5"m no Cn =-a (D 0 L�. �d� a c -0 < = = CL m M C, cr SLID Sm rn 9. -1 ID o -0 0 l< 0 (D f<D 0 a= =2�=; - — .- a —.nc3 �= M (D -0 2-=o � 0 So� 3 R-L t< kom rD 0. m w 'e., (D W CL LIL Ca- rD CL CL C, r) 2mmy 3 FU' 0 oa — 6- 0 =r a- n. 0 Er C:) r cn M) -u' < (D -- . = - 0 C-), 2. -0 - ro m C, O. o C) 0 rD *E52 n o m . m 7- r-' RECEIVED DEPARTMENT OF COMMUNITY DEVELOPMENT NOV 17 2017 33325 8th Avenue South Federal Way WA 98003 253-835-7000; Fax 253-835-2609 CITY OF FEDERAL �V,�Y COMMUNIFTY DEVELOPMEova �cfl �offede�rafwa .co 1, bl�� - -1 hereby declare, under penalty of perjury of the laws of the State of shington, that a: Notice of Land Use Application was posted at the address listed below on 2017 Project Name NWCC Center Plaza -Fire Domade Rebuild File Number(s) 17-104851 -UP & 17-104855-SE r, f Signature Date Posted Sites: Project site: 2020 S. 320th Street C:\Users\swelsh\Desktop\Declaration of Dist6bution.doc/Lost pdnted 11/13/21317 3:08:00 PM Page I of I http://gismaps.kingcounty.gov/arcgis/rest/directories/arcgisoutput/Printing/PrintingServic... 11/14/2017 CITY OF z 4 Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT 33325 8th Avenue South Federal Way WA 98003 253-835-7000; Fax 253-835-2609 r.Jtvcrffcer ieva orb l h f/ herebydeclare, under penalty of perjury of the laws of the State of P Y P I rY Washington, that a: Notice of Land Use Application/Action El Notice of Determination of Significance (DS) and Scoping Notice Notice of Environmental Determination of Nonsignificance (SEPA, DNS) Notice of Mitigated Environmental Determination of Nonsignificance (SEPA, MDNS) El Notice of Land Use Application & Optional DNS/MDNS FWRC Interpretation 11 Other was ❑ mailed ❑ faxed -W—CyL-. 2017 Project Name t' File Number(s)__ Signa 11 Land Use Decision Letter Notice of Public Hearing before the Hearing Examiner Notice of Planning Commission Public Hearing Notice of LUTC/CC Public Hearing Notice of Application for Shoreline Management Permit El Shoreline Management Permit Adoption of Existing Environmental Document ❑ e-mailed and/or <Posted to or at each of the attached addresses on Date l ` f r Posted Sites: Federal Way City Hall: 33325 8th Ave South Federal Way Library: 34200 1 It Way South Federal Way 320th Library: 848 S. 320th St 1:\Declarafion of D1stdbufion.doc/LcM p6nted 8/11/2017 11:45:00 AM Land Use Notices I City of Federal Way Home(/) / Land Use Notices Translate Some land use (planning) applications require a public notice. These notices include a Notice of Application (NOA), Notice of Determination of Nonsignficance (DNS, also referred to as a SEPA notice), Notice of Mitigated Determination ofNoneignificance(MQWS).Notice ofPublic Hearing, and afew others. The notices are published inthe Federal Way Mirror. Some are posted at the project site and at the Federal Way libraries and City Hall; and in some cases, mailed to surrounding property owners. Disclaimer: Only the notice published in the Federal Way Mirror is considered the official legal notice. The notices below are intended for informational purpoueaon|y.TheyoovermughUythe|estoixmontho.P|oameconta±thePermi1Cenh*r at253.835.2GO7.oremail (meiIto: parmitcent*r@oityofedena|way.com).with any questions. Federal Way Land UNotices Type Project Name Address �s/default/files/Documents/Department/CD/Planning/LandOA Plaza - Fire St Wild 36201 Public Hearing (/sites/default/files/20171102080321.pdf) Waves/Enchanted, Enchanted Lakota Park 1415 SW Facility Repair http://www.cityoffederalway.com/node/ 1962 11/16/2017 Project Name: NWCC Center Plaza -Fire Damage Rebuild Project Description: Reconstruction of a 22,000 square -foot multi -tenant commercial building with associated site work. Applicant: NWCC Center Plaza, 1402 East Pike Street, Seattle, WA 98122 Agent: Donahou Design Group, 8383 15811, Avenue NE, Suite 250, Redmond, WA 98052 Project Location: 2020 South 320th Street, Federal Way, WA, King County Parcel #092104-9297 Date of Application: October 10, 2017 Date Determined Complete: November 7, 2017 Date of Notice of •r November 17, 2017 Public Comments Due: December 4, 2017 Requested Decision and Other Permits Included with this Application: The applicant requests a Use Process III decision (file #17-104851-UP) issued by the Director of • Development pursuant to Federal Wlay Revised Code (FWRC) Chapter 19.65. Additional permits and/or approvals in conjunction with the Use Process III decision include a City Center Planned Action determination pursuant to State Environmental 4J. 544Y4�_ project has qualified as a planned action per FWRC 14.15.130. Environmental Documents: City Center Planned Action Determination Review Checklist, Environmental Checklist, and Drainage Memorandum. Otevelopment Regulations to Be Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14, "Environmental Policy"; Title 16, "Surface Water Management"; Title 19, "Zoning and Development Code." Consistency with Appficable City Plans and Regulations: The project will be reviewed for consistency with all applicable codes and regulations, including but not limited to: the Federal Vay Comprehensive Plan, Federal Way Revised Code, 2016 King Couqy Surface Water Desi ,gn Manual as amended by the City of Federal Way, and the Public Works Department Development Standards. Public Comment & Appeals: The official project file is available for public review at the Community Development Department (City Hall, 2nd Floor, 33325 81b Avenue South, Federal Way, WA 98003). Any person may subnait written comments on the Use Process III application to the Director • Community Development by December 4, 2017. Only the applicant, persons who submit written comments to the -­­0 m. I iiiiii ii ii iii ii-4j"Ll ecision imeal the director's decision. Availability • File and Environmental Documents: The official project file and referenced environmental documents are available for pubhc review during normal business hours at the Community Development Department (address above). ► Contact: Senior Planner Stacey Welsh, 253-835-2634, stacey�wehhfitfivofkderalwavxoffl j&L CITY OF Aft Fbdlural WOY vlbi� November 7, 2017 Mr. Joe Donahou Donahou Design Group Architects LLC 8383 158,h Avenue NE, Suite 250 Redmond, WA 98052 CITY HALL 33325 8th Avenue South (253) 835-7000 www,cityoffederalway.com Jim Ferrell, Mayor ILE, The Co unity Development Department is in receipt of your October 10, 2017, and October 30, 2017, project submittals. Your proposed project includes reconstruction of a 22,000 square foot multi -tenant building with associated site work. NOTICE OF COMPLETE APPLICATION Please consider this correspondence a formal Letter of Complete Application. Pursuant to Federal Wlay Revised Code (RXIRC) 19.15.045 and 14.10.020, the application is deemed complete as of the date of this letter. The complete K•f • io •)gise-i �Iave to �those �reauirements as set forth in FWRI 19.15.040 and 14.10.020. The submittal requirements are not intended to determine if an application conforms to t City of Federal Way codes; they are used only to determine if all required materials have been submitte i CLOSING Formal processing and review of your application will now begin. Technical review comments will follow at a later date. A Notice of Application must be posted on site, published in the Federal Way Mirror, and placed at the city's official notice boards within 14 days of this letter. You will be contacted soon regarding placing the public notice board on your property. Any questions concerning your applications may be directed to me at 253-835-2634, or stacey.welsh@cityoffederalway.com. amme Stacey'Welsh, AICP Senior Planner c: Peter Lawrence, Plans Examiner Cole f"lliott Development Services Manager Sarady Long, Senior Transportation Planning Flaginecr Brian iksbury, Lakehaven Water & Sewer Chris Cahan, South King I �ire & Rescue Owner 17- 1 W5 I -00-UP D- T,D. 76823 Stacey Welsh No I'm III 1 11 milli 11 1 From: Cahan, Chris < Chris.Caha n @south kingf i re.org Sent: Wednesday, November 01, 2017 11:31 AM To: Stacey Welsh Subject: Welcome Back Attachments: 17-104851 - Center Plaza Fire Rebuild H,docx Stacey, I only made one small change. I cleared up some of our language. Chris I I � I-, ennai i w, �,is sc�.,'.n ned by R Rd o i'endcr Agenda Date: 