Loading...
15-105689,1 February 17, 2016 Lauchlin Bethune Lauchlin R. Bethune Associates, Inc. PO Box 1442 Maple Valley, WA 98038 252nireNary Jim Ferrell, Mayor Email: laucll rl7i.bathuneassociates.com Re: File #15-105689-00-UP; PROCESS I `DIRECTOR'S APPROVAL' (NW WELLNESS CENTER) Site Improvements and Garbage Enclosure, 34730 Pacific Hwy S, Federal Way Dear Mr. Bethune: The Community Development Department has completed their review of your Process I Master Land Use application to modify a developed site containing a 22,084 sq. ft. medical office at 34730 Pacific Hwy S. The application was received on November 9, 2015. The technical review letter was sent on December 3, 2015. The applicant resubmitted revised plans on January 27, 2016. The Process I application is hereby approved as conditioned, per the findings, conclusions and conditions noted below. The City of Federal Way Planning, Development Services, Solid Waste and Recycling, Traffic and Building Divisions; and South King Fire and Rescue conducted proposal reviews. FINDINGS OF FACT 1. Proposal — The applicant proposes to remove two tandem parking stalls and a landscape buffer along Pacific Highway South to accommodate a city road project (i.e., widening). The area impacted by the city project will be redeveloped with landscaping, one ADA parking stall and ramp, and a pedestrian connection to Pacific Hwy S. Site plan modifications unrelated to the road widening include: • A new screened garbage enclosure; • Removal of existing parking lot landscaping; • Installation of new parking lot landscaping with trees; • Reconfiguration of existing parking stalls; • A new 18" block retaining wal l along 348"' Street (`Pisa II Roman' design); ■ A pedestrian connection to 348'11 Street; • Right -out, one-way only egress onto Pacific Hwy S. with a `Do Not Enter" sign; and • One-way parking aisle circulation where two-way previously existed. 2. Zoning and Comprehensive Plan —Zoning and comprehensive plan designations for the subject property are Commercial Enterprise (CE). The existing chiropractor office is an allowed use in the CE zoning district per Federal Way Revised Code (FWRC) 19.240.080 `Office Uses.' 3. Garbage Enclosure — The proposed site -obscuring enclosure composed of 6 ft. cedar fencing complies with the provisions of FWRC 19.125.150. 33325 8th Avenue South, Federal Way, WA 98003-6325 • (253) 835-7000 • www.cityoffederalway.com Mr. Bethune February 17, 2016 Page 2 4. Rockeries and Retaining Walls — The applicant proposes a new 18" block wall along 348t1i Street. FWRC 19.120.120(6) requires rockeries and retaining walls shall be setback a minimum of three feet from an abutting public right-of-way. The applicant has landscaped the area between the right-of-way and the wall to the road dedication line with day lilies, dwarf roses, rubus and cobble rock, maintaining a 3 ft. setback. 5. Pacific Highway Entrance —The south-east egress onto Pacific Hwy S. shall be right -out only per the Traffic Division. "Do not enter" signs will be placed on site. 6. Parking Space and Aisles —Site modification includes pavement markings to delineated parking and vehicle circulation areas using pavement markings. Due to the road widening, a parking area with loop access will not be feasible. Staff also recommends the installation of directional signage for one way circulation. • Parking stalls meet minimum stall/aisle dimensions pursuant to Bulletin #042 `Parking Lot Design Criteria. ■ The existing building is 22,084 sq. ft. (gross floor area); therefore, 12 parking stalls are required (300 sq. ft. per stall). The proposal provides 16 stalls. • Landscaped areas and abutting parking areas contain pennanent curbing and concrete wheel stops for diagonal and tandem parking. CONCLUSIONS OF LAW 1. The proposed improvements are consistent with applicable chapters of FWRC Title 19 including, but not limited to: Permits and Review Processes; Process I — Director's Approval; Community Design Guidelines; Commercial Enterprise (CE); and Outdoors, Yards and Landscaping. 