Loading...
03-101001FILED FOR RECORD AT REQUEST OF: 1u•_[111WEel CITY OF FEDERAL WAY PO BOX 9718 FEDERAL WAY, WA 98063-9718 ATTN: Kim Scattarella, P. E. CONFORMED COPY EXHIBIT D LICENSE 20030903000047 FEDERAL WAY LICA 20,00 PAGE 001 OF V2 KING3COUNTY , WA9 The undersigned owner of certain real property located in Federal Way, Washington and legally described as follows: TAX PARCEL NO: 132103 9110 LOT 2 OF KING COUNTY SHORT PLAT NO, 888040, ACCORDING TO SHORT PLAT RECORDED DECEMBER 21, 1989 UNDER RECORDING NO. 8912211175, IN KING COUNTY, WASHINGTON. ("Property") hereby grants an irrevocable license to the City of Federal Way ("City") and the City's agents, employees, contractors or representatives to enter upon the Property to inspect the construction of improvements, the performance of work or to allow the City to perform any necessary maintenance or work, all pursuant to that certain Agreement and Performance/Maintenance Bond of even date entered into between the City and the undersigned and incorporated herein by this reference. DATED this 8th day of August ,2003. JACK-IN-THE-BOX, INC. Its: Assistant Secretary 1217 SW Seventh Sireet- 10 9330 Balboa Avenue San Diego, CA 92123 (858) 571-2121 ORIGINAL CALIFORNIA STATE OF 90) SAN DIEGO - ) Ss. COUNTY OF KRiG- 4� ) On this day personally appeared before me Donna J. O'Donnell, to me known to be the Assistant Secretary of Jack -In -The -Box Restaurant, the corporation that executed the foregoing License, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this 8th day of August , 2003. v.+x+�t+MswwrMn4w:: r.'rv: :•.ti•.L:•nti•.tivv.titi�L� j JUDY ANKROM (notary, gnature COMM.#E14 22r 208 8 Jud Ankrom • NOTARY PUBLIC•CALIFORNIA o SAN DIEOO COUNTY J (typed/printed name of notary) California G Comm. Expires July 2, 2007 Notary Public in and for the State of4IiEv My commission expires July 2, 2007 1:\csdc\docs\.save\21911774087.doc G:\LAWFORMS\Agreement&PerformanceMaintenanceBond Rev. 01-31-02 11 KING COUNTY RECORDER 500 4TH AVE ROOM 311 SEATTLE WA 98104 c 206 296-1570 -------------- ISSUED TO: FEDERAL WAY RECEIPT # 296944 -- 09/03/2003 09:09:00 AM ----~ DESCRIPTION! SEE COPYaCONFO 1 PG - ^ 1.00 09:09 20030903000047 LICENSE AG L PGS 20.00 Total Amount Due--------$21.00 Total Number Docs: 1 CASH 21.00 Total Payments: $21.00 VISIT US AT WWW. METROKC. GOV/ RECELEC/RECORDS/ KING COUNTY RECORDERS OFFICE Deputy: PENNYW CONFORMED COPY When Recorded Mail To: CITY 3353 OFFEDERAL WAY SO THY 20040116000291 FEDERAL WAY, WA 98003 FIRST AMERICAN DECL 21.00 PAGE001 OF 003 ATTN: Kim Scattarella, P.E. 01 / 16/2004 09 : 44 KING COUNTY, WA DECLARATION OF COVENANT Grantor (s): JACK IN THE BOX, INC., a Delaware corporation Grantee (s): CITY OF FEDERAL WAY, a Washington Municipal Corporation Property Legal Description (abbreviated): A 100' x 20' portion of Lot 2 of King County Short Plat No. 888040, according to short plat recorded December 21, 1989 under. Recording No. 891221175, in King County, WA Complete Legal Description: See Exhibit "A" 5 CtP6-7--TQ Assessor's