11/01/2017 Subject: 17-104851 - Center Plaza Fire Rebuild Address: 2004 S 320 St Planner: Stacey Welsh From: Chris Cahan, Deputy Fire Marshal South King Fire and Rescue 253-946-7243 hris.cahan .southkinre.crg Fire Flow: The required fire flow for this project is 2,000 gallons per minute. A Certificate of Water Availability including a hydraulic fire flow model shall be requested from the water district and provided at the time of building permit application. Fire Hydrants: This project will require 2 fire hydrant(s) in approved* locations. There are 2 existing fire hydrants available for this project. *Hydrant location in relationship to buildings and sprinkler FDC shall be approved by Fire Marshal's Office Fire hydrants shall be in service prior to and during the time of construction. Emergency Access: Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006 (attached). Designated and marked fire lanes may be required for emergency access. This may be done during the plans check or prior to building final. Requirements and marking options can be found in title 8 of the Federal Way Revised Code: htto,/I .codeoublishin .comiWA/FederalWav/ Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. Fire Department Lock Box: A recessed fire department "Knox" brand key box shall be installed on the building. Location of box will be approved by the plan reviewer or Deputy Fire Marshal onsite. Fire Sprinkler System: An automatic fire sprinkler system shall be installed in all occupancies where the total floor area included within the surrounding exterior walls on all floor levels, including basements, exceeds 5,000 square feet. Fire walls shall not be considered to separate a building to enable deletion of the required automatic fire -extinguishing system. The system demand pressure (to the source) required in a hydraulically designed automatic fire sprinkler system shall be at least 10 per cent less than the correlative water supply curve pressure. Fire Alarm: An automatic fine detection system shall be installed in all buildings exceeding 3.000 square feet gross floor area. The fire alarm system is required to monitor the h klincluding water be required for this pro'ect — check with Fire Marshal's Office when Occu�ancy use is known. This fire detection system shall be monitored by an approved central and/or remote station. Fire Suppression System: DATE: 10/26/2017 TO: Stacey Welsh, Planning FROM: Cole Elliott, PE Development Services Manager SU11133ECT: NWCC CENTER PLAZA - FIRE DAMAGE REBUILD - (17-104855-00-SE) 2004 S 320TH ST Development Services has reviewed the SEPA checklist and make the following comment: • Under B.3.c 3) answer, "Existing drainage will remain unchanged." Should be modified to state: "Existing drainage will remain unchanged EXCEPTAS REQUIRED TO MEETADA STANDARDS OR ADDRESS HEAL TH OR LIFE SAFETY ISSUES. " From: Brian Asbury <BAsbun/@|akehaveno»g> Sent: Thursday, October 26,20I72:0UPKA To: Stacey Welsh Subject: NVV[[Center Plaza -Fire DamageRebui|d(l7-lO484I UP&17 I04855'SE) Following are Lakehaven comments regarding the City's completeness review for the submittal received by the City on 10/10/17 for the subject application/project. Let me know if there's any questions or if additional information is needed. Applicant has not completed and submitted to Lakehaven an application for Certlficate�s) Of Availability. Additidnally, applicant has not completed and submitted to L614haVen other applications that are necessary to be able to more specifically determine the apoicaWs requirements for connection to Lakehaven's water and/or sewer systems to serve the subject property; except the previous building's sewer service connection was appropriately disconnected on 8/1/17 under Lakehaven Sewer Service Connection Permit 28218. As previously noted, applicant will need to submit to Lakehaven an application for Certificate(s) of Availability. For the new building applicant will need to submit applications to Lakehaven for any necessary water and/or sewer service connections. Brian Asbury Development Engineering Supervisor Lakehaven PS - Email from NWCC indicates we should be receiving application for Certificates today or tomorrow, and if so then Id have those issued tomorrow or Monday. The contents of this email may be determined to be a public record and subject to disclosure pursuant to RCW 42.56 regardless of any expectations or claims of confidentiality or privilege asserted. Stacey Welsh From: Stacey Welsh Sent: Thursday, October 26,ZOl7IO:JSAM To: loed@ddganchitectzzonn' Subject: Center Plaza Rebuild (l7 10485I-UP) Attachments: 129Resubmit1a|lnformation.doc current letters of water and sewer availability. The submittal checklist that you turned in had those items checked, so I'm checking with you to see if they were just accidentally omitted. They are required in order to have a complete application. Please provide the items to the Permit Center using the attached Resubmittal Form. 3332SumAvenue South Federal Way, VVA9QQO3'63ZS Phone: 253/835-2634 Fax: 253/835-2609 � '���� � M�� �8�0[ �wo � � ` Lakehaven DTY OF F 4 00��,!MU N TY"DEV ELOPME NT WATER& SEWER DISTRICT This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: El Building Permit-SFR El Building Permit-MFR 0 Building Permit -Other El Subdivision El Short Subdivision El Binding Site Plan [] Rezone El Boundary Line Adjustment El Other (specify/describe) - Tax Parcel Numbor(s):U9l1049297 Site Address: 2020 S 320th St LakahevenGISGrid: K-08 Ex. Bldg. Area to Remain: 46,500±l- s New Bldg. Area Proposed: 22J000±/- s� �. water service can be provided by service connection to an exist 12" diameter waterman that is on the site 2. El Water service for the site will require an improvement mu,xenupm/^water distribution system of: a. feet cf"diameter water main toreach the site; and/or [] b. The construction of water distribution system on the site; and/or [] c. A major portion of Lakehaven's comprehensive water system plan would need to be implemented and/or constructed; and/or d. Other (describe): 3. a. The existing water system is in conformance with Lakehaven's Comprehensive Water System Plan. [] b. The existing water system is not in conformance with Lokehavmn's Comprehensive Water System Plan and an Amendment tothis Plan will be required. This may cause o delay in issuance of land use approvals or permits. 4. a. The subject property is within the corporate limits ofLakeheven VVoter& Sewer District, or has been granted Boundary Review Board approval for extension of water service outside of Lakehaven's water service area. [] b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Water service is subject to: 10 a. Payment of connection charges (for any new/modified sen/|oa connection, to be determined by Lokehaven)} [] b. Proof or reservationof easement(s) as required by Lakeheven' 0 c. Other: VpterComments/special conditions: Jbg,p. a !cd am building I e has an existina water qervice anection (Svc AQ327, y&n �tandam!s­to determine,, iLit!s_ sufficient for new, The nearest fire hydrants are on the Property (as marked on map on the back of this page). Fire Flow etnoless than 20psi available within the water distribution ie2,500GPM (appmximate)for two (z) hours ormore. This flow figure depicts the theoretical performance ofthe water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated through water distribution system improvements, contact Lakehoven for additional information. . 57e Pressure Zone Est. MeterBevobun'SI5: 420+/' Est. Pressure Range etMeter(s) (psi): Min. 85, Max. 74 l hereby certify that the above water system information is true. This certification shall be valid for one (z) year from the gate or signature. Signature. ogz10*sz97w,r.docx(Form Update 1/3/17) Date: ZI Page zofz 0921049297 wtr.docx (Form Update 1/3/17) Page 2 of 2 Q, Lakehaven WATER & SEWER DISTRICT Lakehaven !eMtMTnn!5Mering Section This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: [] Building Permit-SFm [] Building Permit'MRm 0 Building Permit -Other [] Subdivision [] Short Subdivision [] Binding Site Plan [] Rezone LJ Boundary Line Adjustment LJ Other (specifyYdeaor|be)_ Tax Parcel Number(a): D9219-4-92-92 Site Address: u:kehovanszsGrid: K-08 Ex. Bldg. Area to Remain: Applicant's Name: 1. Sewer service can be provided by service connection to on existing J0'diameter sewer main that is on the site and the sewer system has the capacity to serve the proposed land use. 2. Sewer service for the site will require an improvement to Lakehaven's sanitary sewer system of: o. feet of " diameter sewer main ortrunk to reach the site; and/or - [] b. The construction ofnsanitary sewer collection system onthe site; and/or [] c. A major portion ofLokekovent comprehensive wastewater system plan would need to be implemented and/or constructed; and/or El d. Other (describe): 3. 