2. The health, safety, and welfare of the citizens of the city are preserved. 3. Process I "Director's Decision" is the appropriate Master Land Use application as the improvements are to a developed site and do not exceed thresholds set forth in FWRC 19.15.030(1). 4. The proposed improvements are exempt from State Environmental Policy Act review as the scope of work meets categorical exemption WAC 197-11-800(1)(b)(iv), "minor new construction -flexible thresholds." 5. The Federal Way Comprehensive Plan and zoning designation for the subject property is Commercial Enterprise and `CE.' Pursuant to FWRC 19.240.080, the subject property's medical office use is permitted in the CE zoning district. CONDITIONS 1. The proposal is subject to a final inspection per FWRC 19.125.090 `Performance and maintenance standards.' Please contact L. Willoughby -Oakes at 253-835-2644 or leila.willouQ Zb - oakes(@..cilyoffedei-alway.com to schedule an inspection. 2. Per redlined plans place curb -stops for each tandem parking stall along the eastern property line; pursuant to FWRC 19.125.070(4), concrete wheel stops shall be provided in all abutting parking areas. 15-105689 Doc. LD. 71458 Mr. Bethune February 17, 2016 Page 3 3. Place at least 2 inches of mulch in all new landscaped areas. 4. The applicant shall obtain a Right -of -Way permit for sidewalk access to Pacific Highway S. Please contact the Public Works Department, Right -of -Way Permits, at 253-835-2725. 5. The applicant shall submit a building permit application for stairs, ramps, and ADA handrails., APPEALS The effective date of this decision is February 20, 2016. Pursuant to FWRC 19.55.050, any person who received notice of the administrative decision may appeal this decision to the Federal Way Hearing Examiner by March 5, 2016 (14 days after effective date). Any appeal must be in the form of a letter delivered to the Community Development Department with the established fee. The appeal letter must contain a clear reference to the matter being appealed and a statement of the alleged errors in the director's decision, including the identification of specific. findings and conclusions made by the director disputed by the person filing. In that you are the only party of record, your appeal period is waived (assuming you do not wish to appeal this decision). Waiver of the right to appeal does not affect the effective date of this decision. REVIEW BY OTHER DIVISIONS (BUILDING PERMIT REQUIRED) The Building Division requires a building permit application for the concrete ramp, two-sided hand -rail and two -riser stairs Note 1, Sheet L 1.0, noted as "For Submittal Only Not for Construction Use " in order to check code compliance (i.e., rise and runs). Please contact Peter Lawrence, Plans Examiner, at 235- 835-2621 or Peter.Lawrence(@,ciiyoffederalwU.com for additional infonnation. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. This Process I approval does not constitute approval of a right-of- way permit or building permit. If you have any questions regarding this decision, please contact Leila Willoughby -Oakes at 253-835-2644, or leila.willoughby-oaken@cityoffederalway.com. Sincerely, Michael A. Morales Community Development Director enc: Application Invoice (Planning Hourly Fee) Parking Lot Design Criteria Approved Site Plan Building Permit Materials c: Lord A. Nichols LLC, 34730 Pacific Hwy, Federal Way, WA 98003; Email: drlorrinicliolsfaR¢mail.com (Hardcopy & Email) Peter Lawrence, Plans Examiner Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Sr. Transportation Planning Engineer 15-105699 Doc I D 71458 25-P.