Loading...
22-103488City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY MIXED USE @ 348TH - BUILDING G Project Address: 34815 1ST AVE S Building - Multi Family Permit #:22-103488-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 912940 0010 Project Description: BLUEBEAM - Construction of FOUNDATION ONLY for a 13,392 square foot three-story walk-up apartment buildings containing 12 for -rent apartment units. Includes under slab plumbing work. Owner Applicant Contractor Lender X MARKS THE SPOT LLC BRETT JACOBSENX MARKS THE F N W INC KATHLEEN BROWN 'I I WEST VALLEY HWY SUITE 2( SPOT LLC 711 WEST VALLEY HWY SUITE 20 SANDERSUMPQUA BANK AUBURN WA 98001 711 WEST VALLEY HWY SUITE 2( AUBURN WA 98001 11113RD AVE SUITE 2900 AUBURN WA 98001 SEATTLE WA 98101 Census Category: 105 - New 5- or More Family Building Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Mechanical Work Valuation? .................................. 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ Yes Zoning Designation ..................... BC Total Valuation: 57,500.00 Bathtubs Lavatories Water Heaters Plumbing Work Valuation? ................ Number of Stories ............................... Permit for Building Shell Only?......... Comprehensive Plan Designation....... Plumbing Fixtures 18 Dishwashers 18 Sinks 12 Hose Bibbs 18000 3 No Community Business 12 Laundry Washer Outlets 12 12 Water Closets 18 2 CONDITIONS: this permit does not allow for any work above the slab on grade PERMIT EXPIRES Sunday, 29 January, 2023 Permit Issued on Tuesday, August 2, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 7 Date: Ait, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 103488 00 Address: 34815 1ST AVE S Bldg G Project: X MARKS THE SPOT LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) 2❑ Foundation Wall (4115) Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date f l'3 ZZ By Date '3�34 By Date T 2 ® Re -steel (4215) 0 Plumbing Groundwork (4190) ® Slab/Concrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By Date �17 LZ By Date Q Underfloor Framing (4285) Floor Sheathing (4105) 0 Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date Ii) Roof Sheathing (4220) t Rough Plumbing (4230) fz Fire/Draft Stops (4095) Approved to install roofing Approved Approved By Date By Date By Date EandFire/Dra:ftStop duling a Framing inspection; Framing (4120) f4 Insulation (4150) mbing & Mechanical Rough -in Approved to insulate Approved to install wallboard inspections must be signed - approved. IBC 109.3.4 By Date By Date Gypsum Wallboard Nailing (4130) 96 Suspended Ceiling Grid (4265) Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date a Final - Planning Final - Public Works (4080) Final - Plumbing (4075) Approved Approved Approved By Date By Date By Date Final - Building (4050) Approved By Date + 1Z� Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By,, Date