0 a. The existing sewer system is in conformance with Lakeheven's Comprehensive Wastewater System Plan. [] b. The existing sewer system is not in conformance with Lakehaven's Comprehensive Wastewater System Plan and an Amendment to this p|on will be required. This may cause a delay in issuance of land use approvals orpermits. 4. 0 o. The proposed site land use is within the corporate limits ofLakehaven Water mSewer District, or has been granted Boundary Review Board approval for extension of sewer service outside of Lakehaven's sewer service area. [l b. Annexation or Boundary Review Board approval will be necessary to provide service. S. Seweroomicn is subject to: o. Payment of connection charges (for any new/modified service connection, to be determined by Lakehaven); 0! b.Proof or reservationof easement(s) as required by Lah h Comments/special conditions: _ l hereby oarbry that the above sewer system information is true. This certification shall be valid for one (q year from the date of signature. o9z1n49zg7awcdocx(Form Update 1/3/17) Page znfz 0921049297 swr.docx (Form Update 1/3/17) Page 2 of 2 CITY OF FEDERAL VVAf COM,4UNITY DEVELOPNENT DEPARTMENJ !I vm flea I DATE: 10-16-17 TO: Cole Elliott, Development Services Manager Peter Lawrence, Plans Examiner Rick Perez, City Traffic Engineer Brian Asbury, Lakehaven Water & Sewer District Chris Cahan, South King Fire & Rescue Lindsey Sperry, Public Safety Officer Rob Van Orsow, Solid Waste/Recycling Coordinator FROM: Stacey Welsh, Planning FOR DRC MTG. ON: 10-26-17 - Internal completeness FILE NUMBER(s): 17-104851-UP & 17-104855-Se RELATED FILE NOS.: 17-1102705-PC & 17-104861-CO PROJECT NAME: NWCC CENTER PLAZA - FIRE DAMAGE REBUILD PROJECT ADDRESS: 2004 S 320TH ST PARCEL NUIMER: 0921049297 ZONING DISTRICT: CC-C PROJECT DESCRIPTION: Reconstruction of a 22,000 square foot multi -tenant building with associated site work. LAND USE PERM11TS: Up III & City Center Planned Action SEPA PROJECT CONTACT: Joe Donahou Donahou Design Group Architects LLC 8383 15 8th Ave NE, Suite 250 Redmond, WA 98052 MTERIALS SUBZ41TTED: Master Land Use Application Title Report Drainage Memorandum Site Photos CPTED Checklist City Center Planned Action Determination Checklist SEPA Checklist Vicinity Map Plan Set: site plan, elevations, topo, grading, drainage, utility, landscape, materials board RECEIVED'11 � Sj�,,R , LAND USE APPLICATION ,4 ENT OF COMMUNITY DEVELONMENT SERVICES 33325 8'1, Avenue South OCT 10 2017 Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 CITY OF FEDERAI. WAY W \V \v. c i t y_t�ff Ld qr GOMMUNfTY DEVELOPMENT APPLICATION No(s) 17-10ye Date MI&I r7 Project Name Property Address/Location e2e)e5> 4- Parcel Nuniber(s) Project Description =%Z=! ; F999APL4 �11 v � Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information —Zoning Designation Comprehensive Plan Designation Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): A!117 0! Occupancy Type Construction Type Applicant &) W C C, a- N arrie., A4AP-41— /-1600,#�JAL4> Address: 1*4s jqge.5q�� Ci Ly/S rate: es Zip: 22. Phone: Fax: Email: 2 Signature`~` Agent (if different than Applicant) Name: JOC-5 PVJAtfC0 , Address: ''.( � & 4` 01 11 'V - 1�, T' � ­�3F�e 77-S4- 7373 City/State: pt-,VOI 6-?l P 1,4 Zip: 17 S'O 5Z Phone: Fax: Email: Signature: Owner Name: rL,6eA, Address: Cily/State. /1JA_ Iq 12> Paz, Zile: Phone: Fax: Email: Signature_;;01_;�� E 3L[Iletirl #003 — January 1, 2011 Page I of I k:\H and 0 UtSMA aster Land Use Application A" I O �. 7� a) 0 0 Pate Vol? �j �3 '10"�6aUer Way South qlnoS AuM L IC C CP 0 V. fD PQ > ca a to Sa =3 nue Smith 23rd Lr 0 0 o 0 -n :3 ro cn ;P 0 ED 0 m CL r- .< 0 cl, C, §0 C= n m arn m C= < FTI u -4 M, RECEIVED mean= CITY OF FEDERAL WAY OOMMUNMY DEVELOPMENT TO: City of Federal Way FROM: Tim Gabelein, PE DATE: October 3, 2017 RE: Drainage Memorandum for 2020 S 320"' St Rebuild Project Description The project involves the reconstruction of a 22,000 SF single story commercial building located at 2020 S 320'h St in Federal Way, A. The existing structure was destroyed by fire on May 21, 2017. The rebuilt building (Building A) is the southernmost commercial building on the 260,258 SF lot (Parcel #0921049297). Site Access to the site will remain from driveways located off of 21" Ave S, S 318' PI and 20"' Ave S. Improvements include utility connections to the existing utility stubs, site grading as necessary for the construction of the replacement stiucture, and adjacent concrete walkways and asphalt restoration to original conditions. A new fire service will be provided to the building as well. for water Mitigation Because the previous building at 2020 S 32011 St was destroyed by a fire, the project complies with The Federal Way Revised Code (FWRC) 19.30.200 which states that "The use of development, including associated improvements, as reconstructed, is not any more nonconforming than it was immediately prior to the damage". As a result, the design of the rebuilt building has been designed to be just that - no more non -conforming than the previous building prior to its destruction by fire. Complying with FWRC 19.30.200, the rebuilt building will not add any additional impervious area than existed beforehand. Additionally, the rebuilt building will mimic the previous building's drainage system. Roof downspouts will be curb discharged to the parking lot as existing with the prior building. The building's footing drain will connect to an area drain southeast of the building which will then drain to a catch basin with sump in the parking lot. Mount Vernon Office Lake Forest Park Office Whidbey Island Office 2210 Riverside Drive, Suite 110 15029 Bothell Way NE, Suite 600 PO Box 1132 Mount Vernon, WA 98273 Lake Forest Park, WA 98155 Freeland, WA 98249 Tel 360.899.1110 Tel 206.523.0024 Tel 360.331,4131 CITY OF Fbderal Mu J DEPARTMENT OF CO UNITY DEVELOPMENT SERVICES 33325 81h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607; Fax 253-835-2609 RECEIVED A, NV —XV . 1111111111IM11111i I Crime Preven Environmental Design (CPTED) Checklist Directions Please fill out the checklist to indicate which strategies have been used to implement CPTED principles in your proposed project. Please check all strategies that are applicable to your project for each of the numbered guidelines. You may check more than one strategy for each guideline. Your responses will be evaluated by City Staff, and will be integrated into the Site Plan and/or Building Permit review process. Section and v" ---------- Functional Area Evaluation for Performance Performance Standard Agency Use'Only Standard Strategy a Appficable during Site Plan Review E) Applicable during Building Permit Review Section 1.0 Natural Surveillance 1.Blind Corners Avoid blind corners in pathways and parking lots. —Revise NA Comments: Pathways should be direct. All barriers along pathways should be permeable (see through) including landscaping, fencing etc. Consider the installation of mirrors to allow users to see ahead of them and around corners. e Other strategy used----- El ------------- -- 1.2 Site and Building Layout —Conforms Allow natural observation from the street to the use, from the _Revise use to the street, and between uses _NA Comments: Bulletin #022 - August 18, 2004 __Fag_e_i —.f9 k:\Handouts\CPTED Checklist Section and Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy a Applicable duffing Site Plan Review eApplicable durin.- Building Permit Review — ------------ ------ _L 13 Orient the main entrance towards the street or both streets on For Non -Single corners. M Family Development El Position habitable rooms with windows at the front of the dwelling. M ■ Offset windows, doorways and balconies to allow for natural observation while protecthig privacy. 