Loading...
14-101991.-�CITY OF Federal Way May 19, 2014 Mr. Ken Miller City of Federal Way Parks Department 33325 80, Avenue South Federal Way, WA 98003 Re: File #14-101991-00-SE; PLANNED ACTION SEPA APPROVAL Toys `R Us Demolition, 31510 2 01h Avenue South, Federal Way e-q Dear Ivlr. * er: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com FILE The Community Development Department and other city staff have reviewed the Planned Action SEPA (PAS) checklist you submitted. `y1e determined that the demolition of the 46,216 square -foot Toys 'R Us store does qualify as a planned action as provided in Federal Way Revised Code (F`VRC) 14.15.130(3)(�(iii) as follows: The subject property is located within the area targeted by the PAS conducted by the city in 2006. The applicant submitted a PAS checklist that demonstrates that the demolition is eligible to be considered as a planned action, and therefore, exempt from further review under the State Environmental Policy Act (SEPA). This is because: (1) The demolition is related to future construction of a civic use and is therefore, consistent with the uses reviewed under the PAS pursuant to F`NRC 14.15.130, and no mitigation measures from the EIS associated with the PAS are necessary; (2) The proposed demolition will not generate any new PM peak hour trips; and (3) The proposed action meets decisional criteria of FWRC 14.15.130(3)(d)(ii) as follows: (a) The proposal is not otherwise exempt from SEPA because the building is over 12,000 square feet in size; (b) The proposed demolition is consistent with .Federal I116y Comprehensive Plan (FWCP); (c) The project had its significant adverse environmental impacts adequately identified in the EIS; (d) The project falls under the planned action qualifications from FWRC 14.15.130(3)(c) as follows: i. The project is related to a future civic use; ii. The proposal does not involve expansion of additional square footage; Mr. Ken Nlffler Page 2 May 19, 2014 iE The proposed project is located within the City Center -Frame (CC-F) zoning district, and is in the planned action area; iv. The project does not add to PM peak hour trips as it does not involve espgn,§ian of square footage; dr The project does not result in any changes in impacts to any of the elements of the environment that were identified in the EIS; and vi. This project ,��,iil be completed within 2014. Also, environmental conditions have not changed from those analyzed in the EIS; thus, the planned action designation remains applicable; (e) The SEPA official has determined that the project's adverse impacts are able to be mitigated with applicable requirements and conditions; (f) The project complies with allapplicable local, county, state, and federal regulations, and where appropriate needed modifications have been approved; and (g) The demolished building or the proposed replacement building is not an essential public facility. This letter confirms that information submitted by the applicant adequately addresses relevant PAS criteria to the city's satisfaction and further environmental review of the redevelopment project under SEPA is not required. Our decision not to require additional environmental review does not mean that the license, permit, or approval you are seeking from the city has been granted. Approval or denial of the proposal will be made by the appropriate administrative or legislative body vested with that authority. The PAS environmental record is considered by the decision maker(s) and conditions will be imposed to reduce identified environmental impacts, as long as the conditions are based on adopted and designated city policy. If you need further assistance, feel free to contact meat isaac.con len@cityoffcderalvvn v.corn, or 253-835-2643. Sincerely, Isaac Conlen, Planning Manager for Patrick Doherty, Director PJc 414-1111991-00-?IC Da U). 0591 MASTER LAND USE APPLICATION CITY OF Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 w%v kv.cityoffedcrahvU.com PJKZM ,�- lolqii -no � MAY 0 2 2014 APPLICATION NO(S) Date AY Project Name Property Address/Location\�\ Parcel Numbers) Project Description PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI EPA w/Project V SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information Zoning Designation Comprehensive Plan Designation Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): —Occupancy Type Construction Type Applicant Name: Address: City/State. Zip:' -q oc,�40 Phone: Fax_: Email: .--�LI\-eS"+Q '�wJ. Signature:1 Agent (if different than Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Bulletin #003 — January 1, 2011 Page 1 of 1 k:\Handouts\Master Land Use Application CITY OF Federal Way CITY CENTER PLANNED ACTION CHECKLIST This checklist is used to determine whether a proposed project is eligible to be considered a Planned Action and therefore exempt from further review under the State Environmental Policy Act (SEPA). PROJECT NAME �1 753 us tip' STREET ADDRESS PARCEL NUMBER(S) APPLICANT: COMPANY NAME c � OFFICE PHONE (2 �tS _2 'Ik, APPLICANT NAME V. �, 1 r- , 1 - �n � mot! CELL PHONE (20 ) 2Z - ASS MAILING ADDRESS (STREET ADDRESS): FAX NUMBER�� 33�L -- ( ) - (CITY, S TE, ZIP) E-MAIL ADDRESS 1. -Please describe the proposed project in detail. Include the square footage of each proposed use. Also describe any existing uses currently on site and indicate if they will be removed. 1�','� � r r-e-� MAY 0 2 2014 CITY OF FEDERAL WAY CDS 2. Please provide an estimate of the probable, net PM peak -hour vehicle trips to be generated by the proposed use(s). (You may deduct vehicle trips currently/previously generated by pre- existing uses on the site.) Please provide references and/or technical support for your estimates. 3. In order to be considered a "Planned Action" project, pursuant to Federal Way Revised Code (FWRC) 14.15.130(3)(d)(ii), a project must meet the all of the following criteria. Please verify that the proposed project meets these criteria. Feel free to provide explanatory notes, if applicable. a. ❑ The proposed project is not otherwise exempt from SEPA; and b. The proposed project is consistent with the City of Federal Way Comprehensive Plan adopted under RCW 36.70A; and C. ❑ The proposed project is subsequent to or is implementing a project which has had its significant adverse environmental impacts adequately identified in the City Center Planned Action EIS; and d. The proposed project falls within the Planned Action qualifications identified in FWRC 14.15.130(3(c); and If=*� aa•; MAY 0 2 2014 CITY OF FEDERAL WAY CDS e. jz� The proposed project's adverse impacts are able to be mitigated through the application and/or inclusion of mitigation measures detailed in the Mitigation Document, as well as other applicable City, county, state, and federal requirements and conditions, which together constitute sufficient mitigation for the significant environmental impacts associated with the proposed project; and f. J2f The proposed project complies with all applicable local, county, state, and federal regulations, and where appropriate, the proposed project complies with needed variances or modifications or other special permits have been identified; and g. ❑ The proposed project is not an essential public facility.