Tax Parcel ID#(s): 132103-9110 gsrr Am IN CONSIDERATION OF the approved City of Federal Way ("City") building permit for application No. 03-101001-000-00-CO relating to real property legally described as: Legal description of property attached hereto as Exhibit "A" and incorporated herein by reference, in King County, Washington, and portions of vacated streets adjoining ("Property"), the undersigned as Grantor(s) declares that the above described Property is hereby subject to a perpetual easement for a natural or constructed storm water conveyance system- ("System") and hereby dedicates, covenants, and agrees as follows: 1. City shall have the right to ingress and egress over the Property to access such easement area for inspection of and to reasonably monitor the System for performance, operational flows or defects in accordance with City's Surface Water Management Divisions procedures. 2. If City determines that maintenance or repair work is required to be done to the System, the Manager of the Surface Water Management Division of the Department of Public Works ("Manager") shall give notice of the specific maintenance and/or repair required. The Manager shall also set a reasonable time in which such work must be completed by the Grantor, its heirs, successors or assigns. 4f the above required maintenance and/or repair is not completed within the time set by the Manager, the City may perform the required maintenance and/or repair. Written notice will be sent to the Grantor stating the City's intention to perform such maintenance. Maintenance work will not commence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the Manager, there exists an imminent or present danger, said seven (7) day notice period will be waived and maintenance and/or repair work will begin immediately. 3. If at any time the City reasonably determines that any existing retention/detention system creates any . conditions detrimental to the receiving surface water system, public and/or private property, the Manager may take any measures pursuant to Federal Way City Code. 4. The Grantor shall assume all responsibility for the cost of any maintenance and for repairs to the System. Such responsibility shall include reirrlbursement to the City within thirty (30) days of the receipt of the invoice for any such work performed. Overdue payments will require payment of interest at the current legal rate as liquidated damages. If legal action ensues, the prevailing party is entitled to costs and/or fees. 5. The Grantor is hereby required to obtain written approval from the Manager prior to filling, piping, cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated drainage facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or modifications to the drainage facilities contained within Property as described previously. Any notice or consent required to be given or otherwise provided for by the provisions of this Declaration of Covenant shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail, return receipt requested. 