Loading...
12-101877 (2)THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO AT&T MOBILITY CORPORATION SERVICES IS STRICTLY PROHIBITED. SW 320th st 32ft $t S 326th St R z 0 ielrbraN°" Park 8W 130f4 at S 334ih 51 L C") obi y�S 4 S�tafcl SI St 5 336th St S uy " 1 eyerhaeuse a Dam SW C w p PROJECT sl`6'C i 0 �w' Anert yt; �. H �h Parrther Lake St Francs v Elementary q - SctwG HOS0.11 Chase $ S 348th St S 348th St _ 18 :. World S 34M � i`°SiCO Federal Way West,Hylebce We*aruls Pwk. S� St SW 358th St y vi rty $ 40 St Jet Ch""filet s d S 360th St ry m m DRIVING DIRECTIONS =;, AIRPORT: • HEAD SOUTH • KEEP RIGHT AT THE FORK AND MERGE ONTO AIRPORT EXPRESSWAY ® KEEP RIGHT AT THE FORK AND MERGE ONTO WA-518 E ® TAKE THE EXIT ONTO 1-5 S • TAKE EXIT 142B TO MERGE ONTO WA-18 W TOWARD S 348TH ST • CONTINUE ONTO S 348TH ST ® TURN RIGHT ONTO 9TH AVE S ® DESTINATION WILL BE ON THE LEFT PROJECT INFORMATION CODE INFORMATION: ZONING CLASSIFICATION: C-COMMERCIAL BUILDING CODE: 2009 IBC CONSTRUCTION TYPE: IIB OCCUPANCY: S-2 JURISDICTION: FEDERAL WAY PROPOSED BUILDING USE: TELECOM SITE LOCATION (NAD83): a t Your world. Delivered. TAMMY LANE WA415 34301 9TH AVE S FEDERAL WAY, WA 98003 PROJECT CONTACT LIST APPLICANT: PROJECT CONSULTANT: LATITUDE: 47017'46.9" N (47.296361 ° N) LONGITUDE: 122°1934.9" W (122.326361 ° W) TOP OF STRUCTURE: 120'-0" AGL BASE OF STRUCTURE: 0'-0" AGL PROJECT LEASE AREA: 216 SF PARCEL NUMBER: 2021049157 NEW IMPERVIOUS AREA: AREA OF PARCEL: 208 SF 51.55 ACRES GENERAL INFORMATION: 1. PARKING REQUIREMENTS ARE UNCHANGED. 2. TRAFFIC IS UNAFFECTED. 3. SIGNAGE IS UNCHANGED. PROJECT DESCRIPTION: AT&T MOBILITY CORPORATION PROPOSES TO MODIFY AN EXISTING UNSTAFFED TELECOMMUNICATIONS FACILITY WITH THE ADDITION OF (3) NEW PANEL ANTENNAS, (6) RRH UNITS, AND (1) "SQUID" SURGE PROTECTOR AT ANTENNA LEVEL. ALSO THE ADDITION OF (1) PURCELL FLX16WS CABINETS TO HOUSE LTE EQUIPMENT MOUNTED WITHIN EXISTING COMPOUND SHELTER AND (1) GPS ANTENNA ON EXISTING H-FRAME. UTILITY COMPANIES POWER: TELEPHONE: PUGET SOUND ENERGY TBD PHONE: (866) 831-5161 APPROVAL / SIGN OFF OF FINAL CONSTRUCTION DRAWINGS AT&T MOBILITY CORPORATION RTC BUILDING 3 16221 NE 72ND WAY REDMOND, WA 98052 PROJECT ENGINEER: LDC, INC. 14201 NE 200TH ST, SUITE 100 WOODINVILLE, WA 98072 CONTACT: MARK VILLWOCK, P.E. PHONE: (425) 806-1869 FAX: (425) 482-2893 STRUCTURAL ENGINEER: AMERICAN TOWER CORP. 10 PRESIDENTIAL WAY WOBURN, MA 01801 PHONE: (781) 926-4685 ATTN: RICH SCIOLI RF ENGINEER: CONTACT: ARMITPAL SINGH as230b@att.com PHONE: (425) 698-7840 WESTOWER COMMUNICATIONS 7525 SE 24TH ST, SUITE 500 MERCER ISLAND, WA 98040 STRUCTURE OWNER: AMERICAN TOWER CORP. 10 PRESIDENTIAL WAY WOBURN, MA 01801 PHONE: (781) 926-4685 ATTN: RICH SCIOLI PROPERTY OWNER: WESTERN FAC SERVICE OFFICE 34301 9TH AVE S 98003 FEDERAL WAY, WA 98003 PROJECT MANAGER: DRAWING INDEX DWG NO. DESCRIPTION T-1 TITLE SHEET G-1 GENERAL NOTES G-2 GENERAL NOTES AND SYMBOLS A-1 SITE PLAN A-2 ENLARGED SITE PLAN A-3 ELEVATION A-4 CONSTRUCTION DETAILS RF-1 ANTENNA CONFIGURATIONS RF-2 RF DETAILS E-1 SCHEMATIC GROUNDING PLAN E-2 GROUNDING DETAILS CONTACT: MIKE MCRITCHIE mmcritchie@westower.com PHONE: (425) 760-9835 SITE ACQUISITION/ PERMITTING CONTACT: RYKA CONSULTING ATTN: GEORGE PIERCE 918 S HORTON ST, SUITE 1002 SEATTLE, WA 98134 PHONE: (206) 523-1941 gpierce@rykaconsulting.com CONSTRUCTION MANAGER: CONTACT: RON EVENSON revenson@westower.com PHONE: (206) 550-9322 POR OF N 1/2 DAF: BEG CENTER OF SEC; TH N 01-16-46 E ALG N-S C/L 360.82 FT TH N 88-46-14 W 330 FT TH S 01-16-46 W 179.36 FT TO N LN OF S 181.5 FT OF SD N 1/2 TH N 88-46-40 W 220 FT TH S 01-16-46 W 181.5 FT TO E/W 1/4 LN SD SEC; TH N 88-46-40 W 521.96 FT TO A PT S 88-46-40 E 1544.35 FT FR W 1/4 COR SD SEC TH N 01-10-59 E 712.14 FT TH N 53-40-00 W 543.88 FT TH N 36-20-00 E 310 FT; TH ON CURVE TO LEFT RAD 1250 FT THROUGH C/A 18-47-35 ARC DIST OF 410 FT TH S 72-27-35 E 789.85 FT TH S 35-00-00 E 134.66 FT TO S LN OF NE 1/4 OF NW 1/4 TH ON SD S LN & S LN OF NW 1/4 OF NE 1/4 S 88-45-47 E 795.73 FT TAP ON 1130 FT RAD CURVE WHOSE CENTER PT BEARS S 84-52-30 E TH SLY ALG SD CURVE THROUGH C/A 09-57-30 ARC DIST OF 196.40 FT TH S O4-50-00 E 460 FT TAP OF 810 FT RADIUS CURVE TO RGT TH ON SD CURVE THROUGH C/A 30-00-00 ARC DIST OF 424.12 FT TH S 25-10-00 W 271.12 FT TO E/W C/L SD SEC TH ALG SD LN N 88-46-40 W 348.36 FT TO CENTER SD SEC & POB RECEIVED APR 27 zalz CITY OF FEDERAL- WAY CDs Via Commercial Infrastructure L Ij Lw Residential THE CIVIC ENGINEERING GROUP Telecom 14201 NE 200th St., #1000.pM1 Ph 425.806.1869 Woodinville, WA 98072 Fx 425 4822893 www.LDCcorp.com� DATE: 1 DRAWN BY: RM671 CHECKED BY: RJA REVISIONS S REV DATE DESCRIPTION BY 1 10-27-11 1 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA WA 908 �p rTSTER�� ssI®.iVAi. ���� �,�v a�` SKEET TITLE TITLE SHEET E 0 Q0 0 Co i N 0 N N a Q 0 0 0 i 0 U N i i 0 U U) a 0 U 3 a 0 0 a E E 0 f- a N i i E 0 U N i 0 N i n 6) .3 0 GENERAL NOTES: 1. THE CONTRACTOR SHALL NOTIFY TOWER NETWORK CARRIER OF ANY ERRORS, OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE DISCOVERED IN PLANS, DOCUMENTS, NOTES, OR SPECIFICATIONS PRIOR TO STARTING CONSTRUCTION INCLUDING, BUT NOT LIMITED BY, DEMOLITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY ERROR, OMISSION, OR INCONSISTENCY AFTER THE START OF CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE APPROVED BY TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. 2. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT. CONTRACTORS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR HAVING BEEN AWARDED THIS PROJECT SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER VERBALLY AND IN WRITING. 3. FOR COLLOCATION SITES: CONTACT TOWER OWNER REPRESENTATIVE FOR PARTICIPATION IN BID WALK. 4. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, THIS SET OF DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY, UNLESS NOTED OTHERWISE. THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS, EQUIPMENT, LABOR, AND ANY REQUIREMENTS DEEMED NECESSARY TO COMPLETE PROJECT AS DESCRIBED IN THE DRAWINGS AND OWNER'S PROJECT MANUAL. 5. