16-102886CITY OF
ti Federal Way
February 2, 2017
Mr. Eric LaBrie
ESM Consulting Engineers LLC
33400 8th Avenue South, Suite 205
Federal Way, WA 98003
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. cityoffederalway. com
Jim Ferrell, Mayor
RE: File 416-102886-00-SU; BOUNDARY" LINE ADJUSTMENT APPROVAL
Federal Way Campus 2-Lot BLA, 33663 Weyerhaeuser Way South, Federal Way
Dear Mr. LaBrie;
The City of Federal Way has completed an administrative review of the above -referenced Boundary Line
Adjustment (BLA) application. The proposal is to modify the interior lot line between tax parcels 614260-
0005 and 614260-0200. Zoning for both parcels is Corporate Park-1 * with a 1994 Concomitant Zoning
Agreement (CZA) (CP- I *).
The original proposal under this application was for a 10-lot BLA; however, the 10-lot BLA application
was modified to a 2-lot BLA in an August 24, 2016, letter and revision from ESM. The BLA application
was complete on September 29, 2016.
The Department of Community Development hereby approves the Federal Way Campus 2-Lot BLA
based on the survey drawing prepared and resubmitted to the City on January 30, 2017 by ESM.
DECISIONAL CRITERIA
City staff has detennined the BLA meets decisional criteria set forth in Federal. Way Revised Code
(FWRC) Chapter 18.10:
The BLA is a minor alteration of lot boundaries on two existing lots. The proposal is to relocate the
interior lot line between tax parcels 614260-0005 and 614260-0200. The two lots in the BLA contain
approximately 57.76 acres of land area. The BLA will not increase the number of lots, nor diminish
the size of open space or other protected environments. There are several regulated wetlands
identified on proposed Lot 1. At the request of the applicant, the City provided an exception to the
Federal Way Revised Code, to not depict environmental ly critical areas on proposed Lot 2, as
identified in Notes I and 2, sheet 3 of the BLA. Environmental review will occur with subsequent site
development.
2. The BLA will not diminish the size of any lot so as to result in a lot of less square footage than
prescribed in the CP-I zoning district. The 1994 CZA agreement for the subject property does not
cuntain prescriptive lot size minimums for the CP-1 zone.
3. The BLA will not result in the reduction of setbacks or lot coverage to less than prescribed in the CP-
T * zoning district, as both of the subject lots are presently undeveloped.
Mr. LaBrie
February 2, 2017
Page 2
4. All lots resulting from the BLA will be in conformance with the design standards of the city's
subdivision title, except proposed Lot 2 includes portions of land remnants that are not contiguous
with the primary parcel, as existing public rights -of -way bisect portions of these existing parcels. The
land remnants remain unchanged as a result of the BLA.
RECORDATION
Pursuant to FWRC 18.10.060, all boundary line adjustments shall be recorded with the King County
Recorder's Office. To finalize the BLA process, please use the enclosed Resubrnittal Information form
and submit to the Perm it Center payment for recording fees in the amount of $198.00.1 If you are
providing payment with a check, please make it payable to City of Federal Way. The City will sign the
BLA document and have it recorded at King County at the expense of the applicant. You will be provided
a conformed copy of the recorded BLA.
Please note: Blue ink is not acceptable on documents and maps which will be recorded; all signatures and
writing must be made with permanent black ink.
CLOSING
This land use decision does not waive compliance with future City of Federal Way codes, policies, and
standards relating to this development. If you have any questions regarding this decision, please contact
Jim Harris, Planner, at 253-835-2652, or jim.IZarris@cttyoffederalway.com.
Sincerely,
Brian Davis
Director of Community Development
enc: Invoice for Recording Fees
Resubmittal Information Form
o; Tom Messmer. IRG, tmessertc?industrialrealtygroup.com
Cindy Flood, ESM, cindy.flood i esmcivilxom
Jim Harris. Planner
Ann Dower. Senior Engineering Plans Reviewer
Estimated recording tee for the nine -page BLA is based on $157.00 for the first page. $5.00 for eight additional pages. and
$1.00 for a conformed copy.
I6-1028S6-00-sU Um I D 7 338
FILE
CITY OF
�. Federal Way
January 30, 2017
Eric LaBrie
ESM Consulting Engineers LLC
33400 8"' Avenue South, Suite 205
Federal Way, WA 98003
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www cityoffederalway. com
Jim Ferrell, Mayor
Email: eric.labrie@esmcivil.com
esmcivil.com
RE: File No. 16-102886-00-SU; 3rd TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South, Federal Way
Dear Mr. LaBrie:
The following represents the Planning Division and Public Works Department review of the
revised 2-lot Boundary Line Adjustment (BLA) re -submitted to the City on December 8, 2016.
Please make the following revision to the Boundary Line Adjustment Map and provide two
copies of the revised BLA map for further review. Upon review and approval of this final item,
City staff will provide further direction for proceeding to recording the BLA.
In order for the city to approve the BLA, the second sentence that has been added in note 3
sheet 3, needs to be removed.
During the course of the BLA review, ESM did not have data and information regarding the
wetlands on proposed lot 2. Following City review and discussion with ESM staff, the text
included in note 2 on sheet 3 was provided and suggested by the City as an alternative to
delineating and showing the wetlands and buffers on proposed lot 2. Information in Note 2
on sheet 3 regarding the lack of available wetland data was agreed upon by the ESM staff as
a method for the City to review and approve the BLA, absent wetland information on
proposed lot 2.
The second sentence in proposed note 3 was added to the BLA document submitted on
December 8, 2016, and goes beyond language suggested by City staff and is inappropriate to
include on a BLA. City regulation of the wetlands and wetland buffers will be in accordance
with applicable regulations for the property.
In order for the City to approve the BLA, City staff is requesting elimination of the second
sentence in note 3 sheet 3.
Mr. LaBric
January 30.2017
Page 2
Please resubmit with the enclosed resubmittal forni. Contact me at
jiin.harris i7citvoffederal ay -coin or 253-835-2652 if you have any questions.
Sincerely,
Harris
Planner
c: Ann Dower. Senior Engineering* Plans Reviewer
Cindy Flood. cindy.floodfc�esmcivil.com
Tom Messmer, Federal Way Campus LLC, tmessmer(cJindustrial realtygroup.com
Brian Davis. Director of Community Development
enc: Resubmittal Form
I6-102896 Duc I D. 75326
I
RESUBMITTED
From: Cindy Flood �A� 2 y 20i7
To: Jim Harris; Ann Dower
Cc: Stacey Welsh; Eric LaBrie; Matt Reider
Subject: RE: 16-102886-00-sU Crl-Y OF FEDERAL WAY
Date: Tuesday, January 24, 2017 8:55:11 AM GDMMUNFTY IJEVELOPMENT
Hello Jim. The determination of whether a wetland meets the criteria, whether it can be mitigated
and then what buffers apply is usually addressed with the site development plan and are subject to
change over time as regulations are updated or changed. Since a boundary line adjustment cannot
legally establish new easements and restrictions, it seems inappropriate to give the impression that
buffers are being created. Given the way the project has progressed we felt it appropriate to
include a statement that clarifies the legal position should anyone attempt to challenge any future
site development plans for the site.
Warm Regards,
Cindy
CYNTHIA A. FLOOD, P.L.S. ESM Consulting Engineers, LLC
Senior Survey Project Manager www.esmcivil.com
rindv.floodCalesmcivil.com Federal Way a Everett
33400 8th Avenue S., Ste 205
Federal Way, WA 98003
Tel: 253.838.6113
Fax: 253.838.7104
Civil Engineering a Surveying a Land Planning a Landscape Architecture a GIS
From: Jim Harris [mailto:Jim.Harris@cityoffederalway.com]
Sent: Monday, January 23, 2017 11:05 AM
To: Matt Reider; Ann Dower
Cc: Cindy Flood; Stacey Welsh
Subject: RE: 16-102886-00-SU
Matt:
Can you explain the reason and need for the second sentence in note no 3 on sheet 3. 1 am waiting
for some additional staff input on the appropriateness of including this sentence. If this second
sentence is removed, then we can move to recording, except as discussed below in regard to Notary
stamp.
The Notary stamp on the copies and original submitted to the City are not legible and are smeared
and are generally a blob of ink and will need to be re -done.
These are the only comments we have on the BLA.
Jim Harris
Planner
4 Fedem] Way
33325 8th Avenue South
Federal Way, WA 98003-6325
Phone:253/835-2652 Fax: 253/835-2609
Office Hours Mon - Thur, 8:00 AM — 3:30 PM or by appointment
From: Matt Reider
Sent: Friday, January 20, 2017 2:00 PM
To: Jim Harris; Ann Dower
Cc: Cindy Flood
Subject: 16-102886-00-SU
Good afternoon Jim and Ann,
Just curious to know where we stand on the revised 2-lot BLA re -submitted on December 8th�
Thank you,
MATT REIDER
Assistant Planner ESM CONSULTING ENGINEERS, LLC
matt.reiderp—gsmcivil.com
Federal Way a Everett
33400 8th Avenue South, Ste 205
Federal Way, WA 98003
Tel: 253.838.6113
Fax: 253.838.7104
Civil Engineering a Surveying a Land Planning a Landscape Architecture a GIs
CITY OF
Federal Way
November 30, 2016
Eric LaBrie
ESM Consulting Engineers LLC
33400 Bch Avenue South, Suite 205
Federal Way, WA 98003
:.� HAIL
3332!98th A r� Sot�t
Federal Way, WA 98003-6325
(253) 835-7000
www. cityoffederalway.. com
Jim Ferrell, Mayor
Email: eric.labrie@esmcivil.com
RE: File No. 16-102886-00-SU; 2°d TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South, Federal Way
Dear Mr. LaBrie:
The following represents the Planning Division and Public Works Department review of the
revised 2-lot Boundary Line Adjustment re -submitted to the City on October 14, 2016.
Please make the following revisions to the Boundary Line Adjustment Map and provide two
copies of the revised BLA map for further review. Upon review and approval of these three
items, City staff will provide further direction for proceeding to recordintD
g the BLA.
As previously identified in the City's September 29, 2016 review, all wetlands and buffers
must be depicted on revised Lot no. 1.
The wetlands are shown on the BLA map; however, the code required 100-foot wetland
buffers are not shown.
In addition, the BLA map must include a reference of the preparer and date of the wetland
delineation information.
2. A clear depiction of the entire subject site at 300 scale, all on one page, should be added to
the plan set to clarify the proposal and how it affects existing and proposed lots. At the very
least, the current 300-scale drawings on sheets 4 and 5 should show the existing property line E�
with the same line type on both sheets, and it should be clearly la��ei e1�. so, t ere is a ig t
font "MATCH LINE" label (sheet 4, beneath block 8) that doesn't clearly apply to any line;
an arrow would be helpful. Having only one match line instead of two would also be helpful.
3. The requirement to set lot corners also applies to changes in direction or radius that outline
the curved portion of the new lot lines. These lot "corners" must also be set.
Mr. Lagrie
November 30, 201 G
Page 2
Let me know if you have any questions.
Sincerely,
" d��
Harris
Planner
Ann Dower, Senior Engineering Plans Reviewer
Cindy Flood (cindy.flood@esmcivil.com)
Tom Messmer, Federal Way Campus LLC, tmessmer@industrialrealtygroup.com
enc: Resubmittal Form
I & 102886 Doc. L D. 75019
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: October 24, 2016
TO: Ann Dower, PW Development Services
Brian Asbury, Lakehaven Utility District
Sarady Long, Senior Traffic Engineer
FROM: Jim Harris, Planner
FOR DRC MTG. ON: NA — 3rd review
...............................
FILE NUMBER(s): 16-102886-00-SU
RELATED FILE NOS.: None
PROJECT NAME: WEYERHAEUSER 10-LOT BLA 2-lot BLA
PROJECT ADDRESS: 33663 WEYERHAEUSER WAY S
ZONING DISTRICT. CP-1
PROJECT DESCRIPTION: 2 lot boundary line adjustment.
LAND USE PERMITS: BLA
PROJECT CONTACT: ESM CONSULTING ENGINEERS LLC
CINDY FLOOD
334008 TH AVE S Suite205
MATERIALS SUBMITTED: Revised BLA
Revised Lot Closure Calcs
ESM Cover letter 10-14-16
IRG Signature Authorization Letter
Please review and provide me any comments.
CONSULTING ENGINEERS LAC
RESUBMITTED 90
VI
October 14, 2016
OCT 14 2016
CITY OF FEDERAL WAY
Mr. Jim Harris CDS
City of Federal Way Community Development
33325 8th Avenue South
Federal Way, WA 98003
RE: Response to File No.16-102886-00SU; TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South
Email: Jim.Harris@cityoffederalway.com
Dear Mr. Harris:
Thank you for the Technical Review Comment letter dated September 29, 2016. ESM
appreciates the opportunity to respond to technical review comments in line with this
letter. In recognition that the application has been determined complete, ESM is submitting
4 copies of revised BLA plans to reflect changes requested by the Technical Review
Committee.
Per previous discussions, all wetlands and buffers must be depicted on revised Lot If
no.1. �1 J�'� �,�� 51'^'''4- o►'�� �''�¢fSt.� S��F.l+�✓1
VIL The revisedf pTaos reflect these changes. Correspondingly, with respect to sheets
6 through 12, a have provided two versions for each -sheet The first version is
the sheetliF t we would like to propose recotding and does not contain the
4 v� topographical information or wetlands. The second version of each sheet contains �0
the topographical information and wetlands. This second version would not be
`. recorded. This is not unlike a final plat w_herem a recor a version af__ the p1t
woes not contain the topography.
2. Include a note to the following effect under the note column on sheet 3:
As an exception to the Federal Way Revised Code, critical areas are not depicted
on revised lot No. 2, as that information is not available from the properly owner at
the time of preparing this Boundary Line Adjustment.
Critical areas may exist on Lot No. 2 and will need to be delineated prior to
development, and if those wetlands or other critical areas prevent development,
they don't get an accommodation. The BLA does not guarantee the lots will be
suitable for development now or in the future.
The aforementioned note has been added to sheet 3.
ESM Federal Way ESM Everett Civil Engineering Land Planning
33400 8th Ave S, Ste 20S 1010 SE Everett Mall Way, Ste 210 Land Surveying Landscape Architecture
Federal Way, WA 98003 Everett, WA 98208
253.838.6113tel 425.297.9900tel 3D Laser Scanning GIS
800.345.5694 toll free 800.345.5694 toll free www.esmcivii.com
253.938-7104 fax 425.297.9901 fax
Mr. Jim Harris
October 14, 2016
Page 2
3. Remove the word "Services" from the Community Development Director signature
block.
This change has been made.
4. Use the City of Federal Way standard BLA title block and language (emailed from
Ann Dower 9-7-2016).
We have used the City of Federal Way standard title block, but have capitalized all
of the text as when lower case figures are used, the size falls below the 0.08 font
size required by law.
5. Print the name of the person(s) signing on behalf of Federal Way Campus LLC on
the authorization on sheet 1, and provide proof of his/her authority to sign on
behalf of the LLC.
'T. C. Messmer" is the printed name on sheet 1. Signing authority has been
included with our resubmittal.
6. Indicate how lot corners will be set and show on the plans.
Lot comer settings have been indicated on the revised plans.
7. Lot closure calculations must be stamped by the Land Surveyor, and provide two
copies of closures to the City.
Two stamped copies of lot closures have been included with our resubmittal.
Let me know if you have any further questions or need any assistance.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
Matt Reider
Planner
Cc: Ann Dower, Senior Engineering Plans Reviewer
Cindy Flood (cindy.flood@esmcivil.com)
Enc: Resubmittal Form
Revised BLA Plans
Signing Authority
Computation Sheet
LILTING ENGINE
RESUBMITTED
October 14, 2016
OCT 14 2016
CITY OF FEDERAL WAY
Mr. Jim Harris CDS
City of Federal Way Community Development
33325 8th Avenue South
Federal Way, WA 98003
RE: Response to File No.16-102886-00SU; TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South
Email: Jim.Harris@cityoffederalway.com
Dear Mr. Harris:
Thank you for the Technical Review Comment letter dated September 29, 2016. ESM
appreciates the opportunity to respond to technical review comments in line with this
letter. In recognition that the application has been determined complete, ESM is submitting
4 copies of revised BLA plans to reflect changes requested by the Technical Review
Committee.
Per previous discussions, all wetlands and buffers must be depicted on revised Lot
no. 1.
The revised plans reflect these changes. Correspondingly, with respect to sheets
6 through 12, we have provided two versions for each sheet The first version is
the sheet that we would like to propose recording and does not contain the
topographical information or wetlands. The second version of each sheet contains
the topographical information and wetlands. This second version would not be
recorded. This is not unlike a final plat wherein the recorded version of the plat
does not contain the topography.
2. Include a note to the following effect under the note column on sheet 3:
As an exception to the Fedelal Way Revised Code, critical areas are not depicted
on revised lot No. 2, as that information is not available from the properly owner at
the time of preparing this Boundary Line Adjustment
Critical areas may exist on Lot No. 2 and will need to be delineated prior to
development, and if those wetlands or other critical areas prevent development
they don't get an accommodation. The BLA does not guarantee the lots will be
suitable for development now or in the future.
The aforementioned note has been added to sheet 3.
ESM Federal Way
ESM Everett
Civil Engineering
Land Planning
33400 8th Ave S, Ste 205
1010 SE Everett Mall Way, Ste 210
Land Surveying
Landscape Architecture
Federal Way, WA 98003
253.838.6113tel
Everett, WA 98208
425.297.9900tel
3DLaser Scanning
GIS
800.345.5694 toll free
800.345 . 5694 toll free
www.esmcivil.com
253.838.7104fax
425.297,9901fax
Mr. Jim Harris
October 14, 2016
Page 2
3. Remove the word "Services" from the Community Development Director signature
block
This change has been made.
4. Use the City of Federal Way standard BLA title block and language (emailed from
Ann Dower 9-7-2016).
We have used the City of Federal Way standard title block, but have capitalized all
of the text as when lower case figures are used, the size falls below the 0.08 font
size required by law.
5. Print the name of the person(s) signing on behalf of Federal Way Campus LLC on
the authorization on sheet 1, and provide proof of his/her authority to sign on
behalf of the LLC.
`T. C. Messmer" is the printed name on sheet 1. Signing authority has been
included with our resubmittal.
6. Indicate how lot corners will be set and show on the plans.
Lot comer settings have been indicated on the revised plans.
7. Lot closure calculations must be stamped by the Land Surveyor, and provide two
copies of closures to the City.
Two stamped copies of lot closures have been included with our resubmittal.
Let me know if you have any further questions or need any assistance.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
Matt Reider
Planner
Cc: Ann Dower, Senior Engineering Plans Reviewer
Cindy Flood (cindy.flood@esmcivil.com)
Enc: Resubmittal Form
Revised BLA Plans
Signing Authority
Computation Sheet
RESUBMITTED
OCT 14 2016
CITY OF FEDERAL WAY
CDS
CLOSURES FOR BOUNDARY LINE ADJUSTMENT
FOR
FEDERAL WAY CAMPUS, LLC
August 23, 2016
PARCEL U EAST OF ROAD, NORTHERLY PARCEL PRIOR
North: 113038.5490 East: 1277562.3762
Line Course: S 88-15-22 E
Length: 179.94
North: 113033.0731
East: 1277742.2328
Line Course: S 00-56-48 W
Length: 367.96
North: 112665.1633
East: 1277736.1535
Curve Length:114.92
Radius:562.07
Delta: 11-42-54
Tangent: 57.66
Chord: 114.72
Course: N 39-31-54 W
Course In: N 44-36-39 E
Course Out: S 56-19-33 W
RP North: 113065.2971
East: 1278130.8883
End North: 112753.6466
East: 1277663.1313
Line Course: S 56-19-33 W
Length: 6.50
North: 112750.0425
East: 1277657.7220
Curve Length:282.00
Radius:568.57
Delta:28-25-04
Tangent:143.96
Chord: 279.12
Course: N 19-27-55 W
Course In: N 56-19-33 E
Course Out: S 84-44-37 W
RP North: 113065.2971
East: 1278130.8883
End North: 113013.2089
East: 1277564.7093
Line Course: N 05-15-23 W
Length: 25.44
North: 113038.5419
East: 1277562.3787
Line Course: N 19-49-48 W
Length: 0.01
North: 113038.5514
East: 1277562.3753
Area: 44,342 Sq Ft 1.02 Ac.
PARCEL U EAST OF ROAD, MID PARCEL PRIOR
North: 112491.6981 East: 1278351.4678
Line Course: S 40-43-21 W Length: 47.22
North: 112455.9111 East: 1278320.6617
Curve Length:52.35 Radius:71.50
Delta: 41-57-03 Tangent: 27.41
;,gQ/I/ -/n._lZ,
Chord: 51.19
Course: S 83-38-18 W
Course In: N 27-20-14 W
Course Out: S 14-36-49 W
RP North: 112519.4259
East: 1278287.8269
End North: 112450.2390
East: 1278269.7875
Line Course: N 75-23-11 W
Length: 101.83
North: 112475.9306
East: 1278171.2518
Line Course: N 01-10-31 E
Length: 19.01
North: 112494.9366
East : 1278171.6417
Line Course: S 88-58-12 E
Length: 179.86
North: 112491.7035
East: 1278351.4727
Line Course: S 42-16-12 W
Length: 0.01
North: 112491.6961
East: 1278351.4659
Area: 5,788 Sq Ft 0.13 Ac.
PARCEL U EAST OF ROAD, SOUTH PARCEL PRIOR
North: 112447.4529
East: 1278392.5491
Line Course: S 01-14-09 W
Length: 152.23
North: 112295.2583
East: 1278389.2658
Curve Length:34.09
Radius: 386.50
Delta:5-03-12
Tangent:17.06
Chord: 34.08
Course: N 32-39-42 W
Course In: S 59-51-54 W
Course Out: N 54-48-42 E
RP North: 112101.2202
East: 1278055.0033
End North: 112323.9469
East: 1278370.8751
Curve Length:37.19
Radius:51.50
Delta: 41-22-35
Tangent: 19.45
Chord: 36.39
Course: N 14-30-00 W
Course In: N 54-48-42 E
Course Out: N 83-48-43 W
RP North: 112353.6246
East: 1278412.9641
End North: 112359.1759
East: 1278361.7642
Curve Length:16.38
Radius:80.50
Delta: 11-39-25
Tangent: 8.22
Chord: 16.35
Course: N 00-21-35 E
Course In: N 83-48-43 W
Course Out: N 84-31-52 E
RP North: 112367.8532
East: 1278281.7332
End North: 112375.5253
East: 1278361.8668
Curve Length:40.78
Radius: 111.50
Delta:20-57-15
Tangent:20.62
Chord: 40.55
Course: N 05-00-30 E
Course In: N 84-31-52 E
Course Out: N 74-30-53 W
RP North:112386.1518
End North: 112415.9213
Line Course: N 40-43-21 E
North: 112447.4566
Line Course: S 46-52-42 W
North: 112447.4498
Area: 3,249 Sq Ft 0.07 Ac.
East: 1278472.8593
East: 1278365.4068
Length: 41.61
East: 1278392.5530
Length: 0.01
East: 1278392.5457
PARCEL U MAIN PARCEL PRIOR
North: 113092.4229 East: 1277107.2381
Line Course: S 88-15-22 E
Length: 169.87
North: 113087.2534
East: 1277277.0294
Line Course: S 01-14-05 W
Length: 529.31
North: 112558.0663
East: 1277265.6237
Line Course: S 88-16-52 E
Length: 169.87
North: 112552.9709
East: 1277435.4173
Line Course: N 01-14-06 E
Length: 529.23
North: 113082.0780
East: 1277446.8239
Line Course: S 88-15-22 E
Length: 44.92
North: 113080.7110
East: 1277491.7230
Line Course: S 05-15-23 E
Length: 73.89
North: 113007.1317
East: 1277498.4923
Curve Length:671.27
Radius:635.07
Delta:60-33-43
Tangent:370.82
Chord: 640.46
Course: S 35-32-15 E
Course In: N 84-44-37 E
Course Out: S 24-10-54 W
RP North: 113065.3122
East: 1278130.8917
End North: 112485.9688
East: 1277870.7472
Line Course: S 24-10-54 W
Length: 8.00
North: 112478.6708
East: 1277867.4701
Line Course: S 66-59-48 E
Length: 26.44
North: 112468.3384
East: 1277891.8077
Line Course: N 21-49-31 E
Length: 8.00
North: 112475.7650
East: 1277894.7819
Curve Length:67.64
Radius:635.07
Delta:6-06-10
Tangent:33.85
Chord: 67.61
Course: S 71-13-34 E
Course In: N 21-49-31 E
Course Out: S 15-43-21 W
RP North:113065.3144
End North: 112454.0053
Line Course: S 74-16-39 E
North: 112395.8235
Curve Length:58.29
Delta: 64-51-01
Chord: 55.23
Course In: S 15-43-21 W
RP Noah:112346.2503
End North: 112354.6858
Curve Length:101.82
Delta: 72-28-10
Chord: 95.17
Course In: N 80-34-22 E
RP North: 112367.8712
End North: 112288.1750
Curve Length:60.95
Delta: 48-50-17
Chord: 59.12
Course In: S 08-06-12 W
RP North:112217.3889
End North: 112256.3919
Curve Length:134.16
Delta: 24-57-47
Chord: 133.10
Course In: S 56-56-29 W
RP North:112088.4171
End North: 112131.7812
Curve Length:37.36
Delta: 6-49-38
Chord: 37.33
Course In: S 84-24-31 W
RP North:112101.2358
End North: 112094.4743
Line Course: S 01-14-09 W
North: 112062.4218
Line Course: S 02-52-14 W
North: 112016.8990
Line Course: N 88-45-51 W
North: 112017.8092
Line Course: S 01-14-09 W
North: 111882.3507
Line Course: N 88-18-28 W
East: 1278130.8866
East: 1277958.7963
Length: 214.71
East: 1278165.4730
Radius: 51.50
Tangent: 32.71
Course: S 41-51-09 E
Course Out: N 80-34-22 E
East: 1278151.5176
East: 1278202.3221
Radius: 80.50
Tangent: 58.99
Course: S 45-39-43 E
Course Out: S 08-06-12 W
East: 1278281.7349
East: 1278270.3877
Radius: 71.50
Tangent: 32.46
Course: S 57-28-40 E
Course Out: N 56-56-29 E
East: 1278260.3092
East: 1278320.2342
Radius: 307.93
Tangent: 68.16
Course: S 20-34-38 E
Course Out: N 81-54-16 E
East: 1278062.1541
East: 1278367.0155
Radius: 313.50
Tangent: 18.70
Course: S 02-10-40 E
Course Out: S 88-45-51 E
East: 1278055.0071
East: 1278368.4341
Length: 32.06
East: 1278367.7427
Length: 45.58
East: 1278365.4601
Length: 42.20
East: 1278323.2699
Length: 135.49
East: 1278320.3477
Length: 50.60
Line
Line
Line
Line
Line
Line
North: 111883.8449
Course: S 01-12-23 W
North: 111784.0870
Course: N 88-18-47 W
North: 111788.8146
Course: N 01-10-31 E
North: 112003.4094
Course: N 88-18-14 W
North: 112033.8238
Course: N 01-14-04 E
North: 113092.4181
Course: N 41-22-47 W
North: 113092.4256
East: 1278269.7697
Length: 99.78
East: 1278267.6690
Length: 160.59
East: 1278107.1486
Length: 214.64
East: 1278111.5511
Length: 1027.57
East: 1277084.4313
Length: 1058.84
East: 1277107.2423
Length: 0.01
East: 1277107.2357
Perimeter: 5773.08 Area: 795,990 Sq Ft 18.27 Ac.
