23-103270City Federal Way
Communityy Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax:(253)835-2609
Project Name: EBERHARD
Project Address: 1305 S 291ST PL
Project Description: EV Charger, Panel Upgrade, and I alt circuit
Electrical
Permit #:23-103270-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 516210 0010
Owner
Applicant
Contractor
ERIC EBERHARD
AMANDA MOOREFULLER ELECTRIC INC
FULLER ELECTRIC (EL 01)
1305 S 291ST PL
1220 S 356TH ST SUITE A-5
FULLEEI027BK (1/12/24)
FEDERAL WAY WA 98003
FEDERAL WAY WA 98003
37107 12TH AVE S SUITE A-5
USA
FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 2
PERMIT EXPIRES Wednesday, 20 December, 2023
Permit Issued on Friday, June 23, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
ONEINi�
and the Citf Federal Way.
Owner or agent: Date:
�Z'�'l
cli.Y 01
Federal Way
THIS CARD IS TO REII_JI1 O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TMS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
Q
By
LTFER Ground (4295)
Approved
Date
Pool Bonding (4195)
Approved
Date
❑
By
❑
By
Ditch cover (4030)
Approved
Date
Temporary Poorer (4275)
Approved
Date
El
By
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Service (4235)
Approved
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El
Final - Electrical (4055)
Approved
By111�2f
Date/ -
MECHANICAL
❑
Aechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING-
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date