- December 3, 2015 Jim Ferrell, Mayor Lauchlin Bethune Emailed: laucl7@betliuneassociates.com PO Box 1442 Maple Valley, WA 98038 RE: File No. 15-105689-00-UP; TECHNICAL REVIEW COMMENTS NW Wellness Center, 34730 Pacific Hwy South, Federal Way Dear Mr. Bethune: Community Development and Public Works Departments and South King Fire have reviewed your Use Process I application for site improvements to the Northwest Wellness Center at the corner of Pacific Hwy South and S. 348"' Street (34730 Pacific Hwy South). The request includes the removal of two tandem parking stalls and parking lot circulation resulting from city road improvements along Pacific Hwy South. The area impacted by the road widening will be redeveloped with a rain garden, pedestrian pathway to the public sidewalk, and one ADA parking stall. Other site improvements unrelated to the right-of-way widening include a new screened garbage enclosure, existing landscape planter removal and reconfiguration, a pedestrian connection from 348"' Street, overall parking stall reconfiguration/restriping and one-way traffic aisles. Unless otherwise noted, the following comments provided by staff reviewing your project must be addressed prior to issuing the Use Process I decision (15-105689-UP). Please direct questions regarding any of the technical comments to staff representatives below. PLANNING DIVISION (Leila W-Oakes, 253-835-2644, Leila.Willou libv-Oakes wCltl'Offetleralw-,iv.cojn) Landscape Islands — The applicant proposes several new landscaping islands. The site plan modification does not intend to increase the number of parking stalls, and therefore the minimum parking lot landscaping size requirements do not apply. However, staff advises the applicant work towards achieving the minimum code requirements of FWRC 19.125.040 and FWRC 19.125.070 (groundcover, mulch for evaporation, Type IV landscaping in islands and drought resistant/native plantings) to achieve site conformance for future redevelopments. Sign Permits — Two ground signs shown on the site plan will not be a part of this approval. Please apply for separate sign permits, unless exempt per FWRC 19.140.060, through the Permit Center. Please contact 253-835-2607 or Permit.Center(a;cityoffederalway.com for more information. 3. New Garbage Enclosure — Show screening details on the plan submitted. A new enclosure should be screened from abutting property and rights -of -way with a 100 percent site -obscuring fence or wall. Please note chain -link fences with plastic slats are not permitted. 33325 8th Avenue South, Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Mr. Bethune December 3. 2015 Page 2 of 3 4. Curbs Stops (Optional) — The parking proposal does not include or propose concrete curb -stops for parallel parking (FWRC 19.125.070(4)). Planning strongly recommends the installation of curb stops or an alternative wheel stop. 5. Inspections — Site modifications are subject to site improvement and landscaping inspections by the Planning Division. Call Associate Planner Leila Willoughby -Oakes at 253-835-2644 to schedule an inspection. Please see other reviewer comments for required inspections. BUILDING DIVISION (Peter Lawrence, Plans Examiner, Peter.La}vrence(a—i.citvoffederal►vay.com, 253-835-2621) 1. The applicant must provide a more detailed parking stall site plan in addition to ramp and stair configurations, to verify compliance with 2009 ANSI 117.1 501. 2. Commercial applications require handrails on both sides of the new stairs (2012 IBC, Section 1009, 1010 and 1012); it appears the drawing depicts one handrail. Please provide more detail on the site plan, including ramp and stair details if the applicant proposes a new ramp and stairs. Please contact Peter Lawrence, Plans Examiner, for more information. