Loading...
23-102259City of Federal Way E Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: 7-11 STORE W/GAS Project Address: 104 SW 312TH ST Electrical Permit #:23-102259-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 072104 9219 Project Description: Please enReplacing and upgrading 6 existing exterior soffit lights on 7-11 building to LEDter a description Owner Applicant Contractor 7-ELEVEN C/O RYAN LLC JUNIOR SEGURALIGHTS INC LIGHTS INC (ELECTRICAL) 131655 NOEL RD SUITE 100 LB73 3723 N SERENE WAY LIGHTI*830R7 (12/28/23) DALLAS TX 75240 LYNNWOOD WA 98087 3723 N SERENE WAY LYNNWOOD WA 98087 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes — Electrical Fixtures Circuits - Commercial 4 PERMIT EXPIRES Tuesday, 24 October, 2023 Permit Issued on Thursday, April 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of .V_Vashipgtpr� and the Cit of Federal Way. Owner or agent: Date- 1Acnr or Federal Way THIS CARD IS TO RE-1LUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2-53) 835-3050 Scheduled impections aiay be failed if this card is not on -.site. DO NOT LOSE URS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check ;yith your inspector if you are unsure about any of the inspections or the inspection sequence. On -Doing mnspectlons are IooQed on the back of this card. ELECTRICAL 0 L'FER Ground (4295) ❑ Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date S` Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved B} ZZ/1Date G l � MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date