Loading...
23-103184City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BRAEMER/NUNEZ Project Address: 120 S 316TH PL Project Description: Replace gas furnace and install 3-ton heat pump Mechanical Permit #:23-103184-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 337530 0070 Owner Applicant Contractor CODY BRAEMER JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 120 S 316TH PL 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA97IR9 (12/29/23) 4601 S 134TH PL SEATTLE WA 98168 Additional Permit Information Mechanical Work Valuation? .................................. 8092 Is this an Online or O.T.C. application?.....:............ Yes } Mechanical Fixtures 3 Compressors / Heat Pumps I Furnaces 1 PERMIT EXPIRES Sunday, 17 December, 2023 Permit Issued on Tuesday, June 20, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton and the City of Federal Way. ONOwner or agent: I Date: CITY of Federal Way THIS CARD IS TO RENUU O's-SITE Construction Inspection Record INSPECTION REQL-ESTS: (253) 33-5-30-50 Scheduled inspections mi-; be failed if this card is not on -site. DO NOT LOSE THIS (A-RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work nrust not be covered until it is approved. Check with your inspector if you are u nslre about ant- of the inspections or the inspection sequence._ On -going inspections are logged on the back of this card. ELECTRICAL ❑ L'FER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place:concrete BV Date By Date B`- Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Sen-ice (4235) Approved Approved Approved By Date By Date B` Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Corer (4020) Approved Approved Approved By Date BY Date By Date t� 1 El Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date