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Ann Dower, Senior Engineering Plans Reviewer, 253-835-2732, Ann.Do►ver racitvoffederalway.com and Kathy Mathena, Engineering Technician (ROW), 253-835-2725, Kathv.Mathenaacitvoffederalway.com ) 1. The plans submitted on November 9 show new landscaping and walls within the 3' utility strip behind sidewalk. It is recommended that within that area, the property owner wait until the Phase 5 Pacific Highway construction is complete to avoid damage to the new installation. Walls will not be permitted within public right-of-way (unless they are a part of the Phase 5 design). 2. A right-of-way permit will be required for the sidewalk access to Pacific Highway Sand for any other construction within public right-of-way. Please contact the permit desk at 253-835-2725. 3. Please submit a plan and profile for the rain garden and indicate where overflow will go. Show the plants that will be used. Where does roof runoff go now? The plan will need to show that water isn't going to flow into the public right-of-way and the rain garden will function as well or better than the current flow control system. PUBLIC WORKS TRAFFIC DIVISION (Sarady Long, PE, Senior Traffic Engineer, 253-835-2743, Saradv.Lonti!alcityoffederalway.com) Reduce the driveway width and increase the angle of the driveway on Pacific Highway S to limit/restrict northbound right -turn into the site. Also, provide a "Do Not Enter" sign for the right -out only. 2. To improve traffic circulation, Public Works staff encourages the applicant to close the southernmost driveway on Pacific Highway S and utilize the driveway to the north for right -in and right -out. This would improve access to the site but would entail reconfiguring the proposed one-way parking layout. If possible, the applicant should explore a 90 degree parking layout to take advantage of the northernmost driveway on Pacific Highway S. I5-105689-UP Doc I. D. 71491 Mr. Bethune December 3, 2015 Page 3 of 3 Please note, if future development occurs, Federal Way Revised Code (FWRC) 19.135.280 may be enforced, which would require a minimum of 250 feet between the intersection and driveway on Pacific Highway S. CLOSING Unless otherwise noted, the following comments provided by staff reviewing your project must be addressed prior to issuing the Use Process I decision (15-105689-UP). When resubmitting requested information, please provide a written response (cover letter) to the above - referenced items and four (4) copies of corrected full size drawings including rain garden detail with the enclosed resubmittal form. Further correction may be necessary as a result of submitting additional information. PROJECT CANCELLATION Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed void and the city shall have no duty to process, review, or issue any decisions with respect to such an application. If you have any questions regarding this letter or your development project, please contact Leila Willoughby -Oakes at 253-835-2644, or leila.willoughby-oakes@cityoffederalway.com. Sincerely, ro Leila Willoughby -Oakes Associate Planner enc: Resublttittal Form Bulletin #042- Parkin-, Lot Design Criteria Recommended Tree Species Bulletin Redlined Site Plan (Planning Comments) C: Dr. Lord Nichols, NW Wellness Center, Email: drlurrinieliols•ii unt 3il.epm (Owner) Ann Dower, Development Services Peter Lawrence, Building Department Naveen Chandra, Project Engineer, Streets Division Sarady Long, Senior Traffic Engineer/Planner 15-I0S689-UP Doc I D 71491 s� Lauchlin R. Bethune Associates, Inc. X Landscape Architecture & Planning, ASLA January 27, 2016 RESUBMITTED JAN 2 7 2016 Ms. Leila Willougby-Oakes CITY OF FEDERAL WAY City of Federal Way Planning Department CDS 33325 8th Avenue South Federal Way, Washington 98003-6325 RE: File no. 15-105689-00-UP; Revisions per Technical Review Comments NW Wellness Center, 34730 Pacific Highway South, Federal Way Dear Ms. Willougby-Oakes Attached please find four sets of the