Loading...
13-102513.1 OGENE® I CITY OF ., Federal Way 3UN 01 ZZ13 CITY OF FDFRAL\NAY PUBLIC WORKS DEPARTMENT 33325 8'h Avenue South Federal Way WA 98003-6325 253-835-2700;Fax 253-835-2709 www.cityoffederal way_coin 2013 TRAFFIC CONCURRENCY REVIEW APPLICATION APPLICATION NO(s) r r ! Date Mav 21. 2013 Project Name Progressive Insurance Re()ional Claims Office Property Address/Location 34001 Pacific Highway South Federal Way. WA 98003 Parcel Number(s) 2021049051 Project Description The 2rOROsal is for a new Pro ssive Insurance Re ional Claims Office. The building will be a sin le story 16,973 SF office fora roximatel 74 em to ees. Piinamy access will be from Pacific HighwayHjghway South via an extension of a road S 340`' at the intersection of Pacific Highway and 16"' Ave S. APPLICANT (If different than Owner) Name: Zaremba Group, LLC Attn: Sean McDermott Address: 14600 Detroit Ave Email: smcdermoti zaremba ou .com Signatur j ,1/1 t Type of Development permit to be applied for: * Commercial ❑ Single Family (SF) Phone/Fax: (216) 838-6113 x163 City/State/Zip: Lakewood, OH 44107 Cell: N/A ❑ Multifamily (MF) ❑ Subdivision ❑ Short Subdivision ❑ None (Feasibility only) ❑ Other Approval for City to perform Concurrency analysis: * Yes ❑ No If NO: Applicant's Traffic Engineer must perform Concurrency analysis consistent with City procedures; however, the application fee remains the same. PARETAILTROGRESSIVE INSURANCEMA\Seattle SouthTntitlements\Approvals & PermltsTrocess III IVU30602 - Applications\FW Concurency Application Rev Jan2012.doc Required Information — Application is incomplete and will be returned if not filled out. Gross Square Feet (Commercial) Existing0 Sq Ft Proposed 16,973 Sq Ft Number of Dwelling Units Existing 0 DU Proposed 0 DU Number of Employees Existing 0 Employees Proposed 74 Employees Parcel size (acres or square footage) Existing 8.27 Acres Proposed 8.27 Acres Has the property previously been reviewed for concurrency? If yes, date of original application Unknown Is this an amendment to an existing Concurrency Certificate? Will the project be phased? _ Development Build -Out Year Yes X No Concurrency Permit No: Unknown Yes No a Note: - Commercial subdivisions and other projects constructed in phases shall be evaluated for concurrency as each phase is submitted for applicable development permits. - Once the concurrency test result has been determined, any changes to the development project require additional review will be billed on an hourly basis. Estimated Number of New Trip Generated by Project per Pre -application Summary: 29 new weekday PM peak_ If the applicant's engineer has prepared a trip generation analysis.. lie following. If not, staff will calculate the trip generation based on the above information Existing PM Peak D Proposed PM Peal Net New PM Peak L-4> s Ll rt ■ A Concurrency Reserve cancelled, whichever occ ■ A Concurrency Reserve C development parameters a ■ A Concurrency Reserve Ct I have read the above information regari not a guarantee that the City will issue a 2 roperty Owner/Agent Signature nt permit expires, is withdrawn or ald be required. oval consistent with the rred to a different parcel. 0 C,0 �� • A Date SUBMITTAL REQUIREMENTS --- STAFF USE ONL Y Permit Submittal: The following items are required for all applications: ❑ Completed and signed Concurrency Application ❑ Concurrency Application Fee paid (See Below) of a concurrency certificate is Net New PM Peak Hour Trip Less than 10 10 - 50 51 - 500 Greater than 500+ 2013 Application Fee $344.50 $1,584.50 $3,374.50 $5,576.50 P:\RETAIUPROORESSNE INSURANCE\WA\Seattle South\Entitle nts\Approvals & Peemits\Process III IV\130602 - App&mdow\FW Concurency Application Rev. Jan2012.doc CITY OF �. Federal August 26, 2013 Zaremba Group, LLC Attn: Mr. Sean McDermott 14600 Detroit Ave Lakewood, OH 44107 CITY HALL 33325 8th Avenue South FederaWay l Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Re: 13-102513-00-CN; Progressive Insurance Claims Office Concurrency Analysis The Public Works Traffic Division has completed the concurrency test for the subject project, consisting of 16,973 sq. ft. Insurance Claims Office Building. A traffic concurrency test summary is attached for your review. Based on the submitted information, the PW Traffic Division made the following determinations: Approved. All intersections impacted by one or more weekday evening peak hour trips from the proposed development would meet the City of Federal Way LOS standards with programmed