Loading...
23-103312Mechanical City of Federal Way Permit #:23-103312-00-ME Community Development Dept 33325 8th Ave S L F Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KIM Project Address: 29815 11TH AVE SW Parcel Number: 195460 0070 Project Description: Installation of Heat Pump and Air Handler Owner Applicant Contractor JINAH KIM JULIE YUKHNONORTHWEST EXPERT NORTHWEST EXPERT HEATING LLC 29815 11TH AVE SW HEATING LLC NORTHEH833DF (3/15/25) FEDERAL WAY WA 98023 1020 S 344TH ST SUITE 209 1020 S 344TH ST SUITE 209 FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Mechanical Work Valuation? .......... ................... ..--. 5000 Is this an Online or O.T.C. application?.................. Yes 1111111M Mechanical Fixtures Air Handling Units 1 Compressors / Heat Pumps 1 PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ..Washington end the City of Federal Way l Owner or agent: Date: _N� CFVV w Federal Way THIS CARD IS TO REAL -UN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2_53) 33:5-30,50 Scheduled inspections may; be failed if this card is not on -site. DO NOT LOSE IBIS CA". Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be covered until it is approved. Check with your inspector if you are unwire about any of the inspections or the inspection sequence. Chi -going inspections are looped on the back of this card. ELECTRICAL 0 LIFER Ground (4295) Q Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065) By Approved Date By Approved to release test Date Bv �i Approved Dated/�1� PLUMBING Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to corer Approved Approved By Date By Date BY Date