Loading...
23-103320City of Federal Way Community Development Dept. 33Ave Federal Way, WA 98003 Ph: (253) 635-2602607 F Fax: (255 3) 635-2609FILF Project Name: ELKIN Project Address: 34500 LOTH AVE SW Project Description: gas furnace replacement with Heat pump add on Mechanical Permit #:23-103320-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 132171 0510 Owner Applicant Contractor BRADLEY ELKIN TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 34500 LOTH AVE SW COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A 8607 DURANGO ST SW TACOMA WA 98499 ' TACOMA WA 98499 Mechanical Work Valuation?.. Compressors / Heat Pumps Additional Permit Information 14000.00 Is this an Online or O.T.C. application? .................. Yes Mechanical )(fixtures 1 Furnaces PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: r"" /' C �' � CITY Or Federal Way THIS CARD IS TO RE\I_-I\ O- -SITE Construction Inspection Record INSPECTION REQi-ESTS: (253) 53f,-3050 Scheduled inspections ma-; be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order is possible (read left to right. top to bottom). Please schedule inspections as appropriate. lWork must not be covered until it is approved. Check with your inspector if you are un_,ztre about any of the inspections or the inspection sequence- On -going inspections are IoLrged on the back of this card - ELECTRICAL ❑ LIFER Ground (4295) ❑ Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete Br Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Poorer (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 3❑ -Final - Mechanical (4065) Approved By- Date Approved to release test By Date Approved B` Date t J, ❑ Plumbing Groundwork (4190) Approved to cover By Date PLUMBING 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved Approved By Date BY Date