23-102043City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RIGG
Project Address: 3615 SW 339TH PL
Electrical
Permit #:23-102043-00-EL
Inspection Request Line: (253) 835-3050
Project Description: BLUEBEAM - 5.53 kW PV Solar Panel Installation on Roof
Parcel Number: 921150 0660
Owner
Applicant
Contractor
ROLAND RIGG
BRS PERMITTING
B R S FIELD OPS LLC
3615 SW 339TH PL
1403 N RESEARCH WAY
BRSFIFO820N3 (8/23/24)
FEDERAL WAY WA 98023
OREM UT 84097
1403 N RESEARCH WAY
OREM UT 84097
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml
CONDITIONS:
FIRE APPROVAL CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org and alarms@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
- Photo of the front of the house showing the address or street side view.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
If no response from SKFR within 2 business days, call 253-946-7348 to check status.
PERMIT EXPIRES Saturday, 4 November, 2023
Permit Issued on Monday, May 8, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
W nd City of Federal Way.
Owner or agent: Date:
Ft"K-L�
_4%�
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
23 102043 00 Address: 3615 SW 339TH PL
ROLAND RIGG FEDERAL WAY WA 98023-2971
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
UFER Ground (4295)
Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
0
Temporary Power (4275)
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0 Feeders/Sub-panels (4045)
0 Rough Electrical (4225)
0 Final - S K F & R (4060)
Approved
Approved
Approved
By Date
By Date
By Date
5-61
Ceiling Cover (4020)
Final - Electrical (4055)
Approved
Approved
By
Date
By
Date -7 20 ?.3
Rough Electrical
Final Electrical
ElRight
of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
CITY OF
� Federal Way
ADDRESS:
Buildipg Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
IF YOU HAVE QUESTIONS CALL
(253) 835
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page _ of