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS. THE BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING) THE ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR OMISSIONS PRIOR TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT OF DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, UNLESS DIRECTED OTHERWISE. 6. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE. TOWER NETWORK CARRIER IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING FROM THIS PRACTICE WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS. 7. OWNER, CONTRACTOR, AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER SHALL MEET JOINTLY TO VERIFY ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. 8. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. 9. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED HOURS TO AVOID DISTURBING NORMAL BUSINESS. 10. THE CONTRACTOR SHALL PROVIDE TOWER NETWORK CARRIER PROPER INSURANCE CERTIFICATES NAMING TOWER NETWORK CARRIER AS ADDITIONAL INSURED, AND TOWER NETWORK CARRIER PROOF OF LICENSE(S) AND PE & PD INSURANCE. 11. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. 12. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. 13. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF THE WORK. 14. GENERAL CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET OF CONSTRUCTION DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR USE BY ALL PERSONNEL INVOLVED WITH THE PROJECT. THIS SET IS A VALID CONTRACT DOCUMENT ONLY IF THE TITLE SHEET IS STAMPED "FOR CONSTRUCTION" AND EACH SUCCESSIVE SHEET BEARS THE ARCHITECT'S SIGNED WET STAMP. 15. A COPY OF GOVERNING AGENCY APPROVED PLANS SHALL BE KEPT IN A PLACE SPECIFIED BY THE GOVERNING AGENCY, AND BY LAW, SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES. THE PLANS ARE NOT TO BE USED BY THE WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS GOVERNING AGENCY APPROVED PLANS. THE CONTRACTOR SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD CONDITION, COMPLETE WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES UNDER THE DIRECT CARE OF THE SUPERINTENDENT. THE CONTRACTOR SHALL SUPPLY TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. WITH A COPY OF ALL REVISIONS, ADDENDA, AND/OR CHANGE ORDERS AT THE CONCLUSION OF THE WORK AS A PART OF THE AS -BUILT DRAWING RECORDS. 16. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES ARE NOT TO BE ALTERED BY THIS CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. 17. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL, MECHANICAL, AND PLUMBING PLANS AND CROSS CHECK THEIR DETAILS, NOTES, DIMENSIONS, AND ALL REQUIREMENTS PRIOR TO THE START OF ANY WORK. 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS UNTIL THE JOB IS COMPLETE. 19. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON THE PLANS, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR, OR SUBCONTRACTOR AS SPECIFIED IN THE AGREEMENT BETWEEN SUBCONTRACTOR AND CONTRACTOR, SHALL BEAR THE EXPENSES OF REPAIR AND/OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGE BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. 20. THE REFERENCES ON THE DRAWINGS ARE FOR CONVENIENCE ONLY AND SHALL NOT LIMIT THE APPLICATION OF ANY DRAWING OR DETAIL. 21. ALL DIMENSIONS ON THE PLANS ARE TO FACE OF STUD (F.O.S.) UNLESS NOTED OTHERWISE (U.N.O.). GENERAL NOTES CONT'D: 22. ALL EXISTING CONSTRUCTION, EQUIPMENT, AND FINISHES NOTED TO BE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: A. PROPERTY NOTED TO BE RETURNED TO THE OWNER. B. PROPERTY NOTED TO BE REMOVED BY THE OWNER. 23. THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING INSPECTORS SHALL PROVIDE THE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, MATERIALS, AND FINISHES USED THROUGHOUT THE PROJECT. TRADE STANDARDS AND/OR PUBLISHED MANUFACTURERS SPECIFICATIONS MEETING OR EXCEEDING DESIGN REQUIREMENTS SHALL BE USED FOR INSTALLATION. 24. WHEN REQUIRED STORAGE OF MATERIALS OCCURS, THEY SHALL BE EVENLY DISTRIBUTED OVER ROUGH FRAMED FLOORS OR ROOFS SO AS NOT TO EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. TEMPORARY SHORING AND/OR BRACING IS TO BE PROVIDED WHERE THE STRUCTURE HAS NOT ATTAINED THE DESIGN STRENGTH FOR THE CONDITIONS PRESENT. 25. PRIOR TO THE POURING OF ANY NEW SLAB OVER AN EXISTING SLAB THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, CHASES, AND EQUIPMENT WHICH ARE TO BE IMPLEMENTED INTO THE NEW WORK. ALL ITEMS DESIGNATED TO BE ABANDONED SHALL BE NOTED AND DISCUSSED WITH THE OWNER AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER AS PART OF THE AS -BUILT DRAWING PACKAGE. 26. SEAL ALL PENETRATIONS THROUGH FIRE -RATED AREAS WITH U.L. LISTED OR FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THIS FACILITY AND OR PROJECT SITE. 27. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE NOTIFIED PRIOR TO ANY GRADING, CONSTRUCTION, AND ANY OTHER PROJECT EFFORT AS MANDATED BY THE GOVERNING AGENCY. 28. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING CONSTRUCTION. 29. THE PROJECT, WHEN COMPLETED, SHALL COMPLY WITH LOCAL SECURITY CODES AND TITLE-24 ENERGY CONSERVATION REQUIREMENTS. (TITLE-24 WHEN APPLICABLE) 30. ALL GLASS AND GLAZING IS TO COMPLY WITH CHAPTER 54 OF THE U.S. CONSUMER SAFETY COMMISSION - SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (42 FIR 1428, CFR PART 1201) AND LOCAL SECURITY REQUIREMENTS. 31. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, EASEMENTS, PAVING, CURBING, ETC. DURING CONSTRUCTION. UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE PROPERTY. 32. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE DURING CONSTRUCTION AND DISPOSE OF ALL DIRT, DEBRIS, AND RUBBISH. CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY OR PREMISES. SITE SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE. 33. NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH IN FORM, TEXTURE, FINISH, AND IN MATERIALS EXCEPT AS NOTED IN THE PLANS AND SPECIFICATIONS. 34. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, AND/OR SLEEVES REQUIRED FOR THE INSTALLATION OF FIXTURES, MECHANICAL EQUIPMENT, PLUMBING, HARDWARE, AND FINISH ITEMS TO INSURE A PROPER AND COMPLETE JOB. 35. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A PROJECT LEVEL, STRAIGHT, AND TRUE ACCORDING TO THE PLANS. THE CONTRACTOR SHALL COMPARE THE LINES AND LEVELS OF THE EXISTING CONDITIONS WITH THOSE SHOWN ON THE PLANS PRIOR TO THE START OF ANY CONSTRUCTION. TOWER NETWORK CARRIER SHALL BE NOTIFIED OF ANY ERRORS, OMISSIONS, OR INCONSISTENCIES PRIOR TO ANY CONSTRUCTION. 36. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING PROPERTIES FROM PHYSICAL HARM, NOISE, DUST, DIRT, AND FIRE AS REQUIRED BY THE GOVERNING AGENCIES. 37. WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AND/OR REVISIONS AVAILABLE AS REQUIRED BY THE GOVERNING AGENCY RESPONSIBLE FOR RECORDING THE RESULTS. 38. THE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL MATERIALS AND SHALL NOT DO SO ON PUBLIC PROPERTY WITHOUT A PERMIT TO DO SO FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. 39. GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO BE USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY SHOWN OTHERWISE. 40. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR OWN CUTTING, FITTING, PATCHING, ETC., SO AS TO BE RECEIVED PROPERLY BY THE WORK OF OTHER TRADES. 41. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT PREMISES AND SHALL BE LEFT IN A CLEAN (BROOM FINISH) CONDITION AT ALL TIMES BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION OF THE WORK.. 42. TOWER NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, FIXTURES, AND/OR ANY EQUIPMENT NAMED BY A TRADE OR MANUFACTURER. GUARANTEE OR WARRANTY THAT MAY BE IN EFFECT IS DONE SO THROUGH THE COMPANY OR MANUFACTURER PROVIDING THE PRODUCT, FIXTURE, AND/OR EQUIPMENT ONLY: UNLESS SPECIFIC RESPONSIBILITY IS ALSO PROVIDED BY THE CONTRACTOR/SUBCONTRACTOR IN WRITTEN FORM. 43. CAUTION! CALL BEFORE YOU DIG! BURIED UTILITIES EXIST IN THE AREA AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT THE ONE -CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION. 1-800-424-5555. 44. CONTRACTOR TO REPLACE AND/OR REROUTE ANY EXISTING UNDERGROUND UTILITIES ENCOUNTERED DURING TRENCHING AND GENERAL CONSTRUCTION. 45. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO PLACEMENT OF MONOPOLE FOOTING AND OTHER STRUCTURES TO BE PLACED IN GROUND. SEE GENERAL NOTE #6 ON THIS SHEET. 46. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION. 47. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND SUBMIT TO TOWER NETWORK CARRIER ALONG WITH REDLINED CONSTRUCTION SET. GENERAL NOTES CONT'D: 48. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BY MARKING UP (REDLINING) THE APPROVED CONSTRUCTION SET AND SUBMITTING THE REDLINED SET TO TOWER NETWORK CARRIER UPON COMPLETION. 49. GENERAL CONTRACTOR IS TO COORDINATE ALL POWER INSTALLATION WITH POWER COMPANY AS REQUIRED. CONTRACTOR TO REPORT POWER INSTALLATION COORDINATION SOLUTION(S) TO NETWORK CARRIER REPRESENTATIVE, PROJECT CONSTRUCTION MANAGER AND ARCHITECT. 50. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT, MUST BE APPROVED BY TOWER NETWORK CARRIER CONSTRUCTION MANAGER. 51. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL REMEDY ALL FAULTY, INFERIOR, AND/OR IMPROPER MATERIALS, DAMAGED GOODS, AND/OR FAULTY WORKMANSHIP FOR ONE (1) YEAR AFTER THE PROJECT IS COMPETE AND ACCEPTED UNDER THIS CONTRACT; UNLESS NOTED OTHERWISE IN THE CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. (EXCEPTION) THE ROOFING SUBCONTRACTOR SHALL FURNISH A MAINTENANCE AGREEMENT FOR ALL WORK DONE, COSIGNED BY THE GENERAL CONTRACTOR, TO MAINTAIN THE ROOFING IN A WATERTIGHT CONDITION FOR A PERIOD OF TWO (2) YEARS STARTING AFTER THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT, UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. 52. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE SAFETY OF THE OWNER'S EMPLOYEES, WORKMEN, AND ALL TIMES DURING THE CONSTRUCTION OF THE PROJECT. 53. THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR ALL NECESSARY PERMITS AND/OR FEES WITH RESPECT TO THE WORK TO COMPLETE THE PROJECT. BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE OWNER OR HIS REPRESENTATIVE. CONTRACTOR SHALL OBTAIN PERMIT AND MAKE FINAL PAYMENT FOR SAID DOCUMENT. 54. THE ARCHITECT/ENGINEER IN CHARGE SHALL SIGN AND SEAL ALL DRAWINGS AND/OR SPECIFICATIONS. 55. TOWER NETWORK CARRIER WILL REVIEW AND APPROVE SHOP DRAWINGS AND SAMPLES FOR CONFORMANCE WITH DESIGN CONCEPT. TOWER NETWORK CARRIER PROJECT APPROVAL OF A SEPARATE ITEM SHALL NOT INCLUDE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. 56. ALL ANTENNAS MOUNTED ON ROOF SUPPORT FRAMES TO BE PROVIDED BY TOWER NETWORK CARRIER COMMUNICATIONS. 57. CONTRACTOR TO PROVIDE TRENCH AS REQUIRED TO INSTALL BOTH ELECTRICAL AND TELEPHONE UNDERGROUND CONDUITS (#40 PVC) PER S.C.E. WORKORDER. BACKFILL WITH CLEAN SAND AND COMPACT TO THE SATISFACTION OF THE DISTRICTS INSPECTOR. REPLACE FINISH GRADE WITH MATCHING MATERIALS (GRASS, ASPHALT, CONCRETE, ETC.) 58. CONTRACTOR TO PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES FOR SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM HEAVY EQUIPMENT UTILIZED DURING CONSTRUCTION. 59. CONTRACTOR TO PATCH AND REPAIR ALL GROUND SURFACES WITHIN THE CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM SURFACE AND MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. 60. CONTRACTOR TO REPLACE LANDSCAPE VEGETATION THAT WAS DAMAGED DUE TO CONSTRUCTION, AND TO MODIFY REMAINING IRRIGATION LINES TO OPERATING CONDITION, PROVIDING FULL COVERAGE TO IMPACTED AREAS. 61. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS OCCUR, THE GENERAL CONTRACTOR SHALL COORDINATE WITH BUILDING OWNER AND BUILDING ROOFING CONTRACTOR OF RECORD FOR INSTALLATION, PATCH, REPAIR OR ANY AUGMENTATION TO THE ROOF, AND HAVE THE WORK GUARANTEED UNDER THE ROOFING CONTRACTOR'S WARRANTY FOR MOISTURE PENETRATION OR AND OTHER FUTURE BREACH OF ROOFING INTEGRITY. 62. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS WITHIN CONCEALED (SHROUDED) SUPPORT FRAMES OR TRIPODS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE FRP DESIGNER/FABRICATOR TO ENSURE THAT THE FINAL FRP SHROUD IS SIMULATING (IN APPEARANCE) DESIGNATED EXISTING EXTERIOR BUILDING FACADE MATERIALS, TEXTURES, AND COLORS. THE CONTRACTOR SHALL FURTHERMORE ENSURE THE USE OF COUNTERSUNK FASTENERS IN ALL FRP CONSTRUCTION. WHEN PHOTOSIMULATIONS ARE PROVIDED, THE CONTRACTOR SHALL ENSURE THAT FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN PHOTOSIMULATION. SHOP DRAWINGS SHALL BE PROVIDED TO THE GENERAL CONTRACTOR, CONSTRUCTION COORDINATOR, AND ARCHITECT PRIOR TO FABRICATION AND CONSTRUCTION. 63. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE ANCHORING TO A CONCRETE ROOF SLAB IS REQUIRED, CONTRACTORS SHALL CONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING CONSTRUCTION COORDINATOR AND ARCHITECT THE PRESENCE OF POST TENSION TENDONS WITHIN THE ROOF SLAB - RESULTING FROM AN UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING "AS -BUILT DRAWING SET" - HAVING INDICATED AN ORIGINAL DESIGN SOLUTION OF REINFORCED CONCRETE W/ EMBEDDED STEEL REBAR. IN THE EVENT POST TENSION SLAB SOLUTION IS PRESENT, CONTRACTOR SHALL INCLUDE PROVISIONS FOR X-RAY PROCEDURES (INCLUDED IN BID) FOR ALL PENETRATION AREAS WHERE ANCHORING OCCURS. 64. GENERAL & SUB CONTRACTORS SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR ALL CABLE TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS (WHERE APPLICABLE). PLASTIC ZIP TIES SHALL NOT BE PERMITTED FOR USE ON TOWER NETWORK CARRIER PROJECTS. RECOMMENDED MANUFACTURE SHALL BE: PANDUIT CORP. METAL LOCKING TIES MODEL NO. MLT4S-CP UNDER SERIES-304 (OR EQUAL). PANDUIT PRODUCT DISTRIBUTED BY TRIARC. 65. ALL WORK TO BE DONE BETWEEN HOURS OF 8:00 AM AND 5:00 PM, EXCLUDING HOLIDAYS. c�= WE 3� LDCCommercial Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St.,n#100e 4 W Ph 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 www.LDCcorp.com % .r..... w 7AT: 10-27-11 N BY: RMDKED BY: RJA REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA �4� p •WAS���O dfj 40908� �GISTV SITE WA415 TAM MY LANE 34301 9TH AVE S FEDERAL WAY, WA 98003 SHEET TITLE GENERALNOTES SHEET NUMBER Chi 0 0 0 00 N O N d N a Q 0 n DESIGN CRITERIA: STRUCTURAL STEEL NOTES; 1. THE STRUCTURAL DESIGN OF THIS PROJECT IS IN ACCORDANCE WITH THE 1. SHOP DRAWINGS FOR STRUCTURAL STEEL SHALL BE SUBMITTED TO THE INTERNATIONAL BUILDING CODE 2009 WITH WASHINGTON STATE BUILDING CODE CONSULTANT FOR REVIEW PRIOR TO FABRICATION. AMENDMENTS (2009 IBC) 2. STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION (INCLUDING FIELD 2. DESIGN LOADS: WELDING, HIGH STRENGTH FIELD BOLTING, EXPANSION BOLTS, AND THREADED EXPANSION ANCHORS) SHALL BE BASED ON THE A.I.S.C. "SPECIFICATION FOR THE DESIGN DATA FOR FEDERAL WAY, WASHINGTON DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS" LATEST EDITION. SUPERVISION SHALL BE IN ACCORDANCE WITH 2O09 IBC CHAPTER -ROOF SNOW LOAD N/A (NOT A ROOFTOP SOLUTION) 22, BY A QUALIFIED TESTING AGENCY DESIGNATED BY THE CONSULTANT. THE CONSULTANT SHALL BE FURNISHED WITH A COPY OF ALL INSPECTION REPORTS -BASIC WIND SPEED 85 MPH AND TEST RESULTS. -WIND EXPOSURE C 3. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: -SEISMIC ZONE D TYPE OF MEMBER CONCRETE NOTES: CONCRETE �V `7 A. WIDE FLANGE SHAPES ASTM 992, GRADE 50 B. PLATES, SHAPES, ANGLES, AND RODS ASTM A36, Fy 36 KSI 1. ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI-318. C. SPECIAL SHAPES AND PLATES ASTM A572, Fy 50 KSI D. PIPE COLUMNS ASTM A53, Fy 35 KSI 2. CONCRETE SHALL BE MIXED, PROPORTIONED CONVEYED AND PLACED IN E. STRUCTURAL TUBING ASTM A500, Fy 46 KSI ACCORDANCE WITH CHAPTER 19 OF THE 2009 IBC. STRENGTHS AT 28 DAYS AND MIX F. ANCHOR BOLTS ASTM A307 CRITERIA SHALL BE AS FOLLOWS. G. CONNECTION BOLTS ASTM A325 TWIST -OFF -TYPE TYPE OF CONSTRUCTION 28 DAY STRENGTHS W/C MINIMUM CEMENT CONTENT 4. ALL STEEL EXPOSED TO WEATHER TO BE HOT DIPPED GALVANIZED AFTER (f c) RATIO PER CUBIC YARD FABRICATION PER A123/A123M-00. A. SLABS ON GRADE 5. ALL WELDING SHALL BE IN CONFORMANCE WITH A.I.S.C. AND AWS STANDARDS AND TOPPING SLABS CONCRETE PIERS 2,500 PSI < .45 5 1/2 SACKS SHALL BE PERFORMED BY W.A.B.O. CERTIFIED WELDERS USING E70 XX ELECTRODES. ONLY PREQUALIFIED WELDS (AS DEFINED BY AWS) SHALL BE USED. B. ALL STRUCTURAL CONCRETE 4,000 PSI < .45 6 1/2 SACKS WELDING OF GRADE 60 REINFORCING BARS (IF REQUIRED) SHALL BE PERFORMED USING LOW HYDROGEN ELECTRODES. WELDING OF GRADE 40 REINFORCING BARS EXCEPT WALLS (IF REQUIRED) SHALL BE PERFORMED USING E70 XX ELECTRODES. WELDING WITHIN C. CONCRETE WALLS 4,000 PSI < .45 6 1/2 SACKS 4" OF COLD BENDS IN REINFORCING STEEL IS NOT PERMITTED. SEE REINFORCING NOTE FOR MATERIAL REQUIREMENTS OF WELDED BARS. CEMENT SHALL BE ASTM C150, PORTLAND CEMENT TYPE II U.N.O. 6. COLD -FORMED STEEL FRAMING MEMBERS SHALL BE OF THE SHAPE, SIZE, AND 3. THE GENERAL CONTRACTOR SHALL SUPERVISE AND BE RESPONSIBLE FOR THE GAGE SHOWN ON THE PLANS. PROVIDE MINIMUM SECTION PROPERTIES INDICATED. "SPECIFICATION ALL COLD -FORMED STEEL FRAMING SHALL CONFORM TO THE A.I.S.I. METHODS AND PROCEDURES OF CONCRETE PLACEMENT. FOR THE DESIGN OF COLD -FORMED STEEL STRUCTURAL MEMBERS." 4. ALL CONCRETE WITH SURFACES EXPOSED TO STANDING WATER SHALL BE 7. BOLTED CONNECTIONS SHALL USE BEARING TYPE ASTM A325 BOLTS (3/4" DIA.) AND AIR -ENTRAINED WITH AN AIR -ENTRAINING AGENT CONFORMING TO ASTM C260, C494, SHALL HAVE A MINIMUM OF TWO BOLTS UNLESS NOTED OTHERWISE. C618, C989, AND C1017. TOTAL AIR CONTENT SHALL BE IN ACCORDANCE WITH ACI 318, SECTION 4.4.1. 8. NON-STRUCTURAL CONNECTIONS FOR STEEL GRATING MAY USE 5/8" DIA. ASTM A307 BOLTS UNLESS NOTED OTHERWISE. 5. REINFORCING STEEL SHALL CONFORM TO ASTM A615 (INCLUDING SUPPLEMENT S1), GRADE 60, fy=60,000 PSI. EXCEPTIONS: ANY BARS APECIFICALLY SO NOTED ON THE 9, PAINT ALL STEEL WORK (UNLESS NOTED OTHERWISE). PREPARATION AND PAINTING DRAWINGS SHALL BE GRADE 40, fy=40,000 PSI. GRADE 60 REINFORCING BARS SHALL BE IN ACCORDANCE WITH THE PAINT MANUFACTURERS WRITTEN INDICATED ON DRAWINGS TO BE WELDED SHALL CONFORM TO ASTM A706. INSTRUCTIONS. REINFORCING COMPLYING WITH ASTM A615 (S1) MAY BE WELDED ONLY IF MATERIAL PROPERTY REPORTS INDICATING CONFORMANCE WITH WELDING PROCEDURES 10. ALL WELDS TO BE 1/4" FILLET UNLESS NOTED OTHERWISE. SPECIFIED IN A.W.S. D14 ARE SUBMITTED. 11. TOUCH UP ALL FIELD DRILLING AND WELDING WITH 2 COATS OF GALVACON (ZINC 6. REINFORCING STEEL SHALL BE DETAILED (INCLUDING HOOKS AND BENDS) IN RICH PAINT) OR APPROVED EQUAL. ACCORDANCE WITH AC1 315 AND 318. LAP ALL CONTINUOUS REINFORCEMENT AT LEAST 30 BAR DIAMETERS OF A MINIMUM OF Z-0". PROVIDE CORNER BARS AT ALL WALL AND FOOTING INTERSECTIONS. LAP CORNER BARS AT LEAST 30 BAR DIAMETERS OR A MINIMUM OF 2'-0". LAP ADJACENT MATS OF WELDED WIRE FABRIC A MINIMUM OF 8" AT SIDES AND ENDS. 7. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185. 