Loading...
17-105617RESUBMITTED DEC 19 2017 CITY OF CITY OF FEDERAL WAY Federal Way COMMUNMY DEVELOPMEN-1 DEPARTMENT OF COMMIMrY DEVELOPMENT 33325 8ie Avenue South Federal Way, WA 98003 253-835-2607; Fax 253-835-2609 ►ew►v.ci[ t)do , lw-i . •n n CITY CENTER PLANNED ACTION DETERMINATION REVIEW CHECKLIST This checklist is used to determine whether a project is eligible to be considered a Planned Action exempt from further review under the State Environmental Policy Act (SEPA). (Section One is to be completed by the applicant and Sections Two and Three are completed by the city.) *A completed SEPA Checklist shall accompany this City Center Planned Action Checklist.* Project Name: Affinity at Federal Way (Affinity Senior Living Facility, File No. 17-105617-00SE and 17-105616-00-U Site Address: 31701 Pete von Reichbauer Way S., Federal Way W r~ Parcel No.: 0921049034 Property Area Impervious Surface Area Existing: 0 # of buildings on site: Sq. ft.: 77,101 g� � a 0 Acres: 1.77 Proposed: 57934.8 Sq. ft. # to be retained: 0 Name/Company: Matt Reider / ESM Consulting Engineers, LLC Mailing Address: 33400 8th AVE S., Suite 205, Federal Way, WA 98003 �o Email:matt.reider esmcivil.com d Phone: 253-838-6113 Relationship to owner: AGENT Name/Company: William Kell ` Mailing Address:10861 E. Adobe Creek Place L a 0 Phone: 520-638-5657 Email: bill _kelly@comcast.net C Describe the existing land use: Vacant Land c. Proposed land use check all that a 1 : 'o ;. ❑ Retail & Services ❑ Office a a ❑ Lodging ❑ Mixed use A 0 Residential ❑ Other : Residential dwellin units SF=sin le famil ; MF=multi-family Existing Proposed Proposed Density du/ac # SF:0 # SF: SF: ,G c # MF: 0 #MF:179 MR --101 du/ac d $ Office (square feet AExisting: 0 1 Proposed: 0 Retail & Services (square feet Existing: 0 1 Proposed: 0 Bulletin #074 — July 22, 2016 Page 1 of 3 k:\Handouts\CC Planned Action Application Parking Spaces # Existing: 0 Proposed:189 AM Peak Vehicle Trips Existing est. trips: 0 Project est. trips: 36 Net new: 36 PM Peak Vehicle Trips Existing est. trips: 0 Project est. trips-, 47 Net new:47 Source of trips rate: ITE Trip Ge eration Manual 10th Ed. Date: 1 Signature: 11010XA�Vlk, Section Two: Review Criteria (City to complete) The city's SEPA responsible official may designate conforming projects as "planned actions" pursuant to RCW 43.21C.440 that meet the following conditions per Ordinance No. 16-811. Criteria (FWRC 14.15.130[3][d][ii]) Complies i no, explain on separate sheet an ttaeh The project is not otherwise exempt from SEPA. Yes ❑ No The proposal is located within the Planned Action Area as identified on Exhibit A "City Center Planned Action Area Map" of Ordinance No. 16-811. Yes ❑ No The project is consistent with the Federal Way Comprehensive Plan. El,YQS ❑ No The project is subsequent or implementing a project which has had significant adverse environmental impacts adequately identified in the Planned Action SEIS. Yes ❑ No Proposed land uses are consistent with those described in the planned action SEIS and FWRC 14.15.130(3)(c)(i). Y El No The proposal is consistent with the thresholds identified in FWRC 14.15.130(3)(c)(ii) & (iv). Yes ❑ No Residential Threshold: 2,400 units Office Threshold: 400,000 sq. ft. Retail Threshold: 475,000 s . ft. Lodging Threshold: 600 rooms AM Peak Vehicle Tri. s Threshold: 3,617 PM Peak Vehicle Trips Threshold: 6,792 1 *For remaining capacity see attached spreadsheet. The project's adverse impacts are able to be mitigated through the application of mitigation measures detailed in Exhibit B, "Planned Action Mitigation Document," of Ordinance No. 16-811, as well as other applicable city, county, state, and federal requirements and conditions. Yes ❑ No The proposed project complies with all applicable local, county, state, and federal re lations. Yes ❑ No The proposal is not an essential public facility (EPF) as defined in RCW 36.70A.200, unless an EPF is accessory to or part of a development that is designated a planned action. Yes ❑ No Bulletin #074 — July 22, 2016 Page 2 of 3 k:\Handouts\CC Planned Action Application Section Three: Planned Action Determination (city to complete) Requirements Complies (if no, explain on separate sheet and atta h) Application for a Planned Action was made on forms IV yes ❑ No provided by the city, including a SEPA Checklist. The application is complete as provided in FWRC &JIyes ❑ No 14.10.020.7. The application is consistent with the criteria of the 911/yes ❑ No Planned Action Ordinance. The development application meets all applicable ' yes ❑ No requirements of the FWRC. ualifvin Project (if no. explain on a separate sheet and attach C�Vlyes Qualifies as a Planned Action: The application is consistent with the Planned Action Ordinance and thereby qualifies as a Planned Action project. The project shall proceed in accordance with the appropriate permit procedures, except that no additional SEPA review, threshold determination, or EIS will be required. Public notice of this determination shall be provided as specified in FWRC 14.15.060(3). Does Not Qualify as a Planned Action: The application is not consistent with ❑ No the Planned Action Ordinance and does not qualify as a Planned Action project. Additional SEPA Review Required: Projects disqualified as a Planned Action may use or incorporate relevant elements of the environmental review analysis in the SEIS prepared for the Planned Action, as well as other environmental review documents to assist in meeting SEPA requirements. The SEPA Official may choose to limit the scope of the SEPA review to those issues and environmental impacts not previously addressed in the SEIS. SEPA Process Prescribed: Signature (Director): 1 Date: ///Z// g Bulletin ##074 — July 22, 2016 Page 3 of 3 k:\Handouts\CC Planned Action Application 4k Department of Community Development Services 33325 8u' Avenue South Federal Way, WA 980D3-6325 -6325 CITY OF 253-835-2607; Fax 253-835-2609 1112 1 2110 www.ci1yoffederalway.co Federal Waym Cr TY OF FEDERAL VAY COMMUr i7y QFVrELOPME,1, ]' SEPA ENVIRONMENTAL CHECKLIST Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization, or compensatory mitigation measures will address the probable significant impacts, or if an environmental impact statement will be prepared to further analyze the proposal. Inshwcdons fora* cantr. LhelW This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use `Soot applicable" or "does not apply" only swhenyou can explain whyit does not apply and not when the answexis rn Anown. You may also attach or incorporate by reference additional studies and/or reports. Complete and accurate answers to these questions often avoid delays with the SEPA process, as well as later in the decision -malting process. The checklist questions apply to all parts ofyour proposa4 even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instruedons for Lead Agencees: Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal, and an analysis of adverse impacts. The checklist is considered the first, but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonprojeet proposals: U&Ipj For nonproject proposals (such as ordinances, regulations, plans, and programs), complete the applicable parts of sections A and B, plus the i ii°l,l 1 i•.f I ,i S1II_FOR OR ` [ .j`11I:c?II:c: i' r'I rI()itib ,1}� ri I� . Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may, exclude (for nonprojects) questions in Part B (Environmental Elements) that do not contribute meaningfully to the analysis of the proposal. Bulletin #050 — May 1, 2014 Page 1 of 14 k-.\Handouts\Environmental Checklist May 2014 A. BACKGROUND el 1. Name of proposed project, if applicable: "Affinity at Federal Way" 2. Name of applicant: h� 6W Affinity at Federal Way, LLC % Robert Ketner 3. Address and phone number of applicant and contact person: 120 W. Catoldo Ave, Ste 100 Spokane, WA 99201 509-321-3204 4. Date checklist prepared: June 27, 2018 5. Agency requesting checklist: VLe1W City of Federal Way 6. Proposed timing or schedule (including phasing, if applicable): Land Use Process Approval. Fall 2018 Ground Work and Construction: 3-4 months following Land Use Approval Completion: 9-12 Months Following Start of Ground Work 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. DjelW No, this proposal is a single project that will not require future additions or further activity outside of building construction. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. • Phase One Environmental Study by Earth Solutions NW dated 9128117 ■ Geotechnical Report by Earth Solutions Northwest Dated 9128117; i Preliminary technical information report addressing relevance of the 9 Core and 5 Special Requirements of 2016 King County Surface Water Design Manual by ESM Consulting Engineers, LLC dated 612812018; and • Title Report by Chicago Title dated 1111412017 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No other approvals are pending. A Street Modification Request was granted to allow the modified intersection spacing between the driveway access off Pete von Reichbauer Way S and S 3161h Place. 10. List any government approvals or permits that will be needed for your proposal, if known. lDiell VJ Bulletin #050 — May 1, 2014 Page 2 of 14 kAHandouts\Environmental Checklist May 2014 Commercial Grade & Fill City of Federal Way, SEPA Threshold Determination, Process Ill Land Use Review, NPDE Permit/rESCP Permit; at Building: Building Permit, Lakehaven Utility District Developer Extension Agreement and Side Sewer Permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) iel Construction of approximately+ 256,866 square feet of 200 new age -restricted living units and 211 parking stalls (187 stalls are designated for tenants and 24 stalls are designated for guests). Proposed building will be approximately 65' -8 5/8" tall consisting of 6 stories above structure parking. Access to the basement level parking is provided off Pete von Reichbauer Way S while access to ground level parking and the main entrance is provided off of S 3161h Pl. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. VLe1W The site is located to off S 316th Place at 31701 Pete Von Reichbauer Way South. King County parcel numbers 092104-9034; within S/T/R: SW-09-21-04 A site plan has been included with the Land Use Application package. Exhibit A of the title report included with the Land Use application for a complete legal description of the property. B. ENv1RONMENTAL ET-EMENTS 1. Earth a. General description of the site VLcIW (underline/circle one): Flab rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? ±25% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Vashon till deposits are across the site: a compact mixture of silt, sand and gravel. Native soil is primarily dense to medium dense, silty sand with gravel. Otherwise, there is fill and remaining gravel from a previous property development that was decommissioned in 2009 with a building demolition. Please refer to the Geotechnicol Report included with the Land Use application for reference and more information. Bulletin #050 — May 1, 2014 Page 3 of 14 k:\Handouts\Environmental Checklist May 2014 d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. I-elpi None e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. &LIW The purpose of the site fill and grade activities is to provide an adequate and level surface for the building and parking space. There will be approximately 19,200 cubic yards of cut and 1,100 cubic yards of fill for a net cut quantity of 18,100 cubic yards. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Erosion could occur as a result of clearing and construction, particularly if earthwork is completed during periods of rainfall. TESC measures will be implemented as approved by the City prior to construction. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? "el After completion of building construction, surface parking, and ROW improvements approximately±98% of the site will be impervious surface. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. The owner will institute an erosion control plan to be used during earthwork and construction. �Walffl a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. h[ elf] Some heavy machinery exhaust and dust particulates generated primarily by construction equipment could result during the development phase of this project. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. DLelpj None known. c. Proposed measures to reduce or control emissions or other impacts to air, if any. All construction equipment will be in proper working order and regulated for emissions by the manufacturer and local emissions laws. Vehicles entering and leaving the site will also be regulated for emissions by state and local emissions laws. During construction the site will be watered as necessary to keep any dust from impacting surrounding air quality. 3. Water a. Surface Water iel Bulletin #050 — May 1, 2014 Page 4 of 14 k:\Handouts\Environmental Checklist May 2014 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. hj e1W There are no wetlands or any other known environmentally critical areas on or near the site. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. DLelpl There are no wetlands or any other known environmentally critical areas on or near the site. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. �� None proposed. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Not proposed. 5) Does the proposal he within a 100-year floodplain? If so, note the location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. VAW Not proposed. b. Ground Water 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses, and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. hf elR Not proposed. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage; industrial containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Vig.1pl N/A c. Water runoff (including stormwater): 1) Describe the source of runoff (including stormwater) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Bulletin #050 — May 1, 2014 Page 5 of 14 k:\Handouts\Environmental Checklist May 2014 Run-off from impervious surfaces will be collected and directed into on -site stormwater detention and water quality treatment facilities. Once detained and treated for water quality, the storm water will be released to the downstream system. One mile to the south the City's storm system discharges to Hylebos Creek. 2) Could waste materials enter ground or surface waters? If so, generally describe. h� el No. Suspended soils and hydrocarbons associated with automobiles will be collected in catch basins and directed to water quality facilities installed per City of Federal Way standards. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No - discharge will occur at the natural location. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The project contractors, users, and personnel will utilize onsite Best Management Practices. Attached drainage plans show runoff from impervious surfaces will be directed to on site stormwater facilities. 4. Plants VLelW a. Check the types of vegetation found on the site: _ _deciduous tree: alder, maple, aspen, other _ _evergreen tree: fir, cedar, pine, other _shrubs _ X —grass pasture crop or grain orchards, vineyards, or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Since most of the site is unvegetated or minimally vegetated with grass and weed, the amount of vegetation removal will also be minimal. c. List threatened and endangered species known to be on or near the site. No native threatened and endangered plant species observed or known to occur on or immediately adjacent to the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any, VLelW Buffer enhancement with native trees and shrubs will be done as appropriate. e. List all noxious weeds and invasive species known to be on or near the site. Bulletin #050 — May 1, 2014 Page 6 of 14 k:\Handouts\Environmental Checklist May 2014 No none to exist on site. 5. Animals a. List any birds and other animals which have been observed on or near the site, or are known to be on or near the site. Examples include: ftlW birds: hawk, songbirds, other. mammals: rabbits, squirrels fish: no fish inhabit the site b. List any threatened and endangered species known to be on or near the site. No listed species are known to occur on or near the Site. c. Is the site part of a migration route? If so, explain. The entire region is known to be part of the Pacific Flyway. The Pacific Flyway includes Alaska and the Aleutian Islands and the Rocky Mountains and Pacific coast regions of Canada the United States and Mexico, south to where it becomes blended with other flyways in Central and South America. However, the site is not known to be used by migratoryfowl. d. Proposed measures to preserve or enhance wildlife, if any. None proposed, aside from the required landscaping. e. List any invasive animal species known to be on or near the site. None known. 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electrical energy will be the primary source of power serving the project. Natural gas maybe used to satisfy incidental energy needs. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No, any proposed building height will not exceed 66 feet above grade. No existing development utilizes solar energy in proximity to which the shadow cast from the building has any effect. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any. elpj No plans included in the Land Use Process or Commercial Grade & Fill Permit. Energy conservation will be addressed in the building permit documents. 7. Environmental Health Bulletin #050 — May 1, 2014 Page 7of14 kAl-bndouts\Environmental Checklist May 2014 a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposaLO If so, describe. jt� None known. 1) Describe any known or possible contamination at the site from present or past uses. Litter from trespassers is the only known contamination associated with this site. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. None known. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. None known. 4) Describe special emergency services that might be required. Emergency medical and 911 services may be required, along with typical fire and police services. Special services are not anticipated. 5) Proposed measures to reduce or control environmental health hazards, if any. State regulations regarding safety and the handling of hazardous materials will be followed during the construction process. Equipment refueling areas would be located in areas where spill could be quickly contained and where the risk of hazardous materials entering surface water is minimized. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? pLelp The primary source of noise near the project site is from vehicular traffic along S 31 r Pl, S le St, Pete Von Reichbauer Way S, and a further -distant Pacific Highway. It is not anticipated to materially impact the proposed project in any way. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. hel Short-term impacts would result from the use of construction equipment during the site development. Construction would occur during permitted construction hours and always in compliance with the City of federal Way noise regulations. Long-term impacts would be those vehicular trips associated with nearby hotel and developed senior housing community. Noise generated from the proposed senior housing operations is not expected to impact surrounding properties. 3) Proposed measures to reduce or control noise impacts, if any: Bulletin #050 — May 1, 2014 Page 8 of 14 k:\Handouts\Environmental Checklist May 2014 Construction activity will be limited to permitted construction hours and construction equipment will not be allowed to idle for continuous periods of time, which will help mitigate the impacts of potential construction noise. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. Jhel The site is currently vacant, yet was previously developed for a gym space. The site is bordered to the east with Town Square Park and a shopping center with mixed use; to the west and north are hotel facilities; and to the south are more shopping facilities. The proposed development may have a minor, long term impact with respect to the additional trafficfrom tenant and employee trips. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any; If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? Vhe1W No 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how. No impact. c. Describe any structures on the site. ftlo None. The site is currently vacant. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification of the site? ( _I City Center Core - CC f. What is the current comprehensive plan designation of the site? City Center Core g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. No critical areas are on the site. i. Approximately how many people would reside or work in the completed project? Bulletin #050 — May 1, 2014 Page 9 of 14 k:\Handouts\Environmental Checklist May 2014 Approximately±225 people will become residence of the development, and±3 additional employees. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any. el Not applicable. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any. ftlo The project will be developed in accordance with applicable City of Federal Way development and land use codes to ensure the project is consistent with the goals and policies of the Comprehensive Plan and applicable Development Regulations. m. Proposed measures to reduce or control impacts to agricultural and forest land of long-term commercial significance, if any. None proposed. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. The proposal includes 200 units of affordable senior housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. None. c. Proposed measures to reduce or control housing impacts, if any. The proposal incorporates size limitations within the units that accommodate senior -citizen living experiences. No other measures are proposed. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? t 66 feet, 5- stories, concrete case formed walls and lap siding b. What views in the immediate vicinity would be altered or obstructed? No amenity views will be altered by this development. A landscape buffer will border the project on all sides. There will be some sight restrictions from the adjacent hotel on the west to view the park on the east c. Proposed measures to reduce or control aesthetic impacts, if any. DjcI4 Bulletin #050 — May 1, 2014 Page 10 of 14 k:\Handouts\Environmental Checklist May 2014 Newly landscaped areas will be planted to screen areas and blend in with the existing adjacent development. 11, Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Parking lot lighting would occur dusk through dawn at completed project. Minimal glare would occur from sunlight reflected off parked cars. Additionally, the headlights of traveling vehicles would occur any time of day. Some glare may be produced by the reflective glass windows during the early morning and late afternoon periods of sunshine but would be retained on site. A site lighting plan has been included with the application materials. b. Could light or glare from the finished project be a safety hazard or interfere with views? No, not with the landscaping buffers included in the plan. c. What existing off -site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any. In addition to landscape planting, parking lot fixtures will be limited to ±25 feet in height to control glare from these fixtures. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? The Town Square Park to the east of the property is the only known outdoor recreational opportunity in the immediate vicinity of the proposed project. b. Would the proposed project displace any existing recreational uses? If so, describe. Didpj No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any. BLe1W A walkway through campus is proposed for the project site, with a safe crosswalk walking route to the neighboring park and adjacent amenities. Other on site amenities include a pool, game rooms, family dining room, a craft room and communal lounge areas. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. fhelp� None found or known. Bulletin #050 — May 1, 2014 Page 11 of 14 kAHandouts\Environmental Checklist May 2014 b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. No known landmarks or evidence have been observed on or near the site. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. hf elp] The methods used to assess the potential impacts included GIS data analysis and WISAARD GiS data review. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. If any such historic or cultural evidence is encountered during construction or installation of improvements, work will be halted in the area and a state -approved archeologist/historian will be engaged to investigate, evaluate and/or move or curate such resources, as appropriate. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. DLelpj S 3161h Place and Pete Von Reichbauer Way S service the proposed site. The arterial streets that provide access are Pacific Hwy S to the west and S 320th Street to the south. Access is proposed from Pacific Hwy or S 3201h and onto the two streets identified that serve the proposed project site. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? ftl .44 Yes, the site is serviced by Metro Transit's RapidRide along S 316`h and Pacific Hwy. There is a Transit Center Park & Ride nearby, and additional bus routes along S 32016 St. c. How many additional parking spaces would the completed project or non -project proposal have? How many would the project or proposal eliminate? D164 A parking garage is implemented into the proposed building with 189 parking stalls. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle, or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Jbe1W Development of the project will not require any new roads, as adequate access is already developed. Improvements will be made to the right-of-ways adjacent to the project site on S 3161 Place and Pete Von Reichbauer Way S, to include additional planting strip, asphalt and sidewalks. d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. DitIpI Bulletin #050 — May 1, 2014 Page 12 of 14 k:\Handouts\Environmental Checklist May2014 Not expected. e. How many vehicular trips per day would be generated by the completed projector proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and non -passenger vehicles). What data or transportation models were used to make these estimates? Jhel The new, 200 senior -citizen living units with a total of 256,866 square feet is anticipated to generate 634 new daily trips. it is estimated that the proposed development will create 46 new PM peak hour trips. f. Will the proposal interfere with, affect, or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. Not expected. g. Proposed measures to reduce or control transportation impacts, if any. Payment of the City's transportation impact fee will be issued to the City, which will help fund City-wide transportation improvements. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The completed living facilities would result in a slight increase need for public services to include fire protection, police protection, and health care. b. Proposed measures to reduce or control direct impacts on public services, if any. The increased demand will be offset by impact fees, levies, and taxes required to be paid by the applicant as part of this development. Also the proposal has been designed in a manner that will provide adequate access for fire, medic, and police vehicles. Police protection needs will be minimized by the employment of private security monitoring systems. Business and property taxes generated by the proposed residential space should be sufficient to offset any increases in public service needs. 16. Utilities a. Underline/circle utilities currently available at the site: iel electricity, natural gas, water. refuse service telephone, sanitary sewer, septic system, other The above listed utilities are either available on -site or will be extended as necessary to serve the site. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Lakehaven Utility District will provide water and sewer connection. Puget Sound Energy will supply electricity and gas Telephone: Century Link, Verizon, Comcast Fire Protection: South King Fire & Rescue Bulletin #050 — May 1, 2014 Page 13 of 14 lc\Handouts\Environmental Checklist May 2014 C. SIGNATURE i ; ; ; 1 1, i The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Ag�� — — Printed Name of Signee: � e -A Position and Agency/Organization:���Q,►r 1 '�, _711��11f� �► Date Submitted: v/aT T Bulletin #050 — May 1, 2014 Page 14 of 14 k.