Loading...
23-101839City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TCN Project Address: 33455 6TH AVE S Plumbing Permit #:23-101839-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 926500 0340 Project Description: BLUEBEAM - Scope includes: Rough-in/Install plumbing fixtures in new break area including (1) sink and (1) refer/ice maker. Hot water to be provided by under counter point of use water heater (to be located in cabinet under sink). Rough-in/Install of (1) Bi-level drinking fountain. Connect to existing building systems. Owner Applicant Contractor EDIFICE INVESTORS LLC KELSEY KINGAMERICAN MECHANICAL AMERICAN MECHANICAL CORP 11286 LA MADRE RIDGE DR CORP (PLUMBING) LAS VEGAS NV 89135 15820 AMBAUM BLVD SW AMERIMC796MG (7/12/23) BURIEN WA 98166 15820 AMBAUM BLVD SW BURIEN WA 98166 Plumbing Fixtures Drinking Fountains 1 Other Plumbing Fixtures 1 Sinks Water Heaters 1 PERMIT EXPIRES Tuesday, 31 October, 2023 Permit Issued on Thursday, May 4, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: I IF Date: � 0141 t THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQU ESTS: (253) 835-3050 PERMIT #: 23 101839 00 Address: 33455 6TH AVE S Unit 2-C Project: EDIFICE INVESTORS LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Plumbing Groundwork (4190) Q Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Aim Date (0 I',�I z3 By AJJ Date By AYJ Date 7I/� Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date I3F Date