14-105619 (2)BCE GENERAL SITE DEVELOPMENT NOTES: 1. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUCTION OPERATIONS. 2. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION WHETHER SHOWN ON THESE PLANS OR NOT. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND SURFACE OR SHOWN ON RECORD DRAWING PROVIDED BY OTHERS ARE SHOWN HEREON. EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY AND ARE SUBJECT TO A DEGREE OF UNKNOWN VARIATION. SOME UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC RECORDS. BARGHAUSEN CONSULTING ENGINEERS, INC. (BCE). ASSUMES NO LIABILITY FOR THE ACCURACY OF PUBLIC RECORDS OR RECORDS OF OTHERS. IF CONFLICTS SHOULD OCCUR, '�� 0 20' THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC., TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 0 10 20 40 Ilm 3 �:'4 S'�4•, 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF / CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE J SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. f dd 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE UTILITIES d, INVOLVED PRIOR TO CONSTRUCTION. (0 jdl k a dJ 6. INSPECTION OF SITE WORK WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE GOVERNING .� oj Ifpj JURISDICTION. INSPECTION OF PRIVATE FACILITIES WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE INSPECTOR 24' HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. dJf Id$p 7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL CONTACT THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY REQUIRED PRE -CONSTRUCTION MEETING(S). CONTRACTOR SHALL PROVIDE ONE WEEK MIN. ADVANCE NOTIFICATION TO OWNER, FIELD ENGINEER AND ENGINEER OF PRE -CONSTRUCTION MEETINGS. d, ° 8. THE CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND SHALL COMPLY WITH THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER AGENCY HAVING JURISDICTION ` FOR EXCAVATE" AND TRENCHING PROCEDURES. THE CON' _ 1CTOR IS RESPONSIBLE FOR DETERMINING "MEANS AND METHODS" REQUIRED TO h. ,_T THE INTENT AND PERFORMANCE / CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION / AND/OR TRENCHING PROCEDURES. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINr- tiDEQUATE SAFEGUARDS, SAFETY - DEVICES, PRO TIVE EQUIPMENT, FLAGGERS, AND ANY 0, R NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION 4 ° WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. f 10. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL ADJACENT A`/ PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL ° BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY SERVICES THAT ARE TO REMAIN d ' OPERATIONAL WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR NOT SHOWN ON THE PLANS. 11. TWO (2) COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER Q ' CONSTRUCTION IS IN PROGRESS. ONE (1) SET WITH RECORDS OF AS -BUILT INFORMATION SHALL BE SUBMITTED TO BARGHAUSEN CONSULTING ENGINEERS, INC. AT COMPLETION OF PROJECT. / 12. CONTRACTOR SHALL OBTAIN SERVICES OF A LICENSED LAND SURVEYOR TO STAKE HORIZONTAL PLAN CONTROFILESL ALL NEW PROVIDED B IMPROVEMENTS. STAKING CONTROL SHALL BE TAKEN FROM ELECTRONIC ,it — — .. . r....... -r —.....