Loading...
23-102893City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MALLATT Project Address: 28608 27TH PL S Project Description: gas furnace replacement Mechanical FILE Permit #:23-102893-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 746690 0370 Owner Applicant Contractor. MARLA S MALLATT TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 28608 27TH PL S COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 98003 8607 DURANGO ST SW SUITE A 12811 PACIFIC HWY SW TACOMA WA 98499 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? ........................ ...... — 8664 Is this an Online or O.T.C. application? .................. Yes 1 Furnaces Mechanical Fixtures PERMIT EXPIRES Saturday, 2 December, 2023 Permit Issued on Monday, June 5, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way ,,. Date Owner or agent: CITY or Federal Way THIS CARD IS TO RE -LEI\ O\-SITE Construction Inspection Record I\SPECTIOti REQUESTS: (2-53) S35-30:50 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS C A.RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work Hurst not be co Bred until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. Chi -going inspections are logged on the back of this card_ ELECTRICAL ❑ By L'FER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date 0 By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Seri ice (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders[Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ -Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date % PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cm-er Approved Approved By Date By Date By Date