8. SPIRAL REINFORCEMENT SHALL BE PLAIN WIRE CONFORMING TO ASTM A615, GRADE 60, fy=60,000 PSI. 9. NO BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT UNLESS SPECIFICALLY SO DETAILED OR APPROVED BY THE CONSULTANT. 10. CONCRETE PROTECTION (COVER) FOR REINFORCING STEEL SHALL BE AS FOLLOWS: - FOOTINGS AND OTHER UNFORMED SURFACES, EARTH FACE 31' - FORMED SURFACES EXPOSED (#6 BARS OR LARGER) 2" TO EARTH OR WEATHER (#5 BARS OF SMALLER) 1 1/2" - SLABS AND WALLS (INTERIOR FACE) 3/4" 11. BARS SHALL BE SUPPORTED ON CHAIRS OR DOBIE BRICKS. 12. ANCHOR BOLTS TO CONFORM TO ASTM A307 13. NON -SHRINK GROUT SHALL BE FURNISHED BY AN APPROVED MANUFACTURER AND SHALL BE MIXED AND PLACED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED RECOMMENDATIONS. GROUT STRENGTH SHALL BE AT LEAST EQUAL TO THE MATERIAL ON WHICH IT IS PLACED (3,000 PSI MINIMUM). 14. ALL EXPANSION ANCHORS TO BE HILTI BRAND. ADHESIVE ANCHORS REQUIRE TESTING TO CONFIRM CAPACITY UNLESS WAIVED BY ENGINEER. TOWER/POLE NOTES: 1. VERIFICATION THAT THE EXISTING TOWER/POLE CAN SUPPORT THE PROPOSED ANTENNA LOADING IS TO BE DONE BY OTHERS. 2. PROVIDE SUPPORTS FOR THE ANTENNA COAX CABLES TO THE ELEVATION OF ALL INITIAL AND FUTURE ANTENNAS. ANTENNA COAX CABLES ARE TO BE SUPPORTED AND RESTRAINED AT THE CENTERS SUITABLE TO THE MANUFACTURER'S REQUIREMENTS. ABBREVIATED ROOF TOP SAFETY PROCEDURES (WHEN APPLICABLE): (AS PER "ACCIDENT PREVENTION PROGRAM" - BY PERMISSION OF WREN CONSTRUCTION, INC. - 03/01/99) FALL PROTECTION METHODS AND EQUIPMENT ROOF TOP INSTALLATIONS 1. FOR WORK IS BEING PERFORMED WITHIN 25' OF AN UNPROTECTED ROOF EDGE, THE CONSTRUCTION SUPERVISOR SHALL DESIGNATE A TRAINED SAFETY MONITOR TO OBSERVE THE MOVEMENTS AND ACTIVITIES OF THE CONSTRUCTION WORKERS. 2. SAFETY MONITOR SHALL WARN CONSTRUCTION WORKERS OF HAZARDS (I.E., BACKING UP TOWARD A ROOF EDGE, ETC.) OR UNSAFE ACTIVITIES. THE SAFETY MONITOR MUST BE ON THE SAME ROOF AND WITHIN VISUAL AND VERBAL DISTANCE OF THE CONSTRUCTION WORKERS. 3. CONSTRUCTION INVOLVING WORKERS TO APPROACH WITHIN 6' OR LESS OF AN UNPROTECTED ROOF EDGE, REQUIRES WORKERS TO USE SAFETY LINE. 4. SAFETY LINE SHALL BE MINIMUM 1/2" DIAMETER NYLON, WITH A NOMINAL TENSILE STRENGTH OF 5400 LBS. 5. SAFETY LINE SHALL BE ATTACHED TO A SUBSTANTIAL MEMBER OF THE STRUCTURE. 6. SAFETY LINE LENGTH SHALL BE SET ALLOWING CONSTRUCTION WORKER TO REACH EDGE OF ROOF, BUT NOT BEYOND. 7. SAFETY BELTS SHALL BE WORN BY ALL CONSTRUCTION WORKERS. 8. MONTHLY SAFETY INSPECTION AND MAINTENANCE OF THE FALL PROTECTION EQUIPMENT SHALL OCCUR BY THE SAFETY COMMITTEE REPRESENTATIVES, INCLUDING: INSPECTION OF CONSTRUCTION AREA FOR HAZARDS USE OF AN INSPECTION CHECKLIST INTERVIEWING COWORKERS REGARDING SAFETY CONCERNS REPORTING AND DOCUMENTING ANY HAZARDS REPORTING HAZARDS TO THE SAFETY COMMITTEE FOR CONSIDERATION POSTING RESULTS OF INSPECTION AND ANY ACTION TAKEN RECEIVING AN UNBIASED REVIEW OF ONE'S OWN WORK AREA BY ANOTHER COWORKER SAFETY REPRESENTATIVE REFER TO ROOFTOP WORK AREA SAFETY PROTOCOL NATIONAL ASSOCIATION OF TOWER ERECTORS 2000 PUBLICATION REFERENCED OSHA REGULATION/STANDARDS SHALL BE REVIEWED BY TOWER ERECTORS, EQUIPMENT INSTALLERS, AND TOWER/ROOF TOP CONTRACTORS/SUBCONTRACTORS 29 CFR 1926.500 - SCOPE, APPLICATION, AND DEFINITIONS 29 CFR 1926.501 - DUTY TO HAVE FALL PROTECTION 19 CFR 1926.502 - FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES SPECIAL INSPECTIONS REQUIRED: SOILS COMPLIANCE PRIOR TO FOUNDATION INSPECTION CONCRETE OVER 2400 PSI (5 1/2 SACK MIX) AT 28 DAYS CONCRETE PLACEMENT AT SLAB ON GRADE WRITTEN CERTIFICATION FOR PROPER PLACEMENT OF REINFORCEMENTS AT SLAB ON GRADE FOUNDATION EXCAVATION AND FILL INCLUDING UTILITY TRENCHES CERTIFICATION OF BUILDING PAD, FOUNDATION AND FILL BY THE GEOTECHNICAL ENGINEER OF THE RECORD SYMBOLS AND ABBREVIATIONS: A/C AIR CONDITIONING HORZ HORIZONTAL AGL ABOVE FINISH GRADE HR HOUR APPROX APPROXIMATELY HT HEIGHT HVAC HEATING BLDG BUILDING VENTILATION BLK BLOCKING AIR CONDITIONING CLG CEILING ID INSIDE DIAMETER CLR CLEAR IN INCH CONC CONCRETE INFO INFORMATION CONST CONSTRUCTION INSUL INSULATION CONT CONTINUOUS INT INTERIOR IBC INTERNATIONAL DBL DOUBLE BUILDING CODE DIA DIAMETER DIAG DIAGONAL LBS POUNDS DN DOWN MAX MAXIMUM DIET DETAIL MECH MECHANICAL DWG DRAWING MTL METAL MFR MANUFACTURE EA EACH MGR MANAGER ELEV ELEVATION MIN MINIMUM ELEC ELECTRICAL MISC MISCELLANEOUS EQ EQUAL EQUIP EQUIPMENT NA NOT APPLICABLE EXT EXTERIOR NIC NOT IN CONTRACT NTS NOT TO SCALE FIN FINISH FLUOR FLUORESCENT OC ON CENTER FLR FLOOR OD OUTSIDE DIAMETER FT FOOT PLYWD PLYWOOD GA GAUGE PROJ PROJECT GALV GALVANIZED PROP PROPERTY GC GENERAL CONTRACTOR PT PRESSURE TREATED GRND GROUND REQ REQUIRED GYP BD GYPSUM WALL BOARD RM ROOM RO ROUGH OPENING UGT UNDERGROUND TELECO OHT OVERHEAD TELECO UGP UNDERGROUND POWER OHP OVERHEAD POWER P PROPANE UG UNDERGROUND UTILITY COAX COAXIAL CABLE ANTENNA CENTERLINE (E) EXISTING (P) NEW e DETAIL NUMBER SHEET NUMBER SHT SHEET SIM SIMILAR SPEC SPECIFICATION SF SQUAREFOOT SS STAINLESS STEEL STL STEEL STRUCT STRUCTURAL STD STUD SUSP SUSPENDED THRU THROUGH TNNG TINNED TYP TYPICAL LINO UNLESS NOTED OTHERWISE VERT VERTICAL VIF VERIFY IN FIELD W/ WITH W/O WITHOUT WP WATER PROOF ❑ VERIFICATIONS OF MILL REPORT ❑ SPRAYED -ON- FIREPROOFING ❑ IDENTIFICATION OF STEEL AND AT JOB SITE ❑ STRUCTURAL MASONRY ❑ ADHESIVE BOLTS IN CONCRETE OR MASONRY ❑ PRESTRESSED CONCRETE ❑ ALL FIELD WELDING ❑ ANCHOR BOLTS INSTALLATION AND PLACEMENT IN CONCRETE ❑ REINFORCING PLACEMENT ❑ HIGH STRENGTH BOLTING ❑ DESIGNER SPECIFIED (SEE SHEET#_) ❑ OTHER SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED AND SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. Commercial Infrastructure L U Lw Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St., #100 Ph 425.806 1869 Woodinville, WA 98072 Fx. 425.482.2893 M -�- www.LDCcorp.com DATE: DRAWN BY: - s CHECKED BY: RJA REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA 11 SITE I WA415 TAMMY LANE 34301 9TH AVE S FEDERAL WAY, WA 98003 • :r E 0 0 co I N O N N a Q 0 0 Commercial L Lj C' Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St., #100 Ph.425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 a, .