PARCEL V PRIOR
North: 112033.8238 East: 1277084.4313
Line
Course: S 88-18-14 E
Length: 1027.57
North: 112003.4094
East: 1278111.5511
Line
Course: S 01-10-31 W
Length: 214.64
North: 111788.8146
East: 1278107.1486
Line
Course: S 88-18-47 E
Length: 160.59
North: 111784.0870
East: 1278267.6690
Line
Course: N 01-12-23 E
Length: 99.78
North: 111883.8449
East: 1278269.7697
Line
Course: S 88-18-28 E
Length: 50.60
North: 111882.3507
East: 1278320.3477
Line
Course: S 01-14-09 W
Length: 64.51
North: 111817.8557
East: 1278318.9563
Line
Course: S O4-05-54 W
Length: 600.75
North: 111218.6419
East: 1278276.0217
Line
Course: S 30-51-46 W
Length: 241.04
North: 111011.7335
East: 1278152.3721
Line
Course: S 36-06-45 W
Length: 522.01
North: 110590.0219
East: 1277844.7137
Line
Course: S 43-43-14 W
Length: 191.30
North: 110451.7657
East: 1277712.4983
Line Course: N 88-22-17 W
North: 110470.5808
Line Course: N 01-14-04 E
North: 112033.8279
Line Course: S 00-16-39 E
North: 112033.8279
Length: 662.02
East: 1277050.7457
Length: 1563.61
East: 1277084.4312
Length: 0.00
East: 1277084.4312
Area: 1,666,951 Sq Ft 38.27 Ac.
LOT 1 AFTER
North: 111356.9722 East: 1278285.9294
Line Course: N 88-19-36 W
Length: 782.35
North: 111379.8176
East: 1277503.9131
Line Course: N 20-11-12 E
Length: 104.45
North: 111477.8516
East: 1277539.9567
Curve Length:332.27
Radius:985.00
Delta:19-19-40
Tangent:167.73
Chord: 330.70
Course: N 10-31-22 E
Course In: N 69-48-48 W
Course Out: S 89-08-28 E
RP North: 111817.7552
East: 1276615.4619
End North: 111802.9902
East: 1277600.3512
Line Course: N 00-51-32 E
Length: 79.89
North: 111882.8712
East: 1277601.5488
Curve Length:94.22
Radius:485.00
Delta:11-07-52
Tangent:47.26
Chord: 94.08
Course: N 04-42-24 W
Course In: N 89-08-28 W
Course Out: N 79-43-40 E
RP North: 111890.1413
East: 1277116.6033
End North: 111976.6290
East: 1277593.8295
Line Course: N 10-16-20 W
Length: 287.85
North: 112259.8652
East: 1277542.4986
Curve Length:142.02
Radius:415.00
Delta:19-36-29
Tangent:71.71
Chord: 141.33
Course: N 00-28-06 W
Course In: N 79-43-40 E
Course Out: N 80-39-51 W
RP North: 112333.8702
East: 1277950.8468
End North: 112401.1919
East: 1277541.3437
Line Course: N 09-20-09 E
Length: 53.70
North: 112454.1806
East: 1277550.0550
Curve Length:195.24
Delta: 35-30-46
Chord: 192.13
Course In: S 80-39-51 E
RP Noah:112403.0810
End North: 112625.2303
Curve Length:39.82
Delta: 91-14-58
Chord: 35.74
Course In: S 45-09-05 E
RP Noah:112607.5994
End North: 112624.9351
Curve Length:242.92
Delta: 21-54-59
Chord: 241.44
Course In: N 46-05-53 E
RP North: 113065.3093
End North: 112485.9659
Line Course: S 24-10-54 W
North: 112478.6679
Line Course: S 66-59-48 E
North: 112468.3356
Line Course: N 21-49-31 E
North: 112475.7621
Curve Length:67.64
Delta: 6-06-10
Chord: 67.61
Course In: N 21-49-31 E
RP North:113065.3115
End North: 112454.0024
Line Course: S 74-16-39 E
North: 112395.8206
Curve Length:58.29
Delta: 64-51-01
Chord: 55.23
Course In: S 15-43-21 W
RP North:112346,2475
End North: 112354.6829
Curve Length:101.82
Delta: 72-28-10
Chord: 95.17
Course In: N 80-34-22 E
RP Noah:112367.8684
Radius: 315.00
Tangent: 100.87
Course: N 27-05-32 E
Course Out: N 45-09-05 W
East: 1277860.8826
East: 1277637.5562
Radius: 25.00
Tangent: 25.55
Course: S 89-31-36 E
Course Out: N 46-05-53 E
East: 1277655.2806
East: 1277673.2938
Radius: 635.07
Tangent: 122.96
Course: S 54-51-37 E
Course Out: S 24-10-54 W
East: 1278130.8792
East: 1277870.7347
Length: 8.00
East: 1277867.4577
Length: 26.44
East: 1277891.7952
Length: 8.00
East: 1277894.7695
Radius: 635.07
Tangent: 33.85
Course: S 71-13-34 E
Course Out: S 15-43-21 W
East: 1278130.8742
East: 1277958.7839
Length: 214.71
East: 1278165.4606
Radius: 51.50
Tangent: 32.71
Course: S 41-51-09 E
Course Out: N 80-34-22 E
East: 1278151.5052
East: 1278202.3096
Radius: 80.50
Tangent: 58.99
Course: S 45-39-43 E
Course Out: S 08-06-12 W
East: 1278281.7224
End North: 112288.1721
Curve Length:60.95
Delta: 48-50-17
Chord: 59.12
Course In: S 08-06-12 W
RP North:112217.3860
End North: 112256.3890
Curve Length:134.16
Delta: 24-57-47
Chord: 133.10
Course In: S 56-56-29 W
RP North:112088.4142
End North: 112131.7783
Curve Length:37.36
Delta: 6-49-38
Chord: 37.33
Course In: S 84-24-31 W
RP North:112101.2330
End North: 112094.4715
Line Course: S 01-14-09 W
North: 112062.4189
Line Course: S 02-52-14 W
North: 112016.8961
Line Course: N 88-45-51 W
North: 112017.8063
Line Course: S 01-14-09 W
North: 111817.8528
Line Course: S O4-05-54 W
North: 111356.9744
Line Course: S 75-13-41 E
North: 111356.9718
East: 1278270.3753
Radius: 71.50
Tangent: 32.46
Course: S 57-28-40 E
Course Out: N 56-56-29 E
East: 1278260.2967
East: 1278320.2218
Radius: 307.93
Tangent: 68.16
Course: S 20-34-38 E
Course Out: N 81-54-16 E
East: 1278062.1416
East: 1278367.0030
Radius: 313.50
Tangent: 18.70
Course: S 02-10-40 E
Course Out: S 88-45-51 E
East: 1278054.9946
East: 1278368.4217
Length: 32.06
East: 1278367.7302
Length: 45.58
East: 1278365.4476
Length: 42.20
East: 1278323.2574
Length: 200.00
East: 1278318.9439
Length: 462.06
East: 1278285.9212
Length: 0.01
East: 1278285.9308
Perimeter: 3854.01 Area: 826,783 Sq Ft 18.98 Ac.
LOT 2 AFTER
North: 111356.9722 East: 1278285.9294
Line Course: N 88-19-36 W
Length: 782.35
North: 111379.8176
East: 1277503.9131
Line Course: N 20-11-12 E
Length: 104.45
North: 111477.8516
East: 1277539.9567
Curve Length:332.27
Radius:985.00
Delta:19-19-40
Tangent:167.73
Chord: 330.70
Course: N 10-31-22 E
Course In: N 69-48-48 W
Course Out: S 89-08-28 E
RP North: 111817.7552
East: 1276615.4619
End North: 111802.9902
East: 1277600.3512
Line Course: N 00-51-32 E
Length: 79.89
North: 111882.8712
East: 1277601.5488
Curve Length:94.22
Radius:485.00
Delta: 11-07-52
Tangent: 47.26
Chord: 94.08
Course: N 04-42-24 W
Course In: N 89-08-28 W
Course Out: N 79-43-40 E
RP North: 111890.1413
East: 1277116.6033
End North: 111976.6290
East: 1277593.8295
Line Course: N 10-16-20 W
Length: 287.85
North: 112259.8652
East: 1277542.4986
Curve Length:142.02
Radius:415.00
Delta:19-36-29
Tangent:71.71
Chord: 141.33
Course: N 00-28-06 W
Course In: N 79-43-40 E
Course Out: N 80-39-51 W
RP North: 112333.8702
East: 1277950.8468
End North: 112401.1919
East: 1277541.3437
Line Course: N 09-20-09 E
Length: 53.70
North: 112454.1806
East: 1277550.0550
Curve Length:195.24
Radius:315.00
Delta:35-30-46
Tangent:100.87
Chord: 192.13
Course: N 27-05-32 E
Course In: S 80-39-51 E
Course Out: N 45-09-05 W
RP North: 112403.0810
East: 1277860.8826
End North: 112625.2303
East: 1277637.5562
Curve Length:39.82
Radius:25.00
Delta: 91-14-58
Tangent: 25.55
Chord: 35.74
Course: S 89-31-36 E
Course In: S 45-09-05 E
Course Out: N 46-05-53 E
RP North: 112607.5994
East: 1277655.2806
End North: 112624.9351
East: 1277673.2938
Curve Length:428.35
Delta: 38-38-44
Chord: 420.28
Course In: N 46-05-53 E
RP Noah:113065.3093
End North: 113007.1289
Line
Course: N 05-15-23 W
North: 113080.7081
Line
Course: N 88-15-22 W
North: 113082.0751
Line
Course: S 01-14-06 W
North: 112552.9681
Line
Course: N 88-16-52 W
North: 112558.0634
Line
Course: N 01-14-05 E
North: 113087.2505
Line
Course: N 88-15-22 W
North: 113092.4200
Line
Course: S 01-14-04 W
North: 110470.5786
Line
Course: S 88-22-17 E
North: 110451.7635
Line
Course: N 43-43-14 E
North: 110590.0197
Line
Course: N 36-06-45 E
North: 111011.7314
Line
Course: N 30-51-46 E
North: 111218.6397
Line
Course: N 04-05-54 E
North: 111356.9751
Line
Course: S 76-55-48 E
North: 111356.9728
Radius: 635.07
Tangent: 222.68
Course: N 24-34-45 W
Course Out: S 84-44-37 W
East: 1278130.8792
East: 1277498.4798
Length: 73.89
East: 1277491.7106
Length: 44.92
East: 1277446.8114
Length: 529.23
East: 1277435.4048
Length: 169.87
East: 1277265.6113
Length: 529.31
East: 1277277.0170
Length: 169.87
East: 1277107.2257
Length: 2622.45
East: 1277050.7290
Length: 662.02
East: 1277712.4816
Length: 191.30
East: 1277844.6970
Length: 522.01
East: 1278152.3554
Length: 241.04
East: 1278276.0050
Length: 138.69
East: 1278285.9170
Length: 0.01
East: 1278285.9267
Perimeter: 8434.78 Area: 1,636,164 Sq Ft 37.56 Ac.
LOT 2 AFTER EAST OF ROAD, NORTHERLY PARCEL
North: 113038.5490 East: 1277562.3762
Line Course: S 88-15-22 E Length: 179.94
North: 113033.0731 East: 1277742.2328
Line Course: S 00-56-48 W Length: 367.96
North: 112665.1633
Curve Length:114.92
Delta: 11-42-54
Chord: 114.72
Course In: N 44-36-39 E
RP North:113065.2971
End North: 112753.6466
Line Course: S 56-19-33 W
North: 112750.0425
Curve Length:282.00
Delta: 28-25-04
Chord: 279.12
Course In: N 56-19-33 E
RP Noah:113065.2971
End North: 113013.2089
Line Course: N 05-15-23 W
North: 113038.5419
Line Course: N 19-49-48 W
North: 113038.5514
Area: 44,342 Sq Ft 1.02 Ac.
East: 1277736.1535
Radius: 562.07
Tangent: 57.66
Course: N 39-31-54 W
Course Out: S 56-19-33 W
East: 1278130.8883
East : 1277663.1313
Length: 6.50
East: 1277657.7220
Radius: 568.57
Tangent: 143.96
Course: N 19-27-55 W
Course Out: S 84-44-37 W
East: 1278130.8883
East: 1277564.7093
Length: 25.44
East: 1277562.3787
Length: 0.01
East: 1277562.3753
LOT 2 AFTER EAST OF ROAD, MID PARCEL
North: 112491.6981 East: 1278351.4678
Line Course: S 40-43-21 W
Length: 47.22
North: 112455.9111
East: 1278320.6617
Curve Length:52.35
Radius:71.50
Delta: 41-57-03
Tangent: 27.41
Chord: 51.19
Course: S 83-38-18 W
Course In: N 27-20-14 W
Course Out: S 14-36-49 W
RP North: 112519.4259
East: 1278287.8269
End North: 112450.2390
East: 1278269.7875
Line Course: N 75-23-11 W
Length: 101.83
North: 112475.9306
East: 1278171.2518
Line Course: N 01-10-31 E
Length: 19.01
North: 112494.9366
East : 1278171.6417
Line Course: S 88-58-12 E
Length: 179.86
North: 112491.7035
East: 1278351.4727
Line Course: S 42-16-12 W
Length: 0.01
North: 112491.6961
East: 1278351.4659
Area: 5,788 Sq Ft 0.13 Ac.
LOT 2 AFTER EAST OF ROAD, SOUTH PARCEL
North: 112447.4529
East: 1278392.5491
Line Course: S 01-14-09 W
Length: 152.23
North: 112295.2583
East: 1278389.2658
Curve Length:34.09
Radius:386.50
Delta:5-03-12
Tangent:17.06
Chord: 34.08
Course: N 32-39-42 W
Course In: S 59-51-54 W
Course Out: N 54-48-42 E
RP North: 112101.2202
East: 1278055.0033
End North: 112323.9469
East: 1278370.8751
Curve Length:37.19
Radius:51.50
Delta: 41-22-35
Tangent: 19.45
Chord: 36.39
Course: N 14-30-00 W
Course In: N 54-48-42 E
Course Out: N 83-48-43 W
RP North: 112353.6246
East: 1278412.9641
End North: 112359.1759
East: 1278361.7642
Curve Length:16.38
Radius:80.50
Delta: 11-39-25
Tangent: 8.22
Chord: 16.35
Course: N 00-21-35 E
Course In: N 83-48-43 W
Course Out: N 84-31-52 E
RP North: 112367.8532
East: 1278281.7332
End North: 112375.5253
East: 1278361.8668
Curve Length:40.78
Radius: 111.50
Delta:20-57-15
Tangent:20.62
Chord: 40.55
Course: N 05-00-30 E
Course In: N 84-31-52 E
Course Out: N 74-30-53 W
RP North: 112386.1518
East: 1278472.8593
End North: 112415.9213
East: 1278365.4068
Line Course: N 40-43-21 E
Length: 41.61
North: 112447.4566
East: 1278392.5530
Line Course: S 46-52-42 W
Length: 0.01
North: 112447.4498
East: 1278392.5457
Area: 3,249 Sq Ft 0.07 Ac.
Centerline 1-5 to 336�h to Weyerhaeuser Way to SR 18
North: 109142.6631
East: 1274854.0432
Line Course: N 13-58-34 E
Length: 1422.72
North: 110523.2657
East: 1275197.6547
Line Course: N 13-58-34 E
Length: 2687.09
North: 113130.8084
East: 1275846.6335
Line Course: N 88-15-22 W Length: 57.80
North: 113132.5674
East: 1275788.8603
Line Course: S 88-11-07 E
Length: 202.05
North: 113126.1689
East: 1275990.8089
Curve Length:397.43
Radius:350.00
Delta:65-03-36
Tangent:223.23
Chord: 376.42
Course: N 59-12-43 E
Course In: N 01-44-31 E
Course Out: S 63-19-05 E
RP North: 113476.0072
East: 1276001.4482
End North: 113318.8441
East: 1276314.1777
Line Course: N 26-44-37 E
Length: 268.95
North: 113559.0243
East: 1276435.2049
Curve Length:759.63
Radius:596.24
Delta:72-59-47
Tangent:441.17
Chord: 709.28
Course: N 63-14-30 E
Course In: S 63-15-23 E
Course Out: N 09-44-24 E
RP North: 113290.7170
East: 1276967.6646
End North: 113878.3625
East: 1277068.5350
Curve Length:52.07
Radius:596.24
Delta:5-00-13
Tangent:26.05
Chord: 52.05
Course: S 77-45-30 E
Course In: S 09-44-24 W
Course Out: N 14-44-37 E
RP North: 113290.7170
East: 1276967.6646
End North: 113867.3253
East: 1277119.4042
Curve Length:623.08
Radius:510.00
Delta:70-00-00
Tangent:357.11
Chord: 585.05
Course: S 40-15-23 E
Course In: S 14-44-37 W
Course Out: N 84-44-37 E
RP North: 113374.1174
East: 1276989.6122
End North: 113420.8399
East: 1277497.4675
Line Course: S 05-15-23 E
Length: 342.69
North: 113079.5910
East: 1277528.8622
Line Course: S 05-15-23 E
Length: 68.55
North: 113011.3293
East: 1277535.1423
Curve Length:722.78
Radius:600.00
Delta: 69-01-15
Tangent: 412.53
Chord: 679.87
Course In: N 84-44-37 E
RP North: 113066.2969
End North: 112488.7464
Line Course: S 74-16-38 E
North: 112438.1268
Curve Length:461.28
Delta: 75-30-48
Chord: 428.62
Course In: S 15-43-22 W
RP North: 112101.2223
End North: 112093.6719
Line Course: S 01-14-10 W
North: 111016.2727
Line Course: S 01-14-10 W
North: 110716.3225
Line Course: S 52-48-43 W
North: 109103.4050
Line Course: N 88-23-17 W
North: 109118.7837
Line Course: N 88-23-17 W
North: 109126.5639
Line Course: N 88-23-17 W
North: 109142.6706
Line Course: S 65-50-49 E
North: 109142.6624
Course: S 39-46-00 E
Course Out: S 15-43-22 W
East: 1278132.6191
East: 1277970.0292
Length: 186.80
East: 1278149.8399
Radius: 350.00
Tangent: 271.06
Course: S 36-31-14 E
Course Out: S 88-45-50 E
East: 1278054.9958
East: 1278404.9144
Length: 1077.65
East: 1278381.6667
Length: 300.02
East: 1278375.1946
Length: 2668.48
East: 1276249.3341
Length: 546.70
East: 1275702.8505
Length: 276.58
East: 1275426.3799
Length: 572.58
East: 1274854.0265
Length: 0.02
East: 1274854.0447
Centerline 301h to Weyerhaeuser Way to 3361h
North: 113071.8540
East: 1277782.8770
Line Course: S 00-56-48 W
Length: 487.27
North: 112584.6505
East: 1277774.8265
Curve Length:504.08
Radius:600.00
Delta:48-08-11
Tangent:267.99
Chord: 489.39
Course: N 29-19-28 W
Course In: N 36-36-26 E
Course Out: S 84-44-37 W
RP North: 113066.2959
East: 1278132.6221
End North: 113011.3283
East: 1277535.1453
Line Course: N 05-15-23 W
Length: 68.55
North: 113079.5900
East: 1277528.8652
Line Course: S 88-15-22 E
Length: 254.13
North: 113071.8564 East: 1277782.8775
Line Course: S 12-37-32 W Length: 0.00
North: 113071.8564 East: 1277782.8775
Centerline 32"d to Weyerhaeuser Way to 337th
North: 112530.5740 East: 1278414.3470
Line Course: S 01-14-09 W
Length: 437.01
North: 112093.6657
East: 1278404.9217
Curve Length:461.28
Radius:350.00
Delta:75-30-48
Tangent:271.06
Chord: 428.62
Course: N 36-31-15 W
Course In: N 88-45-51 W
Course Out: N 15-43-21 E
RP North: 112101.2143
East: 1278055.0031
End North: 112438.1192
East: 1278149.8456
Line Course: N 74-16-39 W
Length: 186.80
North: 112488.7380
East: 1277970.0346
Curve Length:137.65
Radius:600.00
Delta:13-08-39
Tangent:69.13
Chord: 137.34
Course: N 67-42-20 W
Course In: N 15-43-21 E
Course Out: S 28-52-00 W
RP North: 113066.2893
East: 1278132.6217
End North: 112540.8419
East: 1277842.9579
Line Course: S 88-58-12 E
Length: 571.48
North: 112530.5691
East: 1278414.3456
Line Course: N 15-56-22 E
Length: 0.01
North: 112530.5787
East: 1278414.3483
Centerline 352"d to 16th to 348th to 1-5
North: 107895.3362 East: 1274543.6004
Line
Course: N 88-31-23 W
Length: 1503.72
North: 107934.0941
East: 1273040.3799
Line
Course: N 01-34-24 E
Length: 1259.11
North: 109192.7294
East: 1273074.9506
Line
Course: S 88-23-17 E
Length: 1779.80
North: 109142.6636
East: 1274854.0463
Line
Course: S 13-58-34 W
Length: 1285.38
North: 107895.3353
East: 1274543.6047
Line
Course: N 78-53-32 W
Length: 0.00
North: 107895.3353
East: 1274543.6047
Centerline 16th to 344th to 1-5 to 348`h
North: 109192.7269 East: 1273074.9504
Line
Course: N 01-34-24 E
Length: 1390.33
North: 110582.5327
East: 1273113.1238
Line
Course: S 88-22-17 E
Length: 2085.37
North: 110523.2648
East: 1275197.6514
Line
Course: S 13-58-34 W
Length: 1422.72
North: 109142.6623
East: 1274854.0399
Line
Course: N 88-23-17 W
Length: 1779.80
North: 109192.7281
East: 1273074.9442
Line
Course: S 69-48-02 E
Length: 0.01
North: 109192.7247
East: 1273074.9536
Centerline 1-5 to 34e to 352nd
North: 107895.3362 East: 1274543.6004
Line
Course: N 13-58-34 E
Length: 1285.38
North: 109142.6645
East: 1274854.0419
Line
Course: S 88-23-17 E
Length: 849.16
North: 109118.7776
East: 1275702.8659
Line
Course: S 01-13-38 W
Length: 1252.93
North: 107866.1350
East: 1275676.0313
Line
Course: N 88-31-23 W
Length: 1132.81
North: 107895.3328
East: 1274543.5977
Line
Course: N 38-23-36 E
Length: 0.00
North: 107895.3328
East: 1274543.5977
Centerline 16th to 33e to 1-5 to 344`h
North: 110582.2801 East: 1273113.5446
Line
Course: N 01-12-17 E
Length: 2630.15
North: 113211.8487
East: 1273168.8431
Line
Course: S 88-15-41 E
Length: 2621.64
North: 113132.3086
East: 1275789.2762
Line
Course: S 88-15-22 E
Length: 57.80
North: 113130.5496
East: 1275847.0494
Line
Course: S 13-58-34 W
Length: 2687.09
North: 110523.0069
East: 1275198.0706
Line
Course: N 88-22-17 W
Length: 2085.37
North: 110582.2748
East: 1273113.5430
Line
Course: N 16-52-13 E
Length: 0.01
North: 110582.2843
East: 1273113.5459
llesm8lengrlesm-jobsll886100110161documenticlosures on blal.doc
09CI IO
RESUBMITTED
October 14, 2016
OCT 14 2016
CITY OF FEDERAL WAY
Mr. Jim Harris CDS
City of Federal Way Community Development
33325 8th Avenue South
Federal Way, WA 98003
RE: Response to File No.16-102886-OO-SU; TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South
Email: Jim.Harris@cityoffederalway.com
Dear Mr. Harris:
s i V
Thank you for the Technical Review Comment letter dated September 29, 2016. ESM
appreciates the opportunity to respond to technical review comments in line with this
letter. In recognition that the application has been determined complete, ESM is submitting
4 copies of revised BLA plans to reflect changes requested by the Technical Review
Committee.
Per previous discussions, all wetlands and buffers must be depicted on revised Lot
no. 1.
The revised plans reflect these changes. Correspondingly, with respect to sheets
6 through 12, we have provided two versions for each sheet The first version is
the sheet that we would like to propose recording and does not contain the
topographical information or wetlands. The second version of each sheet contains
the topographical information and wetlands. This second version would not be
recorded. This is not unlike a final plat wherein the recorded version of the plat
does not contain the topography.
2. Include a note to the following effect under the note column on sheet 3:
As an exception to the Federal Way Revised Code, critical areas are not depicted
on revised lot No. 2, as that information is not available from the property owner at
the time of preparIng this Boundary Line Adjustment
Critical areas may exist on Lot No. 2 and will need to be delineated prior to
development and if those wetlands or other critical areas prevent development
they don get an accommodation. The BLA does not guarantee the lots will be
suitable for development now or in the future.
The aforementioned note has been added to sheet 3.
ESM Federal Way
ESM Everett
Civil Engineering
Land Planning
33400 Sth Ave S, Ste 205
1010 SE Everett Mall Way, Ste 210
Land Surveying
Landscape Architecture
Federal Way, WA 98003
253.838.6113 tel
Everett, WA 98208
425.297.9900 tel
3D Laser Scanning
I
GI5
800.345.5694 toll free
800.345.5694 toll free
www.esmcivii.com
253.838.7104 fax
425.297.9901 fax
Mr. Jim Harris
October 14, 2016
Page 2
3. Remove the word "Services" from the Community Development Director signature
block.
This change has been made.
4. Use the City of Federal Way standard BLA title block and language (emailed from
Ann Dower 9-7-2016).
We have used the City of Federal Way standard title block, but have capitalized all
of the text as when lower case figures are used, the size falls below the 0.08 font
size required by law.
5. Print the name of the person(s) signing on behalf of Federal Way Campus LLC on
the authorization on sheet 1, and provide proof of his/her authority to sign on
behalf of the LLC.
`T. C. Messmer" is the printed name on sheet 1. Signing authority has been
included with our resubmittal.
6. Indicate how lot corners will be set and show on the plans.
Lot comer settings have been indicated on the revised plans.
7. Lot closure calculations must be stamped by the Land Surveyor, and provide two
copies of closures to the City.
Two stamped copies of lot closures have been included with our resubmittal.
Let me know if you have any further questions or need any assistance.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
/r4A,/
/----
Matt Reider
Planner
Cc: Ann Dower, Senior Engineering Plans Reviewer
Cindy Flood (cindy.flood@esmcivil.com)
Enc: Resubmittal Form
Revised BLA Plans
Signing Authority
Computation Sheet
'RG
Industrial Realty Group, LLC
October 3, 2016
VIA EMAIL
Mr. Scott Sproul
City of Federal Way
33400 8th Avenue South
Ste. 205
Federal Way, WA 98003
11100 Santa Monica Boulevard, Suite 850
Los Angeles, CA 90025
(310) 806-4434
RE: Tom Messmer133663 We erhaeuser W_ay, Federal Way, WA
Dear Mr. Sproul:
www.industrialrealtygroup.com
RESUBMITTED
OCT 14 2016
CITY OF FEDERAL WAY
CDS
We are the owners of the property located at 33663 Weyerhaeuser Way, Federal Way,
Washington. Please be advised that Tom Messmer works for Industrial Realty Group, LLC as
Vice President. He has the authority to sign on behalf of Federal Way Campus, LLC in
connection with the development of the property.
Please contact us with any questions.
Very truly yours,
INDUSTRIAL REALTY GROUP, LLC
By:
Jo A ase, Chief Executive Officer
&VAMILICHTERWederal Way, WA (Weyerhaeuser)\EnvironmentallMessmer Ltr.doex
Los Angeles • New York • Sacramento • Chicago • Akron • Cleveland • Columbus • Cincinnati • Detroit
D
v
C-
c
m
v
CITY OF
�. Federal Way
September 29, 2016
Eric La Brie
ESM Consulting Engineers LLC
33400 8th Avenue South, Suite 205
Federal Way, WA 98003
RE: File No. 16-102886-00-SU; TECHNICAL REVIEW COMMENTS
Weyerhaeuser 2-Lot BLA, 33663 Weyerhaeuser Way South
Email: eric.labrte@es►neivil.com
Dear Mr. LaBrie:
FILEHALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. cityoffederalway.. com
Jim Ferrell, Mayor
The following represents the Planning Division and Public Works Department review of the revised 2-lot
Boundary Line Adjustment submitted to the City on August 24, 2016. The application is now complete.
Please make the following revisions to the Boundary Line Adjustment Map and provide four copies of the
revised BLA map for further review.
