22-101609F,_ S
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FEDERAL WAY MIXED USE @ 348TH
Project Address: 34815 1ST AVE S
Building - Commercial
Permit #:22-101609-00-CO
Inspection Request Line: (253) 835-3050
Project Description: BLUEBEAM - Construction of MSE walls and rockeries.
Owner Applicant Contractor
X MARKS THE SPOT LLC JOE TAFLINNAVIX F N W INC
'I I WEST VALLEY HWY SUITE 21 ENGINEERING 711 WEST VALLEY HWY SUITE
AUBURN WA 98001 11235 SE 6TH ST SUITE 150 AUBURN WA 98001
BELLEVUE WA 98004
Includes:
occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Census Category: 565 - Fence/retaining wall
Parcel Number: 912940 0010
Lender
OWNER IS LENDER
#1 #2 #3 #4
Additional Permit Information
Mechanical to be Included? .....................................
No
Mechanical Work Valuation? ..................................
0
Is this an Online or O.T.C. application? ..................
No
Plumbing to be Incuded?............. 1......... -..............
No
Zoning Designation .................................................
BC
Total Valuation: 3,800,000.00
Plumbing Work Valuation? ..................................... 0
Number of Stories ................................................... 1
Permit for Building Shell Only? .............................. No
Comprehensive Plan Designation ........................... Community Business
No Fixtures Associated With This Permit II
PERMIT EXPIRES Wednesday, 30 November, 2022
Permit Issued on Friday, June 3, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: F I I Date:
1
A�'
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 101609 00 Address: 34815 1ST AVE S Bldg A
Project: X MARKS THE SPOT LLC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
El
Footings/Setback (4110)
Foundation Wall (4115)
Q Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
By
Date
By Date
By Date
Q Re -steel (4215)
Q Slab/Concrete Floor (4255)
Q Underfloor Framing (4285)
Approved to place concrete or grout
Approved to place concrete
Approved to sheath floor
By
Date
By Date
By Date
-f
Floor Sheathing (4105)
Q Shear Walls (4245) Q Roof Sheathing (4220)
Approved to install flooring
Approved to install siding Approved to install roofing
By
Date
By Date By Date
i v
Fire/Draft Stops (4095)
Prior to scheduling a Framing inspection; 11 Framing (4120)
Approved
Electrical, Plumbing & Mechanical Rough -in
Approved to insulate
and Fire/Draft Stop inspections must be sign
By
Date
off and approved. IBC 109.3.4 By Date
F12
Insulation (4150)
Gypsum Wallboard Nailing (4130)
34
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
Final - S K F & R (4060) Final - Planning 37 Final - Public Works (4080)
Approved Approved Approved
By Date By Date By Date
<< Final - Building (4050)
Approved
By Date
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date