< . www.LDCcorp.com y. DATE: DR , CHECKED- RJA REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA a ,R i v Cs ,\ SITE WA415 TAMMY LANE ZMAII *141�. •�� SWEET TITLE SITE PLAN SWEET NUMBER 1 0 0 SHOWNOTHER CARRIERS ANTENNA ARRAY NOT •` 22"x34" SCALE: 3/3" = 1'-0" 1 11 "x17" SCALE: 3/16" = 1'-0" CONSTRUCTION PLAN KEYED NOTES O PROPOSED AT&T PURCELL FLX16WS CABINET TO HOUSE LTE EQUIPMENT. 1 A-4 O2 PROPOSED AT&T FIBER/POWER ROUTE. OPROPOSED AT&T (1) RAYCAP SQUID MOUNTED BELOW ANTENNA LEVEL ON PROPOSED QUAD MOUNT. RF-2 O4 PROPOSED AT&T 700 MHZ RRH UNIT MOUNTED BELOW ANTENNA 3 LEVEL ON PROPOSED QUAD MOUNT (TYP OF (1) PER SECTOR). RF-2 O5 PROPOSED AT&T AWS RRH UNIT MOUNTED BELOW ANTENNA 2 LEVEL ON PROPOSED QUAD MOUNT (TYP OF (1) PER SECTOR). RF-2 PROPOSED AT&T LTE PANEL ANTENNA TO BE ADDED TO AN EXISTING 5 O(3) SECTOR ANTENNA ARRAY (1) LTE ANTENNA PER SECTOR FOR A RF-2 TOTAL OF (3) NEW LTE ANTENNAS. OPROPOSED AT&T LTE GPS ANTENNA MOUNTED NEXT TO EXISTING GPS ANTENNA ON UTILITY H-FRAME. RF-2 OEXISTING 120'-0" MONOPOLE (TO REMAIN). O PROPOSED AT&T ANTENNA MOUNT. RF-2 10 EXISTING AT&T GPS ANTENNA (TO REMAIN). 11 EXISTING AT&T UMTS CABINET (TO REMAIN). 12 EXISTING AT&T GSM CABINET (TO REMAIN). 13 EXISTING AT&T ARGUS POWER CABINET (TO REMAIN). 14 EXISTING AT&T ARGUS BBU CABINET (TO REMAIN). 15 EXISTING AT&T UTILITY H-FRAME (TO REMAIN). 16 EXISTING AT&T EQUIPMENT SHELTER (TO REMAIN). 17 EXISTING AT&T ARGUS TE43 CABINET (TO REMAIN). 4 A-4 18 RELOCATED AT&T ANTENNA. 19 EXISTING AT&T GSM CABINET TO BE REMOVED (VERIFY). QO EXISTING FENCED COMPOUND (TO REMAIN). Q1 EXISTING DOUBLE SWING GATE (TO REMAIN). EXISTING AT&T HOFFMAN BOX (TO REMAIN). 0 EXISTING AT&T ICE BRIDGE (TO REMAIN). QEXISTING AT&T COAX ENTRY PORT (TO REMAIN). < EXISTING AT&T DIPLEXERS (TO REMAIN). EXISTING AT&T FIBER BOX (TO REMAIN). EXISTING CARRIER EQUIPMENT MOUNTED ON CONCRETE PAD (TO REMAIN). QEXISTING CARRIER H-FRAME (TO REMAIN). 30 EXISTING VACANT ICE BRIDGE MOUNTED ON VACANT CONCRETE PAD (TO REMAIN). SITE NOTES Commercial L C Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St., #100 Ph. 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 �www.LDCcorp.com���� D`10-27-11 DRAWNBY: ,r CHECKED BY: RJA REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA 1. VERIFY ANTENNA MODEL, RAD CENTER & AZIMUTHS WITH LOCKDOWN SET RF SITE BUILD FORM. 2. ANALYSIS OF TOWER & FOUNDATION SHALL BE PERFORMED BY OTHERS & STAMPED BY A LICENSED STRUCTURAL ENGINEER. 3. CROSS SECTOR REDUNDANCY BETWEEN THE PROPOSED RRH UNITS SHALL BE UTILIZED PER AT&T STANDARDS. SITE WA415 TAMMY LANE SHEET TITLE ENLARGED SITE FLAN ., CONSTRUCTION PLAN KEYED NOTES OPROPOSED AT&T FIBER/POWER ROUTE. OPROPOSED AT&T (1) RAYCAP SQUID MOUNTED BELOW rl ANTENNA LEVEL ON PROPOSED QUAD MOUNT. RF-2 O4 PROPOSED AT&T 700 MHZ RRH UNIT MOUNTED BELOW ANTENNA 3 LEVEL ON PROPOSED QUAD MOUNT (TYP OF (1) PER SECTOR). RF-2 TIP HEIGHT OF EXISTING & PROPOSED AT&T AWS RRH UNIT MOUNTED BELOW ANTENNA 2 PROPOSED AT&T ANTENNAS O LEVEL ON PROPOSED QUAD MOUNT (TYP OF (1) PER SECTOR). RF-2 119'-11"AGL PROPOSED AT&T LTE PANEL ANTENNA TO BE ADDED TO AN EXISTING 5 O(3) SECTOR ANTENNA ARRAY (1) LTE ANTENNA PER SECTOR FOR A RF-2 TOTAL OF (3) NEW LTE ANTENNAS. TOP OF EXISTING MONOPOLE TOP OF EXISTING MONOPOLE RAD CENTER OF EXISTING 120'" AGL -0 AGL PROPOSED AT&T LTE GPS ANTENNA MOUNTED NEXT TO EXISTING 6 120-0AT&T ANTENNAS RAD CENTER OF EXISTING O GPS ANTENNA ON UTILITY H-FRAME. RF-2 A 7' AGL 18 AT&T ANTENNAS 31 116'-0" AGL O EXISTING 120'-0" MONOPOLE (TO REMAIN). 9 O PROPOSED AT&T ANTENNA MOUNT. RAD CENTER OF PROPOSED 6 RF-2 AT&T ANTENNAS 5 10 EXISTING AT&T GPS ANTENNA (TO REMAIN). 115'-11" AGL 3 4 27 7 15 EXISTING AT&T UTILITY H-FRAME (TO REMAIN). 16 EXISTING AT&T EQUIPMENT SHELTER (TO REMAIN). 18 RELOCATED AT&T ANTENNA. 7 7 I Q EXISTING FENCED COMPOUND (TO REMAIN). I 2 2 I 23 EXISTING AT&T ICE BRIDGE (TO REMAIN). I 8 8 (p a) Commercial Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St , #100 Ph. 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 -� �� www.LDCcorp.com�� 0 ° STANDARD 19" ° O a ° EQUIPMENT RACK o ° O 0 ° O 0 O O p o O O 0 p O O 0,// a 0 0 O REMOVABLE COVER o ° 0 O O O o 0 O O ° o 0 ° e T O o O a ® ° DC POWER O 0 O [EMPTY] O p O 0 �, ., O - -- O ° S O DC/DC CONVERTER 0 ° ° 0[EMPTY] 0 a ° o [EMPTY] SEE DETAIL ° a Q FIBER CABLE 6/A-4 ° 0 ENCLOSURE O REMOVABLE 19" RACK o FUTURE ALU/BBU ° EAR, TYP ° ° a TELCO 0 U O O , O O MANUFACTURER:ROSENBERGER MODEL: FB-15-ABOX CEQ 10505 EXCESS FIBER CABLE ENCLOSURE DIMENSIONS: 17"W X 1-3/4"H (1 U) X 12"D CAPACITY: 20m (65'±) OF 10MM CABLE EXCESSFIBER CABLE ENCLOSURE 6 NOT USED TE43 RACK CONFIGURATION NOT TO SCALE NOT TO SCALE NOT TO SCALE MANUFACTURER: ALCATEL - LUCENT 6 MODEL: 9926 BBU HEIGHT:19" co WIDTH: 3.469 2U (RACK UNITS) 1 1.25" N DEPTH:11.81" N WEIGHT: 26 LBS 6.0 00.688" MANUFACTURER: PURCELL SYSTEMS MODEL: FLX16WS N 1.25" ° ° o o HEIGHT:30" Q O WIDTH:25" DEPTH: 20" o OLOTOTAL WEIGHT (MAX): 600 LBS � 00 0 00 0° 0 °°°°° PURCELL FLX16WS CABINET. o Q o° ° NOTE: RACK MOUNT LTE 9926 0 0 SEE DETAIL 2/A-4. STACK o ° B° O O ABOVE PURCELL 14" PLINTH. BU WITHIN PURCEL FLX16WS CABINET. SEE DETAIL 3/A-4. ° N 21.50" 0 00 ° o 7/16 DIN CONNECTOR ° N-TYPE CONNECTOR DOOR '0 0 LOCATION LOCATION ° N 00 O°00 p o°o°o Lo on. oO 0 - 0 ° e e 14" PLINTH (PURCELL PN 2000001397) E 19.001, 0 o ; 4. 8x EACH SIDE TOP 2" CONDUIT ° ° `o ' KNOCKOUT o 0 Q Ay CA('L-1 Clnc: co �^ L-r-%Nal I �I�" - I \Ili N o® o o p o = N 1" CONDUIT 20.034" 7.105" KNOCKOUT 24.975 °C — I CCT 1111=1A/ CD(IAIT \/IC\A/ b®o _ n 05 c 4 M Commercial L IJ C Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St., #100 Ph. 