0 Locate main entrances/exits all d in view of the street. X PIA'e.' *X'_ For Commercial/ Retail/ Industrial If employee entrances must be separated from the main and Community El entrance, they should maximize opportunities for natural Facilities surveillance from the street. 0 In industrial developments, administration/offices should be located at the front of the building. a Avoid large expanses of parking. Where large expanses of For Surface parking are proposed, provide surveillance such as security Parking and cameras. 0 Parking Structures Access to elevators, stairwells and pedestrian pathways should be clearly visible from an adjacent parking area. A El Locate parking areas in locations that can be observed by adjoining uses. a Open spaces shall be clearly designated and situated at For Common/ locations that are easily observed by people. Parks, plazas, Open Space common areas, and playgrounds should be placed in the front Areas of buildings. Shopping centers and other similar uses should face streets. M Other strategy used: Bulletin #022 — August 18, 2004 Page 2 of 9 k:\Handouts\CPTED Checklist Section and V Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy it Applicable during Site Plan Review 0 Applicable during Building Permit Review 1.3 Common/Open Space Areas and Public On -Site Open ---Conforms Space —Revise Provide natural surveillance for commonlopen space areas. _NA Comments: Position active uses or habitable rooms with windows adjacent El to main common/open space areas, e.g. playgrounds, swinurung pools, etc., and public on -site open space. Iff Design and locate dumpster enclosures in a manner which Xscreens refuse containers but avoids providing opportunities to hide. 0 Locate waiting areas and external entries to elevators/stairwells El close to areas of active uses to make them visible from the building entry. E) Locate seating in areas of active uses. E) Other strategy used: 0 1.4 Entrances —Conforms Provide entries that are clearly visible. —Revise _NA Comments: Design entrances to allow users to see into them before Aentering. Iff Entrances should be clearly identified (Signs must conform to XFWCC Section 22-1569(D). Permit Exceptions. (Applicable during Other strategy used: 1.5 Fencing —Conforms Fence design should maximize natural surveillance from the —Revise street to the building and from the building to the street, and _NA minimize opportunities for intruders to hide. Comments: Bulletin #022 — August 18, 2004 Page 3 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy it Applicable during Site Plan Review e Applicable during Building Permit Review Front fences should be predominantly open in design, e.g. pickets or wrought iron, or low in height. e Design high solid front fences in a manner that incorporates open elements to allow visibility above the height of five feet. e If noise insulation is required, install double -glazing at the El front of the building rather than solid fences higher than five feet. e Other strategy used: El 1.6 Landscaping Conforms Avoid landscaping which obstructs natural surveillance and - -Revise allows intruders to hide. NA Comments: Trees with dense low growth foliage should be spaced or their JK crown should be. raised to avoid a continuous barrier. Use low groundcover, shrubs a minimum of 24 inches in height, or high -canopied trees (clean trimmed to a height of eight feet) around children's play areas, parking areas, and along pedestrian pathways. 11 Avoid vegetation that conceals the building entrance from the street. Other strategy used: ❑ 1.7 Exterior Lighting —Confo s Provide exterior lighting that enhances natural surveillance. Revise (Refer to FWCC Section 22-1635(g)(1) for specific lighting _NA requirements.) Comments: Prepare a lighting plan in accordance with Illuminating Engineering Society of America (IESA) Standards, which El addresses project lighting in a comprehensive manner. Select a lighting approach that is consistent with local conditions and crime problems. 4 Bulletin #022 — August 18, 2004 Page 4 of 9 kiHandoutslCP'T'ED Checklist Section and Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy 0 Applicable during Site Plan Review Applicable during Building Permit Review Locate elevated light fixtures (poles, light standards, etc.) in a [3 coordinated manner that provides the desired coverage. The useful ground coverage of an elevated light fixture is roughly twice its height. a For areas intended to be used at night, ensure that lighting supports visibility. Where lighting is placed at a lower height to support visibility for pedestrians, ensure that it is vandal - resistant. E) I XEnsure inset or modulated spaces on a building facade, access/egress routes, and signage is well lit. (3 XIn areas used by pedestrians, ensure that lighting shines on pedestrian pathways and possible entrapment spaces. E) Place lighting to lake, into account vegetation, in it, current and mature form, as well as any other element that may have the potential for blocking light. e Avoid lighting of areas not intended for nighttime use to avoid giving a false impression of use or safety. If danger spots are usually vacant at night, avoid lighting them and close them off to pedestrians. E) ■ Select and light "safe routes" so that these become the focus of legitimate pedestrian activity after dark. 0 v-,e Avoid climbing opportunities by locating light standards and A electrical equipment away from walls or low buildings. E) Use photoelectric rather than time switches for exterior lighting. e In projects that will be used primarily by older people El (retirement homes, congregate care facilities, senior and/ or community centers, etc.) provide higher levels of brightness in public/common areas. e Other strategy used: 1.8 Mix of Uses —Conforms In mixed use buildings increase opportunities for natural —Revise surveillance, while protecting privacy. _NA Comments: Bulletin #022 — August 18, 2004 Page 5 of 9 k:kHandouts\CPTED Checklist Section and Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy a Applicable during Site Plan Review during Building Permit Review Where allowed by city code, locateshops and businesses on lower floors and residences on upper floors. In this way, El residents can observe the businesses after hours while the residences can be observed by the businesses during business hours, K Include food kiosks, restaurants, etc, within parks and parking El structures. 0 Other strategy: used El 1.9 Security Bars, Shutters, and Doors —Conforms When used and permitted by building andfire codes, security _Revise bars, shutters, and doors should allow observation of the street --NA and be consistent with the architectural style of the building. Comments: El Security bars and security doors should be visually permeable Other strategy used: _ 2.1 Building Identification —Conforms Ensure buildings are clearly identified by street number to _Revise prevent unintended access and to assistpersons trying tofind —NA the building. Identification signs must conform to FWCC, Comments: Section 22-1569(D). Permit Exceptions. Street numbers should be plainly visible and legible from the street or road fronting the property. e Section and Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy a Applicable during Site Plan Review eApplicable during Building Permit Review In residential uses, each individual unit should be clearly numbered. In multiple building complexes, each building entry El should clearly state the unit numbers accessed from than entry. In addition, unit numbers should be provided on each level or floor. e XStreet numbers should be made of durable materials, preferably reflective or luminous, and unobstructed (e.g. by foliage). e For larger projects, provide location maps (fixed plaque E1_ format) and directional signage at public entry points and along internal public routes of travel. E) Other strategy used: El 2.2 Entrances —Conforms Avoid confusion in locating building entrances. —Revise _NA Comments: Entrances should be easily recognizable through desiga El features and directional signage. (Signs must conform FWCC Section 22-1569(D). Permit Exceptions. 