1. Per previous discussions, all wetlands and buffers must be depicted on revised Lot no. 1.
2. Include a note to the following effect under the note column on sheet 3:
As an exception to the Federal YVay Revised Code, critical areas are not depicted on revised lot
No. 2, as that information is not available from the property owner at the time of preparing this
Boundary Line Adjustment.
Critical areas tnay exist on Lot No. 2 and will need to be delineated prior to development, and if
those wetlands or other critical areas prevent development, they don't get an accornrnodation.
The BLA does not guarantee the lots will be suitable for development now or in the fitture.
3. Remove the word "Services" from the Community Development Director signature block.
4. Use the City of Federal Way standard BLA title block and language (emailed from Ann Dower 9-
7-2016).
5. Print the name of the person(s) signing on behalf of Federal Way Campus LLC on the
authorization on sheet 1, and provide proof of his/her authority to sign on behalf of the LLC.
6. Indicate how lot corners will be set and show on the plans.
7. Lot closure calculations must be stamped by the Land Surveyor, and provide two copies of
Closures to the City.
Y—I WOW
IVIr. LaBrie
September 29. 2016
Noe 2
Let me know if you have any further questions or need any assistance.
Sincerely,
J- arris 4"
Planner
c: Ann Dower, Senior Enoineering Plans Reviewer
Cindy Flood (cindy.Flood!c�esmcivil.com)
Elie: Resubmittal Form
IG-101M, Doc 1 D 74765
{ I
CITY OF FEDERAL WAY
v
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: August 25, 2016
TO: Ann Dower, PW Development Services
Brian Asbury, Lakehaven Utility District
Sarady Long, Senior Traffic Engineer
FROM: Jim Harris
FOR DRC MTG. ON: NA - 2" review
FILE NUMBER(s): 16-102886-00-SU
RELATED FILE NOS.: None
PROJECT NAME: WEYERHAEUSER '^�-BLA 2-lot BLA
PROJECT ADDRESS: 33663 WEYERHAEUSER WAY S
ZONING DISTRICT: CP-1
PROJECT DESCRIPTION: 2 lot boundary line adjustment.
LAND USE PERMITS:
PROJECT CONTACT: ESM CONSULTING ENGINEERS LLC
CINDY FLOOD
334008 TH AVE S Suite205
MATERIALS SUBMITTED: Revised BLA
Revised Lot Closure Calcs
ESM Cover letter 8-24-16
Please review and provide me any comments.
RESUBMI-TTED
AUG. 2 420116
CITY OF FEDERAL WAY
CDS
August 24, 2016
ff MM 41:k D. I (D 10 1
CONSULTING ENGINEERS LLc
Mr. Scott Sproul
City of Federal Way
33325 8th Ave S
Federal Way, WA 98003
RE: Federal Way East Campus - Boundary Line Adjustment
File No.16-102886-00-SU
Dear Mr. Sproul:
Job No. 1886-001-016
As requested, we have revised the boundary line adjustment to include only two of the
existing lots - Parcels U and V - that were a part of the previously submitted 10-lot
boundary line adjustment. The resulting lots will be 1) the parcel which is intended for
Preferred Freezer and 2) everything remaining. The lot for the remainder has three small
portions on the northeasterly side of Weyerhaeuser Way S. with the bulk of the lot on the
southwesterly side of Weyerhaeuser Way S. This remainder lot contains a portion of the
former headquarters building.
Attached are six (6) copies of the revised boundary line adjustment and two (2) copies of
the new closures. The application, check, and title report included in the original submittal
are to be used for this revised boundary line adjustment.
We ask that the City continue with their review of this boundary line adjustment. If there is
anything further that is required, please contact us promptly to discuss.
Sincerely,
ESM CONSULTING ENGINEERS, LLC
0enio
THIA A. FLOOD, P.L.S.
r Survey Project Manager
Attach.
CC: Tom Messmer, IRG
Jack McCullough, McCullough Hill Leary, PS
llesm8lengrlesm-jobs) l EIM001101 &document)letter-004.dou
ESM Federal Way
ESM Everett
33400 Sth Ave S, Ste 205
1010 SE Everett Mall Way, Ste 210
Federal Way, WA 98003
Everett, WA 98208
253.838.6113 tel
425.297.9900 tel
800.345.5694 toll free
800.345.5694 toll free
253.838.7104 fax
425.297.9901 fax
FYI.-,TftG PARCELS TO BE USED FOR BOUNDARY LINE ADJUSTMENT
10 PARCELS PROPOSED TO BE USED AS OF MAY 12. 2016
NOT
INCLUDED
NOT
NOT
INCLUDED
r
AA
FILE
CITY OF
� Federal Way
July 21, 2016
Mr. Eric LaBrie
ESM Consulting Engineers
33400 8"' Avenue South, Suite 205
Federal Way, WA 98003
Eric.labrie@esiiiciviI.com
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www.cityoffederalway.com
Jim Ferrell, Mayor
Re: File No. 16-102886-00-SLI; NOTICE OF INCOMPLETE APPLICATION & PARTIAL CRITICAL
AREA REPORT WAIVER - )Federal Way East Campus 10-Lot BLA, 33663 Weyerhaeuser Way
South, Federal Way
Dear Mr. LaBrie:
This letter responds to your July 8, 2016, letter requesting to waive the critical area report requirements of
Federal Way Revised Code (FWRC) 19.145.080 as it applies to Your pending 10-lot Weyerhaeuser
Campus boundary line adjustment (BLA). In summary, the Department does not support the request to
waive the critical area report for the entire proposed 242-acre BLA site, as critical areas are required to be
depicted on boundary line adjustments, pursuant to FWRC 18.10.030(1). Environmentally critical areas
information is a key element for any land division and it is imperative to have adequate information to
make an informed decision.
In order to assist in expediting the Preferred Freezer development, the City will consider partially waiving
the critical area report requirements for the BLA to the extent that allows the property owner to
reconfigure the minimum number of lot lines to achieve the 18.9-acre Preferred Freezer site. One
potential solution to achieve this outcome would be to revise your application with a 2-lot BLA,
reconfiguring the lot lines of only parcels "U" and "V" into a configuration that achieves the desired
revised parcel "U" into the 18.9-acre Preferred Freezer site. City staff would partially waive the critical
area report requirements for the BLA under this configuration, as we are currently in the process of
reviewing wetlands on (revised) parcel "U" in conjunction with the Preferred Freezer SEPA and Process
III applications. Under this scenario, wetlands and critical areas would be shown on the 18.9-acre site and
a note on the BLA would identify the unknown and unverified status of wetlands and critical areas on the
revised parcel "W'.
The solution outlined above for a 2-lot BLA and a partial critical area report waiver should meet You[ -
objectives to create the 18.9-acre Preferred Freezer parcel (revised lot U /lot 8).
Additional BLAB could be processed in the future when your design team gathers environmentally critical
area information for the remainder of the site.
Mr. LaBrie
July 21. 2016
Page 2
INCOMPLETE APPLICATION
At this time, we still consider the 10-lot BLA application as incomplete. If you choose to revise the BLA
into a 2-lot reconfiguration as discussed above, then City staff would consider the BLA complete upon
resubmittal of the revised 2-lot BLA and accompanying materials. Obviously, a full technical review of the
BLA would be required.
Any resubmittals for this application must be accompanied with a resubmittal form (enclosed). After
receipt of the requested information noted in the incomplete application section of this letter, the
department will notify you within 14 days whether your application is considered complete for
processing, or what, if any, information is still needed. The review clock for processing your formal
application will not begin until all items are submitted.
Please contact Jim Harris atiim.liars-is(,a,.citvoffederaiivay.cotn, or 253 835-2652, if you have any
questions.
Sinc-er I
c Sproul
Acting Community Development Director
enc: Resubmittal Form
c: Jim Harris. Planner
Ann Dower. Senior Engineering Plans Reviewer
Cristina Haworth. Planner. Otak Inc. 11241 Willow Road NE, Suite 200, Redmond. WA 98052
Brian Asbury, Lakehaven Utility District
Cindy Flood, ESM Consulting Engineers, 33400 8`h Avenue South, Suite 205. Federal Way, WA 98003
Tom Messmer. c/o Federal Way Campus LLC. 8847 Imperial Highway, Suite H, Downey. CA 90242
16-102886 Doc. LD, 74174
EXISTING PARCELS TO BE USED FOR BOUNDARY LINE ADJUSTMENT
10 PARCELS PROPOSED TO BE USED AS OF MAY 12, 2016
NOT
INCLUDED
NOT
INCLUDED
NOT
INCLUDED
e✓-
C
OamONI
ION
9LOZ 'ZL AVW AO SV 03sn 39 Ol 03SOdO2ld S1338Vd OL
1N3W1Sflf did 3NI7 AUVaNnos dOd (aril 38 01 S130UVd E)NIISIX3
ADJUSTED PARCELS FOR BOUND_ARY LINE DJUSTMENT
3 ADJUSTED PARCELS AS CIF JULY 22, 201
U
OL�l
-) RESUBMITTED
CONSULTING ENGINEERS LLC
July 8, 2016
Mr. Scott Sproul
City of Federal Way
33325 8m Ave S
Federal Way, WA 98003
RE: Notice of Incompleteness, Weyerhaeuser Campus BLA
File No.16-102886-OO-SU
Dear Mr. Sproul:
JUL 08 2016
CITY OF FEDERAL WAY
CDS
Job No. 1886-001-016
On July 8th, 2016 ESM received a Notice of Incompleteness from Jim Harris, the planner
responsible for the review and processing of the 10-lot BLA application. In his letter, Mr.
Harris states that "during the course of the citys review, the following item was found to be
missing or incomplete... A wetland and stream delineation and analysis must be submitted
with the Boundary Line Adjustment (BLA) application per FWRC 18.10.0300). The
submitted BLA shows several wetlands and drainages, but no supporting documentation
has been submitted to the city regarding the wetland/stream delineation and
classification..."
ESM respectfully requests that you waive this requirement from the 10-lot BLA application.
Pursuant to FWRC section 19.145.080 a critical area report may be waived or modified by
the director in accordance with subsection (4). Subsection (4) goes on to state; "the critical
area report may be waived or modified if the director determines:
(a) there will be no alteration of the critical area or buffer; or
(b) the applicant cannot obtain permission to access off -site critical areas or buffers."
No development is being proposed with the BLA that would alter any critical areas or their
buffers. The intention of this BLA is to clean up the lot boundaries so that existing
structures and existing roadways do not bisect parcel boundaries, and to create lots that
may be sold and developed at a later date under separate applications. This is
specifically the case for the Preferred Freezer site that was recently submitted for Process
III review. That application included a wetland delineation and report since there are
critical areas (wetlands) located on that specific property.
ESM Federal Way
ESM Everett
Civil Engineering Land Planning
33400 8th Ave S, Ste 205
1010 SE Everett Mall Way, Ste 210
Land Surveying Landscape Architecture
Federal Way, WA 98003
253.838.6113tel
Everett, WA 98208
425.297.9900tel
3D Laser Scanning GIS
800.345.5694 toll free
800.345.5694 toll free
www.esmcivil.com
253.838.7104 fax
425.297.9901 fax
Mr. Scott Sproul
July 8, 2016
Page Two
For future reference, we would appreciate staff contacting us immediately with any
question or concerns so that we continue moving forward as fast as possible.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
ERIC G. LaBRIE, AI.C.P.
President
cc: Tom Messmer, IRG
Jack McCullough, McCullough Hill Leary, PS
RJ Burton, Chill Build Seattle, LLC
Cindy Flood, ESM Consulting Engineers, LLC
Ilesm8lengrlesm-jobs11886100110161docu mentl letter-003.docx
A�kCIT
Federal Way
July 6, 2016
Ms. Cindy Flood
ESM Consulting Engineers
33400 8t" Avenue South, Suite 205
Federal Way, WA 98003
cindy. flo od@esmcivil. com
FILE
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. cityo6ederalway.. com
Jim Ferrell, Mayor
Re: File No. 16-102886-00-SU; NOTICE OF -INCOMPLETE APPLICATION
Federal Way East Campus 10-Lot BLA, 33663 Weyerhaeuser Way South, Federal Way
Dear Ms. Flood:
The Department of Community Development has conducted a cursory review of information you submitted
to the city on June 13, 2016, in order to determine if the application is complete for the proposed Federal
Way Campus 10-Lot Boundary Line Adjustment (BLA). The project is being reviewed under the provisions
of Federal Way Revised Code (FWRC) 18.10, "Boundary Line Adjustment."
INCOMPLETE APPLICATION
During the course of the city's review, the following item was found to be missing or incomplete. In order for
your application to be considered -complete and ready for processing, the item below must be provided.
• A wetland and stream delineation and analysis must be submitted with the Boundary Line
Adjustment (BLA) application per FWRC 18.10.030(1). The submitted BLA shows several
wetlands and drainages, but no supporting documentation has been submitted to the city
regarding the wetland/stream delineation and classification. We will need five copies of the
wetland/stream report.
Wetland/stream analysis reports submitted to the city as part of a land use application receive a third -party
peer review at the applicant's expense. Following submittal of a report, the city establishes a contract and
scope of work with the city's on -call environmental consultant. The applicant must provide a deposit for the
anticipated amount of review cost in the scope of work. We are unable to determine the potential cost of peer
review until the appropriate report is submitted and a scope of work is prepared by a city review consultant.
PRELIMINARY TECHNICAL COMMENTS
Since the application is incomplete and the critical areas have not been evaluated, a technical review of the
proposal has not been conducted. A complete technical review of the proposed BLA will occur after the
critical area studies are submitted to the city, and reviewed as required by city staff and consultants.
Ms. Cindy Flood
Page 2of2
July 8, 2016
Any resubmittals for this applicadon must be accompanied with a resubmittal form (enclosed). After receipt
of the requested information noted in the incomplete application section of this letter, the department will
notify you within 14 days whether your application is considered complete for processing, or what, if any,
information is still needed. The review clock for processing your formal application will not begin until all
items are submitted.
Please contact me at jA-ri:Kkris c?tvflTMeral wt4.com or 253 835-2652, if you have any questions. I look
forward to working with you on this pro.Xect.
Sincerely,
Jim Harris
Planner
enc: Resubmittal Form
c: Ann Dower, Senior Engineering Plans Reviewer
Brian Asbury Lakehaven Utility District
Eric La Brie, ESM Consulting Engineers, 33400 8th Avenue South, Suite 205, Federal Way, WA 98003
Tom Messmer, c/o Federal Way Campus LLC, 8847 Imperial Highway, Suite H, Downey, CA 90242
File #16-102886-00-SU Doc ID 74037
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: June 16, 2016
TO: E.J. Walsh, Development Services Manager
Peter Lawrence, Plans Examiner
Brian Asbury, Lakehaven Utility District
South King Fire & Rescue
Rick Perez, City Traffic Engineer
FROM: Jim Harris, Planner
FOR DRC MTG. ON: June 30, 2016
FILE NUMBER(s) : 16-102886-00-SU
RELATED FILE NOS.: None
PROJECT NAME: Weyerhaeuser Campus 10-LOT BLA
PROJECT ADDRESS: 33663 WEYERHAEUSER WAY S
ZONING DISTRICT: CP-1
PROJECT DESCRIPTION: 10-lot boundary line adjustment.
LAND USE PERMITS: BLA Review
PROJECT CONTACT: ESM CONSULTING ENGINEERS LLC
33400 8Ta AVE S. Suite205
MATERIALS SUBMITTED: BLA Map
Title Report
Lot Closure Calcs
ESM Cover Letter
Sketch of Existing and Adjusted Parcels
RECEIVED
J U N 13 2016 MASTER LAND USE APPLICATION
DEPARnUMOFCOMMUti WDEVALO MMITSMVICES
CITY OF CITY OF FEDERAL WAY 33325 Ss' Avenue South
CDS Federal Way, WA 99003-6323
Fed a ra l Wa
y - 253 8 www.cirvoffedamlwgy.com
Fax 25mlwgy2609
��'"'`` www.ci ofFederofwa .cam
APPLICATION NW) 1 �Q / 1 ()1 O((> ( - v 0 Date / " P
ProjectName Federal Way Campus 10 lot BLA
Property Addresslle^,tion 33663 WEYERHAEUSER WAYS 98003
2285=10, 7978200420, 7978200480, 6142600005, 7261200060, 6142600200, 6142603025, 2121049002, 2121049062,
Parcel Ntunber(s) 4420600040, 4420600445, 4420600050, 4420MG055, 442WOOD60. 442060[7055, 4420600070, 4420600075_ `
Project Description 10 lot boundary line adjustment of the Federal Way Campus (previously owned by Weyetilaeuser}
Please see nroiect narrative for details.
PLRAST PRINT
Type of Permit Required
_ Annexation
_Binding Site Plan
Boundary Line Adjustment
Comp Plan)Rezone
_ Land Surface Modification
_ LotLine Elimination
Pceapplication Conference
_ Process I (Director's Approval)
_ Process II (Site Plan Review)
—Process III (Project Approval)
_ Process IV (Hearing Examinees Decision)
_ Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
_ SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
_ Subdivision
Variance: Commercial/Residentud
Required Information
CP-1 _Coworate Park Zoning Designation
Qnrpnraf9 Paris Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
Occupancy Type
Construction Type
Applicant
Name:
Tom Messmer clo Federal Way Campus, LLC
Address:
8847 Imperial Highway, Suite H
City/State:
Downey, CA
Zap:
90242
Phone:
(W2) 8034781
Fax:
Email:
mer&ndustnairealtigroup.com
Signature:
Agent Cif different than Applicant)
Name:
ESM Consulting Engineers, LLC
Address:
33400 8th Ave S. Ste 205
City/State:
Federal Way, WA
Zip:
98003
Phone:
253.838.6113
Fax:
253.838.7104
Email:
cin .flood@esmclvil.com
Signature:
Owner
Name:
Same as applicant
Address:
Citylstate:
Zap:
Phone:
Fax:
Email:
Signature:
Bulletin #003 — January 1, 2011 Page I of I k:%andouts%Wter Land Use Application
RECEIVED E® ADJUSTED PARCELS FOR BOUNDARY LINE ADJUSTMENT
10 ADJUSTED PARCELS AS OF MAY 12. 2016
JUN 13 Z016
NOT
CITY OF FEDEn qL WAY INCLUDED
CIDS
Q
NOT
1NCLIJOEO
NOT
INCLUDED
E
AA
EXISTING PARCELS TO BE USED FOR BOUNDARY LINE ADJUSTMENT
10 PARCELS PROPOSED TO BE USED AS OF MAY 12, 2016
NOT
INCLUDED
NOT
INCLUDED
NOT
INCLUDED
r AA I
ADJUSTED PARCELS FOR BOUNDARY LINE ADJUSTMENT
10 ADJUSTED PARCELS AS OF MAY 12. 2016
Eel
NOT
INCLUDED
NOT
INCI 1J0Ff1
NOT
INCLUDED
RECEIVED
J U N 13 2016 MASTER LAND USE APPLICATION
MpmTmma of Commumw DEvEwpmE 1T SEavim
CITY OF CITY OF FEDERAL WAY 333258`�Avenue South
CDS Federal Way, WA 980OM325
Federal Way �3 8 %"VW. i; Fax 253 835-2609
w�vw.ci tyoffe8eral way,to m
APPLICATIONNO(S) 1 �Q __ 1 0�_ <� (6 v v ^ Date / ' P
ProjectName Federal Way Campus 10 lot BLA
Property AddressnLo*.ation 33663 WEYERHAEUSER WAYS 98003
2285000010, 7978200420, 7978200480, 6142600DD5, 7251200060. 6142BW200, 8142603025, 2121049W2. 2121049052,
Parcel Numbers) 4420600040, 4420600045, 44206WD50, 4420600055, 4420600D60, 44208DOD65 4420600070, 44206D0075
Project Description 10 lot boundary line adjustment of the Federal Way Campus(previously owned by Weyerhaeuser)
Please see project narrative for details.
PLEASE PRINT
Type of Permit Required
_ Annexation
Binding Site Plan
2— Boundary Line Adjustment
Comp Plan/Rezone
_ land Surface Modification
_ Lot Line Elimination
Preapplication Conference
_ Process I (Director's Approval)
_ Process lI (Site Plan Review)
Process IG (Project Approval)
_ Process IV (Hearing Examiner's Decision)
_ Process V (Quasi -Judicial Rezone)
_ Process VI
_ S13PA w/Project
_ SEPA Only
Shoreline: Varience/Conditional Use
Short Subdivision
_ Subdivision
Variance: Commercial/Residential
Required Information
CP-i Corporate lark Zoning Designation
Corporate Park Comprehensive Plan Designation
Value of Existing Impmvements
Value of Proposed Improvement;
Infemational Building Code (IBC):
Occupancy Type
Construction Type
Applicant
Name:
Tom Messmer c/o Federal Way Campus, LLC
Address:
8847 Imperial Highway, Suite H
City/State:
Downey, CA
Zap:
90242
Phone:
(562)803-4761
Fax:
Email:
mer@industnalrealtygroup.00m
Signature:
Agent (if different than Applicant)
Name:
ESM Consulting Engineers, LLC
Address:
33400 8th Ave S. Ste 205
City/State:
Federal Way, WA
Zip:
98003
Phone:
253.838.6113
Fax:
253.838.7104
Email:
Signature:
cin .flood@�esmci+►il.com
Owner
Name:
Same as applicant
Address:
Cit3otate:
Zip:
Phone:
Fax:
Email:
Signature:
Bulletin #003 —January 1, 2011 Page 1 of 1 k WandoutsWaster i end Use Application
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: November 22, 2016
TO: Ann Dower, Senior Engineering Plans Reviewer
Rick Perez, City Traffic Engineer ✓I
-5�T4r"�
FROM: Jim Harris
FOR DRC MTG. ON: NA - By 11-28-16 we need to tell applicant
incomplete or complete based on resubmittal
FILE NUMBER(s): 16-104996-00-SU
16-104997-00-SE
RELATED FILE NOS.: Lots of files
PROJECT NAME: FEDERAL WAY CAMPUS BUSINESS PARK - 5 Lot Binding
Site Plan
PROJECT ADDRESS: 32901 WEYERHAEUSER WAY S
ZONING DISTRICT: CP-1
PROJECT DESCRIPTION: Proposal to create (5) lots and (1) tract.
LAND USE PERMITS: SEPA and Binding Site Plan Review
PROJECT CONTACT: TOM MESSMER
MATERIALS SUBMITTED: TIR
Lot Closure Calculations
Title Report
Signed SEPA Checklist
ESM Cover letter dated 11-11-16
NOTE: Applicant did not submit a TIA, and they say in their 11-11-16
cover letter that a TIA is not required
CONSULTING ENGINEERS LLc
November 11, 2016 Job No. 1886-001-016-0010
RESUBMITTED
Mr. Jim Harris NOV 4 5 2016
City of Federal Way OF FEDERAL WAY
333258 Ave. South CrrY
Federal Way, WA 98003 CDS
RE: Federal Way Campus Business Park Binding Site Plan Application
Dear Jim:
We have received your Notice of Incomplete Application, dated November 10, 2016 for the
Federal Way Campus Business Park Binding Site Plan application. We appreciate your
cursory review of the application materials submitted to the City planning department on
October 13, 2016.
Enclosed with this response you will find the following:
• Two copies of the Title report prepared for the property on September 22,
2016, well within the 90 day timeframe of submittal.
• Three copies of lot closures for existing and proposed lots sealed by a
professional land surveyor.
Eight copies of the signed SEPA checklist that was prepared for the
Binding Site Plan submittal on October 13.
• Four copies of the Technical Information Report.
During our intake appointment, we went through the submittal checklist with the permit
technicians and verified that everything was included in both of the submittals made that
day; the Short Plat and the Binding Site Plan. We are surprised that you were not able to
locate the aforementioned items. We believe that there may have been a mix up in the
box of information you reviewed since these items were also included in the Short Plat
submittal documents. Nevertheless, these items are provided with this letter.
Please note that the directions provided in the FWRC 18.20.020, 18.30.030 regarding the
number of copies of the Technical Information Report required for a binding site plan
submittal state that "all short subdivision applications must at the minimum provide the
information contained within City of Federal Way Department of Community Development
Services Bulletin No. 010, Short Subdivision Submittal Requirements.; however, Bulletin
#10 states that only two copies of the TIR are required. We politely request that Bulletin
#10 be updated to reflect that the number of required copies is (4) four instead of the
listed (2) two so that future permit applications reflect the appropriate number of copies.
ESM Federal Way
ESM Everett
Civil Engineering Land Planning
33400 Sth Ave 5, Ste 205
1010 SE Everett Mall Way, Ste 210
Land Surveying Landscape Architecture
Federal Way, WA 98003
Everett, WA 98208
GIS
253.838.6113tel
425.297.9900tel
3DLaser Scanning
800.345.5694 toll free
800.345.5694 toll free
www.esmcivil.com
253.838.7104 fax
425.297.9901 fax
Mr. Jim Harris
November 11, 2016
Page 2
Lastly, we note that a Transportation Impact Analysis is not listed in Bulletin #10 dated July
20, 2015, which was provided to us by the City, nor is it listed in Bulletin #10 dated
November 9, 2016 posted online as of November 11, 2016. Following the sequence of
code, FWRC 18.20.020 and FWRC 18.30.030 we do not see a direct correlation as to how
a lack of TIA upon submitting for a Binding Site Plan application contributes to a
determination of incomplete application. Consequently, ESM is requesting that this
requirement for a determination be removed and complete application status issued.
Please do not hesitate on contacting ESM with comments, concerns, or questions as we
continue to move forward with the permitting process.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
Matt Reider
Assistant Planner
Hem jobs11886100110160ocumentlLetter-003
4ik
CITY
Federalo.
Way
Department of Community Development Services
33325 8'h Avenue South
RESUBMITTED Federal Way, WA 98003-6325
253-835-2607; Fax 253-835-2609
www.citvoffederalway.com
NOV 15 2016
CITY OF FEDERAL WAY
CDS
SEPA ENVIRONMENTAL CHECKLIST
Pu!pose of checklirt.•
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization, or
compensatory mitigation measures will address the probable significant impacts, or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants wl
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency
specialist or private consultant for some questions. You may Use 'Snot applicable" or "'does not apply" only
when you can explain whyit does not apply and not when the answer is unknown. You may also attach or
incorporate by reference additional studies and/or reports. Complete and accurate answers to these questions
often avoid delays with the SEPA process, as well as later in the decision -making process.
The checklist questions apply to all pacts ofyourproposa4 even if you plan to do them over a period of time or
on different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for Lead Agencaes:
Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the
proposal, and an analysis of adverse impacts. The checklist is considered the first, but not necessarily the only
source of information needed to make an adequate threshold determination. Once a threshold determination
is made, the lead agency is responsible for the completeness and accuracy of the checklist and other
supporting documents.
Use of checklist for nonpmjectpmposalf.DLe-lpj
For nonproject proposals (such as ordinances, regulations, plans, and programs), complete the applicable parts of
sections A and B, plus the sUPP1 I AMENTAI. S1 if --l' FOR N(]ItihRO11s(:'1' ,('PIONS (part D)_ Please completely answer all
questions that apply and note that the words "project," "applicant," and "property or site" should he read as
Ccproposal," °proponent," and "affected geographic area," respectively. The lead agency may exclude (for
nonprojects) questions in Part B (Environmental Elements) that do not contribute meaningfully to the analysis of the
proposal.
Bulletin #050 — May 1, 2014 Page 1 of 14 k\Handouts\F,nvironmenta] Checklist May 2014
A. BACKGROUND ��
1. Name of proposed project, if applicable: iel
"Federal Way Campus Business Park"
2. Name of applicant: Didlpj
Federal Way Campus, LLC
3. Address and phone number of applicant and contact person: iel
11100 Santa Monica Blvd, Suite 850
Los Angeles, CA 90025
Tom Messmer
(562) 803-4761
4. Date checklist prepared: ieiellp
October 13, 2016
5. Agency requesting checklist: hielgj
City of Federal Way
6. Proposed timing or schedule (including phasing, if applicable): Diel
Phase 1 Binding Site Plan into 5 lots and 1 tract - Winter 2016
Phase 2 Installation of required infrastructure - Fall 2017
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain. uelp�
Yes, this binding site plan is necessary to create appropriately sized parcels for future tenants and warehouse
buildings and allows for the consolidation of the parking for eth Tech Center. It also creates two lots for
potential future development (Lots 4 and 5) and a tract (Tract A) for open space and potential stormwater
facilities.