\Handouts\Environmental Checklist May 2014 CONSULTING ENGINEERS LLe June 27, 2018 Mr. Robert "Doc" Hansen Planning Manager City of Federal Way 33325 8th Avenue S Federal Way, WA 98003-6325 Job No.1981-001-017 BMI 1 JUG! 2 8 2018 CITY OF FEDERAL YVA.Y COMMUNITY DEVELOPMW'47 RE: File Nos. 17-105616-00-UP and 17-105617-00SE Response to 1 -11 Technical Review, Affinity Senior Living Facility 31701 Pete von Reichbauer Way S., Federal Way Dear Doc: 2,, d f On behalf of Inland Group, ESM Consulting Engineers, LLC is submitting this letter in response to the 7 Round Technical Comments dated February 20, 2018. Per our usual response letters, responses have been provided in bold under the corresponding comment. The Project has also included programming revisions we would like to highlight that vary from the original submittal: Unit/parking/footage: The project,,now consists of 200 units, 211 parking stalls, and a gross footage of 256,866 versus the original of 179 units, 189 stalls, and a gross footage of 254,971. f - ■ Exterior architecture:-ThrougPi c no tinued correspondence with the planning department the residential siding & opening scheme has been pulled down to cover the level 1 parking garage, canopies have been added, the roof is now flat with varying parapet heights versus a pitched roof, another siding color and texture has been introduced. j ■ Amenities - amenities have been added to the ouch side of the project and an outdoor plaza has replaced the pool area. • Variance - A height variance is no longer required. A variance to reduce the requirement of the northern landscape buffer is being requested. Please see the start of the "Community Design Guideline Compliance" letter for the complete request. This issue stems from the location of the existing paving within the access easements provided for it and the northern property CSC (Ae owners building their landscape buffers within the easement area. f34,110 th Ave S Ste 205 Tet (253) 838 6113 Everett (425) 297 9900 Way. WA 98003 Fax (253) 838 7104 Toll Free (800) 345 5694 www esmcivit com oZ [ Mr. Robert "Doc" H, _�en June 27, 2018 Page 2 CD PLANNING DIVISION Doc Hansen, Planning Manager, roberthansen@cityoffederalway.com 253-835-2643 Planning staff has reviewed the proposed senior citizen housing proposal and has the following comments and requests. General Use Zone Chart & Develol2ment Regulations 1. A height variance is requested for the structure. "A height variance can be granted in exchange for providing publicly visible streetscape amenities, as defined in FWRC 19,05.190, along the right-of-way, the siting and design of which shall be approved by the director" (FWRC 19.225). Streetscape amenities are defined as "pedestrian - oriented features and furnishings within the streetscape, such as bench seats or sitting walls, weather protection, water features, art, transit stops with seating, architectural facade treatments, garden space associated with residences, pedestrian -scale lighting, landscaping that does not block views from the street or adjacent buildings, special paving, kiosks, trellises, trash receptacles, and bike racks." Your introductory letter indicates that the proposal includes "a public plaza (eastside) and a flagpole..." These are not considered to meet the intent of this standard because the access to this "plaza" is limited and not easily accessible to the residents. A "flagpole" referenced in the narrative does not meet the intent of an "amenity." The pitched roof has been replaced with a flat roof and new overall building height of 66-8 5/8" fitting within in the allowable 70' building height A variance is no longer required. 2, Per FWRC 19.225.070, note 6, the rooftop does not have to be gabled if the no -gable rooftop contributes to the open space requirements. A flat roof meeting building and fire standards could provide for open space amenities for residents and meet more of the downtown design objectives listed within the Comprehensive Plan and the City Code. A flat roof design having access and providing open space would not have to exceed the 70 feet height limitation and therefore, would not require a height variance. The pitched roof has been replaced with a flat roof and new overall building height of 66-8 5/8" fitting within in the allowable 70' building height Open outdoor space has been added on the roof of the pool at level 2, see sheet A320. 3. Please note the community deck gross floor area on the Cushing Terrell floor plans. Deck area has been identified. A schedule of open spaces has been added to sheet A310. Mr. Robert "Doc" Ha in June 27, 2018 Page 3 4. Please amend the labels on the site photograph sheet to the correct location. They are currently mirrored and confusing. The mirrored images were inadvertent The images have been revised. 5. While the designs at the east end of the proposal can be considered .1streetscape amenities," the extent of these amenities is not sufficient for the scale of the project. There are opportunities to provide more amenities on the north and west sides of the property, where only the required Type III landscaping is proposed. We are no longer requesting a height variance through additional street scape amenities. We have been in conversation with planning to reduce the north property boundary landscaping requirement See item 13. - We have provided street scape amenities including: a location for public art, additional landscaping east of the building, awnings covering the north sidewalk, raised sidewalk planters, and an extended pone cochere for covered seating area 6. Sheets A2.2 & A2.3 - 'C Corner #1' and 'C Corner #2' do not have any labels. Are these dwelling units? There appears to be no plumbing fixtures. Please clarify and indicate their purpose. Perhaps one of the corners could be abandoned for purposes of providing indoor or outdoor plaza areas for use by residents. Please note that as a condition of the Process III decision, Affinity at Federal Way shall be restricted to a senior housing use per FWRC 19.225.070 requirements. Any land use decision in this project did not include analysis for assisted living and/or approval for convalescent care, a nursing home or hospital use (i.e. a Class II facility) either in whole or even partially as an accessory use. Convalescent centers and nursing homes are defined, "as an inpatient facility, excluding facilities defined as hospitals, for patients who are recovering from an illness or who are receiving care for chronic conditions; mental, physical, emotional or developmental disabilities; terminal illness; or alcohol or drug treatment and may include assisted living facilities." Please contact Plans Examiner Peter Lawrence at 253-835-2621 if the applicant has plans for eventual transition to, or partial use as, an assisted living facility. If residents will age in place, building standards will change from an R-2 to 1-2 occupancy. Different building, fire and zoning code specifications and ADA requirements apply to assisted living uses (i.e. those not capable of self-preservation). If the applicant were to transition to a combined senior housing and convalescent center/nursing home, they are required to first obtain a change of use approval under FWRC 19.15.025. The city would evaluate the change of use request for compliance with FWRC 19.225.080, and all aspects made non -conforming as a result of the change of use must be brought into compliance with the regulations in effect at the time of the application. Said use may not occupy the building unless land use approvals, related building permits and a certificate of occupancy for the new use are issued. Operating an assisted living facility or retirement facility with care without the required permits would constitute a zoning violation. Mr. Robert "Doc" HE an June 27, 2018 Page 4 The °C comer # 1 & 2" are dwelling units and the confusing labels have been cleaned up on this submittal. Common open space areas are clarified in the schedule added to sheet A310 and the architectural floor plans. Comment regarding future change of use is understood. 7. Please submit an exterior materials and colors board per submittal Bulletin #001 (FWRC 19.15.040). Exterior materials board has been added to sheet A500. 8. Open Space Requirements -Per FWRC 19.115.115 and FWRC 19.225.070, notes 8 and 9, the subject property must provide usable open space in a total amount equal to at least 100 sq. ft. per dwelling unit and may include private open spaces such as yards, patios, and balconies (excluding "Juliet" balconies), as well as common open spaces such as plazas, playgrounds, recreation rooms, rooftop terraces, p- patches, pools, active lobbies, and atriums. Hallways, bathrooms or access ways cannot be counted as 'open space.' Entryways, lobbies, courtyards and outside dining areas can be counted as 'common open space.' A minimum of 25 percent of the usable open space provided must be common open space. It appears this standard has been met; however, all eligible usable open space shall also meet the requirements specified in FWRC 19,1 15.115. Please provide your calculations of open space on the revised site and/or floor plans to determine that there is 100 sf per unit of useable open space. Our initial calculations show this open space requirement is not met. The applicant shall provide a minimum of 17,900 square feet of cumulative open space. The narrative indicates that 14,000 square feet is provided. 4,475 square feet shall be common open space per FWRC 19.115.115 requirements. The 24 sq. ft. (3 feet x 8 feet) of 'Juliet' balconies are not considered to meet the intent of 'open space' pursuant to FWRC 19.05.1503. Opens space areas have been identified on the A sheets and a schedule of spaces & square footages is shown on A310. Please note the project is now 200 units requiring 20,000 A Parking 9. Structured Parking - The applicant proposes two levels of parking on the first floor and basement. If constructed alone without dwelling units above, the two floors of parking would be considered a parking structure.' Therefore, the department concludes this proposal includes 'structured parking' pursuant to the definition found in FWRC 19.05.190. Noted, architectural modifications identified in the following item. Mr. Robert "Doc" HL )en June 27, 2018 Page 5 10. Structured Parking Requirements (Community Design Guidelines) - FWRC 19.115.0500 requires: a) Parking structures which are part of new development shall be architecturally consistent with exterior architectural elements of the primary structure, including rooflines, facade design, and finish materials. The parking structure walls on the north, south, east, and west side do not have design characteristics consistent with the proposed senior housing units. Please revise so that the structured parking is consistent with the residential structure. Siding and windows have been added to the at grade building parking level to replicate the residential levels above using similar material variation. Awnings have been added to all building elevations to meet the articulation requirements. The remaining exposed concrete walls (basement level walls on the east side and a small portion of the east side of the north elevation) have been changed to match the adjacent siding color. The east elevation basement wall is further obscured with stepped plantings. b) Parking structures should incorporate methods of articulation and accessory elements, pursuant to FWRC 19.115.060(3)(b), on facades located above ground level. Siding and windows have been added to the at grade building parking level to replicate the residential levels above using similar material variation. Awnings have been added to all building elevations to meet the articulation requirements. The remaining exposed concrete walls (basement level walls on the east side and a small portion of the east side of the north elevation) have been changed to a color that matches a primary siding color. The east elevation basement wall is further obscured with stepped plantings. c) Buildings built over parking should not appear to "float" over the parking area, but should be linked with ground level uses or screening. Parking at grade under a building is discouraged unless the parking area is completely enclosed within the building or wholly screened with walls and/or landscaped berms. Please show how you will link the building with the ground level and City Center streetscape. Although the parking area is completely enclosed within the building, there is little to no articulation. The applicant proposes a 'publicly visible streetscape amenity' with a door from the parking garage. However, this is not sufficient for the purposes of creating a connection to the street. The east elevation is used only as a garage entry and emergency egress door. The residential siding has been pulled down to cover the at grade parking and remove the floating effect A taller and deeper landscape buffer has been added to obscure the exposed basement garage wall which will now be painted to match the evening blue siding. Awnings have been added to increase articulation. The property configuration restricts where Mr. Robert "Doc" Ht en June 27, 2018 Page 6 the building entrance can be located (a long narrow lot) and the substantial grade change creates difficulty locating common areas at PVR Way elevation. To connect, we have added building signage and public art to draw pedestrians to the NE comer of the building and then used awnings, planters, and an oversized sidwalk to draw attention to the Porte Cochere and main entrance. (d) Parking structures and vehicle entrances should be designed to minimize views into the garage interior from surrounding streets. Methods to help minimize such views may include, but are not limited to, landscaping, planters, and decorative grilles and screens. The only view into the garage areas will be available when the garage doors are open as residents enter or exit The windows shown on the at grade level garage will be opaque glass and the basement level parking garage will only have architectural louvers for fresh air requirements. (e) Security grilles for parking structures shall be architecturally consistent with and integrated with the overall design. Chain -link fencing is not permitted for garage security fencing. Please indicate how these standards are being met. The garage does not have any security grills. All openings for venting or light will be architectural in nature and replicate the layout of windows at the residential levels. The garage doors will be solid. There is no chain -link fence schedule for garage enclosures. 11. Guest Parking - The submitted plans depict 189 spaces, leaving additional 10 spaces for staff and resident's guests. Please label on the plans where guest spaces will be assigned. The design narrative states the five surface parking spaces will be beside the front entrance. As a SEPA condition the city requires guest parking for a project of this size. It is expected, as observed at similar projects that such a facility will generate a significant number of guests and employees at one time, thereby exceeding the proposed number of parking spaces. While you meet FWRC parking requirements, the environmental impact upon existing parking can be significant Please indicate how and where such parking will occur for our threshold determination *Please note that your proposal is eligible for a maximum of 40 percent compact stalls as you exceed 20 spaces (i.e. 72 spaces). If you choose to install compact spaces please indicate on the floor plans where compact spaces are proposed and the number. Please see Lindsey Sperry's comments regarding parking overflow issues at other Senior Living Facilities in the city.