-... 12" COMPACTED SUBGRADE TO 95% MAX. DRY DENSITY PER ASTM D-1557. TYPICAL ASPHALT PAVING SECTION NOT TO SCALE CALL BEFORE YOU DIG: 1-800-424-5555 5" (MIN.) PORTLAND CEMENT CONCRETE W/ HI -TECH FIBERS REINFORCEMENT. 6" (MIN.) COMPACTED DEPTH CRUSHED ROCK BASE (95% COMPACTED) o a p o 00 0 0 op �o O 0 p 0 0,00 oOpQ 0 0 0 O O os0 0 00 o p L- 12" COMPACTED SUBGRADE TO 95% MAX. DRY DENSITY PER ASTM D-1557. CONCRETE DRIVE THRU LANE PAVING SECTION NOT TO SCALE: UTILITY CONFLICT NOTE: CAUTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 AND THEN POT HOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. _ PAVEMENT WIDTH 12" 6" 1" R� 1" R cO d v' N CD a m ° 18"--� CEMENT CONCRETE VERTICAL CURB AND GUTTER CURB AND GUTTER DETAIL NOT TO SCALE DRIVE THRU WID OR ENING PLAN FEDERAL WAY, WASHINGTON EASEMENT FGR PYLON I 10" 2 1 /2" 5" 2 1 /. *TOP OF LIP AT DRIVEWAYS VARIES EXTRUDED CEMENT CONCRETE CURB LEGEND: PROPOSED EXISTIN DEMOLISH CURB AND GUTTER SIGN Fl ................... CURB AND GUTTER -..---------------- CURB AND GUTTER CONCRETE a A� CURB --- ASPHALT PAINT STRIPE ROCKERY �UC� CONCRETE: DIRECTIONAL SIGN o ROCKERY CATCH BASIN (TYPE 1) CONTOUR — 100-- PAVEMENT SWALE ------------- PEDESTRIAN CROSSING PAINT STRIPE 6" APPROX. LOCATION 15' PUBLIC WATER EASEMENT. nrn s.rc nnnnn-r sr r. fs.•.s-rk e+ SITE ADDRESS: S. 348TH ST. (SR-18) AND PACIFIC HWY S. (SR-99) FEDERAL WAY, WA PARCEL NUMBER: 185295-0070 SITE ZONING: BC (COMMUNITY BUSINESS) PARCEL SIZE: 36,003 S.F. (0.83 AC) 351ST ST PL cn 5 TRI Q01 • 18 2 -j Z °;' a.O co)tR � 0 S 351Si 0 Z O 0 Z w U °0 a R \� S 355 P 0. VICINITY MAP - - a W 10 1 "=, 200' '—� lU Y LL U Q OWNER DEVELOPER ' a(SR 11 rSI MARK - FE DE RAL WAY CROSSING MCDONALD S USA, L.L.C. 17126 S.E. 29TH PLACE 12131 113TH AVENUE N.E., #103 BEH EVUE, WA 98008 KIRKLAND, WA 98034 0 (206) 916-6254 (425) 242-2411 CONTACT. DOUG BATES - o z ENGINEER SURVEYOR: TIM HANSON AND ASSOCIATES, INC. BARGHAUSEN CONSULTING ENGINEERS, INC. 6025 108th AVE. N.E. 18215 72ND AVENUE SOUTH KIRKLAND, WA 98033 KENT, WA 98032 (425) 822-7271 TEL: (425) 251-6222 FAX: (425) 251-8782 0 CONTACT: CHRIS JENSEN, P.E. 0 U J w WCID M O - : Z ai r q � Q N Z > N n Q aN Z j v 0c�� Q T cU G r N U_ �� w■ ■v • �■ w Mw ■ ■ ice■ a V ■� ■ /—l■V �� — ' � LAND COVER DATA (SITE ONLY) 1,=5" Sb�� TOTAL SITE AREA: 36,003 SF . z EXISTING IMPERVIOUS SURFACE: 24,667 SF (EX. BUILDING, CONCRETE, AND ASPHALT LOT) SITE PLAN AWROVAL _ 0 ; Pamit Numbs~ PROPOSED NEW IMPERVIOUS ASPHALT SURFACE: 77 SF- • �b J� Approved. Y...1.-•1�..-r.M AMM. i..Y C, PROPOSED NEW IMPECOd RVIOUS CONCRETE SURFACE INCLUDING CURB: 176 SF i�1 `' r� TOTAL NEW IMPERVIOUS SURFACE: 253 SF EXISTING PERVIOUS SURFACE: 11,365 SF (LANDSCAPED AREA) PROPOSED PERVIOUS SURFACE: 11,112 SF (LANDSCAPED AREA) RECEIVE,) OCT 28 2014 CITY OF FEDERAL wAY N to 5 N N r III