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 www.LDCcorp.com DATE: 10-27-11 DRAWN RMD CHECKED BY: RJA REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA CONSTRUCTIONSHEET TITLE DETAILS PROPOSED ANTENNA CONFIGURATION AND SCHEDULE SECTOR A AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX COAX O COAX LENGTH GSM 850 50° 118' 1 ANDREW QBXLH-6565A-R2M 20 00 NONE 2 7/8" 138' GSM 1900 (OFF) 118' 20 LGP 21403 UMTS 850 118' 6° NONE 2 7/8" 138' UMTS 1900 118' 20 LGP 21401 UMTS 19001 118' 2° 2 7/8" 138' UMTS 8501 118' 6° NONE 2 7/8" 138' LTE 700 500 116' 1 KMW AM-X-CD-17-65-OOT 9° 20 1 FIBER 150' SECTOR B AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX COAX O COAX LENGTH GSM 850 2150 118' 1 ANDREW QBXLH-6565A-R2M 30 00 1 NONE 2 7/8" 138' GSM 1900 (OFF) 118' 30 LGP 21403 UMTS 850 118' 7° NONE 2 7/8" 138' UMTS 1900 118' 30 LGP 21401 UMTS 19001 118' 30 2 7/8" 138' UMTS 8501 118' 70 NONE 2 7/8" 138' LTE 700 2150 116' 1 KMW AM-X-CD-17-65-OOT 90 00 1 FIBER 150' SECTOR C AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX COAX O COAX LENGTH GSM 850 3200 118' 1 ANDREW QBXLH-6565A-R2M 20 0° NONE 2 7/8" 138' GSM 1900 (OFF) 118' 00 LGP 21403 UMTS 850 118' 00 NONE 2 7/8" 138' UMTS 1900 118' 00 LGP 21401 UMTS 19001 118' 0° 2 7/8" 138' UMTS 850_1 118' 0° NONE 2 7/8" 138' LTE 700 320° 116' 1 KMW AM-X-CD-17-65-OOT 00 1 00 1 FIBER 150' EXISTING ANTENNA CONFIGURATION AND SCHEDULE SECTOR A AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX C® O COAX LENGTH GSM 850 500 116' 1 ANDREW QBXLH-6565A-R2M 20 00 NONE 2 7/8" 138' GSM 1900 (OFF) 116' 20 LGP 21403 UMTS 850 116' 2 NONE 2 7/8" 138' UMTS 1900 116 ° LGP 21401 UMTS 1900_1 116' 20 2 7/8" 138' UMTS 8501 116' 60 NONE 2 7/8" 138' LTE 700 (OFF) 500 116' 1 KMW AM-X-CD-17-65-OOT 90 20 1 FIBER 138' SECTOR B AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER NUMBER COAX COAX O COAX LENGTH GSM 850 2150 116' 1 ANDREW QBXLH-6565A-R2M 30 00 NONE 2 7/8" 138' GSM 1900 (OFF) 116' 30 LGP 21403 UMTS 850 116' 3° NONE 2 7/8" 138' UMTS 1900 116 LGP 21401 UMTS 1900_1 116' 30 2 7/8" 138' UMTS 8501 116' 70 NONE 2 7/8" 138' LTE 700 (OFF) 2150 116' 1 KMW AM-X-CD-17-65-OOT 90 00 1 FIBER 138' SECTOR C AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX C® AX O COAX LENGTH GSM 850 3200 116' 1 ANDREW 1 QBXLH-6565A-R2M 1 20 0° NONE 2 7/8" 138' GSM 1900 (OFF) 116' 00 LGP 21403 UMTS 850 116' O° NONE 2 7/8" 138' UMTS 1900 116 LGP 21401 UMTS 1900_1 116' 0° 2 7/8" 138' UMTS 850_1 116' 00 NONE 2 7/8" 138' LTE 700 (OFF) 320° 116' 1 1 KMW I AM-X-CD-17-65-OOT 0° 00 1 FIBER 138' COAX NOTE.- (10) RUN OF 7/8" 0 COAX ARE UNUSED AND NOT IDENTIFIED IN THE EXISTING SCHEDULE. 76°34°E f s� 3 �0 PROPOSED "AT&T LTE PANEL ANTENNA TYP 1 PER SECTO ( () R) RF-2 4 `mil ~`� / .•-^�_ � ' PROPOSED AT&T AWS RRH UNIT ` Commercial MOUNTED TO EXISTING ANTENNA Infrastructure _`-- �� RF-2 �Z7 L Residential `__. —� _ MOUNT (TYP (1) PER SECTOR) THE CIVIL ENGINEERING GROUP 'Telecoms !_ i 14201 NE 200th St. #100 Ph. 425.806.1869 \ Woodinville, WA 98072 Fx. 425.482.2893 _ /-� F�.wwW.LDCcorp.com � r - O /r �Ic DATE: 10-27-11 DRAWN BY: RM D PROPOSED AT&T 7 - i ;� �; n CHECKED BY: RJA ANTENNA MOUNT Q ...�J r .. r l't t O ¢ ( � I ' f + / � ,.Tt�`- t! J� 1 :� J I f f i I �• '+ -' , f 4ftT1 o EXISTING AT&T ANTENNA - ( (TO BE REPLACED) , � ; -� �---�----�---,'_�--_�_�_-�- ., i �• �' �- ACED) o o PROPOSED AT&T 70OMHZ RRH UNIT MOUNTED TO EXISTING ANTENNA MOUNT TYP 1 PER SECTOR) \ O ° EXISTING 120'-0" MONOPOLE ;^:', EXISTING AT&T ANTENNA - (TO BE RELOCATED) ` co EXISTING 120'-0" MONOPOLE. PROPOSED AT&T (1) RAYCAP 1 SQUID MOUNTED NEAR ANTENNA fl RELOCATED AT&T ANTENNA LEVEL ON"EXISTING MONOPOLE NOTE; NOTE OTHER CARRIERS ANTENNA ARRAY �i OTHER CARRIERS ANTENNA ARRAY NOT SHOWN FOR CLARITY. NOT SHOWN FOR CLARITY. 0 N ®ANTENNA ONFIGURATION EXISTING ANTENNA CONFIGURATION 3 0 22"x34" SCALE: 1/2" = 1'-0" 11"x17" SCALE: 1/4" = V-O" 22"x34" SCALE: 3/4" = 1'-O" 11"x17" SCALE: 3/8" = 1'-0" REVISIONS REV DATE I DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA wasNl�c�®� 08 ®a�' GISTER�� a - SHEET TITLE ANTENNA CONFIGURATIONS MANUFACTURER: KMW COMMUNICATIONS MODEL: AM-X-CD-17-65-OOT-RET WEIGHT: 59.9 LBS DIMENSIONS: 96"x11.8"x5.9° DOWNMECHANICAL FREQUENCY: REFER TO RF DATA SHEET 11.8" BRACKRACK LT 5 g°° BET RING COLLAR MOUNT VALMONT PART AT&T GPS ANTENNA o° o NO. LWRM OR APPROVED EQUIVALENT 0 a 3-1/2" O.D. STD PIPE o CROSSOVER PLATE VALMONT 1 7/8" O.D. PIPE 11.8" � o PART NO. SCX-3-K OR ® oO APPROVED EQUIVALENT ® 0 00 MOUNT TO GPS ®0 0PIPE MOUNT ® ° N CD TOP 0) STAND-OFF ARM VALMONT PART NO. MM01 OR APPROVED EQUIVALENT 11.8" REMOTE ELECTRICAL DOWNTILT ACTUATOR, TYP 0 0) L6 2" STD PIPE MASTS�� TYP R 3-1/2"0.D.x4' LONG TYP CONNECTOR, BOTTOM PIPE �_j -1 1 !7 0 PIPE MOUNT VALMONT PART NO. SP219 NOTES OR APPROVED EQUIVALENT 1. LOCATION OF ANTENNA MUST HAVE CLEAR VIEW OF FRONT SIDE SOUTHERN SKY AND CONNOT HAVE ANY BLOCKAGES EXCEEDING 25% OF THE SURFACE AREA OF A RF CONNECTOR, TYP HEMISPHERE AROUND THE GPS ANTENNA. 2. ALL GPS ANTENNA LOCATIONS MUST BE ABLE TO REMOTE ELECTRICAL RECEIVE CLEAR SIGNALS FROM A MINIMUM OF FOUR DOWNTILT ACTUATOR, (4) SATELLITES. VERIFY WITH HANDHELD GPS TYP BEFORE FINAL LOCATION OF GPS ANTENNA. ANTENNA MOUNT DETAIL 7 CAPS MOUNTING DETAIL KMW ANTENNA SPECIFICATIONS O NOT TO SCALE NOT TO SCALE 6 NOT TO SCALE FRONT SOLAR r ° SHIELD MOUNTING PIPE 00 RRH 70OMHZ O RRH AWS i USER ALARM AISG (ALD) RRH (BELOW) RAYCAP "SQUID" DC N CPRI SURGE PROTECTOR 11.0" ®_ o N _ RRH - TOP b� 10.6' o o07 QUAD MOUNT EXISTING GIgE N SITEPRO PART #UQB4 MONOPOLE DC ENTRY- �d� ry o ♦4 1 7/8" O PIPE N INCLUDED IN MOUNTING KIT PLAN RAYCAP "SQUID" DC GROUND WALL (#B1840) SURGE PROTECTOR BOTTOM MOUNTING j DC CONCUIT BOX BRACKET of co RAYCAP "SQUID" DC EXISTING 12.2" SURGE PROTECTOR MONOPOLE FRONT SOLAR o SHIELD MOUNTING N 1 7/8"0 PIPE INCLUDED BRACKETS 0 o MOUNTING KIT (#B1662) (1 OF 2) ISO VIEW MOUNTING BRACKET BY MANUFACTURER ' - ISO VIEW 18.0" MOUNT E o RRH ® NOTE: NOTE: SEE 4/RF-2 FOR MOUNTING SEE 4/RF-2 FOR MOUNTING Q RRH 700MHZ Co FRONT SEE DETAIL 3 0 ° ° o o NOTE: THIS SHEET SEE 4/RF-2 FOR MOUNTING Q QUAD MOUNT I I MANUFACTURER: ALCATEL-LUCENT MANUFACTURER: ALCATEL-LUCENT N SITEPRO MODEL: RRH 70OMHZ W/SOLAR SHIELD MODEL: 9442 RRH AWS PART #UQB4 HEIGHT: 21.0" HEIGHT: 24.4" RRH AWS WIDTH: 12.2" WIDTH: 10.6" SEE DETAIL 2 DEPTH: 10.8" DEPTH: 6.7" MANUFACTURER: RAYCAP �i THIS SHEET TOP RF ANTENNA WEIGHT: 51 LBS I WEIGHT: 43 LBS MODEL: DC6-48-60-18-8F "SQUID" CONNECTIONS ELEVATION N 0_ YCAP SQUID RRH MOUNTING RRH 70OMHZ DETAIL RRH A WS DETAIL2 RAYCAP IDETAIL 3 ALE NOT TO SCALE o NOT TO SCALE NOT TO SCALE NOT TO SC LDCCommercial Infrastructure Residential THE CIVIL ENGINEERING CROUP Telecom 14201 NE 200th St., #100 Ph. 