* The project now consists of 200 units of affordable senior housing versus market rate. The project will provide 211 total stalls. Of those stalls,187 will be designated tenant stalls. Affordable projects do not demand 1 to 1 parking. The project will provide 24 guest and employee stalls including the 5 surface stalls and the north parking garage on level 1 which has 19 stalls. The north garage door will remain C Mr. Robert "Doc" HG m n r-d j �O� June 27, 2018 Page 7 open during staffing hours, 9 am to 7 pm, and requi key access afterhours. We do not believe overflow parking.will be required. If it w re required, it would likely be after 7 pm (as guest parking garage locks) durin ours where use of the park parking lot located across PVR way use would be low.l We understand the recent affordable project with a parking issue was constru ted at a ratio of % stall per unit Landscaping I have conducted a review of the preliminary landscape plan for compliance with the required minimum spatial requirements of the FWRC. Please note that while the Director is authorized to vary landscaping requirements, the resulting landscaping in other areas of the project must provide significantly greater characteristics of landscape design beyond which is required of FWRC 19.125. 12. Sheet AV - Please remove reference to Affinity at Round Rock, Texas since the project is proposed in Federal Way. If proposed, label the dog park shown including square footage and any proposed landscaping. The Round Rock references have been removed from the plans. Dog park is labeled and footage identified. 13. There is no vegetative relief on the south side of the lot; at a minimum 5 feet of Type III landscaping is required per FWRC 19.125.060.7.c for uses for senior citizen housing in the CC-C zone, as a 5 foot -side yard applies. This can only be waived if landscaping and/or designs proposed significantly exceed minimum standards through other landscaping or other designs such as providing open space on a flat roof for residents and meeting downtown atmosphere. A type III buffer has been added to the southern boundary. The northern property line also requires Type III landscaping per FWRC 19.125.060. There are several perimeter buffers under the required 5 feet and therefore it is substandard. Please revise to meet standards. All perimeter buffers less the north side now meet FWRC requirements. We are requesting to remove the northern boundary landscaping requirement and replace with public amenities including canopy covered sidewalk, public art display location, decorative concrete connections through the entrance area and covered seating at the porte cochere. The northern project boundary is burdened by the offset development of the existing road and the northern neighbors using the roadway easement area for their landscaping buffers, see ALTA survey on sheet FCC-01. The current street requirement for S 316th Place is 28' of paving (FDP) with a 12' sidewalk This requires removing approximately 1 foot of the northern neighbor's landscape buffer. To provide a 5' landscape buffer on the north side of our building we would have to remove in -kind from the landscape buffer on the northside of the street for no net gain. It would also prevent the awnings we are providing along the north sidewalk from offering any pedestrian cover. We are providing additional buffer along the eastern boundary and all available areas on the northern boundary are planted. Multiple outdoor amenities have been added for resident use: dog park, outdoor plaza with resident raised gardens, and a pickleball court Mr. Robert "Doc" H,, men June 27, 2018 Page 8 14. Sheet LA-02 - At least 25 percent of new landscaping materials (i.e. plants, trees, and groundcovers) should be drought -tolerant Please note on landscape plans (FWRC 19.125). Sheet LA-02 has been revised to note which new landscaping materials are drought - tolerant The provided materials follow FWRC 19.125. 15. Please indicate where additional evergreen tree species will be interspersed within the Type III landscape buffer4 per FWRC 19.125.050 along the western property line. Large shrubs and groundcover are missing. Sheet LA-01 has been revised to indicate Type III landscaping pursuant to FWRC 19.125.050. 16. Label the species type proposed on the vegetated lattice, if proposed as part of the structured parking architectural articulation. Please describe if these will be evergreen or deciduous species. As shown on the revised landscape plans (LA-01 and LA-02), the proposed vegetated lattice has been removed and replaced with a variety of tall, skinny columnar plant species to provide texture and color against that wall in the space available. Lawn/Grass Areas 17. Process III Condition: Permanent lawn areas shall have permanent irrigation systems. Submit an irrigation plan for all sod/grass areas. The Planning Division will make a final landscape and irrigation system inspection prior to issuance of occupancy. Irrigation plans will be submitted with building permit 18. Please revise the landscaping legend. The proposed sidewalk resembles grass and could be confusing at time of final inspection. Process III plans have been updated with revised legends and surfaces to avoid confusion. CPTED 19. Please see Crime Prevention Analyst Lindsey Sperry's comments (see comments 79 to 82). Noted - see item 20, 79 through 82. 20. Security Plan - Please provide a detailed security plan and describe in your proposal how you will secure the following areas from unauthorized access: Mr. Robert "Doc" H�- -n June 27, 2018 Page 9 The building will provide electronic access systems at every entry point including the garage car doors. Further - the man doors located within the garage leading to resident spaces will be access controlled to provide 2 points of authentication. The main entry door and the west small garage will be the only points unlocked for public access and parking and only during staffing hours of 9 am to 7 pm. A310 & A320 have been updated to show access control and cameral locations with the following schedule of devices: telephone entry system, key fob access, door ajar alarm, exit only doors, and camera locations. ® Underground parking entrances - key fob entry system. • Building access - telephone entry system for guest, key fob entry system for residents, or exit only. Entryway on east side with stairs located in the retaining wall. - East side man door will be exit only with door ajar alarm. East side garage door will be key fob entry system. Storage area security in the underground parking garage. - The garage itself is key fob entry, the access to the elevators is also key fob entry, any storage areas are controlled by staff only keys and locksets are storeroom function. The security details provided on page 2 of the project narrative prepared by Cushing and Terrell are insufficient. A security program is a condition of the Planned Action SEPA (see FWRC 19.115.040 program requirements enclosed). This comment must be addressed per FWRC 19.115.020 prior to the land use for the subject proposal. Community design guidelines and crime prevention through environmental design (CPTED) shall be processed as a component of the governing land use process. Planning will conduct a final inspection confirming the approved security program is fully implemented prior to final occupancy. Noted. Community Design Guidelines 21. FWRC 19.115.050(1)(b) "Pedestrian areas and amenities should be incorporated in the overall site design. Pedestrian areas include but are not limited to outdoor plazas, arcades, courtyards, seating areas, and amphitheaters. Pedestrian amenities include but are not limited to outdoor benches, tables and other furniture, balconies, gazebos, transparent glass at the ground floor, and landscaping." Again, along Pete von Reichbauer Way S. the building/structured parking provides no connection aside from a utility door from the parking garage and a stairway to the streetscape. No plazas, arcades, courtyards, outdoor benches, tables, gazebos, or transparent glass exist on the property for the benefit of pedestrians. Please revise and indicate how the revisions meet this standard. The revised design is using PVR Way as the parking garage entrance leaving very little space for pedestrian amenities. Additional landscaping has been added to help step the streetscape into the building. We have added the following pedestrian amenities: Canopies over north sidewalks, raided planters within the north sidewalk, seating area at the Porte Cochere, pickle ball court and dog park on the west side Mr. Robert "Doc" H,, man June 27, 2018 Page 10 of the building, and outdoor plaza and patio on the south side of the buildings. The plaza will have raised gardens for tenant planting and a BBQ area with a gazebo. 22. FWRC 19.115.050(1)(c) "Pedestrian areas should be easily seen, accessible, and located to take advantage of surrounding features such as building entrances, open spaces, significant landscaping, unique topography or architecture, and solar exposure." No pedestrian areas are provided from the primary building except along Pete von Reichbauer which is not easily accessible to the residents. Please propose such pedestrian areas in your revision. Pedestrian amenities are identified in item #21 above. The largest amenity, outdoor plaza, is located on the southern side of the building to take advantage of the solar exposure. 23. FWRC 19.115.050(2)(b) "Vehicle turning movements shall be minimized. Parking aisles without loop access are discouraged. Parking and vehicle circulation areas shall be clearly delineated using directional signage." Please clearly define directional signage and pavement markings for vehicles on the surface, first floor and underground parking areas. In particular, clearly define if the drop-off and pick- up area is one or two-way traffic. Vehicle movements have been identified on ST 01 for the drop of area It is one- way traffic. All of the parking garages are designed for two traffic. 24. FWRC 19.115.050(4)(b) "Pedestrian pathways and pedestrian areas should be delineated by separate paved routes using a variation in paved texture and color, and protected from abutting vehicle circulation areas with landscaping. Approved methods of delineation include: stone, brick or granite pavers; exposed aggregate; or stamped and colored concrete." Prior to building permit approval install 6 ft. wide pedestrian walkways from the primary entrance to the S. 316" St sidewalk composed of a separate paved route using variation in texture and color (i.e. stone, brick or granite pavers; exposed aggregate; or stamped and colored concrete). Depict on the construction site and landscaping plans. Paint striping on asphalt is not an approved method of delineation (Sheets A2.0 & A2.1). Colored stamped concrete has been added to lead pedestrians from the front entry, under the porte cochere and then further connecting both directions of sidewalk along 316th place. 25. FWRC 19.115.060 (1)(c) directs that materials and design features of fences and walls should reflect that of the primary buildings. White concrete is not characteristic of, or complimentary to, the primary building and the upper five floors of senior housing. Please revise. Siding and windows have been added to the at grade building parking level to replicate the residential levels above using similar material variation. Awnings have been added to all building elevations to meet the articulation requirements. The remaining exposed concrete walls (basement level walls on the east side and a small portion of the east side of the north elevation) have been changed to a color Mr. Robert "Doc" HG ).m June 27, 2018 Page 11 that matches a primary siding color. The east elevation basement wall is further obscured with vegetate lattice and stepped landscaping features. 26. All buildings except townhouses must meet two of the fapade modulation and screening options outlined in FWRC 19.115.060(2)(a-d). The proposal meets the facade modulation option (a), but needs to either provide one of the options below (you may mix options throughout each facade): a) Eight -foot -wide Type II landscape screening along the base of the facade, except Type IV may be used in place of Type II for facades that are comprised of 50 percent or more window area, and around building entrance(s). (Option b); or We have not included this option. b) Plaza square footage equal to one percent (1 %) of the gross floor area of the building, but must be a minimum of 200 square feet. The plaza should be clearly visible and accessible from the adjacent right-of-way (option d). Approximately 2400 square feet would have to be provided for this project. We have not included this option. c) Canopy or arcade - As a modulation option, canopies or arcades may be used only along facades that are visible from a right-of-way. Minimum length: 50 percent of the length of the facade using this option. We encourage you to provide canopies over the windows along the principal entrance and southern property line in order to achieve minimum FWRC 19.115.060 building modulation and screening requirements. Structural canopies have been added to the west, east, and north elevations. Sunshade canopies have been added to the south. 27. The secondary facade along Pete von Reichbauer does not contain structural modulation (off -set facades) or architectural articulation pursuant to FWRC 1.9.1 15.060(3)(b) on the first 22 vertical feet from street level. Please provide additional structural modulation and architectural articulation on this wall screening the structured parking. Pete von Reichbauer Way S. is a major street in the City Center Core and a vegetated lattice alone would not meet the objective of this standard (Landscaping Sheet LA3.0). Please indicate if any vegetated lattice is evergreen or deciduous species. We are no longer planning a vegetated lattice. Siding has been added to the at grade level parking structure (level 1) to mimic the residential levels. Canopies have been added at two levels to meet the articulation requirements. The basement garage wall color has been changed to match the evening blue siding color, architectural lovers have been added match window openings above and provide fresh air, and a 15' deep landscape buffer that increases in height as it nears the building is being used to obscure the wall. Mr. Robert "Doc" He, 3)n June 27, 2018 Page 12 28. Per FWRC 19.115.070(1)(b) plazas, public open spaces and entries should be located at street corners to optimize pedestrian access and use. The building comers, not labeled on the floor plans (see General section) if taken out, could provide such type of plaza area, publicly visible streetscape amenities and/or enhanced visibility for pedestrians. The properties length and significant grade change creates the necessity of orientating the buildings main entry to 316th PI versus PVR Way. We have provided landscaping along PVR way to minimize the buildings garage level and added building signage to north side of the east face to draw pedestrians towards the main entry. The sidewalk leading to the main entry along 316t" Place has been provided with public art, canopies, and raised planters to invite pedestrians to the porte cochere. The project only public opens spaces are the new location for art work and the porte cochere seating area. All other open spaces are private. 