23-103138CityFederal Way
FILE=
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MORRISON
Project Address: 2219 SW 329TH PL
Project Description: Replace Meter, Riser, Panel and sub -panel
Electrical
Permit 4:23-103138-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 894500 0790
Owner
Applicant
Contractor
DIANNE C MORRISON
AARON MCMULLENMeMullen Electric
MCMULLEN ELECTRIC LLC
2219 SW 329TH PL
7520 147TH STREET CT E
MCMULEL786LF(6/7/24)
FEDERAL WAY WA 98023-2825
PUYALLUP WA 98375
7520 147TH ST CT E
PUYALLUP WA 98375
Is this an Online or O.T.C. application?
:J
Mast or Meter Repair (Resider
Additional Permit Information
Yes
Electrical Fixtures
PERMIT EXPIRES Wednesday, 13 December, 2023
Permit Issued on Friday, June 16, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
ANN
CITY or
Federal Way
THIS CARD IS TO REALM\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 33,-3050
Scheduled inspections rua be failed if this card is not ou-site. DO \ OT 1,07E THIS C ARD. Inspections are listed as close to sequential order as possible
(read Ieft to right. top to bottom). Please schedule inspections as appropriate. Fork umst not be cover ed until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑ LrFER Ground (4295)
Approved
By Date
❑ Ditch corer (4030)
pproved
By z K"I Date day 'gyp
❑
B}-
Slab/Concrete Floor (4255)
Approved to place -concrete
Date
❑
❑
❑
Pool Bonding (4195)
Temporary Power (4275)
Ser-tice (4235)
Approved
Approved
Approved
By
Date
B`•
Date
By
Date �J °?
❑
❑
❑
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
BJ
A�epproved
✓�
Date
Bj•
Date
B}•
Date
❑
Final - Electrical (4055)
BJ
Moved
Ile Date�j
,`
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
15
ElFinal
- Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
13Y
Date