Loading...
23-102138City Of Fedeml Wav Electrical Community33 f]eiriorymcnc ikl�E. Permit #:23-102138-00-EL 333?5 soh q�r S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 635-2609 Inspection Request Line: (253) 835-3050 Project Name: MUNSON Project Address: 35438 18TH AVE SW Parcel Number: 926975 0410 Project Description: BLUEBEAM - 9.60kWDC Rooftop Photovoltaic Solar Installation Owner Applicant GAIL M MUNSON 35.438 18TH AVE SW JESUS FAMILIALUMIO Contractor -FEDERAL WAY WA 98023-6903 1550 W DIGITAL DR LUMIO HX INC LEHI U-T 84043 LUMIOHI784K4 (5/24/24) 1550 W DIGITAL DR LEHI UT 84043 Additional Permit Information Is this an Online or O.T.C. application? .................. No Alt. Serv./Feeder: 0 to 200 aml 1 Electrical Fixtures FIRE APPROVAL CONDITIONS: CONDITIONS: Upon completion of installation, the following photographs shall be emailed to planreview@southkingfire.org and alarmsna southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business days, ca11253-9,46-7348 to check gtat... PERMIT EXPIRES Saturday, 28 October, 2023 Permit Issued on Monday, May 1, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occdpancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Cit.af Federal Way. Owner or agent: Maw _ Date: CITY of Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 102138 00 Address: 35438 18TH AVE SW Project: GAIL M MUNSON FEDERAL WAY WA 98023-6903 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE '111l5 C':1FIU. (read left to right, top to bottom). Please schedule inspections as appropriate. Work must nInspections are listed as close to sequential order as possible ot be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. E FERGround (4295) QDitch cover (4030)[By Approved Slab/Concrete Floor (4255) Approved Approved to place concrete Date By Date Date EBy ool Bonding (4195) =ByDate Power (4275) s❑ Approvedved Service (4235) Approved Date BY Date LZJ Feeders/Sub-panels (4045) ® Rough Electrical 4225 a Approved ( ) ❑ Final - S K F & R (4060) Approved Approved BY Date By Date BY Date 10 Ceiling Cover (4020) 11 ❑ Final -Electrical (4055) pprov ed Approved By ❑at f` By Date -Ar9 j [BBy___ Roug:Approved ectrical❑ Final Electrical Approved FBy Right of WayApproved e By Date Date CITY OF Federal Way Building Division 33325 Eighth Avenie 5ou1,Z Pedero! Way, WA 98003-6325 Phone 253-835-2607 Fox 253-835-2609 CORRECTION NOTICE ADDRESS: ,�� "1 �p ��� j�PERMIT#.�'��� IF YOU HAVE QUESTIONS CALL (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF FOR DETAILS. NOTE; ELECTRICAL CORRECTIONS•ARE REQUIRED TO BE MADE WITHIN 15 DAYS. CARD DATE DO NOT REMOVE THIS NOTICE INSPECTOR Page of