Loading...
04-102068CITY OF Federal May 28, 2004 I J L. imm- CITY HALL Way 33530 1st Way South • PO Box 9718 Federal Way, WA 98063-9718 (253) 661-4000 www. cityoffederalway.. com Mr. Bill Doyle King County Housing Authority 600 Andover Park West Seattle, WA 98188-3326 RE: Permit #04-102068-000-00-UP; EVERGREEN COURT APARTMENTS 1911 South 330`h Street, Federal Way, WA Dear Mr. Doyle: The City has completed a Process I review of the proposal submitted on May 24, 2004, regarding site improvements at the Evergreen Court Apartments. Specifically, you are proposing to install two new windows in the east fagade of an existing office building as well as internal improvements. The proposed project meets the requirements of "community design guidelines," in that the new windows are consistent with the existing structure and do not alter the existing architectural design of the building. Therefore, based on the City's review, the proposed improvements are administratively approved. This decision shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this project site. A building permit is required for this project. The effective date of the decision is May 31, 2004. Pursuant to Federal Way City Code (FWCC) Section 22-355, any person who received notice of the administrative decision may appeal the decision to the Federal Way Hearing Examiner by June 14, 2004. In that you are the only party of record to this proposal, you may waive your right to appeal. The City must receive this waiver'in writing. If you choose to waive your right to appeal, you could begin work on the project as soon as the waiver request is received and the building permit is issued. The total hourly Process I fee for this project is $58.50. This amount is subtracted from the $58.50 application fee paid at the time of project submittal and covers this review cost. There is no additional land use review due at this time. If you have any questions, please call Isaac Conlen, Associate Planner, at 253-661-4082. Sincerely, AM" 6�-� &-,- Kathy McClung, Director Community Development Services c: Isaac Conlen, Associate Planner 04 I02068 Doc I.D. 27528 MASTER LAND USE APPLICATION CITY OF Federal Tyr RECEIVED MAY 2 4 2004 (;I I OF FEDERAL BUILD NG DF=P WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33530 First Way South PO Box 9718 Federal Way WA 98063-9718 253-661-4000; Fax 253-661-4129 rite nffiedernlway com APPLICATION NO(S) O — Date S` Project Name—"0- d Property Address/Location ` �-�� Parcel Number(s) — 0 Project Description�+dU` Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Silt: Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information ing Designation Comprehensive Plan Designation Value of Existing Improvements Value of Proposed Improvements Un'farm Building Code (UBC)- a t 4 Occupancy Type Construction Type Applicant Name: `�K11vCj Address: (pp(� A�r]o0L�' Q�•� City/State: Zip: 019 �►$� Phone: 9,0 (p Fax: r.A b(v g' n i-f 1214 Email: 10. t I c� $) kJ -Lets ® I'c7 Signature: �29D — Agent (if different than Applicant) Name: 9o& Address: City/State-- Zip: Phone: Fax: Email: Signature: Owner Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Bulletin #003 — March 3, 2003 Pa-e 1 of 1 k:\Handouts — Revised\Master Land Use Application �- RECEIVED-) FederalWay MAY 2 4 2004 PERMIT COMMUNW DEVELOPMENT SERVICES 33530 FIRST WAY SOUTH • AA IIQX 9 718 FEDSRLWAY, WA aF FEDERA P p L I C AT I O Nf3253 G61A115• FAX 2S3.661�yC BUILDING DE �w ctft�e[E�rai+uaumm The following is required information - an incomplete appucatiort will not be ,�4 --�QZ � SF MF CO ME EL PL DE EN FP Please SITE ADDRESS 3I a)" SUITE/UNIT # ASSESSOR'S TAX/PARCEL # J— b-- - Cl—> =1 LOT SIZE (.n LEGAL DESCRIPTION (e.g. Acme Estates, Lot 1) C' (Attach separate page for lengthy legal description) G (A PIP) L _ ■ 0 711 L— or TYPE OF PERMIT at BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ELECTRICAL ❑ ENGINEERING ❑ FIRE PREVENTION SYSTEM PROJECT DESCRIPTION (Provide detailed description of work included on this Hermit onl ti►r�ir►r'1 PL•..Lt. i'_].]rl r,-,-hr) IU3 DL�l u�ow� PROJECT NAME (Name of Business or Owner Last Name) PROPERTY OWNER CONTRACTOR APPLICANT CONTACT LENDER EXISTING USE C PANY NAME } APPLICANT NAME rvrr+�:>a rn�+ra STATE, ZIP RELATIONSHIP TO PROJECT ❑ Architect ❑ Tenant ❑ Agent ❑ Other (Describe) C LAP3� Per RCW I9.27.0 5: Lender information is NAME required if project value exceeds $5, UQa At Mr. annRrtC CITY, STATE, ZIP EXISTING ASSESSED/APPRAISED VALUE $ SPRINKLERED BUILDING? ❑ YES ❑ NO WATER SERVICE PROVIDER ❑ LAKEHAVEN SEWER SERVICE PROVIDER ❑ LAKEHAVEN l FAX NUMBER (")'r�Q - 19sy E-MAIL _ PROPOSED USE VALUE OF PROPOSED WORK $ f FIRE SUPPRESSION SYSTEM PROPOSED/REQUIRED? ❑ YES ❑ HIGHLINE ❑ TACOMA ❑ PRIVATE (WELL) ❑ HIGHLINE ❑ PRIVATE (SEPTIC) ❑ NO ,I �� •_r � _ ..'T. .iMr. � • L+ r•� V. y .YNF .��.N.. � . -'M'.V - fr. .- ' '. . - .. Evergreen Community Room Upgrade The purpose of this project is to make the community space user friendly. Currently the space is mostly unused. The offices are to small and lighting is inefficient. The minor upgrades include, Install 2 windows on east side of Community building. Building currently has no windows. Move location of existing offices for more efficient use of space Install drop ceiling for improved lighting and energy savings. Windows Milguard Styleline Vinyl Low-E Doors Solid Core Birch Door Hardware Lever Handles Door Solid Core 1 hour rated Metal Studs 8 and 14 foot 25 gauge Studs Hem -Fir #2 better / existing walls Headers Hem Fir Sheetrock 5/8 GWB Type X Sheetrock '/2 GWB Drop Ceiling Metal Grid with % " 2x 4 Tiles Light Fixtures 2'x2' U tube troffers