23-102259City of Federal Way
E
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: 7-11 STORE W/GAS
Project Address: 104 SW 312TH ST
Electrical
Permit #:23-102259-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 072104 9219
Project Description: Please enReplacing and upgrading 6 existing exterior soffit lights on 7-11 building to LEDter a
description
Owner
Applicant
Contractor
7-ELEVEN C/O RYAN LLC
JUNIOR SEGURALIGHTS INC
LIGHTS INC (ELECTRICAL)
131655 NOEL RD SUITE 100 LB73
3723 N SERENE WAY
LIGHTI*830R7 (12/28/23)
DALLAS TX 75240
LYNNWOOD WA 98087
3723 N SERENE WAY
LYNNWOOD WA 98087
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
—
Electrical Fixtures
Circuits - Commercial 4
PERMIT EXPIRES Tuesday, 24 October, 2023
Permit Issued on Thursday, April 27, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
.V_Vashipgtpr� and the Cit of Federal Way.
Owner or agent: Date-
1Acnr or
Federal Way
THIS CARD IS TO RE-1LUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 835-3050
Scheduled impections aiay be failed if this card is not on -.site. DO NOT LOSE URS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check ;yith your inspector if
you are unsure about any of the inspections or the inspection sequence. On -Doing mnspectlons are IooQed on the back of this card.
ELECTRICAL
0
L'FER Ground (4295)
❑
Ditch cover (4030)
0
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
S`
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
Final - Electrical (4055)
Approved
B}
ZZ/1Date G l �
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date