8. List any environmental information you know about that has been prepared, or will be prepared, directly
related to this proposal. iel
• Title Report
• Wetland delineation;
• Preliminary technical information report addressing relevance of the 9 Core and 5 Special Requirements of
2016 King County Surface Water Design Manual.
9. Do you know whether applications ate pending for governmental approvals of other proposals directly
affecting the property covered by your proposal? If yes, explain. Die1w
No pending applications affecting this proposal
10. List any government approvals or permits that will be needed for your proposal, if known.
Section 404 U.S. Army Corps of Engineers, Commercial Grade & Fill City of Federal Way, SEPA Threshold
Determination, Process III Land Use Review, NPDES Construction Stormwater Discharge Permit, and Forest
Practice Class -IV- General Application.
Bulleri a #050 — May 1, 2014 Page 2 of 14 kAHandouts\Environmental Checklist May 2014
11. Give brief; complete description of your proposal, including the proposed uses and the size of the project
and site. There are several questions later in this checklist that ask you to describe certain aspects of your
proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to
include additional specific information on project description.) DitlPI
Binding site plan encompassing 4 adjoining parcels, totaling ±120 acres, to create 5 lots and 1 tract to
accommodate a total of 1,067,000 square feet of new warehouse (with ancillary office space), reconfiguration
of the parking that serves the existing Technology Center, and the necessary infrastructure, including
stormwater management facilities to accommodate runoff from new or replaced imperious surfaces.
12. Location of the proposal. Give sufficient information for a person to understand the precise location of
your proposed project, including a street address, if any, and section, township, and range, if known. If a
proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit
any plans required by the agency, you are not requited to duplicate maps or detailed plans submitted with
any permit applications related to this checklist. DILIpi
The proposed binding site plan is located on the northern portion of the Cp-1-zoned property on the former
Weyerhaeuser campus. The site lies generally east of Interstate 5, north of the former Weyerhaeuser
Headquarters Building, and west of North Lake, in the City of Federal Way. The binding site plan includes King
County parcel numbers 162104-9056,162104-9013, 162104-9030 and 228500-0010.
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site iel
(underline/circle one): Flat, rolling, lam, steep slopes, mountainous, other
Somewhat undulatory with a general downward slope to the west, east, and south.
b. What is the steepest slope on the site (approximate percent slope)? D-le-1W
±15%
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you
know the classification of agricultural soils, specify them and note any agricultural land of long-term
commercial significance and whether the proposal results in removing any of these soils. D104
Weathered (medium dense) glacial till and unweathered (dense to very dense) glacial till. Generally silty
sand with gravel.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
h��
None
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling,
excavation, and grading proposed. Indicate source of fill. Ikelpi
Cuts generally in the west and fills generally in the east will be completed to create a level development
pads on Lots 1 and 3. A small portion of structural fill material may be imported for the building
foundation. On -site material will be used for general fill. Quantities are approximated as follows: Cut
quantities 306,000 cubic yards, fill quantities 317,800 cubic yards and a total net fill of 11,800 cubic yards.
The source of clean, imported fill will be determined by the contractor and approved by the City.
Bulletin #050 — May 1, 2014 Page 3 of 14
k:\Handouts\Environmental Checklist bfay2014
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. gLeIRI
Erosion could occur as a result of clearing and construction, particularly if earthwork is completed during
periods of rainfall. TESC measures will be implemented as approved by the City prior to construction.
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)? el
±57% (2,947,175 square feet)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: DIL14
The owner will institute an erosion control plan to be used during earthwork and construction.
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation, and
maintenance when the project is completed? If any, generally describe and give approximate
quantities if known. BLelp
Some heavy machinery exhaust and dust particulates generated primarily by construction equipment.
b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally
describe. iel
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any: Biel
All construction equipment will be in proper working order and regulated for emissions by the
manufacturer and local emissions laws. Vehicles entering and leaving the site will also be regulated for
emissions by state and local emissions laws. During construction the site will be watered as necessary to
keep any dust from impacting surrounding air quality.
3. Water
a. Surface Water &lelpj
1) Is there any surface water body on or in the immediate vicinity of the site (including year-round
and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
There is 1 man-made fish -bearing stream on -site that originates from the discharge point of the on -
site stormwater pond for the Tech Center. There are 67 wetlands within the Site. See attached
Wetland report prepared by Talasaea Associates for more details. All wetlands ultimately discharge to
Hylebos Creek to the south via surface or groundwater connections.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans. h� eW
Yes. Approximately 0.17-acre of wetlands will be impacted. While no impacts are proposed to the
onsite stream feature, the stormwater pond which provides the majority of flow to the stream will be
modified as part of the proposed development. See attached plans for details.
3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material. DILlpJ
Total wetland fill to equal t7,365 square feet
Bulletin #050 — May 1, 2014 Page 4 of 14
k!\Handouts\i3nviconmcnta1 Checklist May 2014
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known. iel
No
5) Does the proposal lie within a 100-year floodplain? If so, note the location on the site plan. iel
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge. B26pj
No
b. Ground Water
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses, and approximate quantities withdrawn from the
well. Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known. hel
No
2) Describe waste material drat -,vial be discharged into the ground from septic tanks or other sources,
if any (for example: domestic sewa„ae; industrial containing the following chemicals... ;
agricultural; etc.). Describe the general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number of animals or humans the system(s)
are expected to serve. ��
N/A
c. Water runoff (including stormwater):
1) Describe the source of runoff (including stormwater) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters? If
so, describe. DjtI4
Run-off from impervious surfaces will be collected and directed into on -site stormwater detention and
water quality treatment ponds. Once detained and treated for water quality, the storm water will be
released to the downstream system, including the off -site wetlands.
2) Could waste materials enter ground or surface waters? If so, generally describe.D_ielpl
Not as proposed
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
No - discharge will occur at the natural location.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
The project contractors, users, and personnel will utilize onsite Best Management Practices. Attached
drainage plans show runoff from impervious surfaces will be directed to on site stormwater detention
pond.
Bulletin #050 — May 1, 2014 Page 5 of 14 k:\Handouts\Fnvironmental Checklist May 2014
4. Plants DLelo
a. Check the types of vegetation found on the site: lielp
X_deciduous tree: alder, maple, aspen, other
X_evergreen tree: fir, cedar, pine, other
_X_shrubs
_ X —grass
pasture
crop or grain
orchards, vineyards, or other permanent crops
_X_wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? i- 1w
Native
Native trees and shrubs will be removed during site construction, as well as areas of non-native trees, and
a small portion of open field. Some wetlands will be impacted, but the remaining wetlands will remain
post -development with their associated buffers.
c. List threatened and endangered species known to be on or near the site. htl l
No native threatened and endangered plant species observed or known to occur on or immediately
adjacent to the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the
site, if any. iel
Buffer enhancement with native trees and shrubs will be done as appropriate.
e. List all noxious weeds and invasive species known to be on or near the site.
Himalayan blackberry, English ivy, English holly, creeping buttercup
5. Animals
a List any birds and other animals which have been observed on or near the site, or are known to be on
or near the site. Examples include: hf elp�
birds: hawk, songbirds, other.
mammals: rabbits, squirrels, coyote
fish: no fish were observed within the stream
b. List any threatened and endangered species known to be on or near the site. iel
No listed species are known to occur on or near the Site. North Lake is roughly 300 feet east of the Site at
its closest point, and bald eagles are known to periodically use this lake for foraging.
c. Is the site part of a migration route? If so, explain. VielpJ
The entire region is known to be part of the Pacific Flyway. The Pacific Flyway includes Alaska and the
Aleutian Islands and the Rocky Mountains and Pacific coast regions of Canada the United States and
Mexico, south to where it becomes blended with other flyways in Central and South America. However,
the site is not known to be used by migratory fowl.
Bulletin #050 — May 1, 2014 Page 6 of 14 k_\Handouts\Environmental Checklist May 2014
d. Proposed measures to preserve or enhance wildlife, if any. iel
A corridor will be provided between remaining wetlands with their associated buffers and the required
forested buffer along the western property boundary.
e. List any invasive animal species known to be on or near the site.
Bullfrog
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
projects energy needs? Describe whether it will be used for hearing, manufacturing, etc. iel
Electrical energy will be the primary source of power serving the project. Natural gas maybe used to satisfy
incidental energy needs.
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe. DItIpj
No, any proposed building height will not exceed 70 feet above grade. No existing development utilizes
solar energy in proximity to which the shadow cast from the building has any effect.
c. What kinds of energy conservation features are included in the plans of this proposal? List other
proposed measures to reduce or control energy impacts, if any. lie1w
No plans included in the Commercial grade & Fill Permit. Energy conservation will be addressed in the
building permit documents.
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. BILIpI
None known.
1) Describe any known or possible contamination at the site from present or past uses.
None known.
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located within
the project area and in the vicinity.
None known.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the
projects development or construction, or at any time during the operating life of the project.
None Known At this Time
Bulletin #050 — May 1, 2014 Page 7 of 14 k:\I Iandouts\Environmental Checklist May 2014
4) Describe special emergency services that might be required.
None anticipated
5) Proposed measures to reduce or control environmental health hazards, if any.
State regulations regarding safety and the handling of hazardous materials will be followed during the
construction process. Equipment refueling areas would be located in areas where spill could be quickly
contained and where the risk of hazardous materials entering surface water is minimized.
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)? DLellpj
The primary source of noise near the project site is from vehicular traffic along Weyerhaeuser Way S,
Hwy-18, and Interstate-5. It is not anticipated to materially impact the proposed project in any way.
2) What types and levels of noise would be created by or associated with the project on a short-term
or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours
noise would come from the site. h��
Short-term impacts would result from the use of construction equipment during the site development.
Construction would occur during permitted construction hours and always in compliance with the City
of Federal Way noise regulations. Long-term impacts would be those vehicular trips associated with
warehouse and office space. Noise generated from the proposed warehouse and office operations is
not expected to impact surrounding properties.
3) Proposed measures to reduce or control noise impacts, if any. hel
Construction activity will be limited to permitted construction hours and construction equipment will
not be allowed to idle for continuous periods of time, which will help mitigate the impacts of potential
construction noise.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses
on nearby or adjacent properties? If so, describe. hel
Existing uses on these parcels include the Weyerhaeuser Technology Center, passive and active private
recreation spaces, access and parking areas, and stormwater facilities. The goal of the Binding site plan is
to subdivide the existing parcels to better respect the existing rights -of -way, and to provide the necessary
parcel configuration for the necessary infrastructure, parking, and storm water facilities for redevelopment
of this site. In doing so, this short subdivision proposes a total of 5 lots and 1 tract.
This proposal is in conformance with the Concomitant Agreement made by and between the City of
Federal Way and Weyerhaeuser Company on August 23, 1994, as well as the applicable portions of the
1994 Federal Way Code that was in effect at that time.
North- Office Park
East- North Lake, Single Family Residential
West- Interstate-5
South- Corporate Park
The proposed development may have a minor, long term impact with respect to the additional traffic of
deliveries and employee trips.
Bulletin #050 — May 1, 2014 Page 8 of 14 k:\I Iandouts\Emironmental Checklist A4ay 2014
b. Has the project site been used as working farmlands or worldng forest lands? If so, describe. How
much agricultural or forest land of long-term commercial significance will be converted to other uses
as a result of the proposal, if any? If resource lands have not been designated, how many acres in
farmland or forest land tax status will be converted to nonfarm or nonforest use? Ihel
No
1) Will the proposal affect or be affected by surrounding worldng farm or forest land normal business
operations, such as oversize equipment access, the application of pesticides, tilling, and
harvesting? If so, how.
No impact. The site exists on land previously owned by Weyerhaeuser Company and home to the
Weyerhaeuser Technology Center (to remain).
c. Describe any structures on the site. iel
The Weyerhaeuser Technology Center is used as office space and includes lab spaces for R & D. The shape
is slightly irregular but primarily rectangular. The front fagade is covered with glass windows the exterior
construction is primarily reinforced concrete.
d. Will any structures be demolished? If so, what?Dielpl
No
e. What is the current zoning classification of the site? I,e]
Corporate Park- 01
f. What is the current comprehensive plan designation of the site? DwI4
Corporate Park
g. If applicable, what is the current shoreline master program designation of the site? Vie1w
N/A
h. Has any part of the site been classified as a critical area by the city or county? If so, specify. hj_1
Yes, site reconnaissance conducted by Talasaea resulted in discovery of 67 wetlands and 1 stream on the
proposed project site. A copy of the wetland delineation (existing conditions) report was submitted with
this environmental checklist.
i. Approximately how many people would reside or work in the completed project? iel
Approximately 600 people would work at the completed project.
j. Approximately how many people would the completed project displace? 11el
None
k. Proposed measures to avoid or reduce displacement impacts, if any. gLelo
N/A
Bulletin ##050 — May 1, 2014 Page 9 of 14 k:\Handouts\Environmental Checklist Mary 2014
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and
plans, if any. iel
The project will be developed in accordance with applicable City of Federal Way development and land use
codes and the approved Annexation and Concomitant Agreement to ensure the project is consistent with
the goals and policies of the Comprehensive Plan and applicable Development Regulations.
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of
long-term commercial significance, if any.
None proposed
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. gjg4l
N/A
b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-
income housing. V1d1qJ
N/A
c. Proposed measures to reduce or control housing impacts, if any. Ditlpj
N/A
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal
exterior building material(s) proposed? Dielp
± 50 feet, 1- story, concrete cast formed walls or blocks
b. What views in the immediate vicinity would be altered or obstructed?
There is a 100' managed forested buffer running parallel to 1-5. No view impacts would be altered or
obscured as the development is occurring within the forested area. No development is proposed within
the existing meadow.
c. Proposed measures to reduce or control aesthetic impacts, if any. VifW
Maintain 100' managed forested buffer along 1-5 and prohibit development of above -ground structures
from the meadow area.
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur? "el
Parking lot lighting would occur dusk through dawn at completed project. Minimal glare would occur from
sunlight reflected off parked cars. Additionally, the headlights of traveling vehicles would occur any time
of day.
Bulletin #050 — May 1, 2014 Page 10 of 14 k:\Handouts\Environmental Checklist A4ay 2014
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
c. What existing off -site sources of light or glare may affect your proposal? hel
None
d. Proposed measures to reduce or control light and glare impacts, if any.
N/A
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? 40-W
Private pedestrian trails mea nder throughout property, and a public fishing access is located on North Lake
to the east.
b. Would the proposed project displace any existing recreational uses? If so, describe. iel
A portion of the private trails (within the wooded area) will be covered by the proposed site development.
c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to
be provided by the project or applicant, if any. ael
A continuous sidewalk will be installed along Weyerhaeuser Way S which will provide for pedestrian
connectivity.
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed
in or eligible for listing in national, state, or local preservation registers located on or near the site? If
so, specifically describe. hheellpl
The Weyerhaeuser Technology Center was constructed in 1978 and is located on the site. The
Weyerhaeuser Headquarters building located near the site was constructed in 1969, which makes it 47
years old. Pursuant to CFR 36, Chapter I, subsection 60.4 criteria for evaluation, the Weyerhaeuser
Headquarters building may be eligible.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may
include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural
importance on or near the site? Please list any professional studies conducted at the site to identify
such resources. [helul
No known landmarks or evidence have been observed on or near the site.
c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near
the project site. Examples include consultation with tribes and the department of archeology and
historic preservation, archaeological surveys, historic maps, GIS data, etc. Ihel
The methods used to assess the potential impacts included GIS data analysis and WISAARD GIS data
review.
Bulletin #050 — May 1, 2014 Page 11 of 14 kAHandouts\Environmental Checklist May 2014
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
If any such historic or cultural evidence is encountered during construction or installation of
improvements, work will be halted in the area and a state -approved archeologist/historian will be engaged
to investigate, evaluate and/or move or curate such resources, as appropriate.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. Diedlpj
The project site is primarily served by Weyerhaeuser Way S, with a southern boundary bordered by S
3361h st. There are 4 access points proposed along Weyerhaeuser Way S;
b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If
not, what is the approximate distance to the nearest transit stop? BLelpI
Yes, the site is serviced by Pierce County Transit route 501 with 1 stop along the property frontage on
Weyerhaeuser Way S.
c. How many additional parking spaces would the completed project or non -project proposal have? How
many would the project or proposal eliminate? tel
There were originally 660 parking stalls serving the Technology Center. The final project will result in a total
of 1,874 parking stalls.
Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle, or
state transportation facilities, not including driveways? If so, generally describe (indicate whether
public or private). hf elf]
Development of the project will not require any new roads, but will include frontage improvements
along Weyerhaeuser Way S with sidewalks.
d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation?
If so, generally describe. tel
Not expected.
e. How many vehicular trips per day would be generated by the completed project or proposal? If known,
indicate when peak volumes would occur and what percentage of the volume would be trucks (such as
commercial and non -passenger vehicles). What data or transportation models were used to make these
estimates? (help
For new warehousing area of 1,067,000, the site will generate 756 total truck trips. It is estimated that
the proposed development will create 271 new PM peak hour trips.
f. Will the proposal interfere with, affect, or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
Not expected.
g. Proposed measures to reduce or control transportation impacts, if any. !EW
Payment of the City's transportation impact fee is expected, which will help fund City-wide transportation
improvements.
Bullctin #050 —May 1, 2014 Page 12 of 14 k:\Handouts\Environmental Checklist May 2014
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, public transit, health care, schools, other)? If so, generally describe. Jh_c1pJ
The completed warehouse/office facilities would result in a slight increased need for public services to
include fire protection, police protection, and health care.
b. Proposed measures to reduce or control direct impacts on public services, if any. iel
The increased demand will be offset by impact fees, levies, and taxes required to be paid by the applicant
as part of this development. Also the proposal has been designed in a manner that will provide adequate
access for fire, medic, and police vehicles.
16. Utilities
a. Underline/circle utilities currently available at the site: D_iglp�
electricity, natural gas, water, refuse service telephone, sanitary sewer septic system, other
The above listed utilities are either available on -site or will be extended as necessary to serve the site.
b. Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed. gel
Lakehaven Utility District will provide water and sewer connection.
Puget Sound Energy will supply electricity and gas
Telephone: Century Link, Verizon, Comcast
Fire Protection: South King Fire & Rescue
C. SIGNATURE HELP
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is
relying on them to make its decision.
Signature:
Printed Name of Signee:
Position and Agency/Organization:,�ff-.-tF.-tires E5M .
Date Submitted: 10 - j I- 2�OlLo
Bulletin #050 — May 1, 2014 Page 13 of 14 k:\Handouts\Lnvironmental Checklist hfiy 2014
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS licip
(IT IS NOT NECESSARY to use this sheet for project actions.)
Because these questions are very general, it may be helpful to read them in conjunction with the list of the
elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of activities likely to result
from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not
implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or
release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or
eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers,
threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime
farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
Bulletin #050 — May 1, 2014
Page 14 of 14 k:\Handouts\Fnvironmental Checklist May 2014
5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or
encourage land or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for
the protection of the environment.
Bulletin #050 — May 1, 2014 Page 15 of 14 kAHandouts\Environmental Check ist mqy 2014
I
Form No. 14
Subdivision Guarantee
Guarantee -No.: NCS-794031-WAl
RECEIVED
JUN 13 Z016
CITY OF FEDERAL WAY
CAS
GUARANTEE
Issued by
First American Title Insurance Company
818 Stewart Street, Suite 800, Seattle, WA 98101
Title Officer Chantale A. Stiller Anderson
Phone: (206)728-0400
FAX: (206)448-6348
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
5� AMKJq!
x
Guarantee No.: NCS-794031-WAI
Page No.: 1
First American Title Insurance Company
National Commercial Services
818 Stewart Street, Suite 800, Seattle, WA 98101
(206)728-0400 - (800)526-7544 FAX(206)448-6348
Chantale A. Stiller -Anderson
Terri Nugent
(206)448-6286 (206)615-3041
cstiller@firstam.com tnugent@firstam.com
SUBDIVISION GUARANTEE
LIABILITY $ 2,000.00 ORDER NO.: NCS-794031-WAi
FEE $ 750.00 TAX $ 72.00 YOUR REF.:
First American Title Insurance Company
a Corporation, herein called the Company
Subject to the Liability Exclusions and Limitations set forth below and in Schedule A.
GUARANTEES
ESM Consulting Engineers, LLC
herein called the Assured, against loss not exceeding the liability amount stated above which the Assured
shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
LIABILITY EXCLUSIONS AND LIMITATIONS
1. No guarantee is given nor liability assumed with respect to the validity, legal effect or priority of
any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the
Assured because of reliance upon the assurance herein set forth, but in no event shall the
Company's liability exceed the liability amount set forth above.
3. This Guarantee is restricted to the use of the Assured for the purpose of providing title evidence
as may be required when subdividing land pursuant to the provisions of Chapter 58.17, R.C.W.,
and the local regulations and ordinances adopted pursuant to said statute. It is not to be used
as a basis --for closing any transaction affecting title to said property.
r C ,
Dated/May 13, 2016 at 7:30 A.M.
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
SCHEDULE A
The assurances referred to on the face page are:
A. Title is vested in:
Federal Way Campus, LLC, a Delaware limited liability company
Guarantee No.: NCS-794031-WAI
Page No.: 2
That according to the Company's title plant records relative to the following described real
property (including those records maintained and indexed by name), there are no other
documents affecting title to said real property or any portion thereof, other than those shown
below under Record Matters.
The following matters are excluded from the coverage of this Guarantee:
1. Unpatented Mining Claims, reservations or exceptions in patents or in acts authorizing the
issuance thereof.
2. Water rights, claims or title to water.
3. Tax Deeds to the State of Washington.
4. Documents pertaining to mineral estates.
DESCRIPTION:
PARCEL K (797820-0420-01):
LOTS 40, 41, 42, 44 AND 46 THROUGH 51, INCLUSIVE, VACATED, STATE PLAT IN SECTION 16,
TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, ACCORDING
TO THE PLAT THEREOF RECORDED IN VOLUME 41 OF PLATS, PAGES 30 THROUGH 32,
INCLUSIVE, IN KING COUNTY, WASHINGTON;
TOGETHER WITH THAT PORTION OF LOT 43 THE STATE PLAT IN SECTION 16, TOWNSHIP 21
NORTH, RANGE 4 EAST, W.M., ACCORDING TO THE PLAT RECORDED IN VOLUME 41 OF PLATS
AT PAGES 30, 31 AND 32, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF SAID TRACT 43;
THENCE EAST, ALONG THE SOUTH LINE THEREOF, 112.5 FEET;
THENCE NORTH TO THE NORTH LINE OF SAID TRACT 43;
THENCE WEST ALONG THE NORTH BOUNDARY OF SAID TRACT TO THE NORTHWEST CORNER;
THENCE SOUTHWESTERLY ALONG THE WEST BOUNDARY OF SAID TRACT TO THE POINT OF
BEGINNING;
TOGETHER WITH VACATED SOUTH 333RD STREET, WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH SOUTH 336TH STREET VACATED UNDER KING COUNTY ORDINANCE
NUMBERS 1349 AND 6801 WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH 30TH AVENUE SOUTH VACATED UNDER KING COUNTY ORDINANCE NUMBER
6801 WHICH ATTACHES BY OPERATION OF LAW;
EXCEPT PORTIONS CONVEYED TO KING COUNTY BY DEEDS RECORDED UNDER RECORDING
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 3
NUMBERS 6475093, 7809150862 AND 8406060941;
AND EXCEPT PORTIONS CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED
UNDER RECORDING NO. 20030917000738.
PARCEL 0 (797820-0480-08):
TRACT 45 OF THE STATE PLAT IN SECTION 16, TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M.,
ACCORDING TO THE PLAT RECORDED IN VOLUME 41 OF PLATS AT PAGES 30, 31 AND 32, IN
KING COUNTY, WASHINGTON;
TOGETHER WITH THAT PORTION OF 30TH AVENUE SOUTH VACATED UNDER KING COUNTY
ORDINANCE NO. 6801 AND RECORDED UNDER RECORDING NO. 20020424003359 WHICH
ATTACHES BY OPERATION OF LAW.
PARCEL Q (228500-0010-00):
LOTS 1 THROUGH 6, INCLUSIVE, EICHHOLTZ ADDITION, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 68 OF PLATS PAGE 71, IN KING COUNTY, WASHINGTON;
AND LOTS 30 THROUGH 39, INCLUSIVE, VACATED, STATE PLAT IN SECTION 16, TOWNSHIP 21
NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, ACCORDING TO THE PLAT
THEREOF RECORDED IN VOLUME 41 OF PLATS, PAGES 30 THROUGH 32, INCLUSIVE, IN KING
COUNTY, WASHINGTON;
TOGETHER WITH VACATED SOUTH 333RD STREET, WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH SOUTH 336TH STREET VACATED UNDER KING COUNTY ORDINANCE
NUMBERS 1349 AND 6801 WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH VACATED 28TH AVENUE SOUTH WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH PORTION OF EXCESS RIGHT-OF-WAY SET FORTH IN DEED RECORDED
UNDER RECORDING NUMBER 7303220472;
EXCEPT SR 5 (P.S.H. #1);
AND EXCEPT PORTION OF LOT 32, LYING WESTERLY OF THE WESTERLY MARGIN OF SR 5
(P.S.H. #1);
AND EXCEPT PORTIONS CONVEYED TO KING COUNTY BY DEEDS RECORDED UNDER
RECORDING NUMBERS 6475093, 7809150862 AND 8406060941;
AND EXCEPT PORTIONS CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED
UNDER RECORDING NO. 20030917000738.
PARCEL S (212104-9002-05):
THAT PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER AND THE
SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 21, TOWNSHIP 21 NORTH,
RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, LYING EAST OF THE EASTERLY
BOUNDARY OF I-5 AS THE SAME EXISTED ON JUNE 11 1976;
AND THOSE PORTIONS OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 21,
TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, LYING EAST OF
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: NCS-794031-WAI
Page No.: 4
THE EASTERLY BOUNDARY OF I-5 AS THE SAME EXISTED ON JUNE 1, 1976;
TOGETHER WITH SOUTH 336TH STREET VACATED UNDER KING COUNTY ORDINANCE NO.
1349, WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH SOUTH 344TH STREET, VACATED UNDER KING COUNTY ORDINANCE NO.
1353, WHICH ATTACHES BY OPERATION OF LAW;
TOGETHER WITH THAT PORTION OF EXCESS RIGHT-OF-WAY SET FORTH IN DEED RECORDED
MARCH 22, 1973 UNDER RECORDING NO. 7303220472;
EXCEPT SR 5 (P.S.H. #1);
EXCEPT THAT PORTION CONVEYED TO CITY OF FEDERAL WAY, A WASHINGTON
CORPORATION BY DEED RECORDED SEPTEMBER 17, 2003 UNDER RECORDING NO.
20030917000738.
PARCEL T (614260-3025-08):
LOTS 1 THROUGH 18 IN BLOCK 18 OF VACATED PLAT, NORTH LAKE ADDITION TO EAST
TACOMA, ACCORDING TO THE PLAT THEREOF RECORDED UNDER VOLUME 4 OF PLATS, PAGE
69 IN KING COUNTY, WASHINGTON;
TOGETHER WITH THAT PORTION OF VACATED ALLEY ADJACENT WHICH ATTACHED BY
OPERATION OF LAW;
AND TOGETHER WITH THOSE ADJACENT PORTIONS OF VACATED 29TH AVE SOUTH AND
SOUTH 336TH AND SOUTH 337TH STREETS WHICH ATTACHED BY OPERATION OF LAW.