6. Grantor agrees to indemnify, defend, and hold City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or connected with this Declaration of Covenant except to the extent caused by the sole negligence of the City. This covenant is intended to protect the value and desirability of the Property, and shall inure to the benefit all the citizens of City of Federal Way, and shall run with the land, and shall touch and concern the land, and shall be binding on all heirs, successors, and assigns. GRANTOR JACK IN THE BOX, INC. t : By.:�� Donna O'Dow4l, Assistant Secretary - .c r; 3' " ' d- T S/qti �iEco� CAA 9zIZ3 f. ....-• ., STATE OF )` SAS aft 6o ) ss. COUNTY OF Yci?d6 ) On this day personally appeared before me Donna J. O'Donnell, to me known to be the Assistant Secretary of Jack -in -the -Box, Inc. that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated thatihe was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this clay of 2004 xw.wKtixv.v,nx„. JUDY ANKROM COMM. #1422208 H nkrgm • NOTARY PUBLIC•CALIFORN;A SAN DIEGO COUNTY (typed/printed name of notary) a�d�jfd ri4l A- im �xplres July P, 2QO7 Notary Public in and for the State afAV*&hmgte". 94- My commission expires v2000 7 1Acsdc\docs\save\17515377021.doc G:\LawForrns\Declaratioiiot6ovenantStomi m r� g^ o fb 000 ❑fir, WV I 11�� I VI f e r [n ps i 3 ci o0 u i v�x� r'��� w ' P o bs ,00•ZV „8Z,89.00 N ,98'601 !Yl .gz.$'SJ00 5 a N8 LO L Li } aL M 1 _ • 47�a .' h i 1 Z atw N ,00S9 3 .01,£ 1.10 fi ! 1 i; p p d In 1 i L i Z co e0 N Q 1 O F'� •£'4 I i f v i Li � d� m� ■ Wn o 1 i Yams ¢`mr 3 w LL J W p•��• v�N� ii1 cV 1 # i 1 r o F�c-a U � � 1 f i. rl N f I r 0 0 1 1 l I W Z U � .Ut u f`=-- IQ:� (9 f ...,,r< i -M CL S Z Y O 0 _ 1 S = r N U) [! L N ui UNN Cl a H axe ! i V, OZmM� U � � oD 0 a (7S:V0 LS Cf J gV{U Y00 J oapWZ N cUODU �a°Do��3 00 / Ii 6 Retention/Detention Facility Type of Facility: Detention Vault Facility Length: 30.48 ft Facility Width: 30.48 ft Facility Area: 929. sq. ft Effective Storage Depth: 4.50 ft Stage 0 Elevation: 325.00 ft C y-30 �y C r) Storage Volume: 4181. cu. ft / Riser Head: 4.50 ft Riser Diameter: 12.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 0.65 0.024 2 3.38 0.56 0.009 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 325.00 0. 0.000 0.000 0.00 0.01 325.01 9. 0.000 0.001 0.00 0.02 325.02 19. 0.000 0.002 0.00 0.03 325.03 28. 0.001 0.002 0.00 0.04 325.04 37. 0.001 0.002 0.00 0.05 325.05 47. 0.001 0.003 0.00 0.06 325.06 56. 0.001 0.003 0.00 0:16 325.16 149. 0.003 0.005 0.00 0.26 325.26 242. 0.006 0.006 0.00 0.36 325.36 335. 0.008 0.007 0.00 0.46 325.46 427. 0.010 0.008 0.00 0.56 325.56 520. 0.012 0.008 0.00 0.66 325.66 613. 0.014 0.009 0.00 0.76 325.76 706. 0.016 0.010 0.00 0.86 325.86 799. 0.018 0.010 0.00 0.96 325.96 892. 0.020 0.011 0.00 1.06 326.06 985. 0.023 0.012 0.00 1.16 326.16 1078. 0.025 0.012 0.00 1.26 326.26 1171. 0.027 0.013 0.00 1.36 326.36 1264. 0.029 0.013 0.00 1.46 326.46 1357. 0.031 0.014 0.00 1.56 326.56 1449. 0.033 0.014 0.00 1.66 326.66 1542. 