29. FWRC 19.115.090(3)(d) "Principal cross -site pedestrian pathways shall have a minimum clear width... eight feet in the city center core, and shall be protected from abutting parking and vehicular circulation areas with landscaping." It also indicates, "Pedestrian pathways shall be provided from rights -of -way, bus stops, parking areas, and any pedestrian plazas and public space to primary building entrances. Where a use fronts more than one right-of-way, pedestrian access shall be provided from both rights -of -way, or from the right-of-way nearest to the principal building entrance." Any pathway from the main entrance to the S. 316th St. sidewalk is a principal cross -site pedestrian pathway and must be 8 feet. Other pedestrian pathways may be a width of 6 feet. Pedestrian pathways consisting of stamped colored concrete have been added through the porte cochere and connecting the east & west sidewalks. Their widths are 18' and 12' respectively. 30. "Pedestrian pathways shall be clearly delineated by separate paved routes using a variation in color and texture, and shall be integrated with the landscape plan." As described above, please provide pedestrian connections between 316th Street S. and the main entrance of the building and PVR Way South if the applicant proposes a project redesign. No pedestrian connections for residents are provided throughout the site. Walkways shall be a minimum of 6 ft. and paint striping asphalt is not an approved method of delineation. Again, no pedestrian pathways are provided from right-of-way or potential plaza areas to the primary entrance. Pedestrian pathways consisting of stamped colored concrete have been added through the porte cochere and connecting the east & west sidewalks. Their widths are 18' and 12' respectively. 31. FWRC 19.115.060 (3)(b)(i)-(viii) directs that facades located above ground level shall have a combination of showcase, display, recessed windows; window openings with visible trim material, or painted detailing that resembles trim, vertical trellis(es) in front of the wall with climbing vines or similar planting, architectural features such as setbacks, indentations, overhangs, projections, articulated cornices, bays, reveals, canopies, and awnings; landscaped public plaza(s) with space for vendor carts, concerts and other pedestrian activities; material variations such as colors, brick or Mr. Robert "Doc" K Un June 27, 2018 Page 13 metal banding, or textural changes; artwork such as mosaics, murals, decorative masonry or metal patterns or grillwork, sculptures, relief, etc., over a substantial portion of the blank wall surface. The exterior of the building has been significantly modified to incorporate these Meals. The major items include continuing the residential opening and siding schemer through level 1, addition of awnings on all building elevations, and adding �y another siding texture and color to the project The Department proposes you provide at a minimum, canopies over the proposed windows at ground level along the south and north elevations for additional articulation. Articulation is absent from the south side of the structure and there are no material or color variations along the structured parking facades on the north, east and west. Structural canopies have been added to west, north, and east elevations. Sunshade ��,� 5 style canopies have been added to the south elevation. The building siding and window openings scheme has been added to level 1. �c,o This is provided on the east elevation, but additional plant heights or other methods Jtr` such as public art and/or textures should be incorporated upon a wall of this height {j and total gross area to prevent the "floating' nature of the building. The building siding and opening scheme has been added to the level 1 to reduce the floating effect and the remaining garage wall visible from PVR way (approximately 14') has been change to match a siding color and obscured with a t� 15' landscape buffer which grows in height as you near the wall. �y L 32, The Cushing Terrell project narrative (dated November 20, 2017) is inconsistent with the elevation plans and landscaping detail. Page 2 notes that decorative screens and landscaping will be provided along portions of the garage visible to 6 adjacent streets. Sheets A5.0 and LA-03 do not depict decorative screening. Please 1+ revise.�,�` • tf� The vegetated lattice plan has been abandoned. Please see the revised building elevations on sheet A500. The at grade level parking garage walls have been Lo redesigned to match the siding and window scheme of the residential levels. The {l,. basement garage wall that remains visible on the east will be obscured with a 15' deep landscape buffer that increases in height as you near the garage wall. The color of the wall has been changed to match a primary siding color. PW DEVELOPMENT SERVICES DIVISION Cole Elliott, Development Services Manager, Cole.ElliattQcityoff_ederalway.cam. �y 253-835-2730'r S� 33. The submitted plan set included a detail sheet which outlines details for a "dog AKVJ park." There hasn't been any previous mention of this in association with the proposal. Detail sheet was submitted for "Round Rock" Texas. For future reference no outside agency's details should be submitted, nor will be accepted., Mr. Robert "Doc" Ht 3n June 27, 2018 Page 14 "Round Rock, TX" has been removed from the drawings. There is a dog park located in the SW comer of the project site and will be surrounded by a 36" back vinyl coated chain link fence and landscape buffer on 2 sides. 34. Site photo plan sheet appears to have mirror images of the actual layout printed on them. Why? The mirrored images were inadvertent The images have been revised and is included with the resubmittal. 35. The Plans and the Technical Information Report provide several different total areas for this parcel. Please correct. The correct site area is 77,237 SF or 1.77 acres. The report has been revised to more clearly define and describe the specific areas and includes any reasoning for using areas that might not add up to the total site area. SEPA 36. The submitted SEPA does not include the City Center questionnaire per the Planned Action SEPA completed for the Core Area. The City Center Questionnaire has been included. 37. Question A.9 should also include the submitted Street Modification request. The submitted Street Modification Request has been included. 38. Question Al indicates that as few as 10 parking spaces are proposed for visitors and staff use. The project now consists of 200 units of affordable senior housing versus market rate. The project will provide 211 total stalls. Of those stalls,187 will be designated tenant stalls. Affordable projects do not demand 1 to 1 parking. The project will provide 24 guest and employee stalls including the 5 surface stalls and the north parking garage on level 1 which has 19 stalls. The north garage door will remain open during staffing hours, 9 am to 7 pm, and will require key access afterhours. We do not believe overflow parking will be required. If it were required, it would likely be after 7 pm (as guest parking garage locks) during hours where use of the park parking lot located across PVR way use would be low. We understand the recent affordable project with a parking issue was constructed at a ratio of YZ stall per unit TECHNICAL INFORMATION REPORT MR Section 1 39, Project Overview, Proposed Site Hydrology states that water quality will be provided by a catch basin cartridge filter system. These do not meet enhanced basic water quality treatment standards. Mr. Robert "Doc" HE fan June 27, 2018 Page 15 The report has been revised to state that an approved water quality system which has a "general use" designation for enhanced basic water quality treatment (such as "Modular Wetland" or similar) will be used. 40. Project Overview and Plan Sheet ST-01 states the parcel is 1.77 acres. Figure 1.2 states 1.51 acres (Table 4.1) and the modeling uses a different total value for the parcel. The correct site area is 77,237 SF or 1.77 acres. The report has been revised to more clearly define and describe the specific areas and includes any reasoning for using areas that might not add up to the total site area. 41. Soils on Project Site indicates that the soil is Vashon-age Glacial Till (Qvt) but Figure 1.4 indicates Alderwood (AmC). Figure 1.4 is from the Web Soil Survey (WSS) online resource maintained by the USDA National Resource Conservation Service (NRCS). The information for the WSS is based on generalized soil surveys from decades ago which provides a basis for initial soils assessment The geotechnical report provided in Appendix B affirms that the soils are Vashon-age glacial till (QVT) with the characteristics of Alderwood soils and include areas of "arent" or soils that have undergone historical manipulation, i.e., fill soils. This determination is based on actual field investigations performed by Earth Solutions NW, LLC. The underlying soils should be considered to be Alderwood type soils as is common throughout this area. 42. Figurel .3 also references Table 4.1 and states the parcel is 1.51 acres. The parcel has an area of 1.77-acres. The figure has been revised. Section 2 43, Core Requirement No 2, Downstream analysis for TIR will need to indicate how new storm water will manage existing "as built" systems, lifting gates and other systems. This will have to be shown at next submittal. The downstream analysis includes a more thorough description of the existing downstream system and addresses impacts of the project on how the existing systems will function. 44. Core Requirement No 8, Water Quality calls for catch basin cartridge filter but this does not meet Enhanced Basic water quality treatment. The report has been revised to state that an approved water quality system which has a "general use" designation for enhanced basic water quality treatment (such as "Modular Wetland" or similar) will be used. Section 3 45. Task 1 - calls out Figure 3.3, which does not exist. Mr. Robert "Doc" HE 3n June 27, 2018 Page 16 Figure 3.3 - Offsite Downstream Row Path has been added to the report 46. Task 2 - calls out Appendix C which does not exist. Again due to the conflicting information provided it is unclear exactly what type of soil the Applicant believes exists on the site. "Appendix C" should have been "Appendix B". This has been revised in the TIR. Figure 1.4 is from the Web Soil Survey (WSS) online resource maintained by the USDA National Resource Conservation Service (NRCS). The information for the WSS is based on generalized soil surveys from decades ago which provides a basis for initial soils assessment The geotechnical report provided in Appendix B affirms that the soils are Vashon-age glacial till (Q\M with the characteristics of Alderwood soils and include areas of "arent" or soils that have undergone historical manipulation, i.e., fill soils. This determination is based on actual field investigations performed by Earth Solutions NW, LLC. The soils should be considered to be Alderwood type soils as is common throughout this area. 47. Task 2 - Wetlands inventory references a wetland report which has not been included in the TIR or submitted documentation. References to a wetland report have been removed from the TIR. No wetlands are present on site nor are any near enough to the site to be of any concern. 48. Task 3 - The City anticipates that a true Level 1 inspection and documentation will be prepared and submitted with the TIR in the future. The downstream analysis includes a more thorough description of the existing downstream system and addresses impacts of the project on how the existing systems will function. 49. Task 3 - references a Figure 3.3 which does not exist. Figure 3.3- Offsite Downstream Row Path has been added to the report Section 4 50. The discussion regarding the existing detention pipe and the proposed relocation of the north parcels system lacks sufficient backup documentation of the basin and the sizing approach. The discussion regarding the existing detention pipe and the proposed relocation of the north system and the approach for its sizing has been expanded with a more detailed description. The full analysis for storage and control structure sizing will be provided in the final TIR. 51. Again Table 4.1 and 4.2 are considerably less than the parcel size given in the second paragraph of this Section. Why? The report has been updated to provide more detail and corrections where needed. Mr. Robert "Doc" H,. 3n June 27, 2018 Page 17 52. Performance Standards - references reduction of the Enhanced Basic Water Quality treatment to Basic Water Quality treatment if four criteria are met. The first criteria is misquoted. They state: a. A facility from the Enhanced Basic Water Quality menu is not feasible while allowing the proposed development footprint. The actual criteria statement is: A facility from the Enhanced Basic Water Quality menu is not feasible; There is no mention of maintaining a proposed development footprint. Therefore, you must demonstrate that you cannot feasibly install any of the available Enhanced Basic Water Quality treatment systems. This item has been removed. Enhanced Basic Water Quality treatment will be provided. Item d has also been misquoted. This item has been removed. 53. The second paragraph in Water Quality Systems states the Western Washington Hydrology Model output information is located in Appendix B. Appendix B is the Geotechnical Report. This error has been rectified. 54. The last paragraph in Water Quality Systems makes a statement without any backup documentation. The last paragraph has been expanded to provide additional discussion. Section 6 55. Again there is no Geotechnical Report in an absent Appendix C. "Appendix C" should have been "Appendix B". Plan Sheets 56. Plan sheets will be reviewed when a design set has been prepared and QA/QC completed by the design engineer. Acknowledged. The drawings have been updated and improved where appropriate for this review process. Mr. Robert "Doc" HG f _�Nn June 27, 2018 Page 18 PW TRAFFIC DIVISION Sarady Long, Transportation Planning Engineer, Sarady.Long@cityofFederalway.com, 253-8352743 The Public Works Traffic Division has reviewed the resubmitted materials and provided the following technical comments. These comments must be addressed prior to the land use and Planned Action SEPA checklist approval for the subject project. 