Loading...
23-103299City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PANTHER LAKE ANIMAL HOSPITAL Project Address: 1115 S 348TH ST Project Description: Retrofit LEDs in retail area Electrical Permit #:23-103299-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 202104 9042 Owner Applicant Contractor BROOKLAKE VILLAGE LLC JAN ROSANDERCUSTOM ELECTRICAL CUSTOM ELECTRICAL SERVICES LLC PO BOX 50210 SERVICES LLC (01) BELLEVUE WA 98015 3716 AUBURN WAY N CUSTOES893J2 (4/22/25) AUBURN WA 98002 3802 AUBURN WAY N SUITE 307 AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes L Circuits - Commercial Electrical Fixtures 31 PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: in h I I I h I = Date: r( f vot __N CITY of Federal Way THIS CARD IS TO RE-I_-1� O1-SITE Construction Inspection Record I\SPEC'TION REQUESTS: (253) 335-30-0 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. 'Work- must not be covered to atil it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are Iogged on the back of this card_ ELECTRICAL ❑ By LJFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary- Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ FeedersiSub-panels (4045) e3 Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date Bj Date By Date 0 Final - Electrical (4055) Dyed By Date p^ U MECHANICAL 0 -Mechanical Rough -in (4165) ❑ Gas Piping (4125) Final - -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to voter Approved Approved By Date By Date BY Date