Paving and Parking Layout Plan and the Landscape Planting Plan construction documents for the site improvements to the NW Wellness Center based on the proposed street improvements by the City of Federal Way. There is no clouding on the plan as these are new plans based on the December 3, 2015 letter requesting revisions and additional information. The revision delta and date reference the Technical Review Comments of December 3, 2015. No signage is included in this permit and a-signage permit application will be submitted by the sign manufacturer and installer. The revisions include: 1. Providing a Landscape Planting Plan for the site including parking lot islands and frontage. 2. Details for enclosing the trash enclosure with a 6' tall solid wood cedar fence and gate. 3. Added wheel stops to parking stalls. 4. Provided dimensions, elevations, rails and details for construction of handicap parking ramp. 5. Provided rails and details for the steps: 6. Moved the retaining wall inside the right-of-way by jogging the wall and changing two stalls to the west to compact spaces. 7. Noted the requirement for "ROW Use Permit" for work off the property. 8. The rain garden has been eliminated for traditional landscape. The downspouts on the west side have been directed to a new drywell. 9. Reduced to one way egress to the north. (right turn only for the southwest driveway on Pacific Highway South. Coordination with City of Federal Way Engineering will be required to reduce the curb cut and apron to match the on -site work and new driveway width. Added "Do Not Enter" sign to be coordinated with the sign permit by the sign manufacturer and installer. If you have any questions or need any additional information please let me know Sincerely, Lauchlin R. Bethune Associates, Inc. WOW Lauchlin Bethune. ASLA President CC Dr. Lorri Nichols, NW Wellness Center Enc.: Parking and Paving Layout Plan of 1/6/15 Landscape Planting Plan of 1/6/15 Redlines and Letter of 12/3/15 file: lb/gen)2151541wo P.O. Box 1442 ■ Maple Valley, Washington 98038 ■ (425) 432-9877 ■ facsimile (425) 432-9878 A Air AIX Al "3�47301". icl is Hwy S ..... ANMW MMM 10 2015;Google Anow Go' MEOW �� -- } 4111 CITY OF Federal Way APPLICATION NOW RECEIVE® Nov 09 Z015 CITY OF FEDERAL WAY CDS MASTER LAND USE APPLICATION DEPARTMENT OF CommuNiTy DEVELOPMENT SERVICES 33325 8`' Avenue South Federal Way, WA 98003-6325 253-835-2607;Fax 253-835-2609 w w w. c ltyoffederalway. con] IS —I 5. '81-0C) L)PI Date 11 l Project Name t l l Ke& S CP.r kX Property Address/Location 3 13 0 Pad �,, A-P, Fe A&,-A0 W Parcel Number(s) ��i) t i • Iti S Project Description P�1 r P.vt tlx-7� A >fi�.ti' a� �S 'r e ✓ J ,A...l A l a , t 4-Af I Ot_ASi'1OA4 A,.. - ¢v "n d f%; V1, A pp,-_ �► Df � PLEASE PRINT >-To - • ' ' Type of Permit Required Annexation Binding Site Plan 'Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information r'OY1'lYYlel'1Ct�gA 41 �� g Designftion (r _E Comprehensive Plan Designation f7rJ , ZOValue of Existing Improvements 42P!6' _Value of Proposed Improvements International Building Code (IBC): am — Occupancy Type Y IR Construction Type Applicant , Name: Let.1.Le- Itn l 1 hw-o �-SS' 0 G ate Address: P, D, kk City/State: m ct U VoA l Zip: v JgO,� Phone: �S_ It 3 2, 18 77 Fax: 411 43Z-' 9k78) Email: Signature:k1l,".1„ b� t k.rr ass oC i ott �+'►') , Agent (if diffoXnt sKan Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner ` 4 r Name: { r` i d1l C-1l1;-}U` SS Address: �j 7 T' 1 CitylState; 0,� Phone:ce- (a- Q Fax: 5-5-7 L--r CG C{'�!6C, Signature- Emait:`� �^ � t O.L r Bulletin Bulletin #003 - January 1, 2011 Page 1 of 1 k:\landouts\Master Land Use Application CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: November 10, 2015 �,-.1�; :► TO: E.J. Walsh, Development Service,?anag Peter Lawrence, Plans Examiner ki.4 ek Brian Asbury, Lakehaven Utility District Vince