10 Minimize the number of entry points. 10 Other strategy used:- 13 2.3 Landscaping —Conforms Use vegetation as barriers to deter unauthorized access. —Revise _NA Comments: 0 Consider using thorny plants as an effective barrier. e Other strategy used: 2.4 Landscaping Location —Conforms Avoid placement of vegetation that would enable access to a —Revise building or to neighboring buildings. _NA Comments: Bulletin #022 - August 18, 2004 Page 7 of 9 k:\Handouts\CPTED Checklist Section and ✓Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy a Applicable during Site Plan Review eApplicable during Building Permit Review Avoid placement of large trees, garages, utility structures, fences, and gutters next to second story windows or balconies that could provide a means of access. H Other strategy use&—, 2.5 Security —Conforms Reduce opportunities for Unauthorized access —Revise _NA Corrunents: Consider the use of security hardware and/or human measures to reduce opportunities for unauthorized access. (Applicable during fe .rti �icate 0 Other strategy used, 2.6 Sig age —Conforms Insure that signage is clearly visible, easy to read and simple to —Revise understand [Signs must conform to FWCC Section 22-1569(D). _NA Permit Exceptions]. Comments: Use strong colors, standard symbols, and simple graphics for informational signs. C) Upon entering the parking area, provide both pedestrians and For Surface drivers with a clear understanding of the direction to stairs, Parking and elevators, and exits. e Parking Structures In multi -level parking areas, use creative signage to distinguish between floors to enable users to easily locate their cars. e D Advise users of security measures that are in place and where to find them, i.e. security phone or intercom system, E) Provide signage in the parking area advising users to lock their cars. e Bulletin #022 — August 18, 2004 Page 8 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy a Applicable during Site Plan Review eApplicable during Building Permit Review Where exits are closed after hours, ensure this information is indicated at the parking area entrance. E) Other strategy used Section 3.0 Ownership 3.1 Maintenance —Conforms Create a "cared for" image —Revise NA . 2244e JJ T jAM Comments: Ensure that landscaping is well maintained, as per FWCC Section 22-1569, in order to give an impression of ownership, care, and security. (Ongoing). Where possible, design multi -unit residential uses such that no El more than six to eight units share a common building entrance. a Other strategy used:—,, 3.2 Materials —Conforms Use materials, which reduce the opportunity for vandalism. I —Revise _NA Comments: Consider using strong, wear resistant laminate, impervious glazed ceramics, treated masonry products, stainless steel materials, anti -graffiti paints, and clear over sprays to reduce opportunities for vandalism. Avoid flat or porous finishes in areas where graffiti is likely to be a problem, e 0 Where large walls are unavoidable, refer to FWCC Section 22- 1564(u) regarding the use of vegetative screens. e Common area and/or street furniture shall be made of long wearing vandal resistant materials and secured by sturdy anchor points, or removed after hours. e Other strategy used: — El Bulletin #022 — August 18, 2004 Page 9 of 9 k:\Handouts\CPTED Checklist Fidelityt s rance Co y � � F C October 10, 2017 CC Center Plaza LLC, a Delaware linifted liability company YOUR F: OUR NO.: 20375966 Attached is your Subdivision Guarantee policy of title insurance. Thank you for allowing us to serve you. We look forward to assisting you in the future. Marc Wise Order No. 20375966-416-416- W Guarantee No.WA-FBC-IMP-27WAG14-1-17-20375966 EXHIBIT LEGAL DESCRIPTION LOTS 1, 2 AND 3, TOGETHER WITH AN UNDIVIDED INTEREST IN TRACT "X", OF KING COUNTY SHORT PLAT NO. 1077139, AS RECORDED UNDER RECORDING NO. 7806301002, RECORDS OF KING COUNTY AUDITOR; EXCEPT THAT PORTION OF SAID LOT 3 CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED MARCH 2, 2006 UNDER RECORDING NO. 20060302001898; ALSO EXCEPT THAT PORTION OF TRACT "X" CONVEYED TO THE CITY OF FEDERAL WAY BY DEEDS RECORDED MARCH 2, 2006 AND APRIL 10, 2006 UNDER RECORDING NOS. 20060302001899 AND 200604100023 4; ALSO EXCEPT THAT PORTION OF LOT 3 AND TRACT "X" CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED AUGUST 30, 2017 UNDER RECORDING NO. 20170830000746 10AwI-,-sI" ►� z 27AG14 Subdivision Guarantee Page 11 Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG]4-1-17-20375966 SUBDIVISION GUARANTEE SCHEDULE A Order No.: 20375966-416-416-MAW Liability: $1,000.00 Guarantee No.: WA-FBCM-IMP-27WAG14-1-17-20375966 Premium: $550.00 Customer No.: Tax: $55.55 Total: $605.55 1. Name of Assured: NW Capital Corp 2. Date of Guarantee: October 3, 2017 at 8:00 A.M. The assurances referred to on the face page hereof are: That according to those public records which, under the recording laws, impart constructive notice of matters affecting title to the following described land: See Exhibit A attached hereto and made a part hereof. The estate or interest in the land which is covered by this guarantee is: A FEE Title to the estate or interest in the land is yested i p: NWCC Center Plaza LLC, a Delaware limited liability company subject to the Exceptions shown below, which are not necessarily shown in order of their priority. Exceptions: I Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on land or by the public records. 2. (a) Unpatented mining claims; (b) reservations or exceptions in Patents or in Acts authorizing the issuance thereof; (c) Indian treaty or aboriginal rights, including, but not limited to, easements or equitable servitudes; or, (d) water rights, claims or title to water, whether or not the matters excepted under (a), (b), (c) or (d) are shown by the public records. 1 1 Title to any property beyond the lines of the land expressly described herein, or title to streets, roads, avenues, lanes, ways or waterways on which said land abuts, or the right to maintain vaults, tunnels, ramps or any other structure or improvement; or any rights or easements therein unless such property rights or easements are expressly and specifically set forth in the land described herein. 27WAG14 Subdivision Guarantee Page 2 Order No. 20375966-416-416-MAW Company shall have the following additional options: (a) To Pay or Tender Payment of the Amount of Liability or to Purchase the Indebtedness. The Company shall have the option to pay or settle or compromise for or in the name of the pay the full amount of this Guarantee or, if this Guarantee is issued for the benefit of a holder of a mortgage or a lienholder, the Company shall have the option to Purchase the indebtedness secured by said mortgage or said lien for the amount owing thereon, together with any costs, reasonable to the time of purchase., Such purchase, payment or tender of payment all liability of the company hereund.r, In the event indebtedness, the owner of such indebtedness shall transfer and assign said indebtednes5.-ID_Qetner Win any collateral security, to the Company upon MIN111 W11 W. .1; 1 W., I I UAN-TIUMMUM than ti akei6q nt re '.rejo,that ra h HIR .6 .uIN the Company has exercised its options under Paragraph 5, and the Guarantee shall be surrendered to the Company for cancellation, (b) To Pay Otherwise Settle With Parties Other Than the Assured or With the Assured Claimant. To pay or otherwise settle with other parties for or in the name of the Assured claimant any claim any costs, attorneys' fees and expenses incurred by Company is obligation to pay, Upon the exercise by the Company of the option provided for in Paragraph (b) the Company's obligation to the Assured under this Guarantee for the claimed loss or damage, other than to make the payment required in that paragraph, shall terminate, including any obligation to continue the defense or prosecution of any litigation for which the Company has exercised its options under Paragraph 5. 