Loading...
23-100397City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Commercial Permit #:23-100397-00-CO Project Name: ST FRANCIS HOSPITAL - FAMILY BIRTHING CENTER Project Address: 34515 9TH AVE S Inspection Request Line: (253) 835-3050 Parcel Number: 750451 0020 Project Description: BLUEBEANVI - Renovation scope includes relocating patient registration services on level 01. Level G scope includes minor modifications to administrative offices and relocating the waiting area for radiation oncology. Owner Applicant Contractor Lender COMMON SPIRIT HEALTH HOLLY HERZERPERKINS & WILL SELLEN CONSTRUCTION OWNER IS LENDER 34515 9TH AVE S 1301 N 5TI-I AVE 227 WESTLAKE AVE N FEDERAL WAY WA 98003 SEATTLE WA 98101 SEATTLE WA 98109 Census Category: 437 - Commercial alt / add / conversion Includes: 41 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0.00 0.00 0.00 0.00 Additional Permit Information Mechanical to be Included? .... .............. :.................. Yes Plumbing Work Valuation?..................................... 0 Mechanical Work Valuation? .................................. 9000 Number of Stories................ 2 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ No Total Valuation: 211,000.00 Mechanical Fixtures Ducting 1 CONDITIONS: Fire conditions: A separate permit is required for the modification to the building fire alarm and firesprinkler system. PERMIT EXPIRES Sunday, 3 September, 2023 Permit Issued on Tuesday, March 7, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WashjFnwa the Pity of Federal Way. Owner or agent: i F.f �<i Date: VIAA THIS CARD IS TO REMAIN ON -SITE anor Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 100397 00 Address: 34515 9TH AVE S Project: COMMON SPIRIT HEALTH FEDERAL WAY WA 98003-6761 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Footings/Setback (4110) 0 Re -steel (4215) 0 Slab/Concrete Floor (4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date 0 Underfloor Framing (4285) 0 Floor Sheathing (4105) 0 Mechanical Rough -in (4165) Approved to sheath floor Approved to install flooring Approved By Date By Date By 4 Af Date Gas Piping (4125) 0 Fire/Draft Stops (4095) Approved to release test Approved By Date By Date [Electrical, LFire/Draft duling a Framing inspection; mbing & Mechanical Rough -in Stop inspections must be signed - approved. IBC 109.3.4 Q Framing (4120) 14 Insulation (4150) 11 Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape By Aft) Date By Date By Date *'"3 �2 Suspended Ceiling Grid (4265) Es Final - S K F & R (4060) Approved to drop tile Y 9 Approved By Date By Date 0 Final - Mechanical (4065) 16 Final - Building (4050) Approved Approved By 6 Date 6 By V Date �Z N By #113 - & v ;A I- rvkc- El aba--, a 4- -6 Of J (� -� �ev A Final - Planning Approved Date �vl dcelc on� Ll Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date