0.035 0.015 0.00 1.76 326.76 1635. 0.038 0.015 0.00 1.86 326.86 1728. 0.040 0.015 0.00 1.96 326.96 1821. 0.042 0.016 0.00 2.06 327.06 1914. 0.044 0.016 0.00 2.16 327.16 2007. 0.046 0.017 0.00 2.26 327.26 2100. 0.048 0.017 0.00 2.36 327.36 2193. 0.050 0.017 0.00 2.46 327.46 2286. 0.052 0.018 0.00 2.56 327.56 2379. 0.055 0.018 0.00 2.66 327.66 2471. 0.057 0.018 0.00 2.76 327.76 2564. 0.059 0.019 0.00 2.86 327.86 2657. 0.061 0.019 0.00 2.96 327.96 2750. 0.063 0.019 0.00 3.06 328.06 2843. 0.065 0.020 0.00 3.16 328.16 2936. 0.067 0.020 0.00 3.26 328.26 3029. 0.070 0.020 0.00 3.36 328.36 3122. 0.072 0.021 0.00 3.38 328.38 3140. 0.072 0.021 0.00 3.39 328.39 3150. 0.072 0.021 0.00 3.40 328.40 3159. 0.073 0.022 0.00 3.41 328.41 3168. 0.073 0.023 0.00 3.42 328.42 3178. 0.073 0.023 0.00 3.52 328.52 3271. 0.075 0.025 0.00 3.62 328.62 3363. 0.077 0.026 0.00 3.72 328.72 3456. 0.079 0.027 0.00 3.82 328.82 3549. 0.081 0.028 0.00 3.92 328.92 3642. 0.084 0.029 0.00 4.02 329.02 3735. 0.086 0.030 0.00 4.12 329.12 3828. 0.088 0.030 0.00 4.22 329.22 3921. 0.090 0.031 0.00 4.32 329.32 4014. 0.092 0.032 0.00 4.42 329.42 4107. 0.094 0.033 0.00 4.50 329.50 4�1 1� 0.096 0.033 0.00 4.60 329.60 4274. 0.098 0.342 0.00 4.70 329.70 4367. 0.100 0.905 0.00 4.80 329.80 4460. 0.102 1.640 0.00 4.90 329.90 4553. 0.105 2.430 0.00 5.00 330.00 4646. 0.107 2.710 0.00 5.10 330.10 4738. 0.109 2.970 0.00 5.20 330.20 4831. 0.111 3.200 0.00 5.30 330.30 4924. 0.113 3.420 0.00 5.40 330.40 5017. 0.115 3.630 0.00 5.50 330.50 5110. 0.117 3.820 0.00 5.60 330.60 5203. 0.119 4.010 0.00 5.70 330.70 5296. 0.122 4.180 0.00 5.80 330.80 5389. 0.124 4.350 0.00 5.90 330.90 5482. 0.126 4.520 0.00 6.00 331.00 5575. 0.128 4.670 0.00 6.10 331.10 5668. 0.130 4.830 0.00 6.20 331.20 5761. 0.132 4.970 0.00 6.30 331.30 5853. 0.134 5.120 0.00 6.40 331.40 5946. 0.137 5.260 0.00 6.50 331.50 6039. 0.139 5.390 0.00 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.21 ******* 0.18 4.55 329.55 4224. 0.097 2 0.11 ******* 0.07 4.51 329.51 4191. 0.096 3 0.15 0.03 0.03 4.47 329.47 4151. 0.095 4 0.11 ******* 0.03 4.11 329.11 3822. 0.088 5 0.13 ******* 0.03 3.76 328.76 3497. 0.080 6 0.08 0.02 0.02 2.81 327.81 2607. 0.060 7 0.09 ******* 0.01 1.83 326.83 1704. 0.039 8 0.10 ******* 0.01 1.57 326.57 1456. 0.033 vulm/ AIL R400MQ3 JIB # 8360 — Detention Vault 2500 SW 3361h Street Federal Way, Washington For Freiheit & Ho Architects, Inc., P.S. RESUBMITTEE JUN 0 9 20G3 I June 3, 2003 Project No. — S03-104 Advanced. Structural Concepts A dl SIM of FW*k & HO Ardbat% Inc., P.S. a�+sue �.� a, 10940 NE 33rd Place, Suite 202, Bellevue, WA 98004 P: 425.889.2189 F: 425.828.6899 I Advanced Structural Concepts A Division of Freheit & Ho Architects, Inc., P.S. 10940 NE 33rd Place, Suite 202, Bellevue, WA 98004 P:425.889.2189 F:425.828.6899 www.thoarch.com �Z+etn+ion V a,v It Vzsigvi (ri+e_riA_ ' C E F. P. Sol ( tPreSrzvre_ - 55 Pc4 a_SS i Vt Pre ssotre s 200 P Sf 5611 we -;lint = 110 pcf Rllowo,_ble. So; 6 (dear► vilPress u re = 2000 p sfi r K S2o-4-t a 2'-0 101 IPreeasf 'P1O_V)k5 = loorsf