7. Determination and Extent of Liability. This Guarantee is a contract of Indemnity against actual monetary loss or damage sustained or incurred by the Assured claimant who has suffered loss or damage by reason of reliance upon the assurances set forth in this Guarantee and only to the extent herein described, and subject to the Exclusions From Coverage of This Guarantee. The LiabiI4 of the Company under this these onditions and tipulations or as reduced under Section 10 of these Conditions and Stipulations, at the time the loss or damage Assured against by this Guarantee occurs, together with interest thereon; or (c) The difference between the value of the the value of the estate or interest subject to any defecL lien or encumbrance Assured Guarantee. 8. Limitation of Liability. (a) If the Company establishes the title, or removes the allegei fefectHeA or excuenbrzirce, sr cures any other matter Assured against by this -uaran- — a reasonably diligent manner by any method includinp litigatiin jij. its obligation with respect to that matter and shall not be liable for any loss or damage caused there, (b) In the event of any litigation by the company or with the Company's consent, the of competent jurisdiction, and disposition of all appeals therefrom, adverse to the title, as stated herein, (c) The Company shall not be liable for loss 1".0w"Wk without the prior written consent OfthC Company- 9. Reduction of Liability or Termination of Liability. All payments under this Guarantee, except payments made for costs, attorneys' fees and expenses pursuant to Paragraph 4 shall reduce the amount offiability pro tanto, 10. PaymentofLoss. (a) No payment shall be made without producing this Guarantee for endorsement of the payment unless the Guarantee has bee lost or il-Raweew- shall be furnished to the satisfaction of the Company, (b) When liability and the extent of loss or these Conditions and Stipulations, the loss or damage shall be payable within thirty (30) days thereafter, 11. Sub rogation Upon Payment or Settlement Whenever the Company shall have settled and paid a claim under this Guarantee, all right of any act of the Assured claimant, The Company shall be subrogated to and be respect to the claim had this Guarantee not been issued, If requested by the Company, the Assured shall transfer to the Company all rights and remedies against any person or property necessary in order to perfect this right of subrogation- The Assured shall permit the Company to sue, compromise or settle in the name of the Assured and to use the name of the Assured in any transaction or litigation involving these rights or remedies, If a payment on account of a claim does not fully cover the loss of the Assured the Company shall be subrogated to all rights and remedies of the Assured after the Assured shall have recovered its principal, interest and costs of collection. 12. Arbitration. Unless prohibited by applicable law, either the Company or the Assured may demand arbitration pursuant to the Title Insurance Arbitration Rules of the American Arbitration Association. Arbitrable matters may include, but are not limited to, any controversy or claim between the Company and the Assured arising out of or relating to this Guarantee, any service of the Company in connection with its issuance or the breach of a Guarantee provision or other obligation. All arbitrable matters when the Mount of liability is $1,000,000 or less shall be arbitrated only when agreed to by both the Company and the Assured, The Rules in effect at Date of Guarantee shall be binding upon the parties. The award may include attorneys' fees only if the Arbitrator(s) may be entered in any court having jurisdiction thereof. The law of the shus of the land shall apply to an arbitration under the Title Insurance Arbitration Rules, A copy of the Rules may be obtained from the Company upon request. 13 ' Liability Limited to This Guarantee; Guarantee Entire Contract. (a) This Guarantee together with all endorsements, if any, attached hereto by the Company is the entire Guarantee and contract between the Assured and the Company. In interpreting any provision of this Guarantee, this Guarantee shall be construed as a whole, (b) Any claim of loss or damage, whether or not based on negligence, or any action asserting such claim, shall be restricted to this Guarantee, (c) No amendment of or endorsement to this Guarantee can be made except by a writing endorsed hereon or attached hereto signed by either the President, a Vice President, the Secretary, and Assistant Secretary, or validating officer or authorized signatory of the Company. 14. Notices, Where Sent. Allnotices required to be given the Company and any statement in writing required to be furnished the Company shall include the number of this Guarantee and shall be addressed to the Company at Fidelity National Title Insurance Company Attn: Claims Department P,O, Box 45023 Jacksonville, FL 32232-5023 27WAG14 Subdivision Guarantee Page OrderNo. 20375966-416-416-NIAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966 w I I a mll n -(U-T•-T-# 4. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST, PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY: (I ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1) TAX ACCOUNT NO.: 0921049297 YEAR BILLED PAID BALANCE 2017 $157,276.59 $78,638.30 $78,638.29 TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $78,638.29. LEVY CODE: 1202 ASSESSED VALUE LAND: $4,684,600.00 ASSESSED VALUE IMPROVEMENTS: $5,981,300.00 ffm..= 5. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST, PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY: (1ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1) TAX ACCOUNT NO.: 0921049270 YEAR BILLED PAID BALANCE 2017 $24,356.60 $12,178.30 $12,178.30 TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $12,178.30. LEVY CODE: 1202 ASSESSED VALUE LAND: $991,400.00 ASSESSED VALUE IMPROVEMENTS: $661,700.00 (AFFECTS LOT I OF PARCEL B) 6. GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTER -EST, PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY: (I ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1) TAX ACCOUNT NO.: 0921049296 YEAR BILLED PAID BALANCE 2017 $6,359.83 $3,179.92 $3,179.92 TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $3,179.91. LEVY CODE: 1202 ASSESSED VALUE LAND: $415,600.00 ASSESSED VALUE IMPROVEMENTS: $1,000.00 27WAG14 Subdivision Guarantee Page 3 Order No. 20375966-416-416-MAW Guarantee No.WA-FBC-IMP-27WAG14-1-17-20375966 SCHEDULE (Continued) T GENERAL PROPERTY TAXES AND SERVICE CHARGES, AS FOLLOWS, TOGETHER WITH INTEREST, PENALTY AND STATUTORY FORECLOSURE COSTS, IF ANY, AFTER DELINQUENCY: (1ST HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1) TAX ACCOUNT NO.: 092104 9271 YEAR BILLED PAID BALANCE 2017 $9,933.11 $4,966.56 $4,966.55 TOTAL AMOUNT DUE, NOT INCLUDING INTEREST AND PENALTY: $4,966.55. LEVY CODE: ASSESSED VALUE LAND: ASSESSED VALUE IMPROVEMENTS:1 i 1 FOR SEWER TREATMENT CAPACITY CHARGES, KING, PIERCE r SNOHOMISH COUNTIES.SAID CHARGES * r APPLY TO PROPERTY CONNECTING TO THE METROPOLITAN SEWERAGE# RECONNECTING OR CHANGING ITS USE ir` STRUCTURE AFTER FEBRUARY 1990. #CONTACT WASTEWATER TREATMENT DIVISION, PROGRAM, # FURTHER INFORMATION 206-296-1450 ORFAX NO.206-263-6823 `.: EMAIL AT MAP SHOWING SEWER SERVICEAREA BOUNDARIESAND INCORPORATED AREAS CAN BE r FOUND AT: ji!TRWA�QUAAINKiCMNW.GOV/GIS/WEB/WEB/VMC/UTILITIES/SERVAREA CITIES.PDF 9. NOTICE OF TAP OR CONNECTION CHARGES WHICH HAVE BEEN OR WILL BE DUE IN CONNECTION WITH DEVELOPMENT O -DEVELOPMENT OF THE LAND AS DISCLOSED BY RECORDED INSTRUMENT. INQUIRIES REGARDING THE SPECIFIC AMOUNT OF THE CHARGES SHOULD BE MADE TO THE CITY/COUNTY/AGENCY. CITY/COUNTY/AGENCY: DING COUNTY WATER DISTRICT NO. 124 RECORDED: JUNE 01, 1981 RECORDING NO.: 8106010916 10. RESERVATIONS AND CONDITIONS CONTAINED IN DEED RECORDED UNDER CO ING NO. 4998538. 27AG14 Subdivision Guarantee Page 4 Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966 SCHEDULE A (Continued) 11. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: KING COUNTY WATER DISTRICT NO. 124 PURPOSE: WATER PIPELINE AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: JUNE 03, 1976 RECORDING NO.: 7606030445 11 EASEMENT AND THE TERMS AND CONDITIONS THEREOF: PURPOSE: RECIPROCAL NON-EXCLUSIVE EASEMENT AGREEMENT FOR ACCESS, INGRESS AND EGRESS AREA AFFECTED: A PORTION OF SAID PREMISES RECORDING NO. 77092 L_Z(}#I8 I 13. ALL COVENANTS, CONDITIONS, RESTRICTIONS, BUT OMITTING ANY COVENANTS OR RESTRICTIONS, IF ANY, BASED UPON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, FAMILIAL STATUS, MARITAL STATUS, DISABILITY, HANDICAP, NATIONAL ORIGIN, ANCESTRY, OR SOURCE OF INCOME, AS SET FORTH IN APPLICABLE STATE OR FEDERAL LAWS, EXCEPT TO THE EXTENT THAT SAID COVENANT OR RESTRICTION IS PERMITTED BY APPLICABLE LAW, RESERVATIONS, EASEMENTS OR OTHER SERVITUDES, IF ANY, DISCLOSED BY THE SHORT PLAT RECORDED UNDER RECORDING NO. 7806301002, THIS POLICY DOES NOT INSURE THAT THE LAND DESCRIBED IN SCHEDULE A IS BENEFITED BY EASEMENTS, COVENANTS OR OTHER APPURTENANCES SHOWN ON THE PLAT OR SURVEY TO BENEFIT OR BURDEN REAL PROPERTY OUTSIDE THE BOUNDARIES OF SAID LAND. 14. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: PUGET SOUND POWER & LIGHT COMPANY PURPOSE: ELECT LINE AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: JANUARY 16,1979 RECORDING NO.: 7901160705 15. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: KING COUNTY WATER DISTRICT O. 124 PURPOSE: WATER PIPELINE AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: JANUARY 18,1979 RECORDING NO.: 7901180951 16. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF: RECORDED: FEBRUARY 14,1979 RECORDING NO.: 7902141358 REGARDING: WATER SUPPLY AGREEMENT 27WAG14 Subdivision Guarantee Page 5 Order No. 20375966-416-416-MAW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966 SCHEDULE A (Continued) 17. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: PUGET SOUND POWER & LIGHT COMPANY PURPOSE: ELECTRIC LINE AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: FEBRUARY 25,1980 RECORDING NO.: 8002250572 GRANTEE: PACIFIC NORTHWEST BELL TELEPHONE COMPANY PURPOSE: UNDERGROUND COMMUNICATION LINES AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: NOVEMBER 09,1982 RECORDING NO.: 8211090631 GRANTEE: PACIFIC NORTHWEST BELL TELEPHONE COMPANY PURPOSE: UNDERGROUND COMMUNICATION LINES AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: NOVEMBER 09,1982 RECORDING NO.: 8211090632 20ALL COVENANTS, CONDITIONS, RESTRICTIONS, RESERVATIONS, EASEMENTS OR OTHER SERVITUDES, IF ANY, DISCLOSED BY THE SHORT PLAT RECORDED UNDER RECORDING NO. 8403140752. NUNN'" 0-m-T -11 -011=1 i 1911114=1 11111151h N a GRANTEE: PUGET SOUND POWER & LIGHT COMPANY PURPOSE: ELECTRIC LINE AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: JUNE 26, 1989 RECORDING NO.: 8906260463 22. TERMS AND CONDITIONS OF REAL PROPERTY LICENSE IMPOSED BY INSTRUMENT RECORDED ON FEBRUARY 24,1995, UNDER RECORDING NO. 9502240765. 27WAG14 Subdivision Guarantee Page 6 Order No. 20375966-416-416-NMW Guarantee No. WA-FBCM-IMP-27WAG14-1-17-20375966 SCHEDULE A (Continued) 23. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: LAKEHAVEN UTILITY DISTRICT PURPOSE: WATER FACILITIES AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: MAY 15,1995 RECORDING NO.: 950515116I 24. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: THE CITY OF FEDERAL WAY PURPOSE: PERMANENT BEAUTIFICATION EASEMENT AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: MAY 25, 2000 RECORDING NO.: 20000525001732 25. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: THE CITY OF FEDERAL WAY PURPOSE: BEAUTIFICATION EASEMENT FOR DECORATIVE SIDEWALKS, LANDSCAPING, STREET TREES AND LIGHTING AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: SEPTEMBER 18, 2000 AND OCTOBER 06, 2000 RECORDING NOS.: 20000918000032 & 20001006000672 26. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: PUGET SOUND ENERGY, INC. PURPOSE: TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: OCTOBER 12,2000 RECORDING NO.: LOOO 10 12001360 9 GRANTEE: PUGET SOUND ENERGY, INC. PURPOSE: TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: DECEMBER 19,2000 RECORDING NO.: 20001219000454 28. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: PURPOSE: SHOPPING CENTER SIGN AND LANDSCAPE EASEMENT AREA AFFECTED: A PORTION OF SAID PREMISES RECORDING NO. 2002L)530002228 27WAG14 Subdivision Guarantee Page 7 OrderNo. 20375966-416-416- Guarantee No.WA-FC-IMP-27WAG14-1-17-20375966 SCHEDULE A (Continued) 29. EASEMENT AND THE TERMS AND CONDITIONS THE OF GRANTEE: THE CITY OF FEDERAL WAY PURPOSE: PERMANENT EASEMENT FOR SUBTERRANEAN WALL ANCHOR AREA AFFECTED::, A PORTION OF SAID PREMISES RECORDED: APRIL 10, 2006 RECORDING O.: 20060410002356 30. DECLARATION OF RESTRICTIONS IMPOSED BY INSTRUMENT RECORDED ON NOVEMBER 03, 20 10, 31. ALL COVENANTS, CONDITIONS, RESTRICTIONS, RESERVATIONS, EASEMENTS OR OTHER SERVITUDES, IF ANY, DISCLOSED BY THE BOUNDARY LINE ADJUSTMENT RECORDED UNDER THIS POLICY DOES NOT INSURE THAT THE LAND DESCRIBED IN SCHEDULE A IS BENEFITED BY EASEMENTS, COVENANTS OR OTHER APPURTENANCES SHOWN ON THE PLAT OR SURVEY TO BENEFIT OR BURDEN REAL PROPERTY OUTSIDE THE BOUNDARIES OF SAID LAND. 32. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF: RECORDED: DECEER 23, 2015 RECORDING O.: 20151223000147 CARDING: GRADE RELEASE AGREEMENT — SEWER SERVICE CONNECTION 33. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: PURPOSE: PRIVATE UTILITY EASEMENT AREA AFFECTED: A PORTION OF SAID PREMISES RECORDING NO. 20170329000904 34. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: PUGET SOUND ENERGY, INC. PURPOSE: TRANSMISSION, DISTRIBUTION AND SALE OF ELECTRICITY AREA AFFECTED: A PORTION OF SAID PREMISES RECORDED: APIL 24, 2017 RECORDING NO.: 20170424000170 FILING AND THE TERMS AND CONDITIONS THEREOF: GRANTOR: NCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY COMPANY TRUSTEE: FIDELITY NATIONAL TITLE BENEFICIARY: STARWOOD MORTGAGE CAPITAL LLC ORIGINAL AMOUNT: $10,725,000.00 DATED: JULY 17, 2015 RECORDED: JULY 17, 2015 RECORDING O.: 20150717001350 27AG14 Subdivision Guarantee Page 8 OrderNo. 20375966-416-416-NIAW Guarantee No. WA-FBCM-IMP-27WAG]4-1-17-20375966 I I �16 mil fff=plTl SUCCESSIVE ASSIGNMENTS OF THE DEED OF TRUST: LAST ASSIGNEE: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS TRUSTEE FOR THE BENEFIT OF THE REGISTERED HOLDERS OF JPMBB COMMERCIAL MORTGAGE SECURITIES TRUST 2015-C31, COMMERCIAL MORTGAGE PASS -THROUGH CERTIFICATES, SERIES 2015-C31 RECORDED: OCTOBER 19,2015 RECORDING NO.: 20151019000741 36. ASSIGNMENT OF RENTS AND THE TERMS AND CONDITIONS THEREOF: ASSIGNOR: NWCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY COMPANY ASSIGNEE: STARWOOD MORTGAGE CAPITAL LLC DATED: JULY 17,2015 RECORDED: JULY 17,2015 RECORDING NO.: 201 5Q717()Ql 3LI SUCCESSIVE ASSIGNMENTS OF THE ASSIGNMENT OF LEASES AND RENTS: LAST ASSIGNEE: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS TRUSTEE FOR THE BENEFIT OF THE REGISTERED HOLDERS OF JPMBB COMMERCIAL MORTGAGE SECURITIES TRUST 2015-C31, COMMERCIAL MORTGAGE PASS -THROUGH CERTIFICATES, SERIES 2015-C31 RECORDED: OCTOBER 19,2015 RECORDING NO.: 2015 LO 19000742 37. FINANCING STATEMENT AND THE TERMS AND CONDITIONS THEREOF: SECURED PARTY: STARWOOD MORTGAGE CAPITAL LLC DEBTOR: NWCC CENTER PLAZA LLC, A DELAWARE LIMITED LIABILITY COMPANY COVERS: PERSONAL PROPERTY LOCATED ON SAID PREMISES RECORDED: JULY 17,2015 RECORDING NO.: 20150717001352 LAST ASSIGNEE:: STARWOOD MORTGAGE FUNDING 11 LLC RECORDED: OCTOBER 19,2015 RECORDING NO.: 2b 15 lb 10000141 38. TERMS AND CONDITIONS OF "STIPULATED JUDGMENT AND DECREE OF APPROPRIATION ENTERED JANUARY 5, 2017 UNDER KING COUNTY SUPERIOR COURT CAUSE NO. 61-2-08897-0 RECORDED ON JANUARY 18,2017, UNDER RECORDING NO. 20170118000215. 