Loading...
23-102342Cite orFedenI ►Vav C-nmmunity DCA�clopment Dcpc 33325 &h Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ROWE Project Address: 33664 7TH CT SW Project Description: BLUEBEAM - PV solar roof mount installation. Owner ROBERT ROWE 33664 7TH CT SW FEDERAL WAY WA 98023 Applicant ROBERT ROWE 33664 7TH CT SW FEDERAL WAY WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. No Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml I Electrical Permit #:23-102342-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 729804 0160 Contractor OWNER IS CONTRACTOR FIRE APPROVAL CONDITIONS: CONDITIONS: Upon completion of installation, the following photographs shall be emailed to plan review(j�southkingfire,org and alarms@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location ❑€shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business days, call 253-946-7348 to check status. PERMIT EXPIRES Sunday,10 December, 2023 Permit Issued on Tuesday, June 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy.and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: — Date _1�111 CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 102342 00 Address: 33664 7TH CT SW Project: CONNIE ROWE FEDERAL WAY WA 98023-5006 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover (4030) Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date By Pool Bonding (4195) Approved Date 0 By Temporary Power (4275) Approved Date © By Service (4235) Approved Date E By Rough Electrical (4225) Approved Date By Ceiling Cover (4020) Approved Date Q Feeders/Sub-panels (4045) Approved By Date 10 Final - Electrical (4055) Approved By Date -7 5 Rough Electrical El Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date