PARCEL U (614260-0005-08):
LOTS 1, 2, 3, 30 THROUGH 36 IN BLOCK 2, LOTS 19 THROUGH 36 IN BLOCK 18, ALL OF
BLOCKS 1, 8, 9, 10 AND 17 OF VACATED PLAT, NORTH LAKE ADDITION TO EAST TACOMA,
ACCORDING TO THE PLAT THEREOF RECORDED UNDER VOLUME 4 OF PLATS, PAGE 69 IN KING
COUNTY, WASHINGTON;
EXCEPT THAT PORTION THEREOF FOR SOUTH 336TH STREET (WEYERHAEUSER WAY SOUTH)
AS CONVEYED TO THE CITY OF FEDERAL WAY BY DEED RECORDED UNDER KING COUNTY
RECORDING NUMBER 20000317001900;
AND EXCEPT THAT PORTION THEREOF LYING EASTERLY OF THE WESTERLY MARGIN OF STATE
HIGHWAY ROUTE 18 - JUNCTION STATE ROUTE 5 TO SOUTH 344TH STREET INTERCHANGE AS
CONVEYED TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER RECORDING NO.
6727551, SUBSEQUENTLY CONVEYED TO KING COUNTY, WASHINGTON BY DEED RECORDED
UNDER KING COUNTY RECORDING NUMBER 7612140583.
TOGETHER WITH THOSE ADJACENT PORTIONS OF VACATED 28TH, 29TH, 30TH AND 31ST AVE
SOUTH AND SOUTH 336TH, 337TH, 338TH STREETS WHICH ATTACHED BY OPERATION OF
LAW;
TOGETHER WITH THOSE ADJACENT PORTIONS OF VACATED ALLEY WHICH ATTACHED BY
OPERATION OF LAW.
PARCEL V (614260-0200-01):
First American Tit/e Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: NCS-794031-WAl
Page No.: 5
LOTS 4 THROUGH 29 IN BLOCK 2 AND ALL OF BLOCKS 3, 5, 6, 7, 11, 12, 13, 14, 15 AND 16 OF
VACATED PLAT, NORTH LAKE ADDITION TO EAST TACOMA ACCORDING TO THE PLAT
THEREOF RECORDED UNDER VOLUME 4 OF PLATS, PAGE 69 IN KING COUNTY, WASHINGTON;
TOGETHER WITH THOSE ADJACENT PORTIONS OF VACATED 28TH, 29TH, 30TH AND 31ST
AVENUE SOUTH AND SOUTH 338TH, 339TH, 340TH AND 341ST STREET WHICH ATTACHED BY
OPERATION OF LAW;
TOGETHER WITH THOSE ADJACENT PORTIONS OF VACATED ALLEY WHICH ATTACHED BY
OPERATION OF LAW;
EXCEPT THAT PORTION THEREOF LYING EASTERLY OF THE WESTERLY MARGIN OF STATE
HIGHWAY ROUTE 18 - JUNCTION STATE ROUTE 5 TO SOUTH 344TH STREET INTERCHANGE,
AS CONVEYED TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER RECORDING
NUMBER 6727551 AND THAT PORTION SUBSEQUENTLY CONVEYED TO KING COUNTY,
WASHINGTON BY DEED RECORDED UNDER KING COUNTY RECORDING NUMBER 7612140583.
PARCEL W (212104-9052-04):
THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER AND THE NORTH HALF OF THE
SOUTHEAST QUARTER OF SECTION 21, TOWNSHIP 21 NORTH, RANGE 4, EAST, W.M., IN KING
COUNTY, WASHINGTON, LYING EASTERLY OF I-5 AND WESTERLY AND NORTHERLY OF
PRIMARY NO. 2 (SR 18);
TOGETHER WITH THAT PORTION OF VACATED SOUTH 344TH STREET ADJACENT WHICH
ATTACHED BY OPERATION OF LAW;
TOGETHER WITH THAT PORTION OF EXCESS RIGHT-OF-WAY SET FORTH IN DEED RECORDED
MARCH 22, 1973 UNDER RECORDING NO. 7303220472;
EXCEPT THAT PORTION LYING SOUTHERLY AND WESTERLY OF THE NORTHERLY AND
EASTERLY MARGIN OF STATE HIGHWAY ROUTE 5-PIERCE COUNTY LINE TO JUNCTION SSH
NO, 5-A AND THE STATE ROUTE 18-JUNCTION TO SOUTH 344TH INTERCHANGE AS CONVEYED
TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER RECORDING NO. 6727551.
EXCEPT THAT PORTION CONVEYED TO THE STATE OF WASHINGTON, DEPARTMENT OF
TRANSPORTATION FOR THE PURPOSE OF ROAD RECORDED ON AUGUST 7, 2008 UNDER
RECORDING NO. 20080807000204.
PARCEL Z (442060-0040-03, 442060-0045-08, 442060-0050-00, 442060-0055-05, 442060-0060-
08, 442060-0065-03, 442060-0070-06 and 442060-0075-01):
LOTS 8 THROUGH 15, INCLUSIVE, LOUISE'S NORTH LAKE TRACTS, ACCORDING TO THE PLAT,
RECORDED IN VOLUME 40 OF PLATS, PAGE 23, IN KING COUNTY, WASHINGTON.
PARCEL AA (726120-0060-02):
THAT PORTION OF GOVERNMENT LOT 1 IN SECTION 22, TOWNSHIP 21 NORTH, RANGE 4
EAST, W.M., IN KING COUNTY, WASHINGTON, AS DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF GOVERNMENT LOT 1;
AND RUNNING THENCE NORTH 00 00' 40" EAST ALONG SAID WESTERLY LINE THEROF 572.40
FEET;
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: NCS-794031-WAl
Page No.: 6
THENCE NORTH 890 44' EAST 40 FEET TO THE TRUE POINT OF BEGINNING OF THE TRACT
HEREIN DESCRIBED;
THENCE CONTINUING NORTH 890 44' EAST 640.60 FEET;
THENCE NORTH 00 00' 40" EAST 200.40 FEET;
THENCE SOUTH 890 55" WEST 640.60 FEET;
THENCE SOUTH 00 00' 40" WEST 202.40 FEET TO THE TRUE POINT OF BEGINNING;
(ALSO KNOWN AS TRACT 12 OF RICHARD'S NORTH LAKE ACRES, AN UNRECORDED PLAT);
TOGETHER WITH THAT PORTION OF 33RD PLACE S. VACATED UNDER CITY OF FEDERAL WAY
ORDINANCE NO. 00328, AS WOULD ATTACH TO SAID PREMISES BY OPERATION OF LAW.
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
RECORD MATTERS:
General Taxes for the year 2016
Parcel Tax Account No. Amount
Billed
Guarantee No.: NCS-794031-WAI
Page No.: 7
Amount Amount Due Assessed Land Assessed
Paid Value Improvement
Value
K 797820-0420-01 $48,026.35 $24,013.18 $24,013.17 $3,300,100.00 $0.00
0
797820-0480-08 $4,848.33
$924.17
$924.16
$126,800.00
$0.00
Q
228500-0010-00 $65,640.63
$32,820.32
$32,820.31
$4,510,400.00
$0.00
S
212104-9002-05 $621,897.38
$310,948.69
$310,948.69
$9,059,3000.00
$32,424,400.00
T
614260-3025-08 $6,084.09
$3,042.05
$3,042.04
$249,900.00
$54,200.00
U
614260-0005-08 $41,811.52
$20,905.76
$20,905.76
$2,575,700.00
$0.00
V
614260-0200-01 $72,383.64
$36,191.82
$36,191.82
$4,967,100.00
$0.00
W
212104-9052-04 $79,045.73
$39,522.87
$39,522.86
$4,688,700.00
$736,200.00
Z
442060-0040-03 $1,734.79
$867.40
$867.39
$119,000.00
$0.00
Z
442060-0045-08 $1,989.45
$994.73
$994.72
$136,500.00
$0.00
Z
442060-0050-00 $3,678.17
$1,839.09
$1,839.08
$95,900.00
$150,000.00
Z
442060-0055-05 $1,042.14
$521.07
$521.07
$71,400.00
$0.00
Z
442060-0060-08 $950.46
$475.23
$475.23
$65,100.00
$0.00
Z
442060-0065-03 $777.30
$388.65
$388.65
$53,200.00
$0.00
Z
442060-0070-06 $604.14
$302.07
$302.07
$41,300.00
$0.00
Z
442060-0075-01 $950.46
$475.23
$475.23
$65,100.00
$0.00
AA
726120-0060-02 $2,443.44
$1,221.72
$1,221.72
$161,000.00
$0.00
2. Facility Charges, if any, including but not limited to hook-up, or connection charges and
latecomer charges for water or sewer facilities of Federal Way Water and Sewer District as
disclosed by instrument recorded under recording no. 8905120210.
3. Easement rights and maintenance agreements, if any, for utilities which may have been granted
in vacated streets and alleys prior to the vacations.
(Affects Parcels 0, Q, S thru W and AA)
4. Landscape areas as disclosed on King County Assessor's Map.
(Affects Parcels Q and S)
5. Easement, including terms and provisions contained therein:
Recording Information: April 2, 1936 and August 7, 1940 as 2891878 and 3115046
For: Road
Affects:
Parcel AA
6. Easement, including terms and provisions contained therein:
Recording Information: September 18, 1936 as 2913584
In Favor of: Puget Sound Power and Light Company, a Washington
corporation
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 8
For: Right of way for electric line
Affects: Parcel AA
7. Restrictions, conditions, dedications, notes, easements and provisions, if any, as contained
and/or delineated on the face of the Plat of Louise's North Lake Tracts recorded in Volume 40 at
Page 23, in King County, Washington.
(Affects Parcel Z)
Restrictions, conditions, dedications, notes, easements and provisions, if any, as contained
and/or delineated on the face of the State Plat in Section 16, Township 21N, R. 4E recorded in
Volume 41 of Plats at Page 30, in King County, Washington.
(Affects Parcels 0 and Q)
Provisions in King County Superior Court Cause No. 385515 filed June 25, 1947 fixing the level of
North Lake.
(Affects Parcels 0 and Z)
10. Reservations contained in Deed from the State of Washington recorded under recording no.
3986087, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 43 of State Plat)
11. Reservations contained in Deed from the State of Washington recorded under recording no.
4045871, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 31 of State Plat)
12. Reservations contained in Deed from the State of Washington recorded under recording no.
4381073, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: NCS-794031-WAl
Page No.: 9
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 32 of State Plat)
13. Reservations contained in Deed from the State of Washington recorded under recording no.
4381075, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 33 of State Plat)
14. Reservations contained in Deed from the State of Washington recorded under recording no.
4681254, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 50 of State Plat)
15. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway No. 2, Jct. P.S.H. No. 1 to
Auburn constructed on lands conveyed in Deed to the State of Washington:
Recorded: October 19, 1956
Recording No.: 4741042
(Affects Parcel W)
16. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway No. 2, Jct. P.S.H. No. 1 to
Auburn constructed on lands conveyed in Deed to the State of Washington:
Recorded: October 19, 1956
Recording No.: 4741043
(Affects Parcel W)
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 10
17. Easement, including terms and provisions contained therein:
Recording Information: October 24, 1956 as 4742322
For: Frontage road
Affects: Parcel V
18. Reservations contained in Deed from the State of Washington recorded under recording no.
4778515, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 40 of State Plat)
19. Reservations contained in Deed from the State of Washington recorded under recording no.
4810726, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 44 of State Plat)
20. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway constructed on lands conveyed in Deed to the State of
Washington:
Recorded: December 26, 1958
Recording No.: 4980039
(Affects Parcel W)
21. Relinquishment to all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway constructed on lands conveyed in Deed to the State of
Washington:
Recorded: December 29, 1958
Recording No.: 4980491
(Affects Parcel Q-Tract 32 of State Plat)
22. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway constructed on lands conveyed in Deed to the State of
Washington:
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 11
Recorded: December 29, 1958
Recording No.: 4980493
(Affects Parcel S)
Said document also states "Except that the Grantors shall have the right of reasonable access to
that portion of their remaining lands lying easterly of Highway Engineer's Station 29+25 of the
South 336th Street center line.
23. Reservations contained in Deed from the State of Washington recorded under recording no.
5020234, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 38 of State Plat)
24. Reservations contained in Deed from the State of Washington recorded under recording no.
5073868, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tracct 30 of State Plat)
25. Reservations contained in Deed from the State of Washington recorded under recording no.
5204267, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 36 of State Plat)
26. The terms and provisions contained in the document entitled "Agreement for the Use of Land"
between the State of Washington, Department of Game and E.A. Watts and L.A. Watts for
fisheries management recorded September 30, 1960 as 5207694 of Official Records.
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAI
Subdivision Guarantee (4-10-75) Page No.: 12
(Affects Parcel K-Tract 46 of State Plat)
27. Reservations contained in Deed from the State of Washington recorded under recording no.
5208159, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 34 of State Plat)
28. Reservations contained in Deed from the State of Washington recorded under recording no.
5327214, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel O-Tract 45 of State Plat)
29. Reservations contained in Deed from the State of Washington recorded under recording no.
5628306, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 39 of State Plat)
30. Reservations contained in Deed from the State of Washington recorded under recording no.
5671863, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 13
(Affects Parcel K-Tract 41 of State Plat)
31. Easement, including terms and provisions contained therein:
Recording Information: December 19, 1963 as 5678223
In Favor of: Pacific Northwest Bell Telephone Company
For: Pole line
Affects: Parcel V
32. Easement, including terms and provisions contained therein:
Recording Information: May 20, 1964 as 5738262
In Favor of: King County Water District No. 100
For: Water mains
Affects: ParcelW
33. Easement, including terms and provisions contained therein:
Recording Information: June 2, 1964 as 5743180
In Favor of: Olympic Pipe Line Company
For: Pipelines
Affects: Parcel Q
34. Easement, including terms and provisions contained therein:
Recording Information: July 23, 1964 as 5765326
In Favor of: Olympic Pipe Line Company
For: Pipelines
Affects: Parcel Q
35. Easement, including terms and provisions contained therein:
Recording Information: July 23, 1964 as 5765327
In Favor of: Olympic Pipe Line Company
For: Pipelines
Affects: Parcel Q
36. Easement, including terms and provisions contained therein:
Recording Date: August 24, 1964
Recording Information: 5777746
In Favor of: Olympic Pipe Line Company
For: Oil and gas pipelines
Affects: Parcel W
37. Easement, including terms and provisions contained therein:
Recording Date: August 24, 1964
Recording Information: 5777747
In Favor of: Olympic Pipe Line Company
For: Oil and gas pipelines
Affects: Parcel S
38. Easement, including terms and provisions contained therein:
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Recording Information:
September 11, 1964 as 5785334
In Favor of:
Olympic Pipe Line Company
For:
Pipelines
Affects:
Parcel Q
39. Easement, including terms and provisions contained therein:
Recording Information:
September 25, 1964 as 5791086
In Favor of:
Olympic Pipe Line Company
For:
Pipeline
Affects:
Parcel S
Guarantee No.: NCS-794031-WAS
Page No.: 14
40. Reservations contained in Deed from the State of Washington recorded under recording no.
5907660, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 35 of State Plat)
41. Reservations contained in Deed from the State of Washington recorded under recording no.
5907661, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel Q-Tract 37 of State Plat)
42. Reservations contained in Deed from the State of Washington recorded under recording no.
5911805, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 51 of State Plat)
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 15
43. Reservations contained in Deed from the State of Washington recorded under recording no.
6062468, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 42 of State Plat)
44. Reservations contained in Deed from the State of Washington recorded under recording no.
6235841, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 46 of State Plat)
45. Reservations contained in Deed from the State of Washington recorded under recording no.
6309012, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 47 of State Plat)
46. Reservations contained in Deed from the State of Washington recorded under recording no.
6332501, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 49 of State Plat)
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAl
Subdivision Guarantee (4-10-75) Page No.: 16
47. Reservations contained in Deed from the State of Washington recorded under recording no.
6375720, reserving all oil, gases, coal, ores, minerals, fossils, etc., and the right of entry for
opening, developing and working the same.
The document specifically provides that, "No rights shall be exercised under this reservation by
the State, its successors or assigns, until provision has been made by the State, it successors or
assigns to pay the owner of the land upon which the rights herein reserved to the State, it
successors or assigns, or sought to be exercised, full payment for all damages sustained by said
owner, by reason of entering upon said land."
(Affects Parcel K-Tract 48 of State Plat)
4& Easement, including terms and provisions contained therein:
Recording Information: February 25, 1969 as 64750.93
In Favor of: King County
For: Slopes
Affects: Parcels K, 0, Q and U
49. Easement, including terms and provisions contained therein:
Recording Information: September 22, 1969 as 6567596
In Favor of: Olympic Pipeline Company
For: Transmission of petroleum products
Affects: Parcel Q
50. Easement, including terms and provisions contained therein:
Recording Information: March 6, 1970 as 6627160
In Favor of: Puget Sound Power & Light Co.
For: Underground electric transmission and/or distribution system
Affects: Parcels S, T, U, V and W
A 10-foot portion of said easement has been released under Recording No. 7706200697.
51. Easement, including terms and provisions contained therein:
Recording Information: April 9, 1970 as 6638453
In Favor of: Pacific Northwest Bell Telephone Company
For: Underground telephone system
Affects: Parcels S, T, U and V
52. Easement, including terms and provisions contained therein:
Recording Information: September 16, 1970 as 6693956
In Favor of: King County Water District No. 64
For: Water mains
Affects: Parcel U
53. Easement, including terms and provisions contained therein:
Recording Information: September 16, 1970 as 6693957
In Favor of: King County Water District No. 64
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAI
Subdivision Guarantee (4-10-75) Page No.: 17
For: Water mains
Affects: Parcel U
Document(s) declaring modifications thereof recorded February 23, 2011 as 20110223000006 of
Official Records. T
54. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway constructed on lands conveyed in Deed to the State of
Washington:
Recorded: December 29, 1970
Recording No.: 6727551
(Affects Parcels V and W)
55. Easement, including terms and provisions contained therein:
Recording Information: December 29, 1970 as 6727552
In Favor of: State of Washington
For: Drainage system
Affects: Parcel W
56. The terms and provisions contained in the document entitled "Certificate of Surface Water Right"
recorded March 8, 1971 as 7103080241 of Official Records.
(Affects Parcel S)
5T Easement, including terms and provisions contained therein:
Recording Date: April 5, 1971
Recording Information: 7104050459
In Favor of: Lakehaven Sewer District
For: Sewer
Affects: Parcel Q
58. Easement, including terms and provisions contained therein:
Recording Information: 7104080368
In Favor of: King County Water District No. 100
For: Water mains
Affects: Parcels Q, S, T, U, V and W
59. Easement, including terms and provisions contained therein:
Recording Information: 7104080369
In Favor of: King County Water District No. 100
For: Water mains
Affects: Parcels K and Q
60. Covenants, conditions, restrictions and/or easements:
Recorded: March 22, 1973
Recording No.: 7303220472
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAL
Subdivision Guarantee (4-10-75) Page No.: 18
(Affects Parcels Q, S and W)
61. Easement, including terms and provisions contained therein:
Recording Information: 7611241038
In Favor of: King County Water District No. 124
For: Water pipe lines
Affects: Parcels K, L and M
62. Easement, including terms and provisions contained therein:
Recording Information: 7702090500
In Favor of: Puget Sound Power & Light Co.
For: Electric transmission and/or distribution system
Affects: Parcel K
Said instrument is a re-record of recording no(s). 7612300581.
63. Right to make necessary slopes for cuts or fills upon said premises for 32nd Drive South as
granted by deed recorded September 15, 1978 under recording no. 7809150862.
(Affects Parcels K and Q)
64. Easement, including terms and provisions contained therein:
Recording Information: 8010140815
In Favor of: Lakehaven Sewer District
For: Sewer mains
Affects: Parcel Q
65. Easement, including terms and provisions contained therein:
Recording Information: 8104290757
In Favor of: King County Water District No. 124
For: Water mains
Affects: Parcels K and 0
66. Easement, including terms and provisions contained therein:
Recording Information: 8105070489
In Favor of: Pacific Northwest Bell Telephone Company
For: Underground communication lines
Affects: Parcels K and 0
6T Easement, including terms and provisions contained therein:
Recording Information: 8112170544
In Favor of: Puget Sound Power & Light Co.
For: Electric transmission and/or distribution system
Affects: Parcel 0
68. Easement, including terms and provisions contained therein:
Recording Information: 8112170545
FirstAmerican Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAI
Subdivision Guarantee (4-10-75) Page No.: 19
In Favor of: Puget Sound Power & Light Co.
For: Electric transmission and/or distribution system
Affects: Parcels K and 0
69. Easement, including terms and provisions contained therein:
Recording Information: 8202190544
In Favor of: King County Water District No. 124
For: Water mains
Affects: Parcel K
70. Easement, including terms and provisions contained therein:
Recording Information: 8203290510
In Favor of: Pacific Northwest Bell Telephone Company
For: Underground communication lines
Affects: Parcel U
71. A document entitled "Permit Number M-58-83" to construct gate, executed by and between King
County and Weyerhaeuser Company recorded September 9, 1983, as Instrument No.
8309091039 of Official Records.
(Affects Parcels K, T and U)
72. Easement, including terms and provisions contained therein:
Recording Information: 8406060941
In Favor of: King County
For: Slopes
Affects: parcels bordering South 336th Street and 32nd Drive South in
Sections 16 and 21-Parcels Q, K and U
73. Easement, including terms and provisions contained therein:
Recording Information: 8907311450
In Favor of: Puget Sound Power & Light Company
For: Underground electric transmission and/or distribution system
Affects: Parcel W
74. Easement, including terms and provisions contained therein:
Recording Information: 9002061002
In Favor of: Federal Way Water and Sewer
For: Water facilities
Affects: Parcels S, T, U and V
75. Easement, including terms and provisions contained therein:
Recording Information: 9008270633
In Favor of: Puget Sound Power & Light Company, a Washington
corporation
For: Electric transmission and/or distribution system
Affects: Parcel U
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAI
Subdivision Guarantee (4-10-75) Page No.: 20
76. A document entitled "Agreement", executed by and between Federal Way Water and Sewer
District and Weyerhaeuser Real Estate Company for construction of water mains and
appurtenances recorded December 28, 1990, as Instrument No. 9012281463 of Official Records.
(Affects Parcels K and 0)
77. Easement, including terms and provisions contained therein:
Recording Information: 9201160717
In Favor of: U.S. West Communications
For: Underground communication lines
Affects: Parcel V
78. The terms and provisions contained in the document entitled "Agreement" regarding construction
of sewer facilities recorded February 18, 1994 as Instrument No. 9402182159 of Official
Records. By and between Federal Way Water and Sewer District and Weyerhauser Company,
Corporated.
(Affects Parcels K and Q)
The lien created in Paragraph 26 of said agreement was released by instrument recorded under
Recording No. 9512261712.
79. The terms and provisions contained in the document entitled "City of Federal Way Ordinance No.
94-219" establishing zoning designation recorded October 26, 1994 as 9410260933 of Official
Records.
(Affects all parcels)
Document(s) declaring modifications thereof recorded May 13, 2003 as 20030513002214 of
Official Records.
80. Easement, including terms and provisions contained therein:
Recording Information: 9510121290
In Favor of: U.S. West Communications, Inc.
For: Telecommunication facilities
Affects: Parcel AA
81. Easement, including terms and provisions contained therein:
Recording Information: 9512140223 and 9512140224
In Favor of: Lakehaven Utility District
For: Sewers
Affects: Parcel Q
82. Reservations and exceptions, including the terms and conditions thereof:
Reserving: Minerals
Reserved By: Weyerhaeuser Company
Recorded: May 21, 1996
Recording Information: 9605210333
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
(Affects Parcel AA)
83. Easement, including terms and provisions contained therein:
Recording Information: 19990903000827
In Favor of: Lakehaven Utility District
For: Sewer facilities
Affects: Parcel K
84. Easement, including terms and provisions contained therein:
Recording Information: 19991108000756
In Favor of: U.S. West Communications
For: Communication conductors
Affects: Parcels V and W
85. Easement, including terms and provisions contained therein:
Recording Information: 20001214000760
In Favor of: Lakehaven Utility District
For: Sewer facilities
Affects: Parcels V and W
Guarantee No.: NCS-794031-WAI
Page No.: 21
Said easement contains a recital that this easement supersedes and replaces easements recorded
under Recording Nos. 7104050459 and 9504240822.
86. Easement, including terms and provisions contained therein:
Recording Information: 20030917000844
In Favor of: City of Federal Way
For: Surface water facilities
Affects: Parcel Q
87. A document entitled "Latecomer Agreement", executed by and between The Quadrant Corp. and
Lakehaven Utility District recorded October 21, 2004, as Instrument No. 20041021000099 of
Official Records.
(Affects Parcels T, U, V, W, Z and AA)
88. Relinquishment of all existing and future rights to light, view and air, together with the rights of
access to and from the State Highway constructed on lands conveyed in Deed to the State of
Washington:
Recorded: August 7, 2008
Recording No.: 20080807000204
(Affects Parcel W)
89. The terms and provisions contained in the document entitled 'Bargain and Sale Deed"
recorded February 9, 2016 as 20160209001433 of Official Records.
90. Deed of Trust and the terms and conditions thereof.
Grantor/Trustor: Federal Way Campus, LLC, a Delaware limited liability company
FirstAmerican Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: NCS-794031-WAS
Page No.: 22
Grantee/Beneficiary: CPIF Lending, LLC, a Washington limited liability company
Trustee: First American Title Insurance Company
Amount: $50,000,000.00
Recorded: February 9, 2016
Recording Information: 20160209001434
Affects: The land and other property.
91. A financing statement recorded February 9, 2016 as 20160209001435 of Official Records.
Debtor: Federal Way Campus, LLC, a Delaware limited liability company
Secured party: CPIF Lending, LLC, a Washington limited liability company
Affects: The land and other property.
92. Rights of the general public to the unrestricted use of all the waters of a navigable body of water
not only for the primary purpose of navigation, but also for corollary purposes; including (but not
limited to) fishing, boating, bathing, swimming, water skiing and other related recreational
purposes, as those waters may affect the tidelands, shorelands or adjoining uplands and whether
the level of the water has been raised naturally or artificially to a maintained or fluctuating level,
all as further defined by the decisional law of this state. (Affects all of the premises subject to
such submergence)
(Affects Parcels K, 0 and Z)
93. Such rights and easements for navigation and fishery which may exist over that portion of said
land lying beneath the waters of North Lake.
(Affects Parcels K, 0 and Z)
94. Potential charges, for the King County Sewage Treatment Capacity Charge, as authorized under
RCW 35.58 and King County Code 28.84.050. Said charges could apply for any property that
connected to the King County Sewer Service area on or after February 1, 1990.
Note: Properties located in Snohomish County and Pierce County may be subject to the King
County Sewage Treatment Capacity Charges. To verify charges contact: (206) 296-1450 or
CapChargeEscrow@kingcounty.gov.
95. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property
and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term.
First American Title Insurance Company
Form No. 14
Subdivision Guarantee (4-10-75)
INFORMATIONAL NOTES
Guarantee No.: NCS-794031-WAI
Page No.: 23
A. Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment
or policy. It is furnished solely for the purpose of assisting in locating the premises and First
American expressly disclaims any liability which may result from reliance made upon it.
First American Title Insurance Company
Form No. 14 Guarantee No.: NCS-794031-WAI
Subdivision Guarantee (4-10-75) Page No.: 24
SCHEDULE OF EXCLUSIONS FROM COVERAGE OF THIS GUARANTEE
1. Except to the extent that specific assurance are provided in this Guarantee, the Company assumes no liability for loss or damage by reason of the following:
(a) Defects, liens, encumbrances, adverse claims or other matters against the title, whether or not shown by the public records.
(b) (1) Taxes or assessments of any taxing authority that levies taxes or assessments on real property; or, (2) Proceedings by a public agency which may result in taxes
or assessments, or notices of such proceedings, whether or not the matters excluded under (1) or (2) are shown by the records of the taxing authority or by the public
records.
(c) (1) Unpatented mining claims; (2) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (3) water rights, claims or title to water, whether
or not the matters excluded under (1), (2) or (3) are shown by the public records.
2. Notwithstanding any specific assurances which are provided in this Guarantee, the Company assumes no liability for loss or damage by reason of the following:
(a) Defects, liens, encumbrances, adverse claims or other matters affecting the title to any property beyond the lines of the land expressly described in this Guarantee, or
title to streets, roads, avenues, lanes, ways or waterways to which such land abuts, or the right to maintain therein vaults, tunnels, ramps, or any structure or improvements;
or any rights or easements therein, unless such property, rights or easements are expressly and specifically set forth in said description.