F., South King Fire & Rescue Lindsey Tiroux, Public Safety Officer Rick Perez, City Traffic Engineer PROM: Leila Willoughby -Oakes FOR DRC MTG. ON: No Meeting- Review Only FILE NUMBER(s): 15-105689-00-UP PROJECT NAME: NW WELLNESS CENTER PROJECT ADDRESS: 34730 PACIFIC HWY S LL ZONING DISTRICT: CE PROJECT DESCRIPTION: Reconfigure parking stalls, parking lot circulation pattern and install new planter locations due to Pacific Hwy and S 348th Street road widening. LAND USE PERMITS: Use Process I (Site Plan Review) -Complete at submittal PROJECT CONTACT: Lauchlin R. Bethure Associates P.O. Box 1442, Maple Valley WA 98038 Email: lauch@bethuneassociates.com MATERIALS SUBMITTED: Narrative Site Plan Lauchlin R. Bethune Associates, Inc. ■ Landscape Architecture & Planning, ASLA Northwest Wellness Center 34730 Pacific Highway South Federal Way, Washington Proiect Narrative The proposed scope of work is required due to the road and sidewalk improvements through the widening of Pacific Highway South and South 348"' Street. The work includes reorientation of the parking lot stalls, circulation pattern, associated planters and interior sidewalks at the Northwest Wellness Center. Work includes tying in the existing downspouts on the east side of the building to surface drain to the parking lot and existing catch basins, construction of a 18" high gravity block wall to replace an existing railroad retaining wall and construction of a small rain garden for infiltration of down spouts on the west side of the building. Work includes minor removal of existing paving, adding new paving, new extruded curbs, concrete walks, handicap parking, re -seal coating and striping. All new planters will be landscaped. No subsurface drainage is in the proposed work. The existing sign will be relocated and a sign permit will be completed by the signage company. RECEIVED NOV 0 9 2015 CITY OF FEDERAL WAY CDS P.O. Box 1442 ■ Maple Valley, Washington 98038 ■ (425) 432-9877 ■ facsimile (425) 432-9878 I w x Ln Lo r z J x U r a CURB RAMP LOCATION STATION OFFSET RAMP WIDTH 53+66.56 63.75' LT 4' 53+90.00 42.43' LT 16' 54+22.82 71.69' RT 4' CURB RAMP LOCATION STATION OFFSET RAMP WIDTH 52+55.23 58.18' LT 8' 52+85.56 69.65' RT 4' 53+03.11 81.92' RT 4' POINT TABLE NO. I STATION OFFSET GUTTER ELEV DESCRIPTION 1 52+19.38 41.00' LT 266.60 PC, R=46' 2 52+37.43 44.69' LT 266.48 1/4 3 52+52.59 55.17' LT 266.37 1/2 4 399+01.38 57.38' RT 266.26 3/4 5 398+85.52 48.00' RT 265.36 PT 6 399+09.93 38.44' LT 266.51 MATCH 7 399+44.46 37.00' LT 268.05 PC, R=36' B 399+55.48 38.25' LT 268.63 1/4 9 53+71,15 47.68' LT 269.20 1/2 10 53+89.07 42.71' LT 269.77 3/4 11 54+00.03 41.00' LT 270.34 PT 1,m FILENAME KPF 02115 OESION�O BY m1E KPK 0715 CROMN SY DATE KPF 07/15 CHECKED BY DATE (n \ PLAN 0 10 20 40 60 SCALE IN FEET CURVE TABLE CURVE I DELTAI RADIUS I TANGENT I LENGTH GENERAL NOTES 1. CONSTRUCT CEMENT CONCRETE CURB, GUTTER, AND SIDEWALK PER TYPICAL SECTIONS, SHEETS 26-27. 2. CONTRACTOR SHALL ADJUST ALL JUNCTION BOXES WITHIN SIDEWALK GRADE 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARLY MARKING ALL UTILITY APPURTENANCES PRIOR TO PAYING OVER THEM. ALL CASTINGS SHALL BE ADJUSTED TO MATCH FINISHED ROADWAY GRADE. 4. FOR SIDEWALK TRANSITIONS AND EXTRUDED CURB POINTS NOT SHOWN ON ROADWAY PLAN SHEETS, SEE DRIVEWAY PLAN AND PROFILES, SHEETS 176-191. CONSTRUCTION NOTES �1 MATCH EXISTING. Lo r ®CONSTRUCT CEMENT CONCRETE COMMERCIAL DRIVEWAY ENTRANCE PER CFW STANDARD DETAIL 3-6A. w Lu ORECONSTRUCT HMA DRIVEWAY PER DRIVEWAY DETAILS & PROFILES, 6 SHEETS 176--191. 0 Lo O RECONSTRUCT CEMENT CONCRETE WALKWAY AND MATCH AT EXISTING L 8 JOINT. Lo s CONSTRUCT CEMENT CONCRETE PERPENDICULAR CURB RAMP PER crn O WSDOT STD PLAN F-40.15-02 z INSTALL CEMENT CONCRETE EXTRUDED CURB, PER CFW STANDARD J 16 DETAIL 3-4. x 17 INSTALL MOUNTABLE CURB PER CFW STANDARD DETAIL 3-4 23 ADJUST SEWER MANHOLE TO GRADE. 