57. Please update right-of-way dedication and acreage as indicated in the December 19, 2017, Public Works right-of-way modification letter. Acreages have been revised as indicated. 58. Street improvements on S 316th PI and driveways depicted on plan must be consistent with the approved street modification request issued by the Public Works director on December 19, 2017, received by the city on November 21, 2017. Two of the three street modification requests as submitted have been denied by the Deputy Public Works Director (i.e., sidewalk width in the CC-C zone and garage entrance spacing from Pete von Reichbauer Way South). The street improvements depicted on the plan have been revised to be consistent with the letters received from the City. 59. Show street improvements including street lights on Pete Von Reichbauer Way S consistent with a Type "U street. The proposed 7' concrete sidewalk addition to the existing 5' sidewalk is not acceptable. The street section has been revised to show all required street improvements. 60. Specify on the site plan/floor plans how many and the location of surface parking stalls. A sheet has been added to the Process III drawing set to more clearly show parking for the site. 61. Label dimension of all proposed driveways. All proposed driveways have been dimensioned. 62. When building permits are applied for, show the cross section for improvements on S 316th PI and Pete Von Reichbauer Way S. The construction permit shall be deemed incomplete without these plans at submittal. The cross -sections for the improvements to adjacent streets have been included in the drawings. 63. Before the building permits are approved, sidewalk ramps along S 316th PI S and Pete Von Reichbauer Way S must meet Americans with Disabilities Act/Pedestrian Facilities in the Public Right -of -Way (ADA/PRO WAS requirements. Mr. Robert "Doc" HL man June 27, 2018 Page 19 Sidewalk ramps have been generally shown within the Process III drawings. The details of these ramps will be provided in the final construction documents to be used for site and right-of-way permitting. 64. Street lighting plans must be submitted to the city for review and approval as part of engineering submittal/commercial building permit submittal. The construction permits will be deemed incomplete if these plans are not included. For land use process review the plan must depict conceptual street lights as part of the street improvements to be improved. Please submit such conceptual plans in order to obtain land use approval. Street lighting locations at PVR way have been added to drawing ST-01 and E1.0 and fixture description to E1.1. 65. Please see pedestrian pathway requirements per the Planning comments above. Acknowledged and added to drawings. 66. As shown on your current site plans, please indicate that proposed access/driveways will exist on S 316th PI and none on Pete Von Reichbauer Way S. All access points have been included within the drawings. The lower level garage will be accessed from PVR way as approved via variance. 67. Improvements specified in this section should be consistent with the approved street modification request Also, specify how many of the 189 total parking stalls are surface parking upon the site plan. A sheet has been added to the drawing set to more clearly show parking for the site. There is now a total of 211 stalls of which 5 are surface. SOUTH KING FIRE & RESCUE Chris Cahan, Deputy Fire Marshall, Chris.Cahan@southkingfire.org 253-946-7243 The following is provided for your information to ensure that these items are considered when you submit the building permit. Water Suooly 68. Fire Row - The required fire flow for this project is 3240 gallons per minute. These calculations assume two levels of 1 A construction and five levels of 5A construction. A Certificate -of Water Availability including a hydraulic fire flow model shall be requested from the water district and provided at the time of building permit application. Mr. Robert "Doc" HG �an June 27, 2018 Page 20 Acknowledged. A Certificate of Water Availability including the results from a hydraulic fire flow model has been secured and will be provided to the City. The model indicates that a fire flow of as much as 6,300 gpm may be available to the project 69. Fire Hydrants - This project will require 3 fire hydrant(s) in approved5 locations. Existing fire hydrants on adjacent properties shall not be considered unless fire apparatus access roads extend between properties and easements are established to prevent obstructions of such roads. Fire hydrants shall be in service prior to and during the time of construction. Fire hydrant locations have been added to the drawings and are represented on Drawing 4 - Preliminary Utilities Plan. The existing hydrant located on the west end of 316 h place and across the street exist in an access & utility easement that benefits this property. IEmeWency Access 70. Fire apparatus access roads shall comply with all requirements of Fire Access Policy 10.006 http://southkinafire.org/Docume_ntCenter/HomeNiew/24. The portico minimum clearance is 13.5 feet The turning radius and location of the apparatus roads have been coordinated with Chris Cahan and Gordon Goodsell. The porte cochere will maintain a minimum elevation of 13.5'. See section 2 sheet A600. 71. Designated and marked fire lanes are required for emergency access. This shall be done during the plans check and marked prior to building final. The Portico and adjacent areas will need to be designated as fire lane. Requirements and marking options can be found in title 8 of the Federal Way Revised Code: hUp://www.coder)ublishing,com/WA/FederaI 1 Noted, a striping plan will be submitted with building permit documents. 72. Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction. This was discussed with Gordon Goodsell. The fire apparatus roads will be made operational prior to wood framing construction beginning. The 2 levels of type 3A construction will need to be installed prior to the turnaround being able to be installed. Fire Department Lock Box 73. A recessed fire department "Knox" brand key box shall be installed on the building near the front entrance. Location(s) will be approved by the plan reviewer or Deputy Fire Marshal onsite. Noted, this will be included in the building permit design package. Mr. Robert "Doc" K an June 27, 2018 Page 21 Fire Sprinkler System 74. An NFPA 13 fire sprinkler system is required. An automatic fire sprinkler system shall be installed in all occupancies where the total floor area included within the surrounding exterior walls on all floor levels, including basements, exceeds 5,000 square feet Fire walls shall not be considered to separate a building to enable deletion of the required automatic fire -extinguishing system. The system demand pressure (to the source) required in a hydraulically designed automatic fire sprinkler system shall be at least 10 per cent less than the correlative water supply curve pressure. Noted - Fire sprinkler drawings will be submitted as part of the building permit package. Standpipe 75. A Class I Standpipe is required. A Class I standpipe system is required in buildings where the floor level of the highest story is located more than 30 feet above the lowest level of the fire department vehicle access. Buildings four or more stories in height shall be provided with not less than one standpipe for use during construction. Such standpipes shall be installed when the progress of construction is not more than 40 feet (12 192mm) in height above the lowest level of fire department access. Such standpipe shall be provided with fire department hose connections at accessible locations adjacent to usable stairs. Such standpipes shall be extended as construction progresses to within one floor of the highest point of construction having secured decking or flooring. Noted - Fire sprinkler drawings will be submitted as part of the building permit package. Elevator 76. The elevators) shall be sized to accommodate and ambulance stretcher. Where elevators are provided in buildings four or more stories above grade plane, at least one elevator shall be provided for fire department emergency access to all floors. The elevator car shall be of such a size and arrangement to accommodate a 24- inch by 84-inch ambulance stretcher in the horizontal position. Noted, this will be included in the building permit design package. Fire Alarm 77. A_ Fire Alarm System is required. City Code requires an automatic fire detection system in all buildings exceeding 3,000 square feet gross floor area. The fire alarm system is required to monitor the sprinkler system including water flow. Provide full notification as required by NFPA 72. Complete coverage smoke detection is not required for this project. This fire detection system shall be monitored by an approved central and/or remote station. Mr. Robert "Doc" HL en June 27, 2018 Page 22 Noted, the fire alarm drawings will be submitted with the building permit package. FEDERAL WAY POLICE DEPARTMENT (PD] Lindsey Sperry, Crime Prevention Analyst, Lindsey.Sperry@cityoffederalway.com 253-835-6720 Commander Chris Norman, Christonher.Normancityoffederalway.com, 253-835-6732 SEPA CHECKLIST 78. PD has concerns about the underground structured parking garage. It appears there is a way for the public to enter this facility whether that be on foot or by vehicle (please see FWRC 19.115.010 & 040 for CPTED design principles and Security program strategies for new senior housing facilities). We suggest the parking structure be completely secure with access for residents only and security measures in place such as gates, camera's reflective painting and sufficient lighting. Pursuant to FWRC 19.115.3(f), "parking structures and vehicle entrances should be designed to minimize views into the garage interior from surrounding streets. Methods to help minimize such views may include, but are not limited to, landscaping, planters, and decorative grilles and screens." The entrance to the garage should maximize the ability to be seen, and therefore discourage crime such as unauthorized access. All parking garage entrances will have garage doors controlled by electronic key fobs for resident access only. Further, the doors that lead into the building from the garage will also be key fob controlled in the case that someone may follow a car through the garage door. CCTV will also be provided at all building garage and door entrances. CPTED CHECKLIST 79. Overflow Parking - PD has concerns regarding sufficient parking for residents, workers and visitors. There is no overflow parking anywhere near the property on the street or otherwise which causes additional problems. No on -street parking is available on PVR Way South. At similar properties we have residents, visitors and workers parking at neighboring businesses and parks which cause various problems. Please indicate proposals for overflow parking. The project now consists of 200 units of affordable senior housing versus market rate. The project will provide 211 total stalls. Of those stalls,187 will be designated tenant stalls. Affordable projects do not demand 1 to 1 parking. The project will provide 24 guest and employee stalls including the 5 surface stalls and the north parking garage on level 1 which has 19 stalls. The north garage door will remain open during staffing hours, 9 am to 7 pm, and require key fob access afterhours. We do not believe overflow parking will be required. If it were required, it would likely Mr. Robert "Doc" Ha �-n June 27, 2018 Page 23 be after 7 pm (as guest parking garage locks) during hours where use of the park parking lot located across PVR way would be low. We understand the recent affordable project with a parking issue was constructed at a ratio of 1/2 stall per unit 80. Security Program - (FWRC 19.115.040) PD requests a security plan for access control of this building. Several new senior properties are currently experiencing substantial problems with unwanted guests, vandalism and homeless sleeping on private property. FWPD encourages the use of Knox box for keyed access to the building similar to access granted to South King Fire and Rescue. See item 20 above. All access points will be controlled by electronic key fob system and include CCTV monitoring. The only door open to the public will be the main entry door and only during staffing hours. After staffing hours this door will be key fob controlled also for resident access. Guest will be required to use a phone entry system to gain access from a resident. INFORMATIONAL 81. Entry Points - It is noted in the CPTED review that there will be 'secure entry points' throughout the property. PD would like to know as part of the security plan, how the building is secured and monitored. In particular, the access door from the retaining wall to Pete von Reichbauer Way S. FWPD strongly advises removing the door and stairs leading to the sidewalk to encourage access control to this area. Entry points - See item 20 above. The building is completely secured using a key fob access system with CCTV monitoring. The man door along PVR Way is an emergency egress door and will not have a re-entry function. This door will not be provided with key fob access as it is only an emergency exit 82. Senior/Pedestrian Safety - FWPD is concerned with safe crossings on Pete Von Reichbauer Way. Due to the lack of outside recreational/gathering space on the subject property, it is likely residents will frequent Town Square Park FWPD has several concerns that residents will not utilize signalized intersections but rather jaywalk across the street. We provide this for your information and encourage any "guidance" system you might provide. The revised Process III plan set includes a new pedestrian crossing on PVR Way. PW SOLID WASTE & RECYCUNG Rob van Orsow, Solid Waste/Recycling, Rob.VanOrsow@cityoffederalway.com, 253-835-2770 83. Internal Collection - As outlined on the revised floor plans dated received December 19, 2017, the solid waste and recycling services are acceptable both in terms of service volume and designated storage areas. As highlighted on the plans, the total storage area exceeds the requirement in FWRC 19.125.150(7), and the proposed service volume (as distributed on each floor) providing residents with adequate service capacity. � q cn 0 � � m @ C 0 :3 cn U a) =r � � CD � ■ ■ � 0 c 9 0 C/) � 0 =r k m � C/) 0 c =r 0 :3 C/) w_ CD =r _0 w 0 m . |$ � m CO) 0 �-0 CD « < 0 � 2 0 =r cr m c CD g � A- d l c0 cn 'd ycoWc_ tCC V��c�D�01 yoyC VOetC0o = N. w= O a0 _cVm- L+a-•,� U ai yEO p oNac°' E °' Uew CCoUE oUE EL mS=ce>o �o Cc O— C _E��'nfo+m =VEi c = c C ,� `p a a� mac c Nor c a�i a`�i C co oY�: 7 h wf �L CE d•�,. �� c O U U L N O a> •— a >i � N O1 >+ N R =— E N f0 ti •> •,n ca y L L1 •� c 0 y c= O w d o, c U H O al ~ N Y` li > N� H Lid - L y 'C' " O to L i c� a m O lJ ¢ m 3 ca a o c > y a 0-0 c N N y a� E a> .