23-102138City Of Fedeml Wav Electrical
Community33 f]eiriorymcnc ikl�E. Permit #:23-102138-00-EL
333?5 soh q�r S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 635-2609 Inspection Request Line: (253) 835-3050
Project Name: MUNSON
Project Address: 35438 18TH AVE SW
Parcel Number: 926975 0410
Project Description: BLUEBEAM - 9.60kWDC Rooftop Photovoltaic Solar Installation
Owner
Applicant
GAIL M MUNSON
35.438 18TH AVE SW
JESUS FAMILIALUMIO
Contractor
-FEDERAL WAY WA 98023-6903
1550 W DIGITAL DR
LUMIO HX INC
LEHI U-T 84043
LUMIOHI784K4 (5/24/24)
1550 W DIGITAL DR
LEHI UT 84043
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Alt. Serv./Feeder: 0 to 200 aml 1 Electrical Fixtures
FIRE APPROVAL CONDITIONS: CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org and alarmsna southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
- Photo of the front of the house showing the address or street side view.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
If no response from SKFR within 2 business days, ca11253-9,46-7348 to check gtat...
PERMIT EXPIRES Saturday, 28 October, 2023
Permit Issued on Monday, May 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occdpancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the Cit.af Federal Way.
Owner or agent: Maw
_ Date:
CITY of
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 102138 00 Address: 35438 18TH AVE SW
Project: GAIL M MUNSON
FEDERAL WAY WA 98023-6903
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE '111l5 C':1FIU.
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must nInspections are listed as close to sequential order as possible
ot be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
E
FERGround (4295) QDitch cover (4030)[By
Approved Slab/Concrete Floor (4255)
Approved Approved to place concrete
Date By Date
Date
EBy
ool Bonding (4195) =ByDate
Power (4275) s❑
Approvedved Service (4235)
Approved
Date
BY Date
LZJ Feeders/Sub-panels (4045) ® Rough Electrical 4225 a
Approved ( ) ❑ Final - S K F & R (4060)
Approved Approved
BY Date By Date
BY Date
10 Ceiling Cover (4020) 11
❑ Final -Electrical (4055)
pprov ed Approved
By ❑at f` By Date -Ar9 j
[BBy___ Roug:Approved
ectrical❑ Final Electrical
Approved FBy
Right of WayApproved e By Date
Date
CITY OF
Federal Way
Building Division
33325 Eighth Avenie 5ou1,Z
Pedero! Way, WA 98003-6325
Phone 253-835-2607 Fox 253-835-2609
CORRECTION NOTICE
ADDRESS: ,�� "1 �p ��� j�PERMIT#.�'���
IF YOU HAVE QUESTIONS CALL
(253) 835-
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF
FOR DETAILS. NOTE; ELECTRICAL CORRECTIONS•ARE REQUIRED TO BE MADE WITHIN 15 DAYS. CARD
DATE
DO NOT REMOVE THIS NOTICE INSPECTOR
Page of