Project: J 19 # 8 3 ro a Client:- FH-Q ArOnitec�S Subject: Defeii-6 o v, Vo-u It . By: "-A Job No: Sn3-104 Date O(o I d 5 o Sht -A ._S; d c W as I r 10 I,15'+2-') -r 100FCf (1.o5')] { f;, 61 0S / `�jee, OU IDU+ End Wa-1 F= [!!a F'fel.l5�2�tloc�� �-��l,oa�] 4�2 = 1035��ft See Oufpu+ Advanced Structural Concepts Title : Job # Consulting Structural Engineering Dsgnr: Date: 9:30AM, 5 JUN 03 10940 NE 33rd Place, Suite 202 Description: Bellevue, WA 98004 Scope. P: 425.889.2189 F: 425.828.6899 Rev. 550100 User KW-0604005.Ver5.5.0.25-Sep-2001 Restrained Retaining Wall Design Page x (c)1983-2001 ENERCA!_C EngineiMN Software s:1510bs1iobsls43111xs03-104lencLs03-104.ecw: Description 9'-0" Detention Vault (Side Wall) Crite it a Soil Data Footing Strengths & Dimensions Retained Height = 9.00 ft Allow Soil Bearing = 2,000.0 psf fc = 3,000 psi Fy = 60,000 psi Wall height above soil = 0.00 ft Equivalent Fluid Pressure Method Min. As % = 0.0014 Total Wall Height = 9 9.00ft Heel Active Pressure = 55.0 Toe Width = 1.00 ft Toe Active Pressure = 0.0 Heel Width = 2.50 Top Support Height - 9.00 ft Passive Pressure 200.0 Total Footing Width = 3.50 Water height over heel - 0.0 ft Slope Behind Wall = P 0.00 : 1 FootingllSoil Friction = 0.400 Footing Thickness = 12.00 in Height of Soil over Toe = 0.00 in Soil height to ignore Key Width 0.00 in Soil Density= 110.00 cf P _ for passive pressure - 0.00 in Key Depth - 0.00 in Key Distance from Toe - 0.00 ft Wind on Stem = 0.0 psf Cover @ Top = 3.00 in @ Btrn.= 3.00 in Surcharge Loads Uniform Lateral Load Applied to Stem Adjacent Footing Load Surcharge Over Heel = 522.5 psf Lateral Load - 0.0 #/ft Adjacent Footing Load = 0.0 Ibs -NOT Used To Resist Sliding & Overturn ...Height to Top - 0.00 ft Footing Width = 0.00 ft Surcharge Over Toe = 0.0 psf ,..Height to Bottom = 0.00 ft Eccentricity = 0.00 in NOT Used for Sliding & Overturning Wall to Ftg CL Dist = 0.00 ft Axial Load Applied to Stem Footing Type Line Load Base Above/Below Soil - 0.0 ft Axial Dead Load = 1,815.0 Ibs at Back of Wall Axial Live Load = 1,320.0lbs Axial Load Eccentricity = 0.0 in Design Summary Concrete Stem Construction Total Bearing Load = 6,380 Ibs Thickness = 10.00 in Fy = 60,000psi ...resultant ecc. = 0.20 in Wall Weight = 120.8 pcf Yc = 3,000 psi Soil Pressure @ Toe = 1 771 sf OK Stem is FREE to rotate at top of footing Soil Pressure @ Heel = P 1,874 psf OK Allowable = 2,000 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 2,590 psf ACI Factored @ Heel = 2,740 psf Footing Shear @ Toe = 23.5 psi OK Footing Shear @ Heel = 40.6 psi OK Allowable = 93.1 psi Reaction at Top = 1,918.1 Ibs Reaction at Bottom = 3,444.4 Ibs Sliding Calcs Slab Resists All Slid- ! Lateral Sliding Force = 3.444.41bs Footina Desion Results oe Heel Factored Pressure = 2,590 2,740 psf Mu': Upward = 1,302 0 ft-# Mu': Downward = 105 3,233 ft-# Mu: Design = 1,197 3,233 ft-# Actual 1-Way Shear = 23.54 40.59 psi Allow 1-Way Shear = 93.11 93.11 psi Mmax Between @ Top Support Top & Base @ Base of Wall Stem OK Stem OK Stem OK Design