— E cS' a _ o c .— > a ca >i c0 oC O '—> U of a/ m a� L Y y a � a = y W •� ca w }, T N cV — Y a) _ r L "-' O a> > o_... C O a) ._ O y w c CC 0 cm — C a°J ="o �`�> o_ca�oaca ``o,�c�� p�cvcE_= w 0= L O m— 3 °� o a1 a� m N cc — a w b o a A w w c �+j E U V CL—� ar a� mQc E=ooi c� a• ca cv v is CLa cMi=-° O a w w y _ >.w E y— yL d �°co -0 �o O O may+. Q Eii �md1 �N ar a vEm toa_ OUE `omwwcm,°'ccaa�8C' 2=Eo � C C.7 2'D O E Y o_ O fa Ln al 4 N O U U w ca ` w U c M w N mEs�yLL. aJc 3m—c— iE t° °� aa�.a EOO�oc°'..00 .L.o Y U� C = O y L— d >, d E.n— o_0++�� O y E V C+J M al Y w al C C V~ aJ C L U E N •L.+ = y= y-+ d y> U L A O p Y N E C O C pc a a OwmU 0 ,jr.CO-. .. 3� •� o o w V c>v E < E}L�, = m` y 3 m» ° c'• a� V c L O C t6 - N 01r � U N p >� C N V C O _V Vl m N O ,L.+ O E = t cFs f0 E� m w [O to O C >' C Y U L c w > M O U a E >. ELM, a) 'm y 0 2i m e a r c�°'=oar UcaQOracc�CEUOmmMcoc�E-R-E> a ya co W¢E�m� �oV O::u aYca—a- Mrno0oc�c.�ccmom¢ E'>'>cLnxNdN "Lu °J 'O N L� N C d m N r0 -p ��0 Q C Q �U H `O N N O N C U E T ao .•� L r LL G5 4 'C u7 .2 C C O O O O C O p cD d 1Q.1 C/J ^ .U+ O O dr W LO N r N co N U f0 =_ a 1 0 0 N 0_ L N 6 C ` O O O L 6O O� o1N U MO N'� cL N -' Yrr N o Q� c E� a�i [.7a OUC a = Ucp c_� R-U`—ti No cUa >LLI oa>>= c �'c = E�,a,r a> cflEmwr'o mw U O .2 Lcc ¢ cA w OO oco" R. a a���,�}aia�'�wr'�a J� U:) ycnW� o av c d�c��c=.� rn�=umi ¢� o e Y aci ca o E.ajc c'o�ac�yc -o e Ln0 CD o `m > Q � ° a m C O � cn � ,-., cc 'c ate• Q¢ ��L c a�.,� �Q M� (/J V �.� aN-. v—^U0= o o�¢ o �-2 6 Nr e a x�M o F-- ar o c-- E aw o�c� -_ LLLL Gl 'aN >i N ¢ C./) }�+ a0 O :_. C Z a C U a N= O O E_ pia czOW v— a¢ E i= Q corn W ar m o V Z E m >'U ti C ¢�� a J a>UcC ate-. Z O v in NCO pm O� �� yLM ~ u Eo �� �-n v�p .. cMi� vLL o� O v aNi +L•o-o V c=e y aQ n 3 ° (U U N = Ole ` O- 2 C >: N - o� _ w ate) am.. '— m L r C •O y aJ Z Q 01 Q R O1J cO O O C U fa to t0 j �= to r O N Y O o W C O V aoa}?��c"o¢c�QJ�dc0Y>a000' 3o E>Eo- �Hcaar a wz O O �, Oa U � za o o z� �o _>1 cop C) rx O Q� amp w�4¢ O W sue, b�A s: o O ' O to O 7 to ., v-.Ct � W�aU4� CIO�, o an. 3 '~ a .o °cz o 10. cn a, O � ��� c� 0 y 1 w POW aZw 3 —2 - �'d /� N m U� 2 z N ��-+ 'd A N U N V] f �.," acz .4 o o � � ° o °Cd fi -41-"-p 4�b = 3 E� tn 06 oCq 4-, _ o b w MASTER LAND USE APPLICATION DEPARTMENT OF CommuNm DEVELOPMENT CITY OF �r I w CD 33325 8t° Avenue South Federal Way, WA 98003-6325 FederalWay NOV 21 2017 253-835-2607; Fax 253-835-2609 taZ�tv.cs ❑F€'eJcr�4w�.com CITY OF FEDERAL WAY COMMUNITYDEVELOPMENT APPLICATION NO(S) I 'a ! -7 -SE Date _11 —ev,2 1 - % i Project Name Affinity at Federal Way Property Address/Location 31701 PETE VON REICHBAUER WAY S Parcel Number(s) 0921049034 ~' Project Description Age -restricted market rate senior apartment community on a 1.77-acre site. The building will be six -stories wood -frame over concrete podium with one level underground parking. i'Lr;li,:7G Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment — Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) _ Process II (Site Plan Review) x Process III (Project Approval) Process IV (Hearing Examiner's Decision) ~ Process V (Quasi -Judicial Rezone) Process VI x SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information City Center Core (CC.C) Zoning Designation CilycenlorCore Comprehensive Plan Designation _Value or Existing Improvements Value of Proposed Improvements International Building Code (IBC): Occupancy Type Construction Type Applicant Name: Robert Komar Vo Inland Group Address: 1$0 w. catatdo Ave., Ste 1110 City/State: Spokane, WA Zip: "201 Phone: 6W321.32o4 Fax: Email: roberdOnlandwnst=tIon.crom Signature: Agent (if different than Applicant) Name: Ma Rotder do ESM Consulang Englneers. LLC Address: 33400 81h AVE S. Ste 205 City/State: Federal Way, WA Zip: 9eaa3 Phone: 253-838.6113 Fax: Email: matuaidorearriciv l com Signature: Owner Name: William Kelly Address: 10861 E. Adobe Crook Place City/State. Tucson, AZ Zip: a57as Phone: 2W-375.3397 Fax: Email: • ekll_KeUy@comcasl.net Signature: See Maud /tuemrizaion terser dated 11*12017 Bulletin #003 - January 1, 2011 Page 1 of 1 f 01 IandoutsWastcr Land Use Application CITY OF Federal Way NOTICE OF MASTER LAND USE APPLICATION Project Name: Affinity at Federal Way (Senior Living Community) Project Description: Construction of a 75 -foot-tall "5 over 2" 240,00 sq. ft. age -restricted senior living facility with 15t floor and underground parking (189 stalls) and associated site work on a 1.77 acre site. Applicant: Robert Ketner, Inland Group, 120 W. Cataldo Ave. Ste. 100, Spokane, WA 99201 Agent: Matt Reider, ESM Consulting Engineers, LLC, 33400 8th Avenue So., Suite 205, Federal Way, WA 98003 Project Location: 31701 Pete von Reichbauer Way So., Federal Way, WA, King County Parcel No. 092104-9034 Vicinity Map, N.T.S. Date of Application: November 21, 2017 Date Determined Complete: December 15, 2017 Date of Notice of Application: December 29, 2017 Public Comments Due: January 16, 2018 Requested Decision and Other Permits Included with this Application: The applicant requests a Use Process III `Project Approval' decision (file #17-105616-UP) issued by the Director of Community Development pursuant to Federal Way Revised Code (FWRC) Chapter 19.65. Additional permits and/or approvals in conjunction with the Use Process III decision include a threshold determination pursuant to State Environmental Policy Act (SEPA) Rules WAC 197-11 (file #17-105617-SE), Transportation Concurrency (file #17-105618-CN) and Street Modification (file #17-105622-SM). The project has qualified as a planned action per FWRC 14.15.130. Environmental Documents: City Center Planned Action Determination Review Checklist, Environmental Checklist, Preliminary Technical Information Report and Geotechnical Report. Development Regulations to Be Used for Project Mitigation: Federal Way Revised Code (FWRC) Title 14, "Environmental Policy"; Title 16, "Surface Water Management"; Title 19, "Zoning and Development Code." Consistency with Applicable City Plans and Regulations: The project will be reviewed for consistency with all applicable codes and regulations, including but not limited to: the Federal Way Comprehensive Plan, Federal Way Revised Code, 2016 King County Surface Water Design Manual as amended by the City of Federal Way, and the Public Works Department Development Standards. Public Comnent s: The official project file is available for public review at the Community DevelopmentCity 2nd Floor, 33325 8th Avenue South, Federal Way, WA 98003). Any person may suomm son the Use Process III application to the Director of Community Development, 2018. my the applicant, persons who submit written comments to the director, or pecific request a copy of the original decision may appeal the director's decision. Comments seo e directed to: ro err.hansen cityoffederal\vay.u3m. Availability of File and Environmental Documents: The official project file and referenced environmental documents are available for public review during normal business hours at the Community Development Department (address above). Staff Contact: Planning Manager Robert `Doc' Hansen, 253-835-2643, rnberr.hansenCcitvoffederalway.com Printed in the Federal Way Mirror December 29, 2017 17-105616-00-UP Doc. I.D. 77062 November 1, 2017 Multiple Agency Authorization: City of Federal Way Community Development Department 33325 8`h Avenue South Federal Way, WA 98003 Puget Sound Energy (CCS) Customer Construction Services 3130 S. 381h St. Tacoma, WA 98409 Lakehaven Water & Sewer District Brian Asbury 31627 1" Avenue S. Federal Way, Wa 98003 RE: Authorization letter for Affinity at Federal Way -- proposed 179 unit senior apartment project -- 31701 Pete Von Reichbauer Way S., Federal Way, WA 98003 (Parcel No. 092104-9034) To whom it may concern: Please accept this letter as authorization allowing CAP Acquisitions, LLC, Affinity at Federal Way, LLC (Robert Ketner) and/or ESM Consulting Engineers, LLC to make application to the City of Federal Way for a Land Use Process III and SEPA Checklist including any subsequent requirements for the above - referenced property. CAP Acquisitions, LLC, Affinity at Federal Way, LLC and ESM Consulting Engineers are also authorized to make application on the property for any necessary utilities (water, sewer, storm, power, gas, phone, TV) required to facilitate the project. Please let me know if you need additional information or have any questions. Sincerely, z /, William R. Kelly r 10861 E. Adobe Creek Place Tucson, AZ 85749 Bill_kelly@comcast.net Inland Group Comprehensive Multifamily Construction & Development Services June 18, 2018 Affinity at Federal Way Project Narrative & Design Guideline Compliance RESUBMITTED JUN 2 8 2018 OITY OF FEDERAL bYAY COMMUNITY DEVELOPNIIEti i Affinity at Federal Way is a new 6 story plus basement, 200 unit, affordable senior living apartment building located at the intersection of Pete Von Reichbauer Way (PVR Way) and S. 316th Place. Units vary from studios to 2bed/lbath apartments. Common amenity open spaces are provided for residents within the building including: a library, lobby gathering, game/activity room, lounge, cards & billiards, fitness, crafts, workshop, theater, internet cafe, family dining, community deck, outdoor plaza, raised gardens, and pickleball court. Structured garage parking is located on the basement level and on the ground floor surrounding the main building entrance area. Affinity at Federal Way will be built as 6 stories over a basement. The basement and ground floors are of non-combustible type 1A construction (concrete walls and floors) and the residential floors above will be 5 stories of wood -framed type 5A construction. The exterior is a mixture of vinyl siding profiles and colors, fiber cement siding, colored concrete, architectural trimmed glazing, and flat roof with modulation parapets. Parking has been provided to meet the 1 space per unit requirement. Affinity at Federal Way will offer 10 units at 50% of the average median county income level to meet the requirements of FWRC 19.110.010 of 5% affordable units. The remaining units will be constricted to 60% average median county income. Living units will offer full kitchen and bathrooms, washer/dryers, and walk-in closets, private decks. No meal service or care service will be offered directly by Affinity. However, numerous social activities will be encouraged and offered at the common areas described above. Variance Request: Fire Apparatus Access Roads: The site layout does not meet the South King Fire & Rescue requirement for access to the south side of the building. In previous discussion with SKFR, alternate means of protection would be considered for this area. The developer has committed to providing sprinkler protection of all the unit decks on the south side of the building. 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ■ Tel: 509.891.5162 Y Fax: 509.922.2251 www.InIandConstruction.com Landscaping: The north border landscaping buffer does not meet the required 5'. In order to provide the north landscape buffer, the current road location would have to be shifted north into the neighbor's landscape buffers. Their landscape buffers were built in the easement area for the street which was offset and weighted towards our parcel. Please see existing conditions survey. We would be trading buffer for buffer at no net gain. It was discussed with planning that the large canopies attached to the building would make a nice pedestrian amenity over the sidewalk and the landscaping strip would prevent these from covering a portion of the walk. We have included small raised planters within the sidewalk area and a location for public art display as additional pedestrian amenities. The eastern landscape buffer has been increased to 15'. Design guideline compliance: 040 Security Program (1)-(16): A CPTED checklist accompanies this submittal. The Project is essentially a zero lot line development with most of its activity and common area internal and behind secured entry points. There will only be one public entry point which will only be unlocked only during staffing hours. During all other hours this entry point will be controlled by electronic key card access and monitored via CCTV. Sheet A310 has a schedule of security items and their locations are shown on sheets A300 and A310. Exterior doors are either KF "key fob" access or "E" exit only. Further, garage entrance doors will use the same key fob control device and the man doors leading from the garage space into the building will again require key fob entry providing for 2 points of authentication into the building when entering from the garage. The exterior of the project will be well lighted and all entry points have units in close proximity with full sight lines. 