Loading...
23-103138CityFederal Way FILE= Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MORRISON Project Address: 2219 SW 329TH PL Project Description: Replace Meter, Riser, Panel and sub -panel Electrical Permit 4:23-103138-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 894500 0790 Owner Applicant Contractor DIANNE C MORRISON AARON MCMULLENMeMullen Electric MCMULLEN ELECTRIC LLC 2219 SW 329TH PL 7520 147TH STREET CT E MCMULEL786LF(6/7/24) FEDERAL WAY WA 98023-2825 PUYALLUP WA 98375 7520 147TH ST CT E PUYALLUP WA 98375 Is this an Online or O.T.C. application? :J Mast or Meter Repair (Resider Additional Permit Information Yes Electrical Fixtures PERMIT EXPIRES Wednesday, 13 December, 2023 Permit Issued on Friday, June 16, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: ANN CITY or Federal Way THIS CARD IS TO REALM\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 33,-3050 Scheduled inspections rua be failed if this card is not ou-site. DO \ OT 1,07E THIS C ARD. Inspections are listed as close to sequential order as possible (read Ieft to right. top to bottom). Please schedule inspections as appropriate. Fork umst not be cover ed until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LrFER Ground (4295) Approved By Date ❑ Ditch corer (4030) pproved By z K"I Date day 'gyp ❑ B}- Slab/Concrete Floor (4255) Approved to place -concrete Date ❑ ❑ ❑ Pool Bonding (4195) Temporary Power (4275) Ser-tice (4235) Approved Approved Approved By Date B`• Date By Date �J °? ❑ ❑ ❑ Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved BJ A�epproved ✓� Date Bj• Date B}• Date ❑ Final - Electrical (4055) BJ Moved Ile Date�j ,` MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 15 ElFinal - Plumbing (4075) Approved to cover Approved Approved By Date By Date 13Y Date