improvements. A Capacity Reserve Certificate (CRC) for the project is attached. The CRC certificate allows your project to proceed with other applicable permit processes. The CRC is valid until the development permit expires, is withdrawn or canceled whichever occur first. The CRC cannot be sold or transferred to property not included in the legal description provided by the applicant in the application for a CRC. If you have any questions or need additional information, please feel free to contact me at (253) 835-2743 or sarady.long awC:it offed -rwa .cam. Sincerely, Sarady Long Senior Transportation Planning Engineer SL:mj Enclosures: Traffic Concurrency Test Summary Capacity Reserve Certificate cc: Project File Day File L:\DEPT\P W\TRA\Concurrency\ 13 102513_Progressive Office\CN Determination - Progressive Claims Center.doc 11111; CITY OF Estimate of Development Traffic Impact Fees Federal Way Scroll down and complete the steps outlined below: Please fill in the required information in the yellow highlighted boxes. STEP #1: General Information Enter the following information Project Name -Progressive Claims Office File Number Street Address 34001 Pacific hw So. City, State Zip Federal Way, WA Parcel Number (s) 202104 9051 Traffic Impact Fee Estimated By SL Is this project locate within the City Center Zone? If "YES", please use City Center Impact Fee sheet. STEP #2: Land Use Type Select the proposed Land Use Type(s) from the drop down memu below. Enter the proposed number of units for the Project Proposed Land Use Type (s) 1 12. Single Tenant Office Building 2) '*NONE"* 3) "NONE'* 4) "NONE"' Unit of Number of Impact Fee Rate per Preliminary Impact Measure Unit(s) Unit of Measure Fee Amount sf/GFA 16973 LJ $ N/A $ N/A $ N/A $ 4.72 $ 80,147.36 $ 80,147.36 STEP #3 - Credit/Change in Use (If Applicable) This step applies to development proposal to change existing building or dwelling use. Provide any impact fee previouly paid for the land use category of the prior use IMPACT FEE AMOUNT PAID FOR (Do not include administration fees). PRIOR USE For a change in use of an existing building, the impact fee will be assessed based on the difference between the new uses and the prior use. If no impact fee was required for the prior use, the impact fee for the new use shall be reduced by the amount equal to the current impact fee rate in affect for the prior use. Fill out the lines below of the prior use. Unit of Number of Impact Fee Rate per Proposed Land Use Type (s) Measure Unit(s) Unit of Measure 1) **NONE** N/A $ 2) **NONE** N/A $ 3) **NONE** N/A $ STEP #4: Total Impact Fee Calculate estimated Total Traffic Impact Fee payment amount, including Administrative Fees. Traffic Impact Fee (Before adjustment) Credit/Adjustment including Change of Use Administrative Fee (3%) $ TOTAL TRAFFIC IMPACT FEE PAYMENT ESTIMATE $ Timing of Traffic Impact Fee (TIF) Payment Preliminary Impact Fee Amount 80,147.36 2,404.42 82,551.78 For residential land divisions, fees shall be calculated and paid at the time of plat recording. For un-platted single- family residential lots, commercial and multi -family developments, fees shall be calculated based on the impact fee schedule in effect at the time a completed building permit application is filed and paid prior to permit issuance. For residential land divisions and un-platted single-family residential lots, the transportation impact fee may be deferred, but shall be paid no later than the closing of sale of each individual house. Covenants prepared by the city to enforce payment of the deferred fees shall be recorded at the applicant's expense on each lot at the time of plat recording for residential land divisions and prior to building permit issuance for un-platted single-family residential lots. The fee shall be calculated based on the impact fee schedule in effect on the date of payment of the impact fee. 7rtranSPOGROUP WHAT TRANSPORTATION CAN BE. MEMORANDUM Date: May 16, 2013 TG: 12152.00 To: Sarady Long, City of Federal Way From: Mike Swenson Jesse Birchman cc: Sean McDermott, Zaremba Group Subject: Federal Way Progressive — Traffic Analysis Summary This memorandum presents the result of the traffic operations completed to inform the design of the S 340th Street/Pacific Highway S intersection improvements. Specifically, the analysis focuses on the interaction between the proposed site access and the eastbound left -turn lane at the Pacific Highway S intersection. Traffic Volume Forecasts Weekday PM peak hour background traffic volumes for 2012 conditions that included all vested trips generated by approved but not -yet constructed development projects were provided by Federal Way staff.' These background volumes included trips generated by the adjacent Village at Federal Way development. 