050 Site Design (1) General Criteria: The design intent is for the building footprint to utilize as much of the buildable area of the site as possible, while maintaining views for all units. The site provides opportunities for views of Mt. Rainier to the east and the Olympic Mountains to the west. The site topography allows the basement garage to be almost completely buried and necessitates a main entry location where the grades level off near surrounding property elevations. The length of the property creates a restriction for a thin building and the opportunity to S shape it which provides two outdoor opportunities: the main entry and an exterior plaza on the south side of the building. All exterior common areas and entry points are easily viewed from unit living rooms. Simple landscaping buffers will be easily maintained by the property and site lighting will ensure high visibility for pedestrians and crime prevention. Other pedestrian amenities included for our residents are a dog park & pickleball court on the west side of the building and a public seating area under the extended porto cochere entrance roof. (2) Surface Parking Lots: Surface parking is limited to 5 guest spaces adjacent to the primary entry drop- off area. All other parking is on the interior of the building. (3) Parking Structure: The project provides 2 levels of parking; the entirety of the basement and two smaller garages surrounding the common areas on level 1. The basement level is accessed via PVR Way and the upper levels are accessed off the main drop off area. The short dimension of the parking garage 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 w Tel: 509.891.5162 a Fax: 509.922.2251 www.InIandConstruction.com does align with the ROW. The basement garage is almost completely buried and where it is exposed on the east elevation and partial north is colored to match a primary siding color. Awnings have been added for articulation and tall landscaping is provided on the east elevation to obscure the colored foundation walls. The level 1 parking garage exterior is designed to match the residential levels using identical siding and window openings. Articulation is provided through material color and texture changes and awnings. There are no views available into the parking garages. Windows at the garage levels are architectural only level and will have opaque glazing and the garage doors are solid. (4) Pedestrian Circulation and Public Spaces: The primary building entrance is visible from PVR Way and accentuated by and oversized porto cochere. Pedestrians & vehicles are further drawn towards the 316 Place entrance by building signage and the oversized sidewalk leading up this street. The PVR Way garage entrance is muted by landscaping and only two openings to discourage access. Decorative planters and covered sidewalks lead pedestrians to the main entry. Decorative stamped and colored concrete lead pedestrians across the project's turnaround to the porto cochere seating area and then into the building. This same connection continues to the adjacent property. (5) Landscaping: Landscaping has been provided to meet the requirements of chapter 19.125 on the east, west, and south elevations. The east buffer has been increased to 15' to help obscure the garage wall and highlight the garage entrance. The north landscape buffer doesn't meet the FWRC requirement. In order to provide the north landscape buffer, the current road location would have to be shifted north into the neighbor's landscape buffers. Their landscape buffers were built in the easement area for the street which was offset and weighted towards our parcel. Please see existing conditions survey. We would be trading buffer for buffer at no net gain. It was discussed with planning that the large canopies attached to the building would make a nice pedestrian amenity over the sidewalk and the landscaping strip would prevent these from covering a portion of the walk. We have included small raised planters within the sidewalk area and a location for public art display as additional pedestrian amenities. The eastern landscape buffer has been increased to 15'. (6) Commercial Service: The project does not qualify as commercial service or institutional facility. The on -site garbage collection is internal to the building and coordinates dumpster pickup between staff and WM so there is minimal exposure and only during pickup. There is no service yard. The pickle ball court utilizes removable bollards so delivery trucks can be staged in that location during tenant move in/out. The only chain link fence is 36' coated black vinyl surrounding the dog park. It is not visible from the public street and further obscured by landscaping buffers. (7) Miscellaneous Site Elements: Site lighting levels and locations comply with FWMC requirements. 060 Building Design (1) General Criteria: Significant grade changes within the site boundary have been used to step the building entry points and bury 1 level of parking. The building does not obstruct any public viewpoints. (2) Building Facade Modulation: All building residential facades (level 2-6) comply with 2' modulation requirements. The level 1 garage has incorporated an identical siding and opening scheme to match the residential levels including material variations. Awnings and canopies have been added to meet the 2nd articulation requirement at garage levels. The level 0 garage is only exposed on the eastern and a small 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ag Tel: 509.891.5162 m Fax: 509.922.2251 www.InIandConstruction.com portion of the northern elevation. It has also received canopies and will utilize a dark building primary color and tall landscaping to obscure its appearance. The oversized landscape buffer in this area is 15' deep. (3) Building Articulation and Scale: The building design utilizes multiple siding textures and colors to add additional articulation to the exterior walls. Private protruding decks and window trims add additional features. Canopies have been provided around level 1. An oversized landscape buffer is provided on the east elevations. (4) Methods to Reduce Building Massing: The building's S shape creates the appearance of 2 buildings dependent upon the street level view point thereby reducing the overall size of the project. The flat roof with varying parapet heights further adds to the articulation of the exterior wall. 070 Building and Pedestrian Orientation (1) General Criteria: The property length and severe topography prevent the main entry from being located on PVR Way. We have included additional landscape buffer along PVR Way to meet the orientation requirements. The NE corner of the building will receive building signage and public art to help draw pedestrians up 316th place to the highly visible Porto Cochere. The projects north sidewalk includes decorative raised planters and awnings to further enhance the entrance to the Project. 090 District Guidelines (3a, i, ii, iii) The project has been designed with interior structured parking leaving only 5 surface stalls at the main entry. (3b) The building's principal entrance faces the private street S 316 Place due to the site topography and property perimeter length. The Project has an oversized Porto Cochere to visually signify the entrance from PVR Way. Additional landscape buffer has been added to PVR Way to help mute the basement level of the building and the addition of building signage, public art, canopies, and raised planters will help draw pedestrians and vehicles to the main entrance. (3c) Building articulation and massing are addressed above in 060 items 2 & 3, (3ci) All the building facades utilize similar modulation, material variation, protruding decks, and windows with trim to create appealing architecture. Canopies and awnings have been added to all sides of the building to increase modulation and provide pedestrian cover on the north sidewalk. The roof has been changed to a flat roof to allow for varying parapet heights. Raised planters and artwork have been added to the northern sidewalk as a pedestrian feature. Landscaping has been used to obscure the basement wall which is only exposed on the eastern elevation and highlight the garage entrance. (3cii) Secondary facades match the primary. (3ciii) Not applicable. 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ■ Tel: 509.891.5162 ■ fax: 509.922.2251 www.InIandConstruction.com (3d) Pedestrian routes have been provide through the porto cochere and across the turnaround paving with stamped colored concrete of 18' and 12" wide respectively. They lead to the 12' walk on 316th place and then to PVR Way. (3f & g) The facade of the above grade parking garage has been re -designed with siding windows to mimic the residential levels above and canopies have been added to meet the articulation requirements. (3hi) Curtain wall glazing is not proposed. Chain link fence is only proposed at the resident dog park on the SW corner of the site. It will be black vinyl coated, concealed mostly by landscaping, and is not visible from the public ROW. (3j): (1g,h, I, j) Landscaping yards have been provided between the building and the public street. Parking stalls are inside the building and the 5 surface stalls have a strip of landscaping separating them from the private street. 12' pedestrian walkways lead from the main entrance to the public ROW. Light fixtures include full cut off shields and no light poles exceed 20'. (3j): (1i, m, o) All the exterior common areas at grade have unit living rooms overlooking them and include: plaza, dog park, pickleball court, and main entry. No units are schedule for the main floor. The Project does not include carports or detached garages. (1q, r) The building design uses 4 different colors and 2 different siding materials that differentiate the building between base, middle, and upper floors. A flat roof has been included to provide modulation in parapet heights and add more variation than a pitched roof. Each unit has its own windows with trims and projecting deck. 115 Design Criteria for Residential Usable Open Space. (1) Common Open Space: Common opens space has been provided in accordance with this section to meet the 200 unit requirement of 20,000 sf. Please see the schedule added to A310 for the list of spaces and sf. Those areas have also been highlighted throughout the architectural drawings. Please feel free to contact me should you have any questions. Sincerely, Robert Ketner Development Manager Inland Group 509-321-3204 robertk@inlandconstruction.com 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ■ Tel: 509.891.5162 m Fax: 509.922.2251 www.InIandConstruction.com Cc Lc�,- hil1d Group Comprehensive Multifamily Construction & Development Services June 18, 2018 Affinity at Federal Way JUN 2 Crime Prevention Program ��� CfTY OF FEE)E.F.A! yr `y Affinity at Federal Way is a secure facility and our security program has been EI, through the development of 20 other existing Affinity facilities. All exterior entrances have an electronic access system operated by resident key fobs that record movements, are continually recorded on CCTV and can be viewed in real time, and are well lighted. Sheets A300 and A310 have been updated to show our security feature locations. The schedule of devices is listed on sheet A310 and include: Camera locations, KF — key fob entry, D — door ajar alarms that sound and signal in case door does not close after 60 seconds, E — exit only doors for emergency egress that have no re-entry function, and T— telephone entry system for guest to make contact and be granted access from residents. Main Entry (lobby) — This is the only door open to public entry and only during staffing hours, 9 am to 7 pm. After staffing hours, it will require key fob entry or the use of the telephone entry system to gain access from a resident. North garage at level 1— This garage space will be open for visitors and staff use during staffing hours, 9 am to 7pm. After staffing hours, it will require key fob entry as the garage door will be closed. Guests parking inside this garage, during staffing hours, will be forced to exit through the garage door and enter through the main entry. The two entry points from this garage directly into the building, 1 to lobby and 1 to elevator, will remain locked at all times and require key fob access. Garages — The garages will have solid doors and opaque windows to prevent pedestrians from viewing inside. Resident's will need to use key fobs to gain entry to the garage doors. Once in the garage, residents will again need to use their key fob to gain entry to the elevators, stairs, or lobby areas. We provide 2 points of authentication at the garage spaces as it is the easiest point of invited entry by following a car through the garage door. The garage entry points and interior spaces are covered by CCTV to monitor undesired entry and resident to resident car damage. The interior garage spaces are lighted 24/7. Exterior doors — All exterior doors are provided with key fob access or are exit only with no re-entry function in the case of emergency egress doors. All exterior doors are provided with a door ajar alarm feature that sounds an audible alarm at the door location and sends a notification to the staff. This feature is designed to prevent someone from lodging the door in an unlocked position or to provide notification if a door fails to lock after passage. All exterior entry points are monitored by CCTV and additional cameras are placed inside at main points of entry. 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ■ Tel: 509.891.5162 m Fax: 509.922.2251 www.InlandConstruction.com Visibility — There are no dwelling units located at grade to decrease the potential for illegal entry through a resident unit. All of the building entry points are located within easy view from the tenant dwelling units. Unit living rooms have 6' wide sliding glass doors which provide visibility to building entry points. All building entry points are well lighted. All exterior common areas are also easy to view from tenant living rooms. 19.115.040: 1. A written security plan, emergency management plan, and evacuation maps will be provided to the onsite management staff and residents. 2. The project is essentially a zero -lot line development and all exterior spaces will be well lighted during tenant use times. Exterior entry points will remain lighted during any dark period. Garage spaces, common area circulation, and corridors will remain lighted 24/7. 3. The main entry has no place for concealment and has significant glazing for viewing from inside the building. 4. Full height storefront doors and significant windows are schedule at the main entry. 5. The elevators will require sealable lobbies per the building code. Access to the elevator is restricted to residents through key fob system. 6. All common resident rooms are located within the secure envelope of the building. 95% of the common resident rooms are located on level 1 with relites from the corridor for high visibility. Laundry facilities are located within the individual units. 7. See item 6 above. 8. Mailboxes will be located near the main building entry. 9. Management will control building keys and have 1 lockable key cabinet located in the manager's office which is also locked unless they are present. 10. All exterior entry points are secure and monitored as mention above. 11. Unit entry doors are provided with deadbolts and peepholes. Night latches are provided upon tenant request. 12. CCTV is provided to monitor exterior entry points, exterior activity areas, interior main points of entry, and garage spaces. 13. Minimal landscaping is scheduled for the project as it is essentially a zero -lot line development. 14. Landscaping will be maintained. 15. The only fencing schedule for the project is 36" tall for the dog park and not intended to obstruct visibility. 16. Building signage will be clearly posted. Please feel free to contact me should you have any questions. Sincerely, Robert Ketner Development Manager Inland Group 509-321-3204 robertk@inlandconstruction.com 120 West Cataldo Avenue, Suite 100; Spokane, WA 99201 ■ Tel: 509.891.5162 ■ Fax: 509.922.2251 www.InIandConstruction.com