22-103487City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FEDERAL WAY MIXED USE @ 348TH - BUILDING F
Project Address: 34815 1ST AVE S
Building - Multi Family
Permit #:22-103487-00-MF
Inspection Request Line: (253) 835-3050
Parcel Number: 912940 0010
Project Description: BLUEBEAM - Construction of FOUNDATION ONLY for a 13,392 square foot three-story
walk-up apartment buildings containing 12 for -rent apartment units. Includes under slab
plumbing work.
Owner
Applicant
Contractor
Lender
X MARKS THE SPOT LLC
BRETT JACOBSENX MARKS THE
F N W INC
KATHLEEN BROWN
'I I WEST VALLEY HWY SUITE 21
SPOT LLC
711 WEST VALLEY HWY SUITE 20
SANDERSUMPQUA BANK
AUBURN WA 98001
711 WEST VALLEY HWY SUITE 2(
AUBURN WA 98001
1111 3RD AVE SUITE 2900
AUBURN WA 98001
SEATTLE WA 98101
Census Category: 105 - New 5- or More Family Building
Includes:
#1
#2
#3
#4
Occu ancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 18000
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 3
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only9 .............................. No
Plumbing to be Included? ........................................ Yes Comprehensive Plan Designation........................... Community Business
Zoning Designation ................................................. BC
Total Valuation: 57,500.00
Plumbing Fixtures
Bathtubs 18 Dishwashers 12 Laundry Washer Outlets 12
Lavatories 18 Sinks 12 Water Closets 18
Water Heaters 12 Hose Bibbs 2
CONDITIONS:
this permit does not allow for construction above the slab on grade
PERMIT EXPIRES Sunday, 29 January, 2023
Permit Issued on Tuesday, AuEust 2, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: i- i''I t Date:
E-- t`VlA�
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103487 00 Address: 34815 1ST AVE S Bldg F
Project: X MARKS THE SPOT ITC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
Footings/Setback (4110)
Foundation Wall (4115)
0
Drainage/Downspout (4040)
Approved to place concret
Approved io plaice concrete
Approved to backfill
By
Date Z,
By
Date Z �.
By
Date
0
Re -steel (4215)
®
Plumbing Groundwork (4190)
0
Slab/Concrete Floor (4255)
Approved to place concrete or grout
Approved to cover
Approved to place concrete
By
Date
By
Date 10 j211,
By
Date
0
Underfloor Framing (4285)
Floor Sheathing (4105)
®
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
0
Roof Sheathing (4220)
8
Rough Plumbing (4230)
Fire/Draft Stops (4095)
Approved to install roofing
Approved
Approved
By
Electrical,
Date
Prior to scheduling a Framing inspection;
Plumbing & Mechanical Rough -in
By
0
Date
Framing (4120)
Approved to insulate
By
Date
Insulation (4150)
Approved to install wallboard
and
t Is
Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
By
0
Date
Suspended Ceiling Grid (4265)
By
0
Date
Final - S K F & R (4060)
Approved to install mud & tape
Approved to drop tile
Approved
By
Date
By
Date
By
Date
�$
Final - Planning
t9
Final - Public Works (4080)
Final - Plumbing (4075)
Approved
Approved
Approved
By
Date
By
Date
By
Date
2� Final - Building (4050)
_ Approved
By
1
J0 Date Z�I
Rough Electrical
Final Electrical
El
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date