2012 traffic volumes were increased by an annual rate of 2 percent to forecast 2016 conditions. Weekday PM peak hour trips generated by the proposed Progressive building were estimated using the Institute of Transportation Engineers Trip Generation (9th Edition, 2012). The Progressive office building is estimated to generate 4 inbound and 21 outbound trips during the weekday PM peak hour based on the average trip generation rate for the General Office land use (#710). These trips were distributed consistent with the Village at Federal Way development and added to the S 340th Street-16th Avenue S / Pacific Highway S intersection 2016 background traffic volumes. Future (2016) with -project traffic volumes are shown in the attached worksheet. Traffic Operations Summary An analysis of the intersection level of service (LOS) and key queuing movements were conducted for the intersection of 16th Avenue S/Pacific Highway S and the Progressive site driveway. The LOS and queuing analyses were evaluated using the queue length methodology from the Synchro8 software program and the program's implementation of the Highway Capacity Manual (Transportation Research Board, 2000) level -of -service methodologies. The S 340th Street-16th Avenue S / Pacific Highway S intersection traffic signal was assumed to operate with protected north -south left -turn movements on Pacific Highway S and split east -west signal phases. The S 340th Street-16th Avenue S / Pacific Highway S intersection was estimated to operate at LOS D with vehicles delayed approximately 46 seconds each one average. The Progressive site driveway is located approximately 315 feet west of the 16th Avenue S / Pacific Highway S intersection. Inbound queues during the weekday PM peak hour are forecast to be less than 1 vehicle (less than 25 feet) since only four inbound vehicles are estimated during the PM peak hour. The eastbound left -turn queue on S 340th Street at Pacific Highway S is estimated to extend up to 175 feet2 from the stop -bar. As a result, no queue length conflicts are anticipated. ' Summary spreadsheet provided via email from S. Long (March 28, 2013) 2 Estimated queue length is rounded up to the nearest 25 feet increment. Transpo Group 11730 118th Avenue N.E., Suite 600 Kirkland, WA 98034 425-821-3665 Fax: 425-825-8434 Recommendations Based on this analysis and the driveway location of the proposed development, a center two-way left -turn lane is recommended to be constructed along S 340th Street west from the Pacific Highway S signal along the site frontage. The analysis shows that very little queuing is expected at the site driveway with no anticipated conflicts with eastbound left -turn queues at the 16th Avenue S / Pacific Highway S intersection. MA12\12152.00 - Federal Way Progressive\Documents\Memos\Memo - Progressive 340th WBL Queue2.docx ` TranspoGRouP a 3 f 1 -- r_o- i►r'�_ o� o_.o o LL E L J � � H J•l�l 11 VJ lL G p o Qm rn-- Oo —?mo?p oe\ m O O c �- m O �n W o �o rn N o m o 0 o i� ry c5on pp m N O = O N N o 0 � n f2v��o c . 0 �n �n C L4 •a °� c 2 a m gg C_s X m tY t o '° > a s J>>> p d p J Q Q m U L o .2 m a j J E (� c»E5 0c 0 o U g d m � T Tm U OOZE = S Q = Q V 3 a a o � ' � C NEw I M �,no �cnlrn� •n 000� Cn "' sm.-.P- ti g.�ovo00 �' m 'p O76 0 �CQ�ye H�+�e ram- V�- v e o e m o 0 o N ll 1 d GCc5 [! NOOoO e a` O O Opp - J J J r[T D" o_ c 3 75;�33 oo =1'minrninK m =� IM reports=reports Select Zone Concurrency Distribution for O'Reilly Auto Parts Store 3.12 4 1 mf195 mf 9 4 y prj +bk Proposed Development + bkg trips y 0 n 4 2 1 mf195 mf 94 n all 1244 all y 4 2 2 mf195 mf 94 n y all I-I-Cro 1 3 all 1244 �[ y G` q 3.21 1 y ms34 n mf195 v all 1 2 1 Y ms35 n mf 195 2 1 Y 1 Y mf 94 n (mf94*23)/ms34 Y 1244 all 2 1 Y mf 94 n (mf94*23)/ms35 Y all 1244 2 1 n mf 195 n (V--kcL q 4�0 %�)/ tA-5 :) 4 2 2 1 n mf 94 n 2 1 n mf 94 Y 1244 all 2 1 n mf 94 Y all 1244 2 q 3.12 4 2 1 mf 94 mf 95 Y prj Propose Project Peak Hour TAZ Y 0 Y 1244 all 1244 all 3 Y 4 2 2 mf 94 mf 95 n Y all 1244 all 1244 Y q 3.21 1 n mf95 n 2 q 5.11 1 1 5 mf 94 mf95 5 120 .2 .1 0 �i 1+ OY � � 1 Z z r N � lA1 x w Ln 13 1 5 5w 1 1 1 1 1 1 7Y 4 4 4 1 Q -- Y r i T T i Ii 1 3 3 3h 1 Y ' r _ Y i - W � N 13 w 1 sus W _1 r t0 :v t� I I �