24 RELOCATE TELEPHONE VAULT BY OTHERS. 28 RELOCATE TELEPHONE PEDESTAL BY OTHERS. 34 INSTALL CEMENT CONCRETE FILL WALL PER DETAIL, SHEET 29. LIFE CHIROPRACTIC CLINIC 202104-9145 POINT TABLE NO. STATION OFFSET GUTTER ELEV DESCRIPTION 12 52+59.93 64.00' RT 266.91 PC, R=61' 13 52+79.16 67.11' RT 267.85 1/4 14 52+96.42 76.12' RT 268.78 1/2 15 400+68.49 72.04' RT 269.72 3/4 16 400+87.91 70.60' RT 270.65 PT 17 40D+98.41 71.52' RT 270.74 MATCH 18 401+17.53 25.17' LT 270.96 PC, R=36' 19 401+02.19 30.71' LT 271.06 1/4 20 54+24.69 69.02' RT 271.17 1/2 21F54+37.32 58.69' RT 271.28 3/4 224+53.20 55.00' RT 271.39 PT 1 oo°i° REVIEW I va� Federal Way POINT TABLE NUMBER STATION OFFSET DESCRIPTION 23 52+57.81 5.50' LT END 24 54+20.41 19.50' RT BEGIN 25 53+52-00 88.37' RT BEGIN 26 1 53+59.31 115.68' RT END LEGEND CURB & GUTTER X FENCE F FILL EMBANKMENT LINE CUT EMBANKMENT UNE -- -- EXISTING RIGHT OF WAY -- - - PROPOSED RIGHT OF WAY HMA OVERLAY SECTION HMA PAVEMENT SECTION CEMENT CONC. PAVEMENT O INSTALL HANDRAIL. CORRESPONDING SHEETS RIGHT OF WAY PLAN 40 SITE PREPARATION PLAN 57 ROADWAY PLAN 74 ROADWAY PROFILE 92 DRAINAGE PLAN 109 DRAINAGE PROFILE 125 WATER & SEWER PLAN & PROFILE 147 IRRIGATION PLAN 200 LANDSCAPE PLAN 220 ILLUMINATION PLAN 239 CHANNELIZATION & SIGNING PLANI 21B JOINT UTILITY TRENCH PLAN 1 294 w cn 0 Lo Lo cn w z U LEGEND CURB & GUTTER > FENCE -- FILL EMBANKMENT LINE C-- — CUT EMBANKMENT LINE — — - — EXISTING RIGHT OF WAY — — PROPOSED RIGHT OF WAY HMA OVERLAY SECTION HMA PAVEMENT SECTION 0 CEMENT CONC. PAVEMENT POINT TABLE NO. STATION OFFSET GUTTER ELEV DESCRIPTION 1 59+39.74 44.49' RT 283.40 PC, R=26' 2 59+49.75 46.23' RT 283.67 1 /4 3 59+58.33 51.67' RT 283.93 1/2 4 59+64.17 59.99' RT 284.19 3/4 5 j 59+66.38 69.91' RT 284.46 PT MATCH 6 1 57+45.35 13.85' RT END CURVE TABLE CURVE I DELTA I RADIUS I TANGENT I LENGTH CURB RAMP LOCATION STATION OFFSET RAMP WIDTH 59+60.76 54.34' RT 4' \ ` \, 16 GENERAL NOTES 1. CONSTRUCT CEMENT CONCRETE CURB, GUTTER, AND SIDEWALK PER TYPICAL SECTIONS, SHEETS 26-27. 2. CONTRACTOR SHALL ADJUST ALL JUNCTION BOXES WITHIN SIDEWALK GRADE 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARLY MARKING ALL UTILITY APPURTENANCES PRIOR TO PAVING OVER THEM. ALL CASTINGS SHALL BE ADJUSTED TO MATCH FINISHED ROADWAY GRADE. 4. FOR SIDEWALK TRANSITIONS AND EXTRUDED CURB POINTS NOT SHOWN ON ROADWAY PLAN SHEETS, SEE DRIVEWAY PLAN AND PROFILES, SHEETS 176-191. CONSTRUCTION NOTES to 0MATCH EXISTING. rl w O CONSTRUCT MODULAR BL= WALL. SEE WALL PLAN & ELEVATIONS = AND WALL DETAILS, SHEETS 157-175. N O CONSTRUCT STRUCTURAL EARTH WALL. SEE WALL PLAN & L 3 ELEVATIONS AND WALL DETAILS, SHEETS 157-175 m OCONSTRUCT CEMENT CONCRETE COMMERCIAL DRIVEWAY ENTRANCE PER CFW STANDARD DETAIL 3-6A. RECONSTRUCT HMA DRIVEWAY PER DRIVEWAY DETAILS &PROFILES, z SHEETS 176-191. J CONSTRUCT CEMENT CONCRETE PERPENDICULAR CURB RAMP PER c=i WSDOT STD PLAN F-40.15-02 F- 12 INSTAL BLACK VINYL COATED CHAIN LINK FENCE ON WALL PER WSDOT STANDARD PLAN L-20.10-02 14 CONSTRUCT MEDIAN. SEE POINTS LAYOUT TABLE AND MEDIAN EXTRUDED CURB DETAIL, SHEET 302-305 & 28. 16 INSTALL CEMENT CONCRETE EXTRUDED CURB, PER CFW STANDARD DETAIL 3-4. 17 INSTALL MOUNTABLE CURB PER CFW STANDARD DETAIL 3-4 16 RELOCATE MAILBOX 19 INSTALL BUS SHELTER PAD PER PIERCE TRANSIT 5X70 PAD DETAIL IN APPENDIX C OF THE SPECIFICATIONS, 20 ADJUST MONUMENT CASE AND COVER TO GRADE 21 ADJUST GAS VALVE TO GRADE O ADJUST TELEPHONE MANHOLE TO GRADE BY OTHERS. O ADJUST SEWER MANHOLE TO GRADE. 24 RELOCATE TELEPHONE VAULT BY OTHERS. 28 RELOCATE TELEPHONE PEDESTAL BY OTHERS. CORRESPONDING SHEETS RIGHT OF WAY PLAN 41 SITE PREPARATION PLAN 58 ROADWAY PLAN 75 ROADWAY PROFILE 93 DRAINAGE PLAN 110 DRAINAGE PROFILE 126 WATER & SEWER PLAN &PROFILE 148 IRRIGATION PLAN 201 LANDSCAPE PLAN 221 ILLUMINATION PLAN 240 CHANNELIZATION & SIGNING PLAN 279 JOINT UTILITY TRENCH PLAN 1 295