height = 9.00 ft 4.16 ft 0.00 ft Rebar Size = # 6 # 6 # 6 Rebar Spacing = 9.00 in 9.00 in 12.00 in Rebar Placed at = Center Center Center Rebar Depth 'd' = 5.00 in 5.00 in 5.00 in Design Data fb/FB + fa/Fa = 0.000 0.755 0.000 Mu .... Actual 0.0 ft-# 8,813.6 ft-# 0.0 ft-# Mn'Phi ..... Allowable = 11,677.0ft-# 11,677.0ft-# 9,043.3ft-# Shear Force @ this height = 0.0 Ibs 4,523.1 Ibs Shear..... Actual = 0.00 psi 75.38 psi Shear..... Allowable = 93.11 psi 93.11 psi Rebar Lap Required = 25.63 in 25.63 in Rebar embedment into footing 8.38 in Other Acceptable Sizes & Spacings: Toe: # 5 @ 12.00 in -or- Not req'd, Mu < S ' Fr Heel:# 5 @ 12.00 in -or- #4@ 17.00 in, #5@ 26.25 in, #6@ 37.00 in, #7@ 48 Key: No key defined -or- No key defined Advanced Structural Concepts Title : Job # Consulting Structural Engineering Dsgnr: Date: 9:30AM, 5 JUN 03 10940 NE 33rd Place, Suite 202 Description Bellevue, WA 98004 Scope: P:425.889.2189 F:425.828.6899 Rev: 550100 Laser KW-0604005. Ver5.5.0, 25-Sep-2001 Restrained Retaining Wall Design Page x (c)1983-2001 ENERCALC Engineering Software s:lslabskiobslsO3111xs03-1041enQ%s43-104.ecw: Description 9'-0" Detention Vault (Side Wall) j Summary of Forces on Footing : Slab RESISTS sliding, stem is PINNED at footing Forces acting on footing soil pressure (taking moments about front of footing to find eccentricity) Surcharge Over Heel = Ibs ft ft-# Axial Dead Load on Stem = 3,135.Olbs 1.42 ft 4,441.3ft-# Soil Over Toe = Ibs ft ft-# Surcharge Over Toe = Ibs ft ft-# Stem Weight = 1,087.5lbs 1.42 ft 1,540.6ft-# Soil Over Heel = 1,650.Olbs 2.67 ft 4,400.0ft-# Footing Weight = 507.5lbs 1.75 ft 888.1 ft-# Total Vertical Force = 6,380.Olbs Moment = 11,270.0ft-# Net Moment Used For Soil Pressure Calculations -105.0 ft-# Advanced Structural Concepts Title : Consulting Structural Engineering Dsgnr: 10940 NE 33rd Place, Suite 202 Description: Bellevue, WA 98004 Scope: P:425.889.2189 F:425.828.6899 User KGZ60d005. Ver5.5.0,25-Sep•2091 Restrained Retaining Wall Design (c)l983-2001 ENERCALC Engineering SoWnr re Description 9'-0" Detention Vault (End Wall) Job # Date: 9:30AM, 5 JUN 03 Page -4- Criteria r [Soil Data I Footing Strengths &Dimensions Retained Height - 9.00 ft Allow Soil Bearing = 2,000.0 psf fc = 3,000 psi Fy = 60,000 psi Wall height above soil = 0.00 ft Equivalent Fluid Pressure Method Min. As % = 0.0014 Total Wall Height = 9.00ft Heel Active Pressure = 55.0 Toe Width = 0.50 it Toe Active Pressure = 0.0 Heel Width = 1.50 Top Support Height - 9.00 ft Passive Pressure 200.0 Total Footing Width = 2.00 Water height over heel - 0.0 it Slope Behind Wall = P 0.00 : 1 = FootingllSoil Friction 0.400 Footing Thickness = 12.00 in Height of Soil over Toe = 0.00 in Soil height to ignore Key Width Ke De th y p - 0.00 in = 0.00 in Soil Density = 110.00 pcf for passive pressure = 0.00 in Key Distance from Toe - 0.00 ft Wind on Stem = 0.0 psf Cover @ Top = 3.00 in @ Btm.