(b) Defects, liens, encumbrances, adverse claims or other matters, whether or not shown by the public records; (1) which are created, suffered, assumed or agreed to by
one or more of the Assureds; (2) which result in no loss to the Assured; or (3) which do not result in the invalidity or potential invalidity of any judicial or non -judicial
proceeding which is within the scope and purpose of the assurances provided.
(c) The identity of any party shown or referred to in this Guarantee.
(d) The validity, legal effect or priority of any matter shown or referred to in this Guarantee.
GUARANTEE CONDITIONS AND STIPULATIONS
1. Definition of Terms.
The following terms when used in the Guarantee mean:
(a) the "Assured": the party or parties named as the Assured in this Guarantee, or
on a supplemental writing executed by the Company.
(b) "land": the land described or referred to in this Guarantee, and improvements
affixed thereto which by law constitute real property. The term "land" does not
include any property beyond the lines of the area described or referred to in this
Guarantee, nor any right, title, interest, estate or easement in abutting streets, roads,
avenues, alleys, lanes, ways or waterways.
(c) "mortgage": mortgage, deed of trust, trust deed, or other security instrument.
(d) "public records" : records established under state statutes at Date of
Guarantee for the purpose of imparting constructive notice of matters relating to real
property to purchasers for value and without knowledge.
(e) "date": the effective date.
2. Notice of Claim to be Given by Assured Claimant.
An Assured shall notify the Company promptly in writing in case knowledge shall
come to an Assured hereunder of any claim of title or interest which is adverse to the
title to the estate or interest, as stated herein, and which might cause loss or damage
for which the Company may be liable by virtue of this Guarantee. If prompt notice
shall not be given to the Company, then all liability of the Company shall terminate
with regard to the matter or matters for which prompt notice is required; provided,
however, that failure to notify the Company shall in no case prejudice the rights of
any Assured under this Guarantee unless the Company shall be prejudiced by the
failure and then only to the extent of the prejudice.
3. No Duty to Defend or Prosecute.
The Company shall have no duty to defend or prosecute any action or proceeding to
which the Assured is a party, notwithstanding the nature of any allegation in such
action or proceeding.
4. Company's Option to Defend or Prosecute Actions; Duty of Assured
Claimant to Cooperate.
Even though the Company has no duty to defend or prosecute as set forth in
Paragraph 3 above:
(a) The Company shall have the right, at its sole option and cost, to institute and
prosecute any action or proceeding, interpose a defense, as limited in (b), or to do
any other act which in its opinion may be necessary or desirable to establish the title
to the estate or interest as stated herein, or to establish the lien rights of the
Assured, or to prevent or reduce loss or damage to the Assured. The Company may
take any appropriate action under the terms of this Guarantee, whether or not it shall
be liable hereunder, and shall not thereby concede liability or waive any provision of
this Guarantee. If the Company shall exercise its rights under this paragraph, it shall
do so diligently.
(b) If the Company elects to exercise its options as stated in Paragraph 4(a) the
Company shall have the right to select counsel of its choice (subject to the right of
such Assured to object for reasonable cause) to represent the Assured and shall not
be liable for and will not pay the fees of any other counsel, nor will the Company pay
any fees, costs or expenses incurred by an Assured in the defense of those causes of
action which allege matters not covered by this Guarantee.
(c) Whenever the Company shall have brought an action or interposed a defense
as permitted by the provisions of this Guarantee, the Company may pursue any
litigation to final determination by a court of competent jurisdiction and expressly
reserves the right, in its sole discretion, to appeal from an adverse judgment or order.
(d) In all cases where this Guarantee permits the Company to prosecute or
provide for the defense of any action or proceeding, an Assured shall secure to the
Company the right to so prosecute or provide for the defense of any action or
proceeding, and all appeals therein, and permit the Company to use, at its option, the
name of such Assured for this purpose. Whenever requested by the Company, an
Assured, at the Company's expense, shall give the Company all reasonable aid in any
action or proceeding, securing evidence, obtaining witnesses, prosecuting or
defending the action or lawful act which in the opinion of the Company may be
necessary or desirable to establish the title to the estate or interest as stated herein,
or to establish the lien rights of the Assured. If the Company is prejudiced by the
failure of the Assured to furnish the required cooperation, the Company's obligations
to the Assured under the Guarantee shall terminate.
S. Proof of Loss or Damage.
In addition to and after the notices required under Section 2 of these Conditions and
Stipulations have been provided to the Company, a proof of loss or damage signed
and sworn to by the Assured shall be furnished to the Company within ninety (90)
days after the Assured shall ascertain the facts giving rise to the loss or damage. The
proof of loss or damage shall describe the matters covered by this Guarantee which
constitute the basis of loss or damage and shall state, to the extent possible, the
basis of calculating the amount of the loss or damage. If the Company is prejudiced
by the failure of the Assured to provide the required proof of loss or damage, the
Company's obligation to such Assured under the Guarantee shall terminate. In
addition, the Assured may reasonably be required to submit to examination under
oath by any authorized representative of the Company and shall produce for
examination, inspection and copying, at such reasonable times and places as may be
designated by any authorized representative of the Company, all records, books,
ledgers, checks, correspondence and memoranda, whether bearing a date before or
after Date of Guarantee, which reasonably pertain to the loss or damage. Further, if
requested by any authorized representative of the Company, the Assured shall grant
its permission, in writing, for any authorized representative of the Company to
examine, inspect and copy all records, books, ledgers, checks, correspondence and
memoranda in the custody or control of a third party, which reasonably pertain to the
Loss or Damage. All information designated as confidential by the Assured provided
to the Company, pursuant to this Section shall not be disclosed to others unless, in
the reasonable judgment of the Company, it is necessary in the administration of the
claim. Failure of the Assured to submit for examination under oath, produce other
reasonably requested information or grant permission to secure reasonably necessary
information from third parties as required in the above paragraph, unless prohibited
by law or governmental regulation, shall terminate any liability of the Company under
this Guarantee to the Assured for that claim.
Form No. 1282 (Rev. 12/15/95)
First American Title Insurance Company
6. Options to Pay or Otherwise Settle Claims: Termination of Liability.
In case of a claim under this Guarantee, the Company shall have the following
additional options:
(a) To Pay or Tender Payment of the Amount of Liability or to Purchase the
Indebtedness.
The Company shall have the option to pay or settle or compromise for or in the name
of the Assured any claim which could result in loss to the Assured within the coverage
of this Guarantee, or to pay the full amount of this Guarantee or, if this Guarantee is
issued for the benefit of a holder of a mortgage or a lienholder, the Company shall
have the option to purchase the indebtedness secured by said mortgage or said lien
for the amount owing thereon, together with any costs, reasonable attorneys' fees and
expenses incurred by the Assured claimant which were authorized by the Company up
to the time of purchase.
Such purchase, payment or tender of payment of the full amount of the Guarantee
shall terminate all liability of the Company hereunder. In the event after notice of
claim has been given to the Company by the Assured the Company offers to purchase
said indebtedness, the owner of such indebtedness shall transfer and assign said
indebtedness, together with any collateral security, to the Company upon payment of
the purchase price.
Upon the exercise by the Company of the option provided for in Paragraph (a) the
Company's obligation to the Assured under this Guarantee for the claimed loss or
damage, other than to make the payment required in that paragraph, shall terminate,
including any obligation to continue the defense or prosecution of any litigation for
which the Company has exercised its options under Paragraph 4, and the Guarantee
shall be surrendered to the Company for cancellation.
(b) To Pay or Otherwise Settle With Parties Other Than the Assured or With the
Assured Claimant.
To pay or otherwise settle with other parties for or in the name of an Assured claimant
any claim Assured against under this Guarantee, together with any costs, attorneys'
fees and expenses incurred by the Assured claimant which were authorized by the
Company up to the time of payment and which the Company is obligated to pay.
Upon the exercise by the- Company of the option provided for in Paragraph (b) the
Company's obligation to the Assured under this Guarantee for the claimed loss or
damage, other than to make the payment required in that paragraph, shall terminate,
including any obligation to continue the defense or prosecution of any litigation for
which the Company has exercised its options under Paragraph 4.
7. Determination and Extent of Liability.
This Guarantee is a contract of Indemnity against actual monetary loss or damage
sustained or incurred by the Assured claimant who has suffered loss or damage by
reason of reliance upon the assurances set forth in this Guarantee and only to the
extent herein described, and subject to the Exclusions From Coverage of This
Guarantee.
The Liability of the Company under this Guarantee to the Assured shall not exceed the
least of:
(a) the amount of liability stated in this Guarantee;
(b) the amount of the unpaid principal indebtedness secured by the mortgage of an
Assured mortgagee, as limited or provided under Section 6 of these Conditions and
Stipulations or as reduced under Section 9 of these Conditions and Stipulations, at the
time the loss or damage Assured against by this Guarantee occurs, together with
interest thereon; or
(c) the difference between the value of the estate or interest covered hereby as
stated herein and the value of the estate or interest subject to any defect, lien or
encumbrance Assured against by this Guarantee.
8. Limitation of Liability.
(a) If the Company establishes the title, or removes the alleged defect, lien or
encumbrance, or cures any other matter Assured against by this Guarantee in a
reasonably diligent manner by any method, including litigation and the completion of
any appeals therefrom, it shall have fully performed its obligations with respect to that
matter and shall not be liable for any loss or damage caused thereby.
(b) In the event of any litigation by the Company or with the Company's consent,
the Company shall have no liability for loss or damage until there has been a final
determination by a court of competent jurisdiction, and disposition of all appeals
therefrom, adverse to the title, as stated herein.
(c) The Company shall not be liable for loss or damage to any Assured for liability
voluntarily assumed by the Assured in settling any claim or suit without the
prior written consent of the Company.
9. Reduction of Liability or Termination of Liability.
All payments under this Guarantee, except payments made for costs, attorneys' fees
and expenses pursuant to Paragraph 4 shall reduce the amount of liability pro tanto.
10. Payment of Loss.
(a) No payment shall be made without producing this Guarantee for endorsement
of the payment unless the Guarantee has been lost or destroyed, in which case proof
of loss or destruction shall be furnished to the satisfaction of the Company.
(b) When liability and the extent of loss or damage has been definitely fixed in
accordance with these Conditions and Stipulations, the loss or damage shall be
payable within thirty (30) days thereafter.
11. Subrogation Upon Payment or Settlement.
Whenever the Company shall have settled and paid a claim under this Guarantee, all
right of subrogation shall vest in the Company unaffected by any act of the Assured
claimant.
The Company shall be subrogated to and be entitled to all rights and remedies which
the Assured would have had against any person or property in respect to the claim had
this Guarantee not been issued. If requested by the Company, the Assured shall
transfer to the Company all rights and remedies against any person or property
necessary in order to perfect this right of subrogation. The Assured shall permit the
Company to sue, compromise or settle in the name of the Assured and to use the
name of the Assured in any transaction or litigation involving these rights or remedies.
If a payment on account of a claim does not fully cover the loss of the Assured the
Company shall be subrogated to all rights and remedies of the Assured after the
Assured shall have recovered its principal, interest, and costs of collection.
12. Arbitration.
Unless prohibited by applicable law, either the Company or the Assured may demand
arbitration pursuant to the Title Insurance Arbitration Rules of the American Arbitration
Association. Arbitrable matters may include, but are not limited to, any controversy or
claim between the Company and the Assured arising out of or relating to this
Guarantee, any service of the Company in connection with its issuance or the breach
of a Guarantee provision or other obligation. All arbitrable matters when the Amount
of Liability is $1,000,000 or less shall be arbitrated at the option of either the Company
or the Assured. All arbitrable matters when the amount of liability is in excess of
$1,000,000 shall be arbitrated only when agreed to by both the Company and the
Assured. The Rules in effect at Date of Guarantee shall be binding upon the parties.
The award may include attorneys' fees only if the laws of the state in which the land is
located permits a court to award attorneys' fees to a prevailing party. Judgment upon
the award rendered by the Arbitrator(s) may be entered in any court having
jurisdiction thereof.
The law of the situs of the land shall apply to an arbitration under the Title Insurance
Arbitration Rules.
A copy of the Rules may be obtained from the Company upon request.
13. Liability Limited to This Guarantee; Guarantee Entire Contract.
(a) This Guarantee together with all endorsements, if any, attached hereto by the
Company is the entire Guarantee and contract between the Assured and the
Company. In interpreting any provision of this Guarantee, this Guarantee shall be
construed as a whole.
(b) Any claim of loss or damage, whether or not based on negligence, or any action
asserting such claim, shall be restricted to this Guarantee.
(c) No amendment of or endorsement to this Guarantee can be made except by a
writing endorsed hereon or attached hereto signed by either the President, a Vice
President, the Secretary, an Assistant Secretary, or validating officer or authorized
signatory of the Company.
14. Notices, Where Sent.
All notices required to be given the Company and any statement in writing required to
be furnished the Company shall include the number of this Guarantee and shall be
addressed to the Company at 2 First American Way. Bldg. 2, Santa Ana, CA. 92707.
Form No. 1282 (Rev. 12/15/95)
First American Title Insurance Company
RECEIVED
JUN 13 2016
CITY OF FEDERAL WAY
CDS
CLOSURES FOR BOUNDARY LINE ADJUSTMENT
FOR
FEDERAL WAY CAMPUS, LLC
June 10, 2016
PARCEL K NE PRIOR
North: 114395.7453
East: 1277734.7055
Line
Course: S 88-19-11 E
Length: 279.02
North: 114387.5639
East: 1278013.6056
Line
Course: S 00-53-19 E
Length: 203.75
North: 114183.8384
East: 1278016.7654
Line
Course: N 89-06-41 E
Length: 30.00
North: 114184.3036
East: 1278046.7618
Line
Course: S 88-15-22 E
Length: 390.00
North: 114172.4352
East: 1278436.5812
Line
Course: S 14-42-26 E
Length: 65.00
North: 114109.5649
East: 1278453.0834
Line
Course: S 01-22-34 E
Length: 100.00
North: 114009.5937
East: 1278455.4849
Line
Course: S 20-47-40 W
Length: 40.00
North: 113972.1993
East: 1278441.2843
Line
Course: N 88-15-22 W
Length: 400.00
North: 113984.3721
East: 1278041.4695
Line
Course: N 78-29-33 W
Length: 30.00
North: 113990.3569
East: 1278012.0726
Curve Length:198.38
Radius:330.00
Delta:34-26-38
Tangent:102.29
Chord: 195.41
Course: S 28-43-46 W
Course In: N 78-29-33 W
Course Out: S 44-02-55 E
RP North: 114056.1907
East: 1277688.7060
End North: 113819.0031
East: 1277918.1446
Line
Course: S 44-02-55 E
Length: 30.00
North: 113797.4406
East: 1277939.0027
Line
Course: S 88-15-22 E
Length: 410.00
North: 113784.9636
East: 1278348.8128
Line
Course: S 60-22-51 W
Length: 140.00
North: 113715.7710
East: 1278227.1066
Line
Course: S 32-55-18 W
Length: 180.00
North: 113564.6764
East: 1278129.2781
Line
Course: S 56-47-18 W
Length: 302.19
North: 113399.1568
Line Course: N 88-15-22 W
North: 113407.6068
Line Course: N 69-45-33 W
North: 113417.9858
Line Course: S 20-14-27 W
North: 113324.8648
Line Course: N 05-15-23 W
North: 113423,5879
Line Course: N 05-15-23 W
North: 113600.6103
Curve Length:497.37
Delta: 24-21-23
Chord: 493.63
Course In: N 84-44-37 E
RP North:113707.7971
End North: 114090.6421
Line Course: S 70-54-00 E
North: 114089.3332
Curve Length:347.12
Delta: 17-03-26
Chord: 345.84
Course In: S 70-54-00 E
RP North: 113707.7971
End North: 114395.7407
Line Course: N 01-58-05 W
North: 114395.7407
East: 1277876.4500
Length: 277.67
East: 1277598.9086
Length: 30.00
East: 1277570.7612
Length: 99.25
East: 1277536.4240
Length: 99.14
East: 1277527.3415
Length: 177.77
East: 1277511.0555
Radius: 1170.00
Tangent: 252.50
Course: N 06-55-18 E
Course Out: N 70-54-00 W
East: 1278676.1353
East: 1277570.5451
Length: 4.00
East: 1277574.3249
Radius: 1166.00
Tangent: 174.86
Course: N 27-37-43 E
Course Out: N 53-50-34 W
East: 1278676.1353
East: 1277734.7057
Length: 0.00
East: 1277734.7057
Area: 573,770 Sq Ft 13.17 Ac.
PARCEL K NW PRIOR
North: 114401.6863
Line Course: S 88-19-11 E
North: 114398.2720
Curve Length:223.23
Delta: 10-19-53
Chord: 222.93
Course In: S 56-06-03 E
RP North:113707.7985
End North: 114202.7926
Line Course: N 66-25-56 W
East: 1277532,1790
Length: 116.44
East: 1277648.5689
Radius: 1238.00
Tangent: 111.92
Course: S 28-44-00 W
Course Out: N 66-25-56 W
East: 1278676.1342
East: 1277541.3986
Length: 12.00
North: 114207.5906
Curve Length:6.23
Delta: 0-17-08
Chord: 6.23
Course In: S 66-25-56 E
RP North: 113707.7985
End North: 114201.8742
Line Course: N 01-13-13 E
North: 114401.6888
Line Course: S 00-34-52 W
North: 114401.6888
Area: 12,118 Sq Ft 0.28 Ac.
PARCEL K SE PRIOR
East: 1277530.3995
Radius: 1250.00
Tangent: 3.11
Course: S 23-25-30 W
Course Out: N 66-43-04 W
East: 1278676.1342
East: 1277527.9229
Length: 199.86
East: 1277532.1791
Length: 0.00
East: 1277532.1791
North: 113300.5913 East: 1277827.8489
Line
Course: S.00-12-02 W
Length: 33.10
North: 113267.4915
East: 1277827.7330
Line
Course: S 21-49-25 E
Length: 73.00
North: 113199.7233
East: 1277854.8708
Line
Course: N 88-15-22 W
Length: 250.00
North: 113207.3312
East: 1277604.9866
Line
Course: S 01-44-38 W
Length: 100.00
North: 113107.3775
East: 1277601.9434
Line
Course: N 88-15-22 W
Length: 45.65
North: 113108.7668
East: 1277556.3146
Line
Course: N 05-15-23 W
Length: 210.15
North: 113318.0330
East: 1277537.0622
Line
Course: S 69-45-33 E
Length: 27.05
North: 113308.6746
East: 1277562.4417
Line
Course: S 88-15-22 E
Length: 265.54
North: 113300.5937
East: 1277827.8588
Line
Course: S 76-21-46 W
Length: 0.01
North: 113300.5914
East: 1277827.8490
Area: 34,735 Sq Ft 0.80 Ac.
PARCEL K SW PRIOR
North: 113641.1578 East: 1277373.9475
Line Course: S 01-13-13 W
Length: 116.53
North: 113524.6543
East: 1277371.4658
Line Course: N 88-15-31 W
Length: 129.02
North: 113528.5749
East: 1277242.5054
Line Course: S 01-13-07 W
Length: 410.02
North: 113118.6477
East: 1277233.7854
Line Course: S 88-15-31 E
Length: 34.17
North: 113117.6093
East: 1277267.9397
Line Course: S 01-44-38 W
Length: 30.06
North: 113087.5632
East: 1277267.0249
Line Course: S 88-15-22 E
Length: 219.64
North: 113080.8792
East: 1277486.5631
Line Course: N 05-15-23 W
Length: 337.54
North: 113416.9997
East: 1277455,6402
Curve Length:241.25
Radius:468.00
Delta:29-32-08
Tangent:123.37
Chord: 238.59
Course: N 20-01-27 W
Course In: S 84-44-37 W
Course Out: N 55-12-29 E
RP North: 113374.1250
East: 1276989.6083
End North: 113641.1649
East: 1277373.9437
Line Course: S 28-14-56 E
Length: 0.01
North: 113641.1561
East: 1277373.9484
Area: 103,137 Sq Ft 2.37 Ac.
PARCEL O PRIOR
North: 113399.1568 East: 1277876.4500
Line
Course: S 56-47-18 W
Length: 57.81
North: 113367.4923
East: 1277828.0831
Line
Course: S 00-12-02 W
Length: 66.90
North: 113300.5927
East: 1277827.8489
Line
Course: N 88-15-22 W
Length: 265.54
North: 113308.6736
East: 1277562.4319
Line
Course: N 69-45-33 W
Length: 27.05
North: 113318.0320
East: 1277537.0523
Line
Course: N 05-15-23 W
Length: 6.86
North: 113324.8631
East: 1277536.4239
Line
Course: N 20-14-27 E
Length: 99.25
North: 113417.9841
Line Course: S 69-45-33 E
North: 113407.6051
Line Course: S 88-15-22 E
North: 113399.1551
Line Course: S 07-18-42 E
North: 113399.1551
Area: 28,700 Sq Ft 0.66 Ac.
PARCEL Q NORTH PRIOR
East: 1277570.7611
Length: 30.00
East: 1277598.9085
Length: 277.67
East: 1277876.4499
Length: 0.00
East: 1277876.4499
Course: S 88-19-11 E Length: 1231.96
North: 114401.6858
East: 1277532.1771
Line Course: S 01-13-13 W
Length: 199.86
North: 114201.8711
East: 1277527.9208
Curve Length:31.26
Radius:1250.00
Delta: 1-25-58
Tangent: 15.63
Chord: 31.26
Course: S 22-33-57 W
Course In: S 66-43-04 E
Course Out: N 68-09-02 W
RP North: 113707.7954
East: 1278676.1322
End North: 114173.0066
East: 1277515.9259
Curve Length:303.47
Radius:400.00
Delta:43-28-06
Tangent:159.46
Chord: 296.24
Course: S 43-35-01 W
Course In: N 68-09-02 W
Course Out: S 24-40-56 E
RP North: 114321.8742
East: 1277144.6599
End North: 113958.4191
East: 1277311.6940
Line Course: N 24-40-56 W
Length: 13.00
North: 113970.2314
East: 1277306.2654
Curve Length:92.97
Radius:387.00
Delta:13-45-51
Tangent:46.71
Chord: 92.75
Course: S 72-12-00 W
Course In: N 24-40-56 W
Course Out: S 10-55-05 E
RP North: 114321.8742
East: 1277144.6599
End North: 113941.8793
East: 1277217.9596
Line Course: S 10-55-05 E
Length: 7.00
North: 113935.0060
East: 1277219.2855
Curve Length:142.06
Radius:394.00
Delta:20-39-29
Tangent:71.81
Chord: 141.29
Course: S 89-24-40 W
Course In: N 10-55-05 W
Course Out: S 09-44-24 W
RP North:114321.8742
End North: 113933.5535
Line Course: S 09-44-24 W
North: 113907.9283
Curve Length:797.85
Delta: 72-59-47
Chord: 744.97
Course In: S 09-44-24 W
RP North:113290.7151
End North: 113572.5224
Line Course: S 26-44-37 W
North: 113524.8525
Line Course: N 63-15-23 W
North: 113527.1025
Line Course: S 26-44-37 W
North: 113334.5565
Curve Length:255.00
Delta: 46-22-54
Chord: 248.09
Course In: N 63-19-05 W
RP North:113476.0033
End North: 113174.6652
Line Course: N 00-59-24 E
North: 113635.9864
Line Course: N 13-58-34 E
North: 114437.8153
Line Course: S 50-15-12 E
North: 114437.8089
East: 1277144.6599
East: 1277078.0040
Length: 26.00
East: 1277073.6054
Radius: 626.24
Tangent: 463.36
Course: S 63-14-31 W
Course Out: N 63-15-23 W
East: 1276967.6597
East: 1276408.4091
Length: 53.38
East: 1276384.3882
Length: 5.00
East: 1276379.9230
Length: 215.61
East: 1276282.8988
Radius: 315.00
Tangent: 134.95
Course: S 49-52-22 W
Course Out: S 16-56-11 E
East: 1276001.4422
East: 1276093.2048
Length: 461.39
East: 1276101.1766
Length: 826.29
East: 1276300.7400
Length: 0.01
East: 1276300.7477
Area: 846,937 Sq Ft 19.44 Ac.
PARCEL Q SOUTH PRIOR
North: 113641.1578
East: 1277373.9475
Line
Course: S 01-13-13 W
Length: 116.53
North: 113524.6543
East: 1277371.4658
Line
Course: N 88-15-31 W
Length: 129.02
North: 113528.5749
East: 1277242.5054
Line
Course: S 01-13-07 W
Length: 410.02
North: 113118.6477
East: 1277233.7854
Line
Course: S 88-15-31 E
Length: 34.17
North: 113117.6093
East: 1277267.9397
Line Course: S 01-44-38 W
North: 113087.5632
Line Course: N 88-15-43 W
North: 113120.9270
Curve Length:261.67
Delta: 38-14-47
Chord: 256.84
Course In: N 25-03-55 W
RP North:113476.0107
End North: 113299.9489
Line Course: N 26-44-37 E
North: 113540.1291
Curve Length:754.52
Delta: 78-00-00
Chord: 697.59
Course In: S 63-15-23 E
RP North:113290.7218
End North: 113826.7130
Curve Length:330.52
Delta: 40-27-52
Chord: 323.69
Course In: S 14-44-37 W
RP North:113374.1222
End North: 113641.1622
Line Course: S 59-55-02 E
North: 113641.1571
Length: 30.06
East: 1277267.0249
Length: 1100.02
East: 1276167.5110
Radius: 392.00
Tangent: 135.92
Course: N 45-48-42 E
Course Out: S 63-18-42 E
East: 1276001.4399
East: 1276351.6774
Length: 268.95
East: 1276472.7046
Radius: 554.24
Tangent: 448.81
Course: N 65-44-37 E
Course Out: N 14-44-37 E
East: 1276967.6570
East: 1277108.7079
Radius: 468.00
Tangent: 172.49
Course: S 55-01-27 E
Course Out: N 55-12-29 E
East: 1276989.6046
East: 1277373.9400
Length: 0.01
East: 1277373.9486
Perimeter: 3435.49 Area: 597,463 Sq Ft 13.72 Ac.
PARCEL S PRIOR
North: 113087.2363 East: 1276091.2253
Curve Length:84.00
Radius:399.00
Delta:12-03-44
Tangent:42.16
Chord: 83.84
Course: N 70-57-57 E
Course In: N 13-00-11 W
Course Out: S 25-03-55 E
RP North: 113476.0052
East: 1276001.4491
End North: 113114.5807
East: 1276170.4857
Line Course: N 25-03-55 W
Length: 7.00
North: 113120.9215
East: 1276167.5202
Line Course: S 88-15-43 E
Length: 940.15
North: 113092.4066
East: 1277107.2376
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Course: S 01-14-04 W
North: 110470.5752
Course: N 88-22-17 W
North: 110519.2621
Course: N 01-57-06 E
North: 110579.2273
Course: N 13-58-34 E
North: 111199.9220
Course: S 76-01-26 E
North: 111193.8840
Course: N 13-58-34 E
North: 112843.5581
Course: N 76-01-26 W
North: 112849.5960
Course: N 13-58-34 E
North: 113029.1194
Course: S 87-38-04 E
North: 113023.3714
Course: N 01-44-38 E
North: 113087.2318
Course: N 63-01-19 W
North: 113087.2364
Length: 2622.44
East: 1277050.7412
Length: 1713.07
East: 1275338.3632
Length: 60.00
East: 1275340.4066
Length: 639.63
East: 1275494.8883
Length: 25.00
East: 1275519.1482
Length: 1700.00
East: 1275929.7277
Length: 25.00
East: 1275905.4678
Length: 185.00
East: 1275950.1485
Length: 139.26
East: 1276089.2898
Length: 63.89
East: 1276091.2341
Length: 0.01
East: 1276091.2252
Area: 3,693,352 Sq Ft 84.79 Ac.