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 >� 'www.LDCcorp.com DATE: # DRAWN - CHECKED BY: KJA - REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA E- VI1, pF WAs�jp 0908 s�l0NAI, SITE WA415 TAM MY LANE SHEET TITLE RF DETAILS 1 0 i E -- ao N - ' N - Q 0 i 3 r v O W 0 1 N U I a I o E E \. Q N I E 0 U N N F- 1 / O N U ®LNG PLAN 3 22"x34" SCALE: 3/4" = V-0" 11 °'x17'° SCALE: 3/6" = 1'-0" O CAD WELD (TYP). SEE DETAIL 2/E-2. EXISTING ANTENNA GROUND BUS BAR NEAR ANTENNAS WITH COAX OGROUND KIT. SEE DETAIL 6/E-2 FOR GROUND BAR CONSTRUCTION. SEE DETAIL 5/E-2 FOR GROUND WIRE CONNECTIONS, AND SEE DETAIL 3/E-2 FOR COAX GROUNDING. OEXISTING TOWER GROUND BUS BAR AT BASE OF TOWER. SEE DETAIL 6/E-2 FOR GROUND BAR CONSTRUCTION. O#6 AWG ANTENNA MOUNT GROUND TO ANTENNA GROUND BUS BAR (TYP OF 3). O5 EXISTING GROUND FROM ANTENNA GROUND BUS BAR TO TOWER GROUND BUS BAR (TYP OF (2) PLACES). O#6 AWG AWS RRH UNIT GROUND TO ANTENNA GROUND BUS BAR (TYP OF 3). O#6 AWG 700 RRH UNIT GROUND TO ANTENNA GROUND BUS BAR (TYP OF 3). sO #6 AWG RAYCAP SQUID GROUND TO ANTENNA GROUND BUS BAR. O#6 AWG LTE EQUIPMENT CABINET TO TIE INTO EXISTING SYSTEM GROUND RING. GENERAL GROUNDING NOTES 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS. ACTUAL INSTALLATION AND CONSTRUCTION MAY VARY DUE TO SITE SPECIFIC CONDITIONS. 2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS, AND OTHER METALLIC COMPONENTS USING GROUND WIRES AND CONNECT TO SURFACE MOUNTED BUS BARS. FOLLOW ANTENNA AND BTS MANUFACTURER'S PRACTICES FOR GROUNDING REQUIREMENTS. GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM TOWER OR POLE USING MFR'S PRACTICES. 3. ALL GROUND CONNECTIONS SHALL BE CADWELD. ALL WIRES SHALL BE COPPER THHN/THWN. ALL GROUND WIRE SHALL BE GREEN INSULATED WIRE ABOVE GROUND. 4. CONTRACTOR TO VERIFY AND TEXT GROUND SOURCE, GROUNDING AND OTHER OPERATIONAL TESTING WILL BE WITNESSED BY AT&T, LLC REPRESENTATIVE. 5. REFER TO DIVISION 16 GENERAL ELECTRIC; GENERAL ELECTRICAL PROVISION AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING STANDARDS. 6. ELECTRICAL CONTRACTOR TO PROVIDE DETAILED DESIGN OF GROUNDING SYSTEM, AND RECEIVE APPROVAL OF DESIGN BY AUTHORIZED AT&T, LLC REPRESENTATIVE, PRIOR TO INSTALLATION OF GROUNDING SYSTEM. PHOTO DOCUMENT ALL CALDWELDS AND GROUND RINGS. 7. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY DIFFICULTIES INSTALLING GROUNDING SYSTEM DUE TO SITE SOIL CONDITIONS. GROUNDING LEGEND DATE: 10-27-11 GROUND BAR DRAWN BY: RMD O GROUND INSPECTION WELL CHECKED BY: RJA ® COPPER GROUND ROD ® CADWELD CONNECTION REVISIONS REV DATE DESCRIPTION BY ® SIDE SPLICE CADWELD 1 10-27-11 PRELIMINARY IMINARYCONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA FIELD VERIFY & TIE INTO EXISTING GROUNDING SYSTEM Mw ff"I& C Commercial Infrastructure Residential -HE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St #100 Ph 425.806.1869 Noodmvllle WA 98072 Fx 425 482 2893 e www.LDCcorp.com �� � �_-..,., GROUNDING ROD NOTES (WHERE APPLICABLE1 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND RESISTANCE TESTING ONCE THE GROUND SYSTEM HAS BEEN INSTALLED; A QUALIFIED 1 INDIVIDUAL, UTILIZING THE FALL OF POTENTIAL METHOD, SHOULD PERFORM THE TEST. THE REPORT WILL SHOW THE LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 TEST POINTS ALONG THE TESTING ` LINE, GRAPHED OUT TO SHOW THE PLATEAU. 2. POINT GROUND TEST OR 3 POINT 62% TESTS WILL NOT BE ACCEPTED AS ALTERNATIVES TO THE AFORE MENTIONED GROUND TESTS. TEST SHALL BE PERFORMED WHILE THE COUNTERPOISE IS ISOLATED FROM THE A/C SYSTEM GRIDS AND EXISTING COMMUNICATIONS FACILITY. PROPRIETARY INFORMATION THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO AT&T, LLC. SERVICES ARE STRICTLY PROHIBITED. 1 E- �i E a r` 0 00 I N O N d N L 0- v 0 d 0) 0 I N W I 0 J r d- N I i 0 U 7 0 0 / .3 a 0 / 0 J T E E 0 H t I F ¢ N I E 0 U N N I / 0 N !Z 3 0 NEW COAXIAL GROUND KITS W/LONG BARREL COMPRESSION DOUBLE LUGS, ATTACH TO GROUND BAR & INSTALL BY ANTENNA #6 AWG FROM ANTENNA CONTRACTOR (CADWELD TYPE-GL) CABLE GROUND KIT COPPER GROUND BAR ON (TYPICALLY NEW 4"x24"x1/4 THK COPPER GROUND BAR. WALL, ICE BRIDGE, FLOOR 12" TO 24" GROUND ISOLATOR (TYP INSTALLED BY GENERAL CONTRACTOR OR ON ANTENNA TOWER ANTENNA CABLE 2 1/2" 0 120" MAX AT EACH GROUND BAR) Q Q r-1 '1� r%, MAx 0000 COD 0 0 _ O O O O O O O O O O O O O O O 00 Q 000 000 Q 00 e 0 0 0 0 Q 0 WEATHERPROOFING 0 0 0 0 0 0 0 0 0 0 0 KIT (SEE NOTE 3) CABLE 800 0 0 0 0 O O O O O O O O Q CABLE GROUND KIT CONNECTOR #6 AWG STRANDED COPPER GROUND WIRE (GROUNDED TO 1-011 Q GROUND BAR). SEE NOTE 1 AND 2 10. 26" MGB OR 6" ANTENNA MGB FIELD VERIFY *TWO HOLE LUG, OR EXOTHERMIC WELD TO BE USED WITH #2 AWG GROUND CONDUCTOR SHALL BE _ BCW TO BUILDING SERVICE ELIMINATED WHEN GROUND BAR IS ® = GROUND OR GROUND RING ELECTRICALLY BONDED TO METAL TOWER/MONOPOLE STRUCTURE #2 SOLID BARE TINNED COPPER WIRE CADWELD (TYPE-GL) NOTES 1. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECT GROUND WIRE DOWN TO GROUND BAR. 2. GROUNDING KIT SHALL BE TYPE AND PART NUMBER AS NOTE NOTE SUPPLIED OR RECOMMENDED BY CABLE MANUFACTURER. COAT ALL MECHANICAL CONNECTIONS GROUND BARS AT BOTTOM OF TOWERS/MONOPOLES 3. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT, WITH "NOOX" OR APPROVED EQUAL SHALL ONLY USE EXOTHERMIC WELDS. COLD SHRINK SHALL NOT BE USED. GROUND BAR GROUND WIRE INSTALLATION CABLE GROUND KIT CONNECTION 6 NOT TO SCALE 5 NOT TO SCALE NOT TO SCALE TO ANTENNAS 0 COAX JUMPER (TYP) WEATHERPROOFING KIT (TYP) TYPE TA TYPE VN TYPE NC TYPE SS GROUND KIT (TYP) SEE DETAIL 4/E-2 CONNECTOR WEATHERPROOFING KIT (TYP) SEE NOTE 2 #6 AWG ~ ISOLATE FROM TOWER HALO W/ TYPE VV TYPE VS TYPE VB TYPE PT #2 TO LOWER TOWER BUS BAR ANTENNA CABLE TO BTS EQUIPMENT (TYP) `~ TO GROUND RING TYPE GT TYPE GY TYPE GR TYPE GL COPPER ANTENNA GROUND NOTES BAR, WITH INSULATORS. 1. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND BONDED DIRECTLY TO TOP OF ALWAYS DIRECT GROUND WIRE DOWN TO ANTENNA MONOPOLE OR UTILITY POLE. GROUND BAR. 2. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT. COLD SHRINK SHALL NOT BE USED. GROUND CABLE CONNECTION CADWELD GROUNDING CONNECTIONS 3 NOT TO SCALE TO NOT SCALE N NOT TO SCALE 4 Appoftf Commercial Infrastructure Residential THE CIVIL ENGINEERING GROUP Telecom 14201 NE 200th St., #100H� NY Ph. 425.806.1869 Woodinville, WA 98072 Fx. 425.482.2893 �. www.LDCoorp.com DATE: 10-27-11 DRAWN BY: RMD CHECKED BY: 1 REVISIONS REV DATE DESCRIPTION BY 1 10-27-11 PRELIMINARY CONSTRUCTION RJA 2 4-18-12 FINAL CONSTRUCTION RJA 40908 >ISTY a GROUNDINGSHEET TITLE