39. UNRECORDED LEASEHOLDS, IF ANY; RIGHTS OF VENDORS AND HOLDERS OF SECURITY INTERESTS ON PERSONAL PROPERTY INSTALLED UPON THE LAND; AND RIGHTS OF TENANTS TO REMOVE TRADE FIXTURES AT THE EXPIRATION OF THE TERM. 27WA 314 Subdivision Guarantee Page 9 SCHEDULE A (Continued) 40. ANY RIGHT, INTEREST OR CLAIM THAT MAY EXIST, ARISE OR BE ASSERTED AGAINST THE TITLE UNDER OR PURSUANT TO THE PERISHABLE AGRICULTURAL COMMODITIES ACT OF 1930, AS AMENDED, 7 USC 499A ET SE., THE PACKERS AND STOCKYARD ACT OF 1921, AS AMENDED, 7 USC 11 ET SE., OR ANY SIMILAR STATE LAWS. RIGHTS,4L ANY INTERESTS OR CLAIMS WHICH MAY EXIST OR ARISE ii REASON FOLLOWINGDISCLOSED BY A SURVEY PREPARED BY r DATED JULY 6,2015, DESIGNATED JOB NO.t w A) CONCRETE STAIRS AND WALKWAY ALONG NORTH PROPERTY LINE ENCROACH INTO NORTHERLY ADJOIER. B) GRAVEL AA ENCROACHES ACROSS NORTHEAST CORNER OF PROPERTY INTO NORTHERLY PROPERTY AJOIE. CONCRETE CURB FOR PARKING AREA ENCROACHESMUCH AS l • FEET INTO PUBLIC RIGHT-OF-WAY FOR 21 ST AVENUE S ALONG EAST PROPERTY LINE OF PROPERTY. r ROCKERY ENCROACHES AS PROPERTY LOCATIONS ALONG WEST LINE OF SOUTHWESTERLY PORTION OF THE PROPERTY INTO WESTERLY r• E) WEST FACE OF CONCRETE WALL IN SOUTHEAST CORNER OF PROPERTY ENCROACHES 0.3 FEET EAST OF EAST PROPERTY LINE INTO PUBLIC RIGHT-OF-WAY 21 ST AVENUE S. i Y i a x.. r i} • 41111 i I 27AG14 Subdivision Guarantee Page 10 1. Definition of Terms. The following terms when used in the Guarantee mean: (a) The "Assured": the party or parties named as the Assured in this Guarantee, or on a supplemental writing executed by the Company. (b) "land": the land described or referred to in Schedule or in Part 2, and improvements affixed thereto which by law constitute real property. The term "land" does not include any property beyond the lines of the area described or referred to in Schedule A or in Part 2, nor any right title, interest estate Or easement in abutting streets, roads, avenues, alleys, lanes, ways or waterways. (c) "mortgage": mortgage, deed of trust, trust deed, or other security instrument. (d) "public records": records established under state statutes at Date of Guarantee for the purpose of imparting constructive notice of matter relating to real property to purchasers for value and without knowledge. (e) "date": the effective date, 2. Notice of Claim to be Given by Assured Claimant. An Assured shall notify the Company P&IM.00-ow-MMA AM Wo as stated herein, and which might cause loss or oil of the prejudice. 3. No Duty to Defend or Prosecute. The Company shall have no duty to defend or prosecute any action or proceeding to which the A�,xrei is 2 pMy, n6t,,vjt%stznfhi& tXe Aztur@ bf?,ny allegation in such action or proceeding 4. Company's Option to Defend or Prosecute Even though the Company has no duty to defend or prosecute as set forth in Paragraph4 above: Except to the extent that specific assurances are provided In Schedule A of this Guarantee, the Company assumes no liability for loss or damage by reason of the following' (a) Detects, liens, encumbrances, adverse claims or other matters against the title, whether or not Shown by the public records, (b) (1) Taxes or assessments of any taxing authority that It -vies taxes or assessments on real property- or, 12) Proceedings by I , ! a public agency which may result in taxes Or assessniLrM, or notices of such Proceedings, whether or not the matters excluded under (1) or (2) are shoNvn by the records of the taxing authority or by the public records, (c) (1) Unpatented mining claims; (2) reservations or exceptions in parents or in Acts authorizing the issuance thereof, (3) water rights, claims Or title to water, whether or not the matters excluded under (1), (2) or (3) are, shomm by the public records - Notwithstanding any specific assurances which are provided in Schedule A of this Guarantee, the Company assurnes no liability for loss or damage by reason of the following: (a) Beets, liens, encumbrances, adverse claims or other matters affecting the title to any property beyond die lines ofthe land expressly described in the description set forth in Schedule (A), (C) or in Part 2 oftbi% Guarantee, or title to streets, roads. avenues, lanes. ways or waterways to which such land abuts, or the right to maintain therein vaults, tunnels, ramps or any structure or improvements, or any rights or easements therein, unless such property, rights or easements are expressly and specifically set forth in said description. (b) Defects, liens, encumbrances, adverse claims or Other matters, whether or not shown by the public records; (1) v%,hich are created, suffered., assumed or agreed to by one or more of the Assureds; (2) which result in no loss to the Assured; or (3) which do not result in the invalidity or potential invalidity ofany Judicial or non -judicial proceeding which is within die scope and purpose of the assurances provided, (c) The identity ofany part), shown or referred to in Schedule A. (d) The validity, legal effect or priority oraoy matter sho-wrt or referred to in this Guarantee, GUARANTEE CONDITIONS AND STIPULATIONS the required cooperation, the Company's obligations to the Assured under the Guarantee shall terminate, 5. Proof of Loss Damage. In addition to and after the notices required under Section 3 of these Conditions and Stipulations have been provided to the company, a Proof Of loss or damage signed and swam to by the Assured shall be furnished to the Company within ninety (90) days after the Assured shall ascertain the facts giving rise to the loss or damage, The proof of loss or damage shall describe the matters covered by this Guarantee which constitute the basis of loss or damage and shall state, to the extent possible, the basis of calculating the amount of the loss or damage. If the company is prejudiced by the firdure of the Assured to provide the required proof of loss or dam age, the company's obligation to such Assured under the Guarantee shall terminate. hi addition, the Assured may reasonably be required to submit to examination let oath by any authorized representative of the (a) The Company shall have the right, at its 0C I L I -L provision of this Guarantee, If the Company shall diligently, (b) If the Company elects to exercise its options as stated in Paragraph 5(a) the Company shall have the right to select counsel of its choice MR �- �M e naOIC 10I duir V;Ijl OUL Pdy LOC ICCb A counsel, norAill the Company pay any fees, costs or expenses incurred by an Assured in the defense of &�- wwes—of covered by this Guarantee, (c) Whenever the Company shall have brought an action or interposed a defense as Company may pursue any litigation to final determination by a court of competent jurisdiction and expressly reserves the rjght� in its so e discretion, to appeal from and adverse judgment or order, (d) In all cases where the Guarantee permits aw"if n ExT r, n -i0 wlw-NW$,N.Ilil 1 its option, the name of such Assured for this purpose, Whenever requested by the Company, an Assured, at the Company's expense, shall give the Company all reasonable aid in any action or proceeding, securing evidence, obtaining witnesses, prosecuting or defending the action or lawful act which in the opinion of the Company may b4 necessary or desirable to establish the title to th; estate or interest as stated herein, or to establish &- lien rights of the Assured, If the Company's ,whether bearing a date before or after Date of Guarantee, which reasonably pertain to the loss or damage- Further, if requested by any authorized representative of Ole Company, the Assured ,;hall grant its permissirm, in writing, for any authorized representative of the Company to examine, inspect and cop), all rccords& books, ledgers, checks, correspondence and memoranda in the custody or control of a third party, which reasonably pertain to the loss damage, All information designated as confidential by the Assured provided to the Company, pursuant to this Section shall not be disclosed to other unless, in the reasonable judgment of the Company, it is necessary in the administration of the claim. Failure of the Assured to submit for examination under oath, produce other reasonably requested infirrmaboo of grant permission to secure reasonably necessary information from third parties as required in the above paragraph, unless prohibited by law or governmental regulation, shall terminate any liability of the Company under this Guarantee to the Assured for that claim, 6. Options to Pay or Otherwise Settle Claims: Termination of Liability. In case of a claim under this Guarantee, the 27WAG 14 Subdivision Guarantee Page 2 SUBJECT TO THE EXCLUSIONS FROM COVERAGE, THE LIMITS OF LIABILITY AND THE CONDITIONS AND STIPULATIONS OF THIS GUARANTEE. Policy No.: WA-FBCM-IMP-27WAG14-1-17-20375966 end Fidelity National Title Insurance Company a Florida Corporation, herein called the Company GUARANTEES The Assured named in Schedule A against actual monetary loss or damage not exceeding the liability stated in Schedule A, which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A. Fidelity National Title Insurance Company Countersigned by: By ( -SEAL Meat Randy Qwrk President Authorized Signature 27WAG14 Subdivision Guarantee Page I