PARCEL T PRIOR
North: 113087.2554
Line
Course: S 88-15-22 E
North: 113082.0860
Line
Course: S 01-14-06 W
North: 112552.9789
Line
Course: N 88-16-52 W
North: 112558.0743
Line
Course: N 01-14-05 E
North: 113087.2614
Line
Course: S 27-22-15 E
North: 113087.2525
Area: 89,904 Sq Ft 2.06 Ac.
East: 1277277.0273
Length: 169.87
East: 1277446.8186
Length: 529.23
East: 1277435.4120
Length: 169.87
East: 1277265.6184
Length: 529.31
East: 1277277.0242
Length: 0.01
East: 1277277.0288
PARCEL U EAST OF ROAD, NORTHERLY PARCEL PRIOR
North: 113038.5490 East: 1277562.3762
Line Course: S 88-15-22 E
Length: 179.94
North: 113033.0731
East: 1277742.2328
Line Course: S 00-56-48 W
Length: 367.96
North: 112665.1633
East: 1277736.1535
Curve Length:114.92
Radius:562.07
Delta: 11-42-54
Tangent: 57.66
Chord: 114.72
Course: N 39-31-54 W
Course In: N 44-36-39 E
Course Out: S 56-19-33 W
RP North: 113065.2971
East: 1278130.8883
End North: 112753.6466
East : 1277663.1313
Line Course: S 56-19-33 W
Length: 6.50
North: 112750.0425
East: 1277657.7220
Curve Length:282.02
Radius:568.57
Delta:28-25-11
Tangent:143.97
Chord: 279.14
Course: N 19-27-52 W
Course In: N 56-19-33 E
Course Out: S 84-44-44 W
RP North: 113065.2971
East: 1278130.8883
End North: 113013.2281
East: 1277564.7076
Line Course: N 05-15-16 W
Length: 25.43
North: 113038.5513
East: 1277562.3787
Line Course: S 47-50-56 W
Length: 0.00
North: 113038.5513
East: 1277562.3787
Area: 44,342 Sq Ft 1.02 Ac.
PARCEL U EAST OF ROAD, MID PARCEL PRIOR
North: 112491.6981 East: 1278351.4678
Line Course: S 40-43-21 W Length: 47.22
North: 112455.9111 East: 1278320.6617
Curve Length:52.35 Radius:71.50
Delta: 41-57-03 Tangent: 27.41
Chord: 51.19 Course: S 83-38-18 W
Course In: N 27-20-14 W Course Out: S 14-36-49 W
RP North: 112519.4259 East: 1278287.8269
End North: 112450.2390 East: 1278269.7875
Line Course: N 75-23-11 W Length: 101.83
North: 112475.9306 East : 1278171.2518
Line Course: N 01-10-31 E Length: 19.01
North: 112494.9366 East: 1278171.6417
Line Course: S 88-58-12 E Length: 179.86
North: 112491.7035 East: 1278351.4727
Line Course: S 42-16-12 W Length: 0.01
North: 112491.6961 East: 1278351.4659
Area: 5,788 Sq Ft 0.13 Ac.
PARCEL U EAST OF ROAD, SOUTH PARCEL PRIOR
North: 112447.4529
East: 1278392.5491
Line Course: S 01-14-09 W
Length: 152.23
North: 112295.2583
East: 1278389.2658
Curve Length:34.09
Radius:386.50
Delta:5-03-12
Tangent:17.06
Chord: 34.08
Course: N 32-39-42 W
Course In: S 59-51-54 W
Course Out: N 54-48-42 E
RP North: 112101.2202
East: 1278055.0033
End North: 112323.9469
East: 1278370.8751
Curve Length:37.19
Radius:51.50
Delta: 41-22-35
Tangent: 19.45
Chord: 36.39
Course: N 14-30-00 W
Course In: N 54-48-42 E
Course Out: N 83-48-43 W
RP North: 112353.6246
East: 1278412.9641
End North: 112359.1759
East: 1278361.7642
Curve Length:16.38
Radius:80.50
Delta: 11-39-25
Tangent: 8.22
Chord: 16.35
Course: N 00-21-35 E
Course In: N 83-48-43 W
Course Out: N 84-31-52 E
RP North: 112367.8532
East: 1278281.7332
End North: 112375.5253
East: 1278361.8668
Curve Length:40.78
Radius:111.50
Delta:20-57-15
Tangent:20.62
Chord: 40.55
Course: N 05-00-30 E
Course In: N 84-31-52 E
Course Out: N 74-30-53 W
RP North: 112386.1518
East: 1278472.8593
End North: 112415.9213
East: 1278365.4068
Line Course: N 40-43-21 E
Length: 41.61
North: 112447.4566
East: 1278392.5530
Line Course: S 46-52-42 W
Length: 0.01
North: 112447.4498
East: 1278392.5457
Area: 3,249 Sq Ft 0.07 Ac.
PARCEL U MAIN PARCEL PRIOR
orth: 113092.4066 East: 1277107.2376
Line Course: S 88-15-43 E
Length: 159.87
North: 113087.5577
East: 1277267.0341
Line Course: S 88-15-22 E
Length: 10.00
North: 113087.2534
East: 1277277.0294
Line Course: S 01-14-05 W
Length: 529.31
North: 112558.0663
East: 1277265.6237
Line Course: S 88-16-52 E
Length: 169.87
North: 112552.9709
East: 1277435.4173
Line Course: N 01-14-06 E
Length: 529.23
North: 113082.0780
East: 1277446.8239
Line Course: S 88-15-22 E
Length: 44.92
North: 113080.7110
East: 1277491.7230
Line Course: S 05-15-23 E
Length: 73.89
North: 113007.1317
East: 1277498.4923
Curve Length:671.27
Radius:635.07
Delta:60-33-43
Tangent:370.82
Chord: 640.46
Course: S 35-32-15 E
Course In: N 84-44-37 E
Course Out: S 24-10-54 W
RP North: 113065.3122
East: 1278130.8917
End North: 112485.9688
East: 1277870.7472
Line Course: S 24-10-54 W
Length: 8.00
North: 112478.6708
East: 1277867.4701
Line Course: S 66-59-48 E
Length: 26.44
North: 112468.3384
East: 1277891.8077
Line Course: N 21-49-31 E
Length: 8.00
North: 112475.7650
East: 1277894.7819
Curve Length:67.64
Radius:635.07
Delta:6-06-10
Tangent:33.85
Chord: 67.61
Course: S 71-13-34 E
Course In: N 21-49-31 E
Course Out: S 15-43-21 W
RP North: 113065.3144
East: 1278130.8866
End North: 112454.0053
East: 1277958.7963
Line Course: S 74-16-39 E
Length: 214.71
North: 112395.8235
East: 1278165.4730
Curve Length:58.29
Radius:51.50
Delta: 64-51-01
Tangent: 32.71
Chord: 55.23
Course: S 41-51-09 E
Course In: S 15-43-21 W
Course Out: N 80-34-22 E
RP North: 112346.2503
East: 1278151.5176
End North: 112354.6858
East: 1278202.3221
Curve Length:101.82
Delta: 72-28-10
Chord: 95.17
Course In: N 80-34-22 E
RP North:112367.8712
End North: 112288.1750
Curve Length:60.95
Delta: 48-50-17
Chord: 59.12
Course In: S 08-06-12 W
RP North:112217.3889
End North: 112256.3919
Curve Length:134.16
Delta: 24-57-47
Chord: 133.10
Course In: S 56-56-29 W
RP North:112088.4171
End North: 112131.7812
Curve Length:37.36
Delta: 6-49-38
Chord: 37.33
Course In: S 84-24-31 W
RP North:112101.2358
End North: 112094.4743
Line Course: S 01-14-09 W
North: 112062.4218
Line Course: S 02-52-14 W
North: 112016.8990
Line Course: N 88-45-51 W
North: 112017.8092
Line Course: S 01-14-09 W
North: 111882.3507
Line Course: N 88-18-28 W
North: 111883.8449
Line Course: S 01-12-23 W
North: 111784.0870
Line Course: N 88-18-47 W
North: 111788.8146
Line Course: N 01-10-31 E
North: 112003.4094
Line Course: N 88-18-14 W
North: 112033.8238
Line Course: N 01-14-04 E
Radius: 80.50
Tangent: 58.99
Course: S 45-39-43 E
Course Out: S 08-06-12 W
East: 1278281.7349
East: 1278270.3877
Radius: 71.50
Tangent: 32.46
Course: S 57-28-40 E
Course Out: N 56-56-29 E
East: 1278260.3092
East: 1278320.2342
Radius: 307.93
Tangent: 68.16
Course: S 20-34-38 E
Course Out: N 81-54-16 E
East: 1278062.1541
East: 1278367.0155
Radius: 313.50
Tangent: 18.70
Course: S 02-10-40 E
Course Out: S 88-45-51 E
East: 1278055.0071
East: 1278368.4341
Length: 32.06
East: 1278367.7427
Length: 45.58
East: 1278365.4601
Length: 42.20
East: 1278323.2699
Length: 135.49
East: 1278320.3477
Length: 50.60
East: 1278269.7697
Length: 99.78
East: 1278267.6690
Length: 160.59
East: 1278107.1486
Length: 214.64
East: 1278111.5511
Length: 1027.57
East: 1277084.4313
Length: 1058.83
North: 113092.4081 East: 1277107.2421
Line Course: S 71-41-14 W Length: 0.00
North: 113092.4081 East: 1277107.2421
Area: 795,988 Sq Ft 18.27 Ac.
PARCEL V PRIOR
North: 112033.8238 East: 1277084.4313
Line
Course: S 88-18-14 E
Length: 1027.57
North: 112003.4094
East: 1278111.5511
Line
Course: S 01-10-31 W
Length: 214.64
North: 111788.8146
East: 1278107.1486
Line
Course: S 88-18-47 E
Length: 160.59
North: 111784.0870
East: 1278267.6690
Line
Course: N 01-12-23 E
Length: 99.78
North: 111883.8449
East: 1278269.7697
Line
Course: S 88-18-28 E
Length: 50.60
North: 111882.3507
East: 1278320.3477
Line
Course: S 01-14-09 W
Length: 64.51
North: 111817.8557
East: 1278318.9563
Line
Course: S O4-05-54 W
Length: 600.75
North: 111218.6419
East: 1278276.0217
Line
Course: S 30-51-46 W
Length: 241.04
North: 111011.7335
East: 1278152.3721
Line
Course: S 36-06-45 W
Length: 522.01
North: 110590.0219
East: 1277844.7137
Line
Course: S 43-43-14 W
Length: 191.30
North: 110451.7657
East: 1277712.4983
Line
Course: N 88-22-17 W
Length: 662.02
North: 110470.5808
East: 1277050.7457
Line
Course: N 01-14-04 E
Length: 1563.61
North: 112033.8279
East: 1277084.4312
Line
Course: S 00-16-39 E
Length: 0.00
North: 112033.8279
East: 1277084.4312
Area: 1,666,951 Sq Ft 38.27 Ac.
PARCEL W PRIOR
North: 110519.2679 East: 1275338.3577
Line
Course: S 88-22-17 E
Length: 2375.10
North: 110451.7657
East: 1277712.4983
Line
Course: S 43-43-14 W
Length: 315.06
North: 110224.0657
East: 1277494.7471
Line
Course: S 52-48-43 W
Length: 200.00
North: 110103.1791
East: 1277335.4160
Line
Course: S 58-31-17 W
Length: 602.99
North: 109788.3097
East: 1276821.1649
Line
Course: S 56-30-28 W
Length: 648.68
North: 109430.3526
East: 1276280.1912
Line
Course: S 80-56-23 W
Length: 544.66
North: 109344.5831
East: 1275742.3268
Line
Course: N 68-37-19 W
Length: 26.06
North: 109354.0825
East: 1275718.0599
Line
Course: N 37-19-00 W
Length: 539.60
North: 109783.2249
East: 1275390.9437
Line
Course: N 21-49-35 W
Length: 369.74
North: 110126.4599
East: 1275253.4761
Line
Course: N 13-58-34 E
Length: 343.00
North: 110459.3059
East: 1275336.3165
Line
Course: N 01-57-06 E
Length: 60.00
North: 110519.2711
East: 1275338.3599
Line
Course: S 34-04-34 W
Length: 0.00
North: 110519.2711
East: 1275338.3599
Area: 1,810,094 Sq Ft 41.55 Ac.
PARCEL Z PRIOR
North: 113070.6366 East: 1277822.8623
Line
Course: S 88-15-22 E
Length: 80.00
North: 113068.2020
East: 1277902.8253
Line
Course: S 28-51-54 E
Length: 130.00
North: 112954.3533
East: 1277965.5825
Line
Course: S 38-55-19 W
Length: 45.00
North: 112919.3432
East: 1277937.3107
Line
Course: S 39-31-24 E
Length: 45.00
North: 112884.6317
East: 1277965.9484
Line
Course: N 74-15-23 E
Length: 65.00
North: 112902.2684
East: 1278028.5099
Line Course: S 47-15-37 E
Length: 115.00
North: 112824.2214
East: 1278112.9710
Line Course: S 35-12-37 W
Length: 300.00
North: 112579.1090
East: 1277939.9974
Line Course: N 88-58-12 W
Length: 94.05
North: 112580.7996
East: 1277845.9626
Curve Length:36.53
Radius:562.07
Delta:3-43-26
Tangent:18.27
Chord: 36.52
Course: N 57-40-43 W
Course In: N 30-27-34 E
Course Out: S 34-11-00 W
RP North: 113065.2973
East: 1278130.8918
End North: 112600.3283
East: 1277815.0968
Line Course: N 00-56-48 E
Length: 470.37
North: 113070.6341
East: 1277822.8681
Line Course: N 66-30-37 W
Length: 0.01
North: 113070.6381
East: 1277822.8589
Area: 89,490 Sq Ft 2.05 Ac.
PARCEL AA PRIOR
North: 112328.0293
East: 1278409.9772
Line
Course: N 01-14-09 E
Length: 151.03
North: 112479.0242
East: 1278413.2346
Line
Course: N 36-48-48 E
Length: 62.14
North: 112528,7730
East: 1278450.4695
Line
Course: S 88-56-00 E
Length: 643.46
North: 112516.7945
East: 1279093.8180
Line
Course: S 01-14-56 W
Length: 199.81
North: 112317.0319
East: 1279089.4630
Line
Course: N 89-04-20 W
Length: 679.58
North: 112328.0358
East: 1278409.9721
Line
Course: S 38-26-37 E
Length: 0.01
North: 112328.0279
East: 1278409.9783
Area: 135,436 Sq Ft 3.11 Ac.
LOT 1 AFTER
North: 114437.8095 East: 1276300.7468
Line Course: S 88-19-11 E Length: 1348.40
North: 114398.2715
East: 1277648.5671
Curve Length:223.23
Radius:1238.00
Delta:10-19-53
Tangent:111.92
Chord: 222.93
Course: S 28-44-00 W
Course In: S 56-06-03 E
Course Out: N 66-25-56 W
RP North: 113707.7980
East: 1278676.1323
End North: 114202.7920
East: 1277541.3967
Line Course: N 66-25-56 W
Length: 12.00
North: 114207.5900
East: 1277530.3976
Curve Length:37.49
Radius:1250.00
Delta: 1-43-06
Tangent: 18.75
Chord: 37.49
Course: S 22-42-31 W
Course In: S 66-25-56 E
Course Out: N 68-09-02 W
RP North: 113707.7980
East: 1278676.1323
End North: 114173.0092
East: 1277515.9260
Curve Length:303.47
Radius:400.00
Delta:43-28-06
Tangent:159.46
Chord: 296.24
Course: S 43-35-01 W
Course In: N 68-09-02 W
Course Out: S 24-40-56 E
RP North: 114321.8767
East: 1277144.6600
End North: 113958.4216
East: 1277311.6941
Line Course: N 24-40-56 W
Length: 13.00
North: 113970.2339
East: 1277306.2655
Curve Length:92.97
Radius:387.00
Delta:13-45-51
Tangent:46.71
Chord: 92.75
Course: S 72-12-00 W
Course In: N 24-40-56 W
Course Out: S 10-55-05 E
RP North: 114321.8767
East: 1277144.6600
End North: 113941.8818
East: 1277217.9597
Line Course: S 10-55-05 E
Length: 7.00
North: 113935.0085
East: 1277219.2856
Curve Length:142.06
Radius:394.00
Delta:20-39-29
Tangent:71.81
Chord: 141.29
Course: S 89-24-40 W
Course In: N 10-55-05 W
Course Out: S 09-44-24 W
RP North: 114321.8767
East: 1277144.6600
End North: 113933.5560
East: 1277078.0041
Line Course: S 09-44-24 W
Length: 26.00
North: 113907.9308
East: 1277073.6055
Curve Length:797.85
Delta: 72-59-47
Chord: 744.97
Course In: S 09-44-24 W
RP North:113290.7177
End North: 113572.5250
Line Course: S 26-44-37 W
North: 113524.8551
Line Course: N 63-15-23 W
North: 113527.1051
Line Course: S 26-44-37 W
North: 113334.5590
Curve Length:255.00
Delta: 46-22-54
Chord: 248.09
Course In: N 63-19-05 W
RP North: 113476,0058
End North: 113174.6678
Line Course: N 00-59-24 E
North: 113635.9889
Line Course: N 13-58-34 E
North: 114437.8178
Line Course: S 38-47-30 E
North: 114437.8100
Radius: 626.24
Tangent: 463.36
Course: S 63-14-31 W
Course Out: N 63-15-23 W
East: 1276967.6598
East: 1276408.4092
Length: 53.38
East: 1276384.3883
Length: 5.00
East: 1276379.9231
Length: 215.61
East: 1276282.8989
Radius: 315.00
Tangent: 134.95
Course: S 49-52-22 W
Course Out: S 16-56-11 E
East: 1276001.4423
East: 1276093.2049
Length: 461.39
East: 1276101.1768
Length: 826.29
East: 1276300.7401
Length: 0.01
East: 1276300.7464
Area: 859,051 Sq Ft 19.72 Ac.
LOT 2 AFTER
North: 114395.7453 East: 1277734.7055
Line
Course: S 88-19-11 E
Length: 279.02
North: 114387.5639
East: 1278013.6056
Line
Course: S 00-53-19 E
Length: 203.75
North: 114183.8384
East: 1278016.7654
Line
Course: N 89-06-41 E
Length: 30.00
North: 114184.3036
East: 1278046.7618
Line
Course: S 88-15-22 E
Length: 390.00
North: 114172.4352
East: 1278436.5812
Line
Course: S 14-42-26 E
Length: 65.00
North: 114109.5649
East: 1278453.0834
Line
Course: S 01-22-34 E
Length: 100.00
North: 114009.5937
East: 1278455.4849
Line Course: S 20-47-40 W
North: 113972.1993
Line Course: N 88-15-22 W
North: 113984.3721
Line Course: N 78-29-33 W
North: 113990.3569
Curve Length:198.38
Delta: 34-26-38
Chord: 195.41
Course In: N 78-29-33 W
RP North: 114056.1907
End North: 113819.0031
Line Course: S 44-02-55 E
North: 113797.4406
Line Course: S 88-15-22 E
North: 113784.9636
Line Course: S 60-22-51 W
North: 113715.7710
Line Course: S 32-55-18 W
North: 113564.6764
Line Course: S 56-47-18 W
North: 113367.4923
Line Course: S 00-12-02 W
North: 113267.4929
Line Course: S 21-49-25 E
North: 113199.7246
Line Course: N 88-15-22 W
North: 113207.3326
Line Course: S 01-44-38 W
North: 113107.3789
Line Course: N 88-15-22 W
North: 113108.7681
Line Course: N 05-15-23 W
North: 113423.5886
Line Course: N 05-15-23 W
North: 113600.6110
Curve Length:497.37
Delta: 24-21-23
Chord: 493.63
Course In: N 84-44-37 E
RP North: 113707.7979
End North: 114090.6428
Line Course: S 70-54-00 E
Length: 40.00
East: 1278441.2843
Length: 400.00
East: 1278041.4695
Length: 30.00
East: 1278012.0726
Radius: 330.00
Tangent: 102.29
Course: S 28-43-46 W
Course Out: S 44-02-55 E
East: 1277688.7060
East: 1277918.1446
Length: 30.00
East: 1277939.0027
Length: 410.00
East: 1278348.8128
Length: 140.00
East: 1278227.1066
Length: 180.00
East: 1278129.2781
Length: 360.00
East: 1277828.0831
Length: 100.00
East: 1277827.7330
Length: 73.00
East: 1277854.8708
Length: 250.00
East: 1277604.9866
Length: 100.00
East: 1277601.9434
Length: 45.65
East: 1277556.3146
Length: 316.15
East: 1277527.3512
Length: 177.77
East: 1277511.0652
Radius: 1170.00
Tangent: 252.50
Course: N 06-55-18 E
Course Out: N 70-54-00 W
East: 1278676.1451
East: 1277570.5548
Length: 4.00
North: 114089.3339
Curve Length:347.12
Delta: 17-03-26
Chord: 345.84
Course In: S 70-54-00 E
RP North:113707.7979
End North: 114395.7414
Line Course: N 68-09-18 W
North: 114395.7451
East: 1277574.3346
Radius: 1166.00
Tangent: 174.86
Course: N 27-37-43 E
Course Out: N 53-50-34 W
East: 1278676.1451
East: 1277734.7155
Length: 0.01
East: 1277734.7062
Area: 637,193 Sq Ft 14.63 Ac.
LOT 3 WEST AFTER
North: 113038.5490 East: 1277562.3762
Line Course: S 88-15-22 E
Length: 179.94
North: 113033.0731
East: 1277742.2328
Line Course: S 00-56-48 W
Length: 367.96
North: 112665.1633
East: 1277736.1535
Curve Length:114.92
Radius:562.07
Delta: 11-42-54
Tangent: 57.66
Chord: 114.72
Course: N 39-31-54 W
Course In: N 44-36-39 E
Course Out: S 56-19-33 W
RP North: 113065.2971
East: 1278130.8883
End North: 112753.6466
East : 1277663.1313
Line Course: S 56-19-33 W
Length: 6.50
North: 112750.0425
East: 1277657.7220
Curve Length:282.02
Radius:568.57
Delta:28-25-11
Tangent:143.97
Chord: 279.14
Course: N 19-27-52 W
Course In: N 56-19-33 E
Course Out: S 84-44-44 W
RP North: 113065.2971
East: 1278130.8883
End North: 113013.2281
East: 1277564.7076
Line Course: N 05-15-16 W
Length: 25.43
North: 113038.5513
East: 1277562.3787
Line Course: S 47-50-56 W
Length: 0.00
North: 113038.5513
East: 1277562.3787
Area: 44,342 Sq Ft 1.02 Ac.
LOT 3 EAST AFTER
North: 113070.6366 East: 1277822.8623
Line Course: S 88-15-22 E
Length: 80.00
North: 113068.2020
East: 1277902.8253
Line Course: S 28-51-54 E
Length: 130.00
North: 112954.3533
East: 1277965.5825
Line Course: S 38-55-19 W
Length: 45.00
North: 112919.3432
East: 1277937.3107
Line Course: S 39-31-24 E
Length: 45.00
North: 112884.6317
East: 1277965.9484
Line Course: N 74-15-23 E
Length: 65.00
North: 112902.2684
East: 1278028.5099
Line Course: S 47-15-37 E
Length: 115.00
North: 112824.2214
East: 1278112.9710
Line Course: S 35-12-37 W
Length: 300.00
North: 112579.1090
East: 1277939.9974
Line Course: N 88-58-12 W
Length: 94.05
North: 112580.7996
East: 1277845.9626
Curve Length:36.53
Radius:562.07
Delta:3-43-26
Tangent:18.27
Chord: 36.52
Course: N 57-40-43 W
Course In: N 30-27-34 E
Course Out: S 34-11-00 W
RP North: 113065.2973
East: 1278130.8918
End North: 112600.3283
East: 1277815.0968
Line Course: N 00-56-48 E
Length: 470.37
North: 113070.6341
East: 1277822.8681
Line Course: N 66-30-37 W
Length: 0.01
North: 113070.6381
East: 1277822.8589
Area: 89,490 Sq Ft 2.05 Ac.
LOT 4 AFTER
North: 113171.2622 East: 1276248.0165
Curve Length:166.49
Radius:392.00
Delta:24-20-07
Tangent:84.52
Chord: 165.25
Course: N 38-51-22 E
Course In: N 38-58-35 W
Course Out: S 63-18-42 E
RP North: 113476.0051
East: 1276001.4484
End North: 113299.9433
East: 1276351.6859
Line Course: N 26-44-37 E
Length: 268.95
North: 113540.1235
East: 1276472.7131
Curve Length:754.52
Radius:554.24
Delta:78-00-00
Tangent:448.81
Chord: 697.59
Course: N 65-44-37 E
Course In: S 63-15-23 E
Course Out: N 14-44-37 E
RP North: 113290.7161
East: 1276967.6655
End North: 113826.7074
East: 1277108.7164
Curve Length:571.77
Radius:468.00
Delta:70-00-00
Tangent:327.70
Chord: 536.87
Course: S 40-15-23 E
Course In: S 14-44-37 W
Course Out: N 84-44-37 E
RP North: 113374.1166
East: 1276989.6131
End North: 113416.9914
East: 1277455.6450
Line Course: S 05-15-23 E
Length: 337.54
North: 113080.8708
East: 1277486.5680
Line Course: S 88-15-22 E
Length: 5.15
North: 113080.7141
East: 1277491.7156
Line Course: S 05-15-23 E
Length: 73.89
North: 113007.1348
East: 1277498.4849
Curve Length:312.21
Radius:635.07
Delta:28-10-02
Tangent:159.33
Chord: 309.07
Course: S 19-20-24 E
Course In: N 84-44-37 E
Course Out: S 56-34-35 W
RP North: 113065.3153
East: 1278130.8842
End North: 112715.5030
East: 1277600.8415
Curve Length:34.98
Radius:25.00
Delta:80-10-35
Tangent:21.04
Chord: 32.20
Course: S 06-39-53 W
Course In: S 56-34-35 W
Course Out: S 43-14-50 E
RP North: 112701.7324
East: 1277579.9760
End North: 112683.5223
East: 1277597.1047
Curve Length:131.76
Radius:385.00
Delta:19-36-33
Tangent:66.53
Chord: 131.12
Course In: S 43-14-50 E
RP North:112403.0867
End North: 112578.7323
Line Course: N 89-48-47 W
North: 112580.7120
Line Course: S 33-28-52 W
North: 112508.4567
Line Course: S 23-38-16 W
North: 112434.0146
Line Course: S 00-00-00 W
North: 112334.7546
Line Course: S 46-01-00 E
North: 112254.9554
Line Course: S 06-33-15 E
North: 111914.5250
Line Course: S 83-06-19 W
North: 111807.2632
Curve Length:502.38
Delta: 24-17-25
Chord: 498.62
Course In: N 89-35-50 E
RP North: 111815.5935
End North: 112295.4499
Line Course: N 23-53-15 E
North: 112416.1431
Curve Length:245.71
Delta: 15-43-48
Chord: 244.94
Course In: N 66-06-45 W
RP Noah:112778.5662
End North: 112651.5705
Line Course: N 08-09-27 E
North: 112774.8108
Curve Length:377.14
Delta: 36-19-01
Chord: 370.86
Course In: N 81-50-33 W
RP Noah:112859.2381
End North: 113140.0346
Curve Length:34.55
Delta: 79-10-59
Chord: 31.87
Course: S 36-56-53 W
Course Out: N 62-51-23 W
East: 1277860.8865
East: 1277518.2882
Length: 606.76
East: 1276911.5314
Length: 86.63
East: 1276863.7409
Length: 81.26
East: 1276831.1595
Length: 99.26
East: 1276831.1595
Length: 114.91
East: 1276913.8420
Length: 342.67
East: 1276952.9552
Length: 893.51
East: 1276065.9067
Radius: 1185.00
Tangent: 255.02
Course: N 11-44-32 E
Course Out: N 66-06-45 W
East: 1277250.8774
East: 1276167.3818
Length: 132.00
East: 1276220.8342
Radius: 895.00
Tangent: 123.63
Course: N 16-01-21 E
Course Out: S 81-50-33 E
East: 1275402.4978
East: 1276288.4419
Length: 124.50
East: 1276306.1078
Radius: 595.00
Tangent: 195.15
Course: N 10-00-03 W
Course Out: N 61-50-26 E
East : 1275717.1282
East: 1276241.7026
Radius: 25.00
Tangent: 20.68
Course: N 11-25-56 E
Course In: N 61-50-26 E
RP North: 113151.8327
End North: 113171.2679
Line Course: S 20-20-14 W
North: 113171.2585
Course Out: N 38-58-35 W
East: 1276263.7436
East: 1276248.0186
Length: 0.01
East: 1276248.0151
Area: 1,881,534 Sq Ft 43.19 Ac.