= 3.00 in Surcharge Loads Uniform Lateral Load Applied to Stem Adjacent Footing Load Surcharge Over Heel = 522.5 psf Lateral Load 0.0 #/ft Adjacent Footing Load - 0.0 Ibs -NOT Used To Resist Sliding & Overtum ..,Height to Top - 0.00 ft Footing Width 0.00 ft Surcharge Over Toe = 0.0 psf ...Height to Bottom = 0.00 ft Eccentricity - 0.00 in NOT Used for Sliding & Overturning Wall to Ftg CL Dist = 0.00 ft Axial Load Applied to Stem ` Footing Type Line Load Base Above/Below Soil _ 0.0 ft f Axial Dead Load = 605.0 Ibs at Back of Wall Axial Live Load = 440.0 Ibs Axial Load Eccentricity 0.0 in Des! B Summary Concrete Stem Construction Total Bearing Load = 3,083 Ibs Thickness = 10.00 in Fy = 60,000 psi ...resultant ecc. = 1.02 in Wall Weight = 120.8 pcf fc = 3,000 psi Soil Pressure @ Toe = 1 148 sf OK Stem is FREE to rotate at top of footing Soil Pressure @ Heel = P 1,935 psf OK Allowable = 2,000 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,656 psf ACI Factored @ Heel = 2,791 psf Footing Shear @ Toe = 7.8 psi OK Footing Shear @ Heel = 16.2 psi OK Allowable = 93.1 psi Reaction at Top = 1,918.1 Ibs Reaction at Bottom = 3,444.4 Ibs Sliding Cales Slab Resists All Sliding Lateral Sliding Force = 3.44.4 Ibs Footing Design Results Toe Heel Factored Pressure = 1,656 2,791 psf Mu': Upward = 219 0 ft- # Mu': Downward = 26 517 ft-# Mu: Design = 193 517 it-# Actual 1-Way Shear = 7.78 16.24 psi Allow 1-Way Shear = 93.11 93.11 psi Design height Rebar Size Rebar Spacing Rebar Placed at Rebar Depth 'd' Design Data fb/FB + fa/Fa Mu .... Actual Mn * Phi..... Allowable Shear Force @ this height Shear..... Actual Shear..... Allowable Mmax Between @ Top Support Top & Base Stem OK Stem OK = 9.00 ft 4.16 ft _ # 6 # 6 = 9.00 in 9.00 in = Center Center = 5.00 in 5.00 in @ Base of Wall Stem OK 0.00 ft # 6 12.00 in Center 5.00 in - 0.000 0.755 0.000 - 0.0 ft- # 8,813.6 ft- # 0.0 ft-# = 11,677.0ft-# 11,677.0ft-# 9,043.3ft-# = 0.0lbs 4,523.1lbs = 0.00 psi 75.38 psi = 93.11 psi 93.11 psi Rebar Lap Required = 25.63 in 25.63 in Rebar embedment into footing = 8.38 in Other Acceptable Sizes & Spacings: Toe: # 5 @ 12.00 in -or- Not req'd, Mu < S * Fr Heel:# 5 @ 12.00 in -or- #4@ 17.00 in, #5@ 26.25 in, #6@ 37.00 in, #7@ 48 Key: No key defined -or- No key defined Description Advanced Structural Concepts Title : Consulting Structural Engineering Dsgnr: 10940 NE 33rd Place, Suite 202 Description Bellevue, WA 98004 Scope P:425.889.2189 F:425.828.6899 5.5.0, 'zi0, Restrained Retaining Wall Design C Engineering Software 9'-0" Detention Vault (End Wall) of Forces on Footing : Slab RESISTS sliding, stem is PINNED at Forces acting on footing soil pressure (taking moments about front of footing to find eccentricity) Surcharge Over Heel = Ibs ft ft-# Axial Dead Load on Stem = 1,045.Olbs 0.92 it 957.9ft-# Soil Over Toe = Ibs It ft-# Surcharge Over Toe = Ibs It ft-# Stem Weight = 1,087.5lbs 0.92 ft 996.9114 Soil Over Heel = 660.Olbs 1.67 ft 1,100.Oft-# Footing Weight = 290.Olbs 1.00 it 290.Oft-# Total Vertical Force = 3,082.5lbs Moment = 3,344.8ft-# Net Moment Used For Soil Pressure Calculations -262.3 ft-# Job # Date: 9:30AM, 5 JUN 03 Page -'