LOT 5 AFTER
North: 113087.2363
Curve Length:66.06
Delta: 9-29-10
Chord: 65.98
Course In: N 13-00-11 W
RP North: 113476.0052
End North: 113107.3484
Curve Length:37.41
Delta: 85-44-36
Chord: 34.02
Course In: S 22-29-21 E
RP North: 113084.2496
End North: 113095.5004
Curve Length:319.82
Delta: 34-54-12
Chord: 314.90
Course In: S 63-15-15 W
RP Noah:112859.2328
End North: 112784.7381
Line Course: S 08-09-27 W
North: 112661.4978
Curve Length:226.50
Delta: 15-43-48
Chord: 225.79
Course In: N 81-50-33 W
RP North: 112778.5610
End North: 112444.4837
Line Course: S 23-53-15 W
North: 112323.7905
Curve Length:753.44
Delta: 34-23-51
Chord: 742.17
East: 1276091.2253
Radius: 399.00
Tangent: 33.11
Course: N 72-15-14 E
Course Out: S 22-29-21 E
East: 1276001.4491
East: 1276154.0701
Radius: 25.00
Tangent: 23.21
Course: S 69-37-03 E
Course Out: N 63-15-15 E
East: 1276163.6328
East: 1276185.9581
Radius: 525.00
Tangent: 165.05
Course: S 09-17-39 E
Course Out: S 81-50-33 E
East : 1275717.1270
East: 1276236.8149
Length: 124.50
East: 1276219.1490
Radius: 825.00
Tangent: 113.96
Course: S 16-01-21 W
Course Out: S 66-06-45 E
East: 1275402.4966
East: 1276156.8290
Length: 132.00
East: 1276103.3766
Radius: 1255.00
Tangent: 388.46
Course: S 06-41-19 W
Course In: S 66-06-45 E
RP North:111815.5882
End North: 111586.6672
Line Course: S 10-30-36 E
North: 111196.9962
Curve Length:335.06
Delta: 8-52-02
Chord: 334.73
Course In: S 79-29-24 W
RP North:110802.0848
End North: 110864.1509
Line Course: S 85-44-34 W
North: 110849.7992
Line Course: S 25-42-22 W
North: 110526.1400
Line Course: N 89-23-50 W
North: 110530.7408
Line Course: N 01-57-06 E
North: 110579.2326
Line Course: N 13-58-34 E
North: 111199.9274
Line Course: S 76-01-26 E
North: 111193.8894
Line Course: N 13-58-34 E
North: 112843.5635
Line Course: N 76-01-26 W
North: 112849.6014
Line Course: N 13-58-34 E
North: 113029.1248
Line Course: S 87-38-04 E
North: 113023.3768
Line Course: N 01-44-38 E
North: 113087.2372
Line Course: S 64-24-41 E
North: 113087.2372
Course Out: S 79-29-24 W
East: 1277250.8763
East: 1276016.9313
Length: 396.32
East: 1276089.2229
Radius: 2165.00
Tangent: 167.87
Course: S 06-04-35 E
Course Out: N 88-21-26 E
East: 1273960.5449
East: 1276124.6551
Length: 193.33
East: 1275931.8585
Length: 359.21
East: 1275776.0493
Length: 437.33
East: 1275338.7435
Length: 48.52
East: 1275340.3959
Length: 639.63
East: 1275494.8776
Length: 25.00
East: 1275519.1375
Length: 1700.00
East: 1275929.7170
Length: 25.00
East: 1275905.4571
Length: 185.00
East: 1275950.1378
Length: 139.26
East: 1276089.2791
Length: 63.89
East: 1276091.2234
Length: 0.00
East: 1276091.2234
Area: 1,038,473 Sq Ft 23.84 Ac.
LOT 6 AFTER
North: 110530.7364 East: 1275338.7457
Line Course: S 89-23-50 E
Length: 437.33
North: 110526.1356
East: 1275776.0515
Line Course: N 25-42-22 E
Length: 359.21
North: 110849.7948
East: 1275931.8607
Line Course: N 85-44-34 E
Length: 193.33
North: 110864.1465
East: 1276124.6573
Curve Length:75.84
Radius:2165.00
Delta:2-00-25
Tangent:37.92
Chord: 75.83
Course: S 00-38-22 E
Course In: S 88-21-26 W
Course Out: S 89-38-09 E
RP North: 110802.0804
East: 1273960.5471
End North: 110788.3200
East: 1276125.5034
Line Course: S 00-21-51 W
Length: 228.02
North: 110560.3046
East: 1276124.0541
Curve Length:278.87
Radius:255.00
Delta:62-39-32
Tangent:155.22
Chord: 265.18
Course: S 30-57-55 E
Course In: S 89-38-09 E
Course Out: S 27-42-19 W
RP North: 110558.6838
East: 1276379.0489
End North: 110332.9194
East: 1276260.4934
Line Course: S 62-17-41 E
Length: 14.37
North: 110326.2384
East: 1276273.2159
Curve Length:33.57
Radius:285.00
Delta:6-44-58
Tangent:16.81
Chord: 33.55
Course: S 65-40-10 E
Course In: N 27-42-19 E
Course Out: S 20-57-21 W
RP North: 110578.5634
East: 1276405.7191
End North: 110312.4143
East: 1276303.7894
Line Course: S 14-17-03 W
Length: 944.69
North: 109396.9304
East: 1276070.7049
Line Course: S 80-56-23 W
Length: 332.52
North: 109344.5673
East: 1275742.3337
Line Course: N 68-37-19 W
Length: 26.06
North: 109354.0667
East: 1275718.0667
Line Course: N 37-19-00 W
Length: 539.60
North: 109783.2091
East: 1275390.9505
Line Course: N 21-49-35 W
Length: 369.74
North: 110126.4442
East: 1275253.4829
Line Course: N 13-58-34 E
Length: 343.00
North: 110459.2902
East: 1275336.3233
Line Course: N 01-57-06 E Length: 71.48
North: 110530.7287 East: 1275338.7577
Line Course: N 57-16-07 W Length: 0.01
North: 110530.7341 East: 1275338.7493
Area: 1,000,511 Sq Ft 22.97 Ac.
LOT 7 AFTER
North: 113107.3539 East: 1276154.0715
Curve Length:17.94
Radius:399.00
Delta:2-34-34
Tangent:8.97
Chord: 17.94
Course: N 66-13-22 E
Course In: N 22-29-21 W
Course Out: S 25-03-55 E
RP North: 113476.0107
East: 1276001.4505
End North: 113114.5863
East: 1276170.4871
Line Course: N 25-03-55 W
Length: 7.00
North: 113120.9271
East : 1276167.5216
Curve Length:95.18
Radius:392.00
Delta:13-54-40
Tangent:47.82
Chord: 94.94
Course: N 57-58-45 E
Course In: N 25-03-55 W
Course Out: S 38-58-35 E
RP North: 113476.0107
East: 1276001.4505
End North: 113171.2679
East: 1276248.0186
Curve Length:34.55
Radius:25.00
Delta:79-10-59
Tangent:20.68
Chord: 31.87
Course: S 11-25-55 W
Course In: S 38-58-35 E
Course Out: S 61-50-26 W
RP North: 113151.8327
East: 1276263.7436
End North: 113140.0346
East: 1276241.7026
Curve Length:377.14
Radius:595.00
Delta:36-19-01
Tangent:195.15
Chord: 370.86
Course: S 10-00-03 E
Course In: S 61-50-26 W
Course Out: S 81-50-33 E
RP North: 112859.2381
East : 1275717.1282
End North: 112774.8108
East: 1276306.1078
Line Course: S 08-09-27 W
Length: 124.50
North: 112651.5705
East: 1276288.4419
Curve Length:245.71
Radius:895.00
Delta:15-43-48
Tangent:123.63
Chord: 244.94
Course: S 16-01-21 W
Course In: N 81-50-33 W
Course Out: S 66-06-45 E
RP Noah:112778.5662
End North: 112416.1431
Line Course: S 23-53-15 W
North: 112295.4499
Curve Length:502.38
Delta: 24-17-25
Chord: 498.62
Course In: S 66-06-45 E
RP North:111815.5935
End North: 111807.2632
Line Course: N 83-06-19 E
North: 111914.5250
Line Course: N 06-33-15 W
North: 112254.9554
Line Course: N 46-01-00 W
North: 112334.7546
Line Course: N 00-00-00 E
North: 112434.0146
Line Course: N 23-38-16 E
North: 112508.4567
Line Course: N 33-28-52 E
North: 112580.7120
Line Course: S 89-48-47 E
North: 112578.7323
Curve Length:131.76
Delta: 19-36-33
Chord: 131.12
Course In: S 62-51-23 E
RP North:112403.0867
End North: 112683.5223
Curve Length:34.98
Delta: 80-10-35
Chord: 32.20
Course In: N 43-14-50 W
RP North:112701.7324
End North: 112715.5030
Curve Length:116.14
Delta: 10-28-42
Chord: 115.98
Course In: N 56-34-35 E
RP North:113065.3153
End North: 112624.9410
Curve Length:39.82
East: 1275402.4978
East: 1276220.8342
Length: 132.00
East: 1276167.3818
Radius: 1185.00
Tangent: 255.02
Course: S 11-44-32 W
Course Out: S 89-35-50 W
East: 1277250.8774
East: 1276065.9067
Length: 893.51
East: 1276952.9552
Length: 342.67
East: 1276913.8420
Length: 114.91
East: 1276831.1595
Length: 99.26
East: 1276831.1595
Length: 81.26
East: 1276863.7409
Length: 86.63
East: 1276911.5314
Length: 606.76
East: 1277518.2882
Radius: 385.00
Tangent: 66.53
Course: N 36-56-53 E
Course Out: N 43-14-50 W
East: 1277860.8865
East: 1277597.1047
Radius: 25.00
Tangent: 21.04
Course: N 06-39-52 E
Course Out: N 56-34-35 E
East: 1277579.9760
East: 1277600.8415
Radius: 635.07
Tangent: 58.23
Course: S 38-39-46 E
Course Out: S 46-05-53 W
East: 1278130.8842
East: 1277673.2988
Radius: 25.00
Delta: 91-14-58
Chord: 35.74
Course In: S 46-05-53 W
RP North:112607.6054
End North: 112625.2363
Curve Length:195.24
Delta: 35-30-46
Chord: 192.13
Course In: S 45-09-05 E
RP North:112403.0869
End North: 112454.1866
Line Course: S 09-20-09 W
North: 112401.1978
Curve Length:142.02
Delta: 19-36-29
Chord: 141.33
Course In: S 80-39-51 E
RP North:112333.8761
End North: 112259.8712
Line Course: S 10-16-20 E
North: 111976.6350
Curve Length:94.22
Delta: 11-07-52
Chord: 94.08
Course In: S 79-43-40 W
RP North: 111890.1472
End North: 111882.8771
Line Course: S 00-51-32 W
North: 111802.9961
Curve Length:332.27
Delta: 19-19-40
Chord: 330.70
Course In: N 89-08-28 W
RP North:111817.7612
End North: 111477.8576
Line Course: S 20-11-12 W
North: 111257.2647
Curve Length:327.94
Delta: 19-28-15
Chord: 326.36
Course In: S 69-48-48 E
RP Noah:110924.2627
End North: 110936.3187
Tangent: 25.55
Course: N 89-31-36 W
Course Out: N 45-09-05 W
East: 1277655.2856
East: 1277637.5613
Radius: 315.00
Tangent: 100.87
Course: S 27-05-32 W
Course Out: N 80-39-51 W
East: 1277860.8876
East: 1277550.0600
Length: 53.70
East: 1277541.3487
Radius: 415.00
Tangent: 71.71
Course: S 00-28-06 E
Course Out: S 79-43-40 W
East: 1277950.8518
East: 1277542.5036
Length: 287.85
East: 1277593.8345
Radius: 485.00
Tangent: 47.26
Course: S O4-42-24 E
Course Out: S 89-08-28 E
East: 1277116.6083
East: 1277601.5538
Length: 79.89
East: 1277600.3562
Radius: 985.00
Tangent: 167.73
Course: S 10-31-22 W
Course Out: S 69-48-48 E
East: 1276615.4669
East: 1277539.9617
Length: 235.03
East: 1277458.8576
Radius: 965.00
Tangent: 165.56
Course: S 10-27-05 W
Course Out: N 89-17-03 W
East: 1278364.5808
East: 1277399.6562
Line Course: S 00-42-57 W
Length: 89.75
North: 110846.5757
East: 1277398.5349
Curve Length:92.91
Radius:327.00
Delta:16-16-47
Tangent:46.77
Chord: 92.60
Course: S 08-51-20 W
Course In: N 89-17-03 W
Course Out: S 73-00-16 E
RP North: 110850.6610
East: 1277071.5604
End North: 110755.0797
East: 1277384.2795
Line Course: S 73-00-16 E
Length: 23.40
North: 110748.2400
East: 1277406.6575
Line Course: S 02-01-41 W
Length: 245.08
North: 110503.3135
East: 1277397.9844
Line Course: S 35-26-02 E
Length: 22.04
North: 110485.3556
East: 1277410.7624
Line Course: S 88-22-17 E
Length: 325.13
North: 110476.1152
East: 1277735.7611
Line Course: S 43-43-14 W
Length: 348.73
North: 110224.0813
East: 1277494.7392
Line Course: S 52-48-39 W
Length: 200.00
North: 110103.1916
East: 1277335.4104
Line Course: S 58-31-17 W
Length: 602.99
North: 109788.3221
East: 1276821.1593
Line Course: S 56-30-28 W
Length: 648.68
North: 109430.3651
East: 1276280.1857
Line Course: S 80-56-23 W
Length: 212.14
North: 109396.9587
East: 1276070.6925
Line Course: N 14-17-03 E
Length: 944.69
North: 110312.4426
East: 1276303.7770
Curve Length:33.57
Radius:285.00
Delta:6-44-58
Tangent:16.81
Chord: 33.55
Course: N 65-40-10 W
Course In: N 20-57-21 E
Course Out: S 27-42-19 W
RP North: 110578.5917
East: 1276405.7067
End North: 110326.2667
East: 1276273.2035
Line Course: N 62-17-41 W
Length: 14.37
North: 110332.9476
East: 1276260.4810
Curve Length:278.87
Radius:255.00
Delta:62-39-32
Tangent:155.22
Chord: 265.18
Course: N 30-57-55 W
Course In: N 27-42-19 E
Course Out: N 89-38-09 W
RP North: 110558.7121
East: 1276379.0365
End North: 110560.3328
East: 1276124.0417
Line Course: N 00-21-51 E
Length: 228.02
North: 110788.3482
Curve Length:410.90
Delta: 10-52-27
Chord: 410.28
Course In: N 89-38-09 W
RP North: 110802.1087
End North: 111197.0201
Line Course: N 10-30-36 W
North: 111586.6911
Curve Length:753.44
Delta: 34-23-51
Chord: 742.17
Course In: N 79-29-24 E
RP North:111815.6120
End North: 112323.8144
Line Course: N 23-53-15 E
North: 112444.5076
Curve Length:226.50
Delta: 15-43-48
Chord: 225.79
Course In: N 66-06-45 W
RP Noah:112778.5848
End North: 112661.5217
Line Course: N 08-09-27 E
North: 112784.7620
Curve Length:319.82
Delta: 34-54-12
Chord: 314.90
Course In: N 81-50-33 W
RP North:112859.2567
End North: 113095.5243
Curve Length:37.41
Delta: 85-44-36
Chord: 34.02
Course In: S 63-15-15 W
RP North:113084.2735
End North: 113107.3723
Line Course: S 32-24-30 E
North: 113107.3554
East: 1276125.4909
Radius: 2165.00
Tangent: 206.07
Course: N 05-04-22 W
Course Out: N 79-29-24 E
East: 1273960.5347
East: 1276089.2127
Length: 396.32
East : 1276016.9211
Radius: 1255.00
Tangent: 388.46
Course: N 06-41-19 E
Course Out: N 66-06-45 W
East: 1277250.8660
East: 1276103.3664
Length: 132.00
East : 1276156.8188
Radius: 825.00
Tangent: 113.96
Course: N 16-01-21 E
Course Out: S 81-50-33 E
East: 1275402.4864
East : 1276219.1388
Length: 124.50
East: 1276236.8047
Radius: 525.00
Tangent: 165.05
Course: N 09-17-39 W
Course Out: N 63-15-15 E
East: 1275717.1168
East: 1276185.9479
Radius: 25.00
Tangent: 23.21
Course: N 69-37-03 W
Course Out: N 22-29-21 W
East: 1276163.6226
East: 1276154.0599
Length: 0.02
East: 1276154.0706
Area: 3,429,008 Sq Ft 78.72 Ac.
LOT 8 AFTER
North: 112016.8940 East: 1278365.4559
Line Course: N 88-45-51 W
Length: 42.20
North: 112017.8041
East: 1278323.2657
Line Course: S 01-14-09 W
Length: 200.00
North: 111817.8506
East: 1278318.9521
Line Course: S O4-05-54 W
Length: 462.06
North: 111356.9722
East: 1278285.9294
Line Course: N 88-19-36 W
Length: 782.35
North: 111379.8176
East: 1277503.9131
Line Course: N 20-11-12 E
Length: 104.45
North: 111477.8516
East: 1277539,9567
Curve Length:332.27
Radius:985.00
Delta:19-19-40
Tangent:167.73
Chord: 330.70
Course: N 10-31-22 E
Course In: N 69-48-48 W
Course Out: S 89-08-28 E
RP North: 111817.7552
East: 1276615.4619
End North: 111802.9902
East: 1277600.3512
Line Course: N 00-51-32 E
Length: 79.89
North: 111882.8712
East: 1277601.5488
Curve Length:94.22
Radius:485.00
Delta: 11-07-52
Tangent: 47.26
Chord: 94.08
Course: N 04-42-24 W
Course In: N 89-08-28 W
Course Out: N 79-43-40 E
RP North: 111890.1413
East: 1277116.6033
End North: 111976.6290
East: 1277593.8295
Line Course: N 10-16-20 W
Length: 287.85
North: 112259.8652
East: 1277542.4986
Curve Length: 142.02
Radius:415.00
Delta:19-36-29
Tangent:71.71
Chord: 141.33
Course: N 00-28-06 W
Course In: N 79-43-40 E
Course Out: N 80-39-51 W
RP North: 112333.8702
East: 1277950.8468
End North: 112401.1919
East: 1277541.3437
Line Course: N 09-20-09 E
Length: 53.70
North: 112454.1806
East: 1277550.0550
Curve Length:195.24
Radius:315.00
Delta:35-30-46
Tangent:100.87
Chord: 192.13
Course: N 27-05-32 E
Course In: S 80-39-51 E
Course Out: N 45-09-05 W
RP North: 112403.0810
East: 1277860.8826
End North: 112625.2303
East: 1277637.5562
Curve Length:39.82
Delta: 91-14-58
Chord: 35.74
Course In: S 45-09-05 E
RP North: 112607.5994
End North: 112624.9351
Curve Length:242.92
Delta: 21-54-59
Chord: 241.44
Course In: N 46-05-53 E
RP North:113065.3093
End North: 112485.9659
Line Course: S 24-10-54 W
North: 112478.6679
Line Course: S 66-59-48 E
North: 112468.3356
Line Course: N 21-49-31 E
North: 112475.7621
Curve Length:67.64
Delta: 6-06-10
Chord: 67.61
Course In: N 21-49-31 E
RP North:113065.3115
End North: 112454.0024
Line Course: S 74-16-39 E
North: 112395.8206
Curve Length:58.29
Delta: 64-51-01
Chord: 55.23
Course In: S 15-43-21 W
RP Noah:112346.2475
End North: 112354.6829
Curve Length:101.82
Delta: 72-28-10
Chord: 95.17
Course In: N 80-34-22 E
RP North: 112367.8684
End North: 112288.1721
Curve Length:60.95
Delta: 48-50-17
Chord: 59.12
Course In: S 08-06-12 W
RP North: 112217.3860
Radius: 25.00
Tangent: 25.55
Course: S 89-31-36 E
Course Out: N 46-05-53 E
East: 1277655.2806
East: 1277673.2938
Radius: 635.07
Tangent: 122.96
Course: S 54-51-37 E
Course Out: S 24-10-54 W
East: 1278130.8792
East: 1277870.7347
Length: 8.00
East: 1277867.4577
Length: 26.44
East: 1277891.7952
Length: 8.00
East: 1277894.7695
Radius: 635.07
Tangent: 33.85
Course: S 71-13-34 E
Course Out: S 15-43-21 W
East: 1278130.8742
East: 1277958.7839
Length: 214.71
East: 1278165.4606
Radius: 51.50
Tangent: 32.71
Course: S 41-51-09 E
Course Out: N 80-34-22 E
East: 1278151.5052
East: 1278202.3096
Radius: 80.50
Tangent: 58.99
Course: S 45-39-43 E
Course Out: S 08-06-12 W
East: 1278281.7224
East: 1278270.3753
Radius: 71.50
Tangent: 32.46
Course: S 57-28-40 E
Course Out: N 56-56-29 E
East: 1278260.2967
End North: 112256.3890
Curve Length:134.16
Delta: 24-57-47
Chord: 133.10
Course In: S 56-56-29 W
RP North:112088.4142
End North: 112131.7783
Curve Length:37.36
Delta: 6-49-38
Chord: 37.33
Course In: S 84-24-31 W
RP North:112101.2330
End North: 112094.4715
Line Course: S 01-14-09 W
North: 112062.4189
Line Course: S 02-52-14 W
North: 112016.8961
Line Course: S 75-13-41 E
North: 112016.8936
East: 1278320.2218
Radius: 307.93
Tangent: 68.16
Course: S 20-34-38 E
Course Out: N 81-54-16 E
East: 1278062.1416
East: 1278367.0030
Radius: 313.50
Tangent: 18.70
Course: S 02-10-40 E
Course Out: S 88-45-51 E
East: 1278054.9946
East: 1278368.4217
Length: 32.06
East: 1278367.7302
Length: 45.58
East: 1278365.4476
Length: 0.01
East: 1278365.4573
Area: 826,788 Sq Ft 18.98 Ac.
LOT 9 AFTER
North: 111356.9690 East: 1278285.9289
Line
Course: S O4-05-54 W
Length: 138.69
North: 111218.6336
East: 1278276.0169
Line
Course: S 30-51-46 W
Length: 241.04
North: 111011.7253
East: 1278152.3673
Line
Course: S 36-06-45 W
Length: 522.01
North: 110590.0136
East: 1277844.7089
Line
Course: S 43-43-14 W
Length: 157.63
North: 110476.0914
East: 1277735.7642
Line
Course: N 88-22-17 W
Length: 325.13
North: 110485.3318
East: 1277410.7656
Line
Course: N 35-26-02 W
Length: 22.04
North: 110503.2897
East: 1277397.9876
Line
Course: N 02-01-41 E
Length: 245.08
North: 110748.2162
East: 1277406.6607
Line
Course: N 73-00-16 W
Length: 23.40
North: 110755.0559
East: 1277384.2826
Curve Length:92.91
Radius:327.00
Delta: 16-16-47
Chord: 92.60
Course In: N 73-00-16 W
RP North:110850.6372
End North: 110846.5519
Line Course: N 00-42-57 E
North: 110936.2949
Curve Length:327.93
Delta: 19-28-14
Chord: 326.36
Course In: S 89-17-03 E
RP North:110924.2388
End North: 111257.2364
Line Course: N 20-11-11 E
North: 111379.7956
Line Course: S 88-19-36 E
North: 111356.9502
Line Course: N 25-01-52 W
North: 111356.9683
Tangent: 46.77
Course: N 08-51-20 E
Course Out: S 89-17-03 E
East: 1277071.5636
East: 1277398.5380
Length: 89.75
East: 1277399.6593
Radius: 965.00
Tangent: 165.56
Course: N 10-27-04 E
Course Out: N 69-48-49 W
East: 1278364.5840
East: 1277458.8591
Length: 130.58
East: 1277503.9190
Length: 782.35
East: 1278285.9354
Length: 0.02
East: 1278285.9269
Area: 580,602 Sq Ft 13.33 Ac.
LOT 10 WEST AFTER
North: 112491.6981 East: 1278351.4678
Line Course: S 40-43-21 W
Length: 47.22
North: 112455.9111
East: 1278320.6617
Curve Length: 52.35
Radius:• 71.50
Delta: 41-57-03
Tangent: 27.41
Chord: 51.19
Course: S 83-38-18 W
Course In: N 27-20-14 W
Course Out: S 14-36-49 W
RP North: 112519.4259
East: 1278287.8269
End North: 112450.2390
East: 1278269.7875
Line Course: N 75-23-11 W
Length: 101.83
North: 112475.9306
East: 1278171.2518
Line Course: N 01-10-31 E
Length: 19.01
North: 112494.9366
East: 1278171.6417
Line Course: S 88-58-12 E
Length: 179.86
North: 112491.7035
East: 1278351.4727
Line Course: S 42-16-12 W
Length: 0.01
North: 112491.6961
East: 1278351.4659
Area: 5,788 Sq Ft 0.13 Ac.
LOT 10 MID AFTER
North: 112447.4529
Line Course: S 01-14-09 W
North: 112295.2583
Curve Length:34.09
Delta: 5-03-12 .
Chord: 34.08
Course In: S 59-51-54 W
RP North: 112101.2202
End North: 112323.9469
Curve Length:37.19
Delta: 41-22-35
Chord: 36.39
Course In: N 54-48-42 E
RP North: 112353.6246
End North: 112359.1759
Curve Length:16.38
Delta: 11-39-25
Chord: 16.35
Course In: N 83-48-43 W
RP North: 112367.8532
End North: 112375.5253
Curve Length:40.78
Delta: 20-57-15
Chord: 40.55
Course In: N 84-31-52 E
RP North: 112386.1518
End North: 112415.9213
Line Course: N 40-43-21 E
North: 112447.4566
Line Course: S 46-52-42 W
North: 112447.4498
Area: 3,249 Sq Ft 0.07 Ac.
East: 1278392.5491
Length: 152.23
East: 1278389.2658
Radius: 386.50
Tangent: 17.06
Course: N 32-39-42 W
Course Out: N 54-48-42 E
East: 1278055.0033
East: 1278370.8751
Radius: 51.50
Tangent: 19.45
Course: N 14-30-00 W
Course Out: N 83-48-43 W
East: 1278412.9641
East: 1278361.7642
Radius: 80.50
Tangent: 8.22
Course: N 00-21-35 E
Course Out: N 84-31-52 E
East: 1278281.7332
East: 1278361.8668
Radius: 111.50
Tangent: 20.62
Course: N 05-00-30 E
Course Out: N 74-30-53 W
East: 1278472.8593
East: 1278365.4068
Length: 41.61
East: 1278392.5530
Length: 0.01
East: 1278392.5457
LOT 10 EAST AFTER
North: 112328.0293
East: 1278409.9772
Line
Course: N 01-14-09 E
Length: 151.03
North: 112479.0242
East: 1278413.2346
Line
Course: N 36-48-48 E
Length: 62.14
North: 112528.7730
East: 1278450.4695
Line
Course: S 88-56-00 E
Length: 643.46
North: 112516.7945
East: 1279093.8180
Line
Course: S 01-14-56 W
Length: 199.81
North: 112317.0319
East: 1279089.4630
Line
Course: N 89-04-20 W
Length: 679.58
North: 112328.0358
East: 1278409.9721
Line
Course: S 38-26-37 E
Length: 0.01
North: 112328.0279
East: 1278409.9783
Area: 1355436 Sq Ft 3.11 Ac.